2014-09-25 Ordinary Meeting Agenda

of 29

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                    AGENDA


           Ordinary Meeting


       Thursday, 25 September 2014

                  commencing at 6pm
        Council Chambers, 9 Pelican Street, Tewantin




Crs Noel Playford (Chair), Bob Abbot, Sandy Bolton, Joe Jurisevic,
Frank Pardon, Tony Wellington, Frank Wilkie
Log in to download the original file

2014-09-25 Ordinary Meeting Agenda(PDF, 495KB).pdf · 507 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 28 sections

Section 2

ORDINARY MEETING AGENDA                                25 SEPTEMBER 2014


TABLE OF CONTENTS


ITEM                                                                 PAGE
1      ATTENDANCE & APOLOGIES                                             3
2      CONFIRMATION OF MINUTES                                            3
3      MAYORAL MINUTES                                                    3
4      NOTIFIED MOTIONS                                                   3
5      CONSIDERATION OF COMMITTEE RECOMMENDATIONS                         4
       INFRASTRUCTURE AND SERVICES COMMITTEE RECOMMENDATIONS              4
       PLANNING & ORGANISATION COMMITTEE RECOMMENDATIONS                  6
       GENERAL COMMITTEE RECOMMENDATIONS                                22
6      ORDINARY MEETING REPORTS                                         24
       1   DEVELOPMENT APPLICATION FOR RECONFIGURING A LOT - 1 LOT
           INTO 2 LOTS AND AN ACCESS EASEMENT AT 22 & 23 EDWARD
           STREET, COORAN REC14/0002 – FURTHER REPORTDOCUMENT
           INFORMATION                                                  24
7      PETITIONS                                                        29
8      CLOSED SESSION                                             29
9      NEXT MEETING                                                     29
10     MEETING CLOSURE                                                  29




                                                               Page 2 of 29

Section 3

ORDINARY MEETING AGENDA                                              25 SEPTEMBER 2014


1   ATTENDANCE & APOLOGIES
    Apologies: Cr Bob Abbot, Cr Tony Wellington




2   CONFIRMATION OF MINUTES
    The Minutes of the Ordinary Meeting held on 28 August 2014 be received and confirmed.




3   MAYORAL MINUTES

    Nil.




4   NOTIFIED MOTIONS

    Nil.




                                                                              Page 3 of 29

Section 4

ORDINARY MEETING AGENDA                                                      25 SEPTEMBER 2014


5    CONSIDERATION OF COMMITTEE RECOMMENDATIONS


INFRASTRUCTURE AND SERVICES COMMITTEE RECOMMENDATIONS
16 SEPTEMBER 2014 - Crs Sandy Bolton (Chair), Frank Pardon, Noel Playford
Apology: Cr Bob Abbot
Other Councillors in Attendance: Cr Jurisevic

1    COOLOOLA RECREATION AREA REVENUE AND EXPENDITURE
     That Council note the report by the Director, Planning & Infrastructure to the Infrastructure
     & Services Committee Meeting dated 16 September 2014 regarding the Cooloola
     Recreation Area Revenue and Expenditure.


2    NOOSA RIVER EROSION MANAGEMENT
     That Council note the report by the Director Planning & Infrastructure and Senior Technical
     Officer to the Infrastructure & Services Committee Meeting dated 16 September 2014 and:
     A.    Request that a detailed assessment for the development of a hydrodynamic model
           for the Noosa River between Tewantin and the river mouth be prepared for
           consideration by Council at the next budget review; and
     B.    That a Tidal Works application be submitted to the Department of Environment and
           Heritage Protection for the trialling of geotextile sandbag groynes at Noosa River
           Holiday Park located at Munna Point.



3    COUNCIL CABS ELIGIBILITY CRITERIA
     That Council note the report by the Senior Project Officer and the Development Officer to
     the Infrastructure & Services Committee Meeting dated 16 September 2014 and defer
     consideration of the matter to a future round of Council meetings to allow staff to
     investigate possibilities for partnering with existing community organisations involved in the
     provision of subsidised transport.
     A.    Continue to provide the Council Cabs service;
     B.    Confirm that the eligibility criteria for use of the service be for people who hold a
           Pensioner Concession Card.
     C.    That fares be increased to $3 each way; and
     D.    Approve a revised service schedule to include the Christian Outreach Centre Food
           Outlet and Bottlebrush Community Health Centre.



4    BOREEN POINT-TEWANTIN FLEXILINK SERVICE
     That Council note the report by the Senior Project Officer to the Infrastructure & Services
     Committee Meeting dated 16 September 2014 and defer consideration of the matter to a
     future round of Council meetings to allow staff to investigate possibilities for partnering with
     existing community organisations involved in the provision of subsidised transport.
     A.     Continue the Boreen Point – Tewantin Flexilink service; and
     .     Increase single trip fares to $2 for concession card holders and $4 for adults.


                                                                                       Page 4 of 29

Section 5

ORDINARY MEETING AGENDA                                                   25 SEPTEMBER 2014


5   COUNCIL POLICY - ASSET MANAGEMENT
    Item not dealt with by Infrastructure & Services Committee. Referred to General
    Committee for consideration.
    Reason for referral: Request for a further report outlining the amendments to the
    Policy suggested by the Infrastructure & Services Committee


6   CAPITAL PROGRAM DELIVERY STATUS - SEPTEMBER 2014
    That Council note the report by the Asset Planning Manager to the Infrastructure &
    Services Committee Meeting dated 16 September 2014 providing an update on the status
    of the projects within the 2014/15 Capital Works Program.


7   EXTERNAL FUNDING GRANTS - BUS STOPS & CYCLE NETWORKS
    That Council note the report by the Senior Technical Officer to the Infrastructure & Services
    Committee Meeting dated 16 September 2014 regarding Council’s successful grant funding
    under the Passenger Transport Accessible Infrastructure Program 2014-15 and the Cycle
    Network Local Government Grants Program 2014-15 and:
    A.   Authorise the CEO to sign all necessary documentation related to the grant funding;
    B.   Provide authority to proceed with the delivery of all grant approved projects and any
         necessary ancillary works.


8   TENDER CONSIDERATION PLAN FOR SUPPLY OF QUARRY, ASPHALT AND
    BITUMINOUS MATERIALS
    That Council note the report by the Manager Civil Operations to the Infrastructure &
    Services Committee Meeting dated 16 September 2014 and resolve to establish a Supplier
    Arrangement for the Supply of Quarry, Asphalt and Bituminous Materials (Contract
    1415T002) commencing 1 October 2014 for a period of 9 (nine) months expiring 30 June
    2015, with the Suppliers listed in Attachment 1 and schedule of rates subject to rise and
    fall.




Recommendation

The Infrastructure & Services Committee recommendations dated 16 September, 2014 be
adopted except where dealt with or held over by separate resolution.




                                                                                   Page 5 of 29

Section 6

ORDINARY MEETING AGENDA                                                         25 SEPTEMBER 2014


PLANNING & ORGANISATION COMMITTEE RECOMMENDATIONS

16 SEPTEMBER 2014 – Crs Frank Wilkie (Chair), Joe Jurisevic, Noel Playford
Apology : Cr Tony Wellington
Other Councillors in Attendance: Crs Sandy Bolton and Frank Pardon.

1    DEVELOPMENT   APPLICATION    FOR   PRELIMINARY    BUILDING WORKS
     ASSESSABLE AGAINST THE PLANNING SCHEME FOR ADDITIONS TO A
     DETACHED HOUSE 19 ALLAMBI RISE NOOSA HEADS - PBA14/0017
     That Council note the report by the Planning Technical Officer to the Planning &
     Organisation Committee Meeting dated 16 September 2014 regarding application
     PBA14/0017 for Preliminary Building Works Assessable against the Planning Scheme – 3
     storey addition at 19 Allambi Rise, Noosa Heads and approve the application in
     accordance with the following conditions:
     PLANNING
     When Conditions must be Complied With
     1.    Unless otherwise stated, all conditions of this Decision Notice must be complied with
           prior to the use commencing, and then compliance maintained at all times while the
           use continues.
     Approved Plans
     2.    Development undertaken in accordance with this approval must generally comply
           with the approved plans of development. The approved plans are listed in the
           following table unless otherwise amended by these conditions.
            Plan No.       Rev.   Plan name, prepared by                               Date
            DD 1.01 P1     P1     Site Plan, prepared by Tim Ditchfield Architects     01/08/14

            DD 2.04 P1     P1     Undercroft Floor Plan, prepared by Tim Ditchfield    01/08/14
                                  Architects

            DD 2.03 P1     P1     Lower Ground Floor, prepared by Tim Ditchfield       01/08/14
                                  Architects

            DD 2.03 P1     P1     Upper Ground Floor, prepared by Tim Ditchfield       01/08/14
                                  Architects

            DD 2.02 P1     P1     First Floor, prepared by Tim Ditchfield Architects   01/08/14

            DD 2.05 P1     P1     Roof Plan, prepared by Tim Ditchfield Architects     01/08/14

            DD 3.03 P1     P1     Section C-C, prepared by Tim Ditchfield Architects   01/08/14

            DD 4.01 P1     P1     South Elevation, prepared by Tim Ditchfield          01/08/14
                                  Architects

            DD 4.02 P1     P1     East Elevation, prepared by Tim Ditchfield           01/08/14
                                  Architects

            DD 4.03 P1     P1     North Elevation, prepared by Tim Ditchfield          01/08/14
                                  Architects

            DD 4.04 P1     P1     West Elevation, prepared by Tim Ditchfield           01/08/14
                                  Architects




                                                                                        Page 6 of 29

Section 7

ORDINARY MEETING AGENDA                                                    25 SEPTEMBER 2014


      Building Height
      3.    The maximum height of all new additions to the dwelling must not exceed 8
            metres above the finished ground level and the natural ground surface. The new 3
            storey portion is only permitted where indicated on the approved plans.
      4.    Certification must be submitted to Council from a Licensed Surveyor which
            certifies that the building does not exceed the maximum height requirement of this
            Decision Notice.
      Performance Bond
      5.    Security in the form of a cash bond or trading bank guarantee to the sum of
            $5,000 must be submitted to Council, to secure performance of all conditions of
            this approval, prior to the issue of a Development Permit for Building Works. The
            cash bond or trading bank guarantee will be returned on performance of the
            conditions of approval less any costs incurred by Council in respect of enforcing
            performance of this permit. Council reserves the right to call upon the bond or
            guaranteed sum to effect compliance with conditions.
      Landscaping
      6.    The land between the dwelling and the eastern boundary must be reinstated to the
            natural ground surface level except for the vehicle access to the north east corner
            of the lot.
      7.    Existing trees on the site and within road reserves must be retained, except where
            required to be removed between the dwelling and the eastern boundary.
      8.    Trees to be retained and must be protected from construction activities by:
            a.    clearly marking vegetation to be retained with flagging tape
            b.    installing protective fencing around the drip line of the vegetation
            c.    restricting stockpiling, storage and vehicle parking to those areas which are
                  already cleared
            d.    using low impact construction techniques around vegetation.
      9.    Screening vegetation must be planted along the eastern boundary in accordance
            with Council’s Planning Scheme Policy PSP3 Landscaping Plants and Guidelines.
            The planted vegetation must have a minimum pot size of 200mm and consist of
            native, endemic species. In this regard, 4 species with a pot size of 45 litres, must
            be planted and evenly spaced along the length of the eastern elevation.
      Geotechnical Stability
      10.   All works must be carried out in accordance with a Geotechnical Report for the
            site prepared by a qualified person*. Prior to the issue of a Development Permit
            for Building Works, certification must be submitted to Council from a qualified
            person* which certifies that the site is not at risk from landslide emanating from the
            site or from other land.
      External Colours
      11.   External colours and finishes of the building must comprise of
            muted/environmental tones that blend with the natural environment to assist the
            building to blend with the surrounding vegetation. In this regard, the colour palette
            must be in accordance with the colour indicated on the approved plans or
            alternatively submitted to Council for approval prior to the issue of Development
            Permit for Building Works.




                                                                                    Page 7 of 29

Section 8

ORDINARY MEETING AGENDA                                                          25 SEPTEMBER 2014


         ADVISORY NOTES
         The following notes are included for guidance and information purposes only and do not
         form part of the assessment manager conditions:
         Development Compliance Inspection
         1.        Prior to the commencement of the use, please contact Council's Planning
                   Assessment Branch to arrange a Development Compliance Inspection.
                   * Qualified Person – Geotechnical Stability
         2.        For the purpose of preparing a Geotechnical Report, and for certifying
                   geotechnical stability for the development, a qualified person is considered to be a
                   person who:
                   a.      is a Registered Professional Engineer of Queensland (RPEQ); and
                   b.      has a degree in civil engineering or engineering geology; and
                   c.      has a minimum of 5 years’ experience in the field of geotechnical
                           engineering or engineering geology.



2   APPLICATION FOR MATERIAL CHANGE OF USE ANIMAL HUSBANDRY TYPE 2 -
    INTENSIVE) AND ENVIRONMENTALLY RELEVANT ACTIVITY (ERA 4 - POULTRY
    FARMING) SITUATED AT 136 TOP FORESTRY ROAD, RIDGEWOOD MCU12/0184
    Item not dealt with by Planning & Organisation Committee. Referred to General
    Committee for consideration.
    Reason for referral: Significance of issue.



3   APPLICATION FOR MATERIAL CHANGE OF USE - MULTIPLE HOUSING TYPE 4
    CONVENTIONAL (4 UNITS) AND ASSOCIATED OPERATIONAL WORKS SITUATED
    AT 28 NANNYGAI STREET, NOOSAVILLE MCU14/0051 & OPW14/0274
    That Council note the report by the Development Planner to the Planning & Organisation
    Committee Meeting dated 16 September 2014 regarding Application No. MCU14/0051 and
    OPW14/0274 for Development Permits for Material Change of Use for Multiple Housing
    Type 4 Conventional (4 units) and Operational Works situated at 28 Nannygai Street,
    Noosaville; and
    A.        Approve the applications in accordance with the following conditions:
              Development Permit for Material Change of Use for Multiple Housing Type 4
                   Conventional (4 units)
              PLANNING
              When Conditions must be Complied With
              1.        Unless otherwise stated, all conditions of this Decision Notice must be complied
                        with prior to the use commencing, and then compliance maintained at all times
                        while the use continues.
              Approved Plans
              2.        Development undertaken in accordance with this approval must generally
                        comply with the approved plans of development. The approved plans are listed
                        in the following table unless otherwise amended by these conditions.


                                                                                           Page 8 of 29

Section 9

ORDINARY MEETING AGENDA                                                   25 SEPTEMBER 2014


             Plan No.                  Rev.   Plan/Document Name                 Date
             4416SM Sheet 5 of 36      PA     Site Plan, prepared by I Want      27 June 2014
                                              That Design
             4416SM Sheet 6 of 36      PA     Lower Floor Plans, prepared by I   27 June 2014
                                              Want That Design
             4416SM Sheet 7 of 36      PA     Upper Floor Plans, prepared by I   27 June 2014
                                              Want That Design
             4416SM Sheet 35 of 36     PA     3D Perspectives 1 of 2, prepared   27 June 2014
                                              by I Want That Design
             4416SM Sheet 36 of 36     PA     3D Perspectives 2 of 2, prepared   27 June 2014
                                              by I Want That Design
             1196-Sk01                        Driveway Layout, prepared by       1 July 2014
                                              Contour

        3.      Development authorised by this approval must be undertaken generally in
                accordance with the Approved Plans listed within this Decision Notice.
        Building Height
        4.      The maximum height of the development must not exceed 8 metres above the
                finished ground level and the natural ground level.
        5.      Certification must be submitted to Council from a Licensed Surveyor which
                certifies that the buildings do not exceed the maximum height requirement of
                this Decision Notice.
        Landscaping
        6.      The development site must be landscaped prior to the commencement of use.
                The works must be undertaken in accordance the works shown on the
                Approved Plans, except where amended by these conditions.
        7.      4 x 45L street trees must be planted within the Nannygai Street frontage. The
                trees shall be located so as to allow for adequate sight lines, and be clear of
                existing and proposed services within the road reserve, including the footpath.
        8.      All landscape works must be maintained generally in accordance with the
                approved design for the life of the development.
        9.      All landscape works must be established and maintained in accordance with
                horticultural best practice with construction techniques that allow for healthy,
                sustained and vigorous plant growth. All plant material must be allowed to grow
                to full form.
        Performance Bond
        10.     Security in the form of a cash bond or trading bank guarantee to the sum of
                $20,000 must be submitted to Council, to secure performance of all conditions
                of this approval, prior to the pre-start meeting. The cash bond or trading bank
                guarantee will be returned on performance of the conditions of approval less
                any costs incurred by Council in respect of enforcing performance of this
                permit. Council reserves the right to call upon the bond or guaranteed sum to
                effect compliance with conditions.
        Building Appearance
        11.     All air conditioning units or other mechanical equipment must be located at
                ground level, or otherwise fully enclosed or screened such that they are not
                visible from the street frontages nor adjoining properties.



                                                                                    Page 9 of 29

Section 10

ORDINARY MEETING AGENDA                                                 25 SEPTEMBER 2014


        Fencing and Walls
        12.   Any street fencing must be set back an average of 1 metre from the front
              property boundary. Any fencing on the front boundary must either:
              a.     not exceed a maximum height of 1.2m; or
              b.     be of open construction.
        13.   The area of land between the fence and the front property boundary must be
              densely landscaped to screen any fencing from the street.
        Community Management Statement
        14.   Any proposed Community Management Statement required for the
              development pursuant to the Body Corporate and Community Management Act
              1997 must be submitted to Council for endorsement at the same time as
              submission of the Building Format Plan (or similar) to Council for compliance
              assessment.
        15.   All clauses and by-laws of the proposed Community Management Statement
              must accord with the requirements of this Decision Notice
        Waste Management
        16.   Refuse storage, removal and collection facilities must be provided in
              accordance with the following:
              a.     provision of a minimum of two 240L wheelie bins for each dwelling unit;
              b.     provision of separate bins for general and recyclable waste for each
                     tenancy, with an equal number of each being provided; and
              c.     provision of a hardstand impervious area in accordance with the
                     approved plan.
        Unitywater
        17.   Reticulated water supply and sewerage must be provided to the development.
        18.   Construction activities must not impede the access of Unitywater or Fire
              Brigade personnel to vital infrastructure (eg. valves, fire hydrants and sewer
              access chambers).
        19.   The fire-fighting demand on Unitywater’s water supply system from the
              development must not exceed 15 litres per second.
        20.   A single Unitywater installed primary water meter must be provided immediately
              inside the property boundary. Meters must be Unitywater approved, installed in
              accordance with Unitywater requirements and remain accessible at all times for
              reading and maintenance purposes.
        21.   Sub meters must be provided at the boundary of each title to be administered
              by a body corporate.
        22.   The existing 100mm diameter AC watermain within Nannygai Street must be
              replaced for the full frontage of the development site with DICL pipes. The
              replacement works must be completed prior to placing construction
              materials/site offices over or adjacent to the water main alignment.
        23.   Easements of between 3 and 10 metres must be provided over all Unitywater
              sewers located within property boundaries in accordance with the SEQ
              standards. Easements shall be centred over the pipe. Easement terms shall be
              the most current registered dealing held by the Department of Natural
              Resources & Mines and shall not be altered or amended.
        24.   Water meters must be located on alternative boundaries to electrical pillars.

                                                                                Page 10 of 29

Section 11

ORDINARY MEETING AGENDA                                                  25 SEPTEMBER 2014


        25.   Buildings and other structures must maintain a minimum clearance of 1.5
              meters from Unitywater sewer mains, and 1.0 meter from a sewer manhole
              chamber or sewer inspection opening.
        26.   Storm water retention systems and gross pollutant traps must maintain a
              minimum clearance of 1.5 meters from Unitywater water supply and sewerage
              infrastructure.
        27.   The applicant must adjust the level of the existing sewerage inspection opening
              as necessary to suit the proposed finished levels. Work must be undertaken by
              Unitywater at the owner’s cost. Where the existing sewerage inspection
              opening point is located within a sealed or concreted parking area, a brass cap
              is required to be fitted.
        28.   Tree plantings must maintain a minimum horizontal clearance of 1.0 metre from
              Unitywater water mains and 1.5 metres from Unitywater sewerage mains.
              Landscaping plants within these clearances must be low growing when mature,
              and suitable approved varieties.
        29.   Construction works undertaken in the vicinity of Unitywater water supply or
              sewerage infrastructure must not adversely affect the integrity of the
              infrastructure. All costs associated with repair, replacement or alteration of
              infrastructure must be met by the applicant.
        ENGINEERING
        External Works
        30.   Nannygai Street must be upgraded for the length of its frontage to the subject
              site. The works must include in particular:
              a.    Construction of a pedestrian footpath in accordance with the conditions of
                    this Decision Notice; and
              b.    Removal of the existing property accesses, stormwater outlet points and
                    reinstatement of the kerb, footpath and verge area to match the balance
                    of the site frontage, including the provision of topsoil and turf where the
                    existing verge is grassed.
              This condition is imposed pursuant to s665 of the Sustainable Planning Act
              2009 being non-trunk infrastructure.
        Site Access and Driveways
        31.   A sealed access driveway must be provided from Nannygai Street to all parking
              and manoeuvring areas of the development. The works must include in
              particular a driveway crossover in accordance with IPWEAQ standard drawing
              SEQ R-051with a maximum width of 6 metres at the property boundary.
        Car Parking
        32.   A minimum of 9 car parking spaces must be provided and marked on the site.
              The works must include crossfalls, gradients and dimensions in accordance
              with Australian Standard AS2890: Parking Facilities
        33.   All vehicles must enter and exit the site in a forward gear.
        Footpath
        34.   A pedestrian and bicycle footpath must be provided for the development. The
              works must include in particular a 2.0 metre wide footpath within the road verge
              for the entire length of the site’s frontage to Nannygai Street. This condition is
              imposed pursuant to s665 of the Sustainable Planning Act 2009 being non-
              trunk infrastructure.


                                                                                 Page 11 of 29

Section 12

ORDINARY MEETING AGENDA                                                 25 SEPTEMBER 2014


        Stormwater Drainage
        35.   The site must be provided with a stormwater drainage system connecting to a
              lawful point of discharge.
        36.   All stormwater runoff from the site must be discharged in to Council’s kerb and
              channel drainage system in Nannygai Street.
        37.   Approved kerb adapters must be constructed at each outlet point.
        38.   Electricity and Telecommunication Services
        39.   Unless otherwise stipulated by telecommunications legislation at the time of
              construction, the development must be provided with all necessary conduits,
              pits and pipes to accommodate the future connection of optic fibre technology
              telecommunications.
        40.  Certification must be submitted to Council from all relevant service providers
             which certifies that the development has met the requirements of this Decision
             Notice and all applicable legislation at the time of construction.
        Earthworks and Retaining Walls
        41.   All fill and associated batters must be contained entirely within the subject site
              unless written permission from the respective landowner(s) is provided to
              Council. All earthworks must be undertaken in accordance with the provisions
              of Australian Standard AS3798: Guidelines on Earthworks for Commercial and
              Residential Developments.
        42.   Where the development involves excavation or filling over, or adjacent to,
              drainage, water supply or sewerage infrastructure, all access chamber surface
              levels must be adjusted to provide a freeboard of 100mm above the finished
              ground surface level.
              Damage to Services and Assets
        43.   Any damage caused to existing services and assets as a result of the
              development works must be repaired at no cost to the asset owner at the
              following times:
              a.  where the damage would cause a hazard to pedestrian or vehicle safety,
                  immediately; or
             b.   where otherwise, upon completion of the works associated with the
                  development.
        Development Permit for Operational Works (Vehicle Crossover, Landscaping,
        Drainage Works and Carparking)
        OPERATIONAL WORKS
        Approved Plans
        1.    Development undertaken in accordance with this approval must generally
              comply with the approved plans of development. The approved plans are listed
              in the following table unless otherwise amended by these conditions.
               Plan No.     Rev.    Plan/Document Name                                Date
               1193-SK01            Driveway Layout, prepared by Contour              1 July 2014
               1193-SK03            Stormwater Management Plan, prepared by           7 July 2014
                                    Contour
               4416SM       PB      Stormwater Plan, prepared by I Want That Design   17 July 2014
               1193-SK04    A       Live Sewer Works Table                            2 Sept 2014
               CD-001       A       Cover Sheet Notes and Schedules, prepared by      3 July 2014
                                    DFS Group
               CD-002       A       External Works and Planting Plan, prepared by     3 July 2014
                                    DFS Group
               CD-003       A       Landscape Details, prepared by DFS Group          3 July 2014

                                                                                 Page 12 of 29

Section 13

ORDINARY MEETING AGENDA                                               25 SEPTEMBER 2014


        2.   Development authorised by this approval must be undertaken generally in
             accordance with the Approved Plans listed within this Decision Notice.
             Prior to Commencement of Works
        3.   Council must be contacted at least 5 working days prior to any works
             commencing to organise a prestart. The contact number to arrange a pre-start
             meeting is 5329 6244. The pre-start meeting must include the relevant parties
             for the following aspects of the works:
             a.   Civil engineering works;
             b.   Erosion and sediment control works
        4.   A Construction Management Plan must be submitted to Council prior to the pre-
             start meeting and must specifically address the following:
             a.   Traffic Management during all aspects of the construct phase including:
                  i.     A Traffic Management Control Plan in accordance with Manual of
                         Uniform Traffic Control Devices (MUTCD) detailing all temporary
                         signage and traffic control measures prior to construction
                  ii.    Maintenance of safe pedestrian access across the frontage of the
                         site both during daily construction and after daily construction has
                         ceased
                  iii.   Proposed fencing to the site during the construction phase of the
                         development
                  iv.    Adequate parking arrangements for construction workers
             b.   Maintenance and protection of water quality and existing drainage lines
                  through the construction site through the implementation of appropriate
                  erosion and sediment control measures
             c.   Works programme identifying key components of the works and their
                  respective durations
             d.   Establishment of a communication protocol with the general public,
                  adjoining owners, emergency services and local businesses to advise of
                  agreed construction times, impacts on traffic and services and other
                  relevant issues
        5.   Any conflict between the development and an existing or proposed service
             must be referred to the relevant service authority for determination prior to
             commencement of works.
        During Construction
        6.   The developer must meet any costs to repair damage to any Council asset
             during construction, where damage is a result of the development works.
             Damage to assets must be repaired immediately where it creates a hazard to
             the community. In circumstances where the damage does not create a hazard
             to the community, it must be repaired immediately on completion of the works
             associated with the development. A condition report including photographs of
             the frontage of the site should be completed and submitted to Council at the
             prestart meeting or prior to any works commencing (where no prestart meeting
             is to occur).




                                                                              Page 13 of 29

Section 14

ORDINARY MEETING AGENDA                                                  25 SEPTEMBER 2014


        7.    All works must be supervised by a Registered Professional Engineer of
              Queensland (RPEQ) who is independent of the Developer and Principal
              Contractor, and they must certify that all works conform to the Operational
              Works permit. Where municipal works are involved, such confirmation must be
              submitted for the respective hold points prior to any site inspection by Council
              Officers.
        8.    All works must be constructed and work procedure undertaken in accordance
              with:
              a.   The approved plans/documents and conditions detailed in this Decision
                   Notice
              b.   All relevant Noosa Council Planning Scheme Policies, standard drawings,
                   standard specifications and guidelines
              c.   The latest version of the Healthy Waterways document “Water Sensitive
                   Urban Design Technical Design Guidelines for South East Queensland”
                   for all water quality devices to be constructed on site
        Works Within Road Reserve/Reinstatement
        9.    Safe pedestrian access on all streets in the vicinity of the development must be
              maintained at all times. Should footpath/road closures be necessary to carry out
              construction works, Council’s Engineering Officer must be notified prior to the
              proposed closure and all requirements complied with.
        10.   All frontage works must match neatly with existing road and verge/footpath
              features. Additional works beyond the frontage may be required to provide an
              acceptable transition to existing road and verge/footpath profiles.
        Pathways
        11.   All pathways must be constructed in accordance with the following
              requirements:
              a.   All footpath/cycleway must comply with Council’s Standard Drawing SEQ
                   R-065.
              b.   All paths must have a slip resistant surface
              c.   Expansion and contraction joints must provide a flush finish. Installation of
                   joints by saw cutting is preferred to ensure a smooth ride for cyclists
              d.   The required work includes any modifications to ensure the footpath
                   finishes flush with all existing service covers and the like, or alternatively
                   these services are raised or altered, so as not to create a pedestrian
                   safety hazard
        12.   Pathways must:
              a.   terminate in a manner that ensures smooth transition to existing surfaces
                   for public safety
              b.   be designed and constructed to comply with the Disability Discrimination
                   Act (DDA), Access to Premises Standard, Austroads and relevant
                   sections of AS1428 Design for access and mobility
        Site Access and Driveways
        13.   Any existing unnecessary or redundant property accesses must be removed,
              and the kerb, footpath and verge area reinstated to match the existing footpath
              and/or verge treatments. Grassed verge areas to be reinstated must be
              provided with 100 mm topsoil and grass seed or turf, and must be maintained
              by the developer until established.

                                                                                 Page 14 of 29

Section 15

ORDINARY MEETING AGENDA                                                   25 SEPTEMBER 2014


        14.   The driveway must be constructed so as not to concentrate stormwater runoff
              onto neighbouring properties or cause ponding of water within the road reserve
        Earthworks
        15.   The finished surface level of the site must be graded and shaped to ensure that
              all surface runoff is directed to Nannygai Street and not directed on to any
              adjoining property.
        16.   All earthworks shall be undertaken in accordance with the provisions of AS
              3798 Guidelines on Earthworks for Commercial and Residential Development.
              Certification shall be provided by an RPEQ and submitted to Council the issue
              of the Certificate of Classification for the building.
        Service Conduits under Existing Road Features
        17.   Electrical conduits or other services proposed to be installed under existing
              sealed carriageways, concrete pathways or concrete/sealed driveways must be
              installed by boring. Trenching is not permitted, unless specifically approved by
              Council.
        Erosion and Sediment Control
        18.   Prescribed Water Contaminants (as defined in the Environmental Protection Act
              1994) must not be released from the site or to waters within the site, or be likely
              to be released should rainfall occur, unless all reasonable and practicable
              measures are taken to prevent or minimise the release and concentration of
              contamination.
        19.   Erosion and sediment control measures must be installed and maintained to
              minimise erosion on the site and to minimise the export of sediment and
              associated pollutants from the site. The erosion and sediment control measures
              must be designed, installed and maintained in accordance with current best
              practice standards (refer to advisory notes).
        20.   Prior to the issue of the Certificate of Classification, all site surfaces must be
              effectively stabilised using methods which have achieved effective short-term
              stabilisation and which will continue to achieve effective stabilisation in the
              medium to long-term (refer to advisory notes). For the purpose of this condition,
              an effectively stabilised surface is defined as one that does not, or is not likely
              to result in visible evidence of soil loss caused by sheet, rill or gully erosion or
              lead to sedimentation, or lead to water contamination.
        21.   Any exposed areas must be effectively stabilised without delay and prior to
              rainfall occurring.
        Supervision/Certification
        22.   Upon completion of the work a certificate must be issued by an RPEQ certifying
              that the works have been constructed in accordance with the Operational
              Works permit.
        23.   All municipal works must be accepted ‘On Maintenance’ by Council in
              accordance with Council’s relevant Planning Scheme Policy prior to plan
              sealing. To achieve ‘On Maintenance’, the supervising RPEQ must submit to
              council:
              a.    certification that all works have been undertaken and completed in
                    accordance with the requirements of this Permit
              b.    As Constructed details in accordance with Council’s Planning Scheme
                    Policy
              c.    Maintenance and operational manuals for all proprietary devices

                                                                                  Page 15 of 29

Section 16

ORDINARY MEETING AGENDA                                                   25 SEPTEMBER 2014


        As Constructed Plans
        24.   Prior to acceptance of civil works to become Council assets “On Maintenance”,
              the lodgement of satisfactory “As Constructed” records must be submitted to
              Council. The “As Constructed” information must include:
              a.   Drawings and data certified by a qualified experienced Civil Engineer
                   (RPEQ) for design intent, and certified by a Licensed Surveyor in regard
                   to the cadastre and the location, level and type of all services and
                   structures.
              b.   The data must be in accordance with Council’s (Noosa Plan) – Planning
                   Scheme Policy 5 – Engineering Design Standards – Roads, Drainage and
                   Earthworks, and Planning Scheme Policy 6 Engineering Design
                   Standards – Water and Sewerage and fully detail levels for all
                   engineering works including but not limited to drainage structures,
                   finished ground levels and pavement surface levels.
              c.   The data must be submitted in hardcopy form and digital format (Asset
                   Design and As Constructed (ADAC)) in GDA94 Zone 56 coordinate
                   values. Guidelines on the use of ADAC are available at
                   www.adac.com.au
        Landscaping
        25.   The site must be landscaped in accordance with The Noosa Plan’s Planning
              Scheme Policy PSP 3 – Landscaping Plants and Guidelines.
        During Construction
        26.   Landscape General - The following requirements apply to all landscape works:
              a.   All imported topsoil or ameliorated site soil complies with Australian
                   Standard AS4419 and/or is appropriate for the proposed plant species.
              b.   All tree stock must conform to NATSPEC criteria as outlined in Specifying
                   Trees: a guide to assessment of tree quality.
              c.   Mulch is to be aged, comprised of leaf and limb of varying sizes, free of
                   foreign matter including, anthropogenic waste, rock, soil / sediment
                   contamination and applied to ensure 100mm in depth.
              d.   All necessary measures must be taken to prevent fire ants (or any stages
                   of the fire ants life cycle) entering the work site. If fire ants are suspected,
                   the applicant must contact the Department of Primary Industries &
                   Fisheries Call Centre on 132523.
              e.   Landscaping must not obstruct overland flow paths and must include
                   adequate drainage to minimise ponding. Mulch or any floatable material
                   must not be located in swales or overland flow paths.
              f.   Landscaping must not encroach onto kerb and channel, footpaths,
                   pedestrian or vehicular / circulation areas.
              g.   Landscaping must not restrict access to service meters.
        27.   Landscaping of Road Reserves - The following requirements apply to
              landscaping within road reserves:
              a.   Permanent ornamental lighting must not be installed within road reserve.
              b.   Permanent irrigation must not be installed on road reserve.
              c.   Vegetation must not be subjected to any hedging maintenance regime
                   and must be allowed to grow to its natural form.


                                                                                   Page 16 of 29

Section 17

ORDINARY MEETING AGENDA                                                 25 SEPTEMBER 2014


        28.   Turf (verge): The applicant must ensure turf is in accordance with the following:
              a.   Turf species to be sustainable for local and design conditions without
                   requiring irrigation.
              b.   Turf is easily accessible and navigable by ride-on mowers with cutting
                   decks of 2.1 metres wide.
              c.   Be free of rocks and debris.
              d.   Turf is rolled and joined smoothly and level with adjoining surfaces.
              e.   Turf is pest, weed and disease free.
        Following Construction
        29.   Ongoing maintenance: The site must be maintained to aesthetically compliment
              the surrounding local area for the life of the development. The maintenance
              must include:
              a.   Regular mowing, weeding and fertilising of turf verge.
              b.   Replenishing of mulch to 100mm depth, fertilising and aeration of
                   landscape areas.
              c.   Cleaning of all external surfaces including prompt removal of graffiti.
              d.   Replacement of dead or poorly performing plants.
              e.   Inspection and assessment of all vegetation such that it does not
                   adversely affect adjoining property or pedestrians.
              f.   Remedial action if any vegetation poses a health or safety risk to site
                   users or adjoining property.
        Any repair work which proposes to alter the alignment or level of existing services
        and assets must first be referred to the relevant service authority for approval.
        UNITYWATER
        During Construction
        30.   Water meters must be installed to each lot of the development in accordance
              with Unitywater requirements and SEQ Standard Drawings.
        31.   Electrical pillars must be located on alternative boundaries to water meters.
        32.   A minimum horizontal clearance of 1.0 metre must be maintained between
              stormwater pipes greater than 225mm diameter and Unitywater water supply or
              sewerage infrastructure.
        33.   Stormwater filtration/retention systems and gross pollutant traps must maintain
              a minimum of 1.5 metres horizontal clearance from a sewerage main or sewer
              house connection point.
        34.   A minimum of 0.5 metres separation must be maintained between the
              outermost edge of  sewer access chambers or sewerage mains and the
              property boundary.
        35.   Easements of between 3 and 10 metres must be provided over all Unitywater
              sewers located within property boundaries in accordance with the SEQ
              standards. Easements shall be centred over the pipe. Easement terms shall be
              the most current registered dealing held by the Department of Natural
              Resources & Mines and shall not be altered or amended.




                                                                                 Page 17 of 29

Section 18

ORDINARY MEETING AGENDA                                                     25 SEPTEMBER 2014


         36.   Proposed tree plantings must maintain a minimum horizontal clearance of 1.0
               metre from Unitywater water mains and 1.5 metres from Unitywater sewerage
               mains. Landscaping plants within these clearances must be low growing when
               mature and suitable approved varieties.
         37.   During the maintenance period the applicant must carry out necessary repairs
               to: defects and/or damage of road works; drainage and associated work; water
               supply and sewerage reticulation and associated equipment. These repairs
               include damage and/or alterations caused by third parties carrying out works
               within the development.
         38.   Construction works undertaken in the vicinity of Unitywater’s existing water
               supply or sewerage infrastructure must not adversely affect the integrity of the
               infrastructure. All costs associated with repair, replacement or alteration to
               existing infrastructure must be met by the applicant.
               Prior to issue of certificate of compliance
         39.   As Constructed drawings shall be lodged in both hardcopy and ADAC digital
               format in GDA94 Zone 56 coordinate values. As constructed drawings will be
               required prior to works being accepted On Maintenance. The GDA co-
               ordinates and AHD levels of all permanent survey marks installed shall be
               provided. The surveyed location, meter numbers and readings of water meters
               installed by the developer must be included in the as - constructed information.
         40.   A water meter record sheet must be completed and submitted to Unitywater
               prior to works being accepted on-maintenance.
         41.   Upon completion of the works a certificate must be issued by a RPEQ certifying
               that the works have been constructed in accordance with Unitywater standards,
               and in compliance with the approved plans and specifications. The works must
               be supervised by the Engineer in a planned and timely manner to ensure the
               integrity of the certification is upheld.

    B.   Find the following are sufficient grounds to justify the decision despite the conflict with
         the Planning Scheme:
         1.    The proposal provides for a high level of residential amenity, consistent with the
               surrounding development in the area and The Noosa Plan requirements for the
               Semi Attached Housing zone;
         2.    The development is located within convenient access to the major road network
               and surrounding shops; and
         3.    The proposed built form is equivalent to 2 duplex developments, which is
               consistent with the permitted development on the site.


4   DEVELOPMENT APPLICATION FOR RECONFIGURING A LOT - 1 LOT INTO 2 LOTS
    AND AN ACCESS EASEMENT AT 22 & 23 EDWARD STREET, COORAN REC14/0002
    Item not dealt with by Planning & Organisation Committee. Referred to General
    N




    Committee for consideration.

    Reason for referral: Cr Playford disagrees with the Recommendation.




                                                                                    Page 18 of 29

Section 19

ORDINARY MEETING AGENDA                                                   25 SEPTEMBER 2014


5   PLANNING & DEVELOPMENT BILL 2014 AND PLANNING & ENVIRONMENT COURT
    BILL 2014
    That Council note the report by the Manager, Planning & Environment and Strategic
    Planner to the Planning & Organisation Committee Meeting dated 16 September 2014 and
    request the Chief Executive Officer to make a submission to the draft Planning and
    Development Bill 2014 and Planning and Environment Court Bill 2014 generally seeking
    that:-
    A.   The Department of State Development, Infrastructure and Planning undertake
         consultation on the draft Planning and Development Regulations and Guidelines
         where much of the practical impacts of the legislation changes for the community,
         development industry and local governments will be located;
    B.   Local governments and their communities should continue to retain the ability to
         decide through their planning schemes which developments will be required to be
         publicly notified and have third party appeal rights;
    C.   Where an application conflicts with the planning scheme, the onus of proof should be
         on the applicant to prove the merits of the proposal and justify the inconsistency
         rather than what appears to be an onus on the assessment manager to prove that the
         intent of the planning scheme should be upheld;
    D.   Section 89 of the Planning and Development Bill 2014 be amended to remove the
         requirement for local governments to provide a notice to applicants and owners that
         their approval will lapse, as this should be the responsibility for applicants and owners
         to monitor;
    E.   A time limit requirement be included for Conversion Applications and Offset
         Establishment Cost review requests to be made and undertaken during the period for
         a Negotiated Decision Notice to reduce uncertainty for local governments;
    F.   An allowance be included for Local Governments to index all Infrastructure Charges
         from a set base date in accordance with the applicable index to address increasing
         infrastructure costs; and
    G.   Councils should have the ability to issue an Infrastructure Charges Notice for minor
         changes to development approvals issued prior to 1 July 2011 that involve an
         increase to the intensity of the development and for extensions to the currency
         period; and.
    H.   Provide within the P&D Bill the ability for local government planning schemes to also
         apply to assessment of uses within the local government tidal area/river lease areas
         to support improved management of marine activities and address potential impacts
         on adjacent foreshores and uses.



6   ADVERTISING EXPENDITURE POLICY REPORT
    That Council note the report by the Director Corporate Services to the Planning &
    Organisation Committee Meeting dated 16 September 2014 and:

    A.   Rescind the existing Advertising Expenditure policy that transferred to Council from
         the Sunshine Coast Regional Council under the Local Government (De-
         amalgamation Implementation) Regulation 2013; and

    B.   Adopt the new Advertising Expenditure Policy provided in Attachment 1 to the report.




                                                                                   Page 19 of 29

Section 20

ORDINARY MEETING AGENDA                                                 25 SEPTEMBER 2014




7    2014/15 NATIONAL COMPETITION POLICY REFORM APPLICATION
     That Council note the report by the Director Corporate Services to the Planning &
     Organisation Committee Meeting dated 16 September 2014 and

     A.   Apply the Full Cost Pricing reform option to the Waste Management business activity
          for the 2014/15 financial year in accordance with section 44(1)(b) of the Local
          Government Act 2009; and

     B.   Apply the Code of Competitive Conduct to the Holiday Parks business activity for the
          2014/15 financial year in accordance with section 47 of the Local Government Act
          2009.


8    FINANCIAL PERFORMANCE REPORT AUGUST 2014
     That Council note the report by the Manager Financial Services to the Planning &
     Organisation Committee Meeting dated 16 September 2014 providing the August monthly
     financial report.


9    TELECOMMUNICATION SERVICES UPDATE
     That Council note the report by the ICT Operations Officer to the Planning & Organisation
     Committee Meeting dated 16 September 2014 providing an update on the progress made
     with reviewing Council’s telecommunication services.


10   JULY 2014 RATE LEVY
     That Council note the report by the Manager Revenue Services to the Planning &
     Organisation Committee Meeting dated 16 September 2014 providing an overview of the
     July 2014 Rate Levy.


11   COMMUNITY ENGAGEMENT PROJECT NEWDEMOCRACY FOUNDATION
     That Council note the report by the Executive Manager to the Planning & Organisation
     Committee Meeting dated 16 September 2014 and
     A.   Accept the proposal from the newDemocracy Foundation to undertake a community
          engagement project utilising the community jury methodology and approve
          commencement of the jury selection process; and
     B.   Provide a further report to Council detailing the topic/s for the community
          engagement project and level of authority to be given to the community jury.




                                                                               Page 20 of 29

Section 21

ORDINARY MEETING AGENDA                                                  25 SEPTEMBER 2014


Closure of the Meeting to the Public

The meeting was closed to the public pursuant to section 275 (1)(f) of the Local Government
Regulation 2012 for the purpose of discussing Item 12 - Closed Session Item: Access Issue Walter Hay Drive – Noosa on Weyba – Planning & Environment Court
Appeal (Northbrook) – MCU12.0208.

Re-opening of the Meeting to the Public

The meeting was re-opened to the public.


12   CLOSED SESSION ITEM - ACCESS ISSUE WALTER HAY
     DRIVE - NOOSA ON WEYBA - PLANNING & ENVIRONMENT COURT APPEAL
     (NORTHBROOK) - MCU12.0208

     That Council note the report by the Manager, Planning & Environment to the Planning &
     Organisation Committee Meeting dated 16 September 2014 regarding access to Walter
     Hay Drive – Noosa on Weyba and:
     A.     Resolve that it regards the proposed roundabout access from Walter Hay Drive to
            the subject land as undesirable and that in the event that the development was
            approved by the court it would not accept such works;
     B.     Resolve as the road authority, that it regards the proposed roundabout access in
            Walter Hay Drive as contrary to the public interest which requires the preservation
            of the efficiency of the road carrying capacity and the speed environment, of Walter
            Hay Drive;
     C.     Resolve that, as the road authority, it will not accept any access proposal to the
            development which will have the effect of slowing the speed environment of Walter
            Hay Drive as such an outcome is contrary to and likely to undermine Council’s long
            term traffic planning objectives for the area; and
     D.     Instruct Council’s Solicitor for Planning & Environment Court Appeal No 1648/2014
            to advise the appellant of Council’s resolution.




Recommendation

The Planning & Organisation Committee recommendations dated 16 September, 2014 be
adopted except where dealt with or held over by separate resolution.




                                                                                 Page 21 of 29

Section 22

ORDINARY MEETING AGENDA                                                          25 SEPTEMBER 2014


GENERAL COMMITTEE RECOMMENDATIONS

22 SEPTEMBER 2014 - Sandy Bolton, Joe Jurisevic, Noel Playford, Frank Wilkie
Apologies: Cr Tony Wellington and Cr Bob Abbot

1           ASSET MANAGEMENT POLICY - FURTHER REPORT
            That Council note the report by the Asset Planning Manager to the Infrastructure &
            Services Committee Meeting dated 16 September 2014 and the General Committee
            Meeting dated 22 September 2014 and:
            A.    Rescind the existing Asset Management policy that transferred to Council from the
                  Sunshine Coast Regional Council under the Local Government (De-amalgamation
                  Implementation) Regulation 2013; and
            B.    Adopt the new Asset Management Policy shown as Attachment 1 to the report to
                  General Committee dated 22 September 2014 and authorise the Chief Executive
                  Officer to put in place administrative guidelines and tools required to implement the
                  policy.


    2   APPLICATION FOR MATERIAL CHANGE OF USE ANIMAL HUSBANDRY TYPE 2 -
        INTENSIVE) AND ENVIRONMENTALLY RELEVANT ACTIVITY (ERA 4 - POULTRY
        FARMING) SITUATED AT 136 TOP FORESTRY ROAD, RIDGEWOOD MCU12/0184
        That Council note the report by the Development Planner to the Planning & Organisation
        Committee Meeting dated 16 September 2014 and defer Application No. MCU12/0184 for
        a Development Permit for Material Change of Use (Animal Husbandry Type 2 – Intensive)
        and Environmentally Relevant Activity (ERA 4 – Poultry Farming), situated at 136 Top
        Forestry Road, Ridgewood and request the applicant to address the following:-
        A.       Identify measures to mitigate dust nuisance for residents living along Top Forestry
                 Road and minimise road maintenance requirements such as sealing of Top Forestry
                 Road;
        B        Investigate whether an alternative haul route can be used that does not include the
                 residential streets of Cooroy (Maple Street and Crystal Street) and is suitable for
                 heavy vehicles;
        C.       Confirm whether chicken pick-up times can be limited to day time only (6am to 7pm);
        D.       Identify how unacceptable odour impacts on future residents of 124, 146, 172 and
                 224 Top Forestry Road may be addressed; and
        E.       Provide an Infrastructure Agreement that includes all proposed road works and/or
                 maintenance measures to be undertaken to Top Forestry Road to address road
                 safety, amenity and maintenance issues and where appropriate odour measures for
                 124, 146, 172 and 224 Top Forestry Road.


3       DEVELOPMENT APPLICATION FOR RECONFIGURING A LOT - 1 LOT INTO 2 LOTS
        AND AN ACCESS EASEMENT AT 22 & 23 EDWARD STREET, COORAN REC14/0002
        That Council note the report by the Senior Development Planner to the Planning &
        Organisation Committee Meeting dated 16 September 2014 regarding Application No.
        REC14/0002 to Reconfigure a Lot (1 lot into 2 lots and an access easement) and provide a
        further report to the Council Ordinary Meeting on 25 September 2014 advising proposed
        conditions to support the approval of this application on the basis of a minimum lot size of
        2000m2.



                                                                                         Page 22 of 29

Section 23

ORDINARY MEETING AGENDA                                           25 SEPTEMBER 2014




Recommendation

The General Committee recommendations dated 22 September, 2014 be adopted except where
dealt with or held over by separate resolution.




                                                                         Page 23 of 29

Section 24

ORDINARY MEETING AGENDA                                                   25 SEPTEMBER 2014


6   ORDINARY MEETING REPORTS

    1    DEVELOPMENT APPLICATION FOR RECONFIGURING A LOT - 1 LOT INTO 2
         LOTS AND AN ACCESS EASEMENT AT 22 & 23 EDWARD STREET, COORAN
         REC14/0002 – FURTHER REPORT          DOCUM ENT IN FORM ATION




    Author            Senior Development Planner, Denis Wallace
                      Planning & Infrastructure Department

    Index             ECM / Application / REC14/0002

    Attachments       Nil


    EXECUTIVE SUMMARY
    Not applicable.

    ALTERNATE MOTION
    That Council note the reports by the Senior Development Planner to the Planning &
    Organisation Committee Meeting dated 16 September 2014 and the Ordinary Meeting
    dated 25 September 2014 regarding Application No. REC14/0002 to Reconfigure a Lot (1
    lot into 2 lots and an access easement) and:
    A.   Approve the application, subject to the following conditions:
         PLANNING
         When Conditions Must Be Complied With
         1.    Unless otherwise stated, all works required by the conditions of this Decision
               Notice must be completed prior to submission of the subdivision plan to Council
               for compliance assessment.
         Approved Plans
         2.    Development undertaken in accordance with this approval must generally
               comply with the approved plans of development. The approved plans are listed
               in the following table and are subject to further amendments by these
               conditions.
              Plan No.            Rev.   Plan/Document Name                             Date
              13-3482AD           _      Plan of Proposed Reconfiguration of Lot 2 on   08-07-14
              Sheet 1 of 1               SP155477
         Minimum Lot Size
         3.    Lot 1 shall maintain a minimum lot size of 2,000m2 in accordance with The
               Noosa Plan. Prior to the issue of any Development Permit for Operational
               Works an amended plan of development must be submitted to Council
               demonstrating compliance with this condition.
         Lot Numbering
         4.    All lot numbering on the subdivision plan to be submitted to Council for
               compliance assessment must remain as shown on the Approved Plans.




                                                                                   Page 24 of 29

Section 25

ORDINARY MEETING AGENDA                                                 25 SEPTEMBER 2014


        Boundary Encroachments
        5.   Certification must be submitted to Council from a Licensed Surveyor which
             certifies that:
             a.   the boundary clearances for any existing buildings remaining on the site
                  comply with the relevant provisions of the planning scheme and the
                  Building Act 1975, unless varied by this Decision Notice;
             b.   all constructed access and roadworks (including associated fill batters
                  and retaining walls) are fully contained within a dedicated reserve or
                  registered easement;
             c.   all utility services and connections (eg. electricity, telecommunications,
                  water, sewerage) are wholly located within the lot they serve or
                  alternatively included within an easement;
             d.   all existing effluent disposal areas are wholly located within the lot they
                  serve and comply with the boundary setback requirements of the
                  Plumbing and Drainage Act 2002 and associated codes and
                  requirements;
             e.   all retaining walls and structures are fully contained within the lot they
                  retain;
             f.   any fill, including fill batters, are wholly contained within the subject site
                  and not on adjacent properties.
        House Site Areas
        6.   Prior to endorsement of the plan of survey by Council, a plan shall be submitted
             to Council identifying a building envelope for the house site and effluent
             disposal area/s on Lot 2. To address noise, the house site area/s shall be
             greater than 80m from the rail corridor, or alternatively, positioned outside the
             65dB(A) 24hr average equivalent A-weighted sound pressure level AND
             87dB(A) single event maximum sound pressure level contours emanating from
             rail noise, as identified in an acoustic assessment prepared by a suitably
             qualified person and approved by Council.
        ENGINEERING
        Site Access and Driveways
        7.   A sealed access driveway must be provided from Edward Street for the full
             length of the proposed access easement. The works must be undertaken in
             accordance with an Operational Works approval and must include in particular:
             a.   A 3m wide sealed access extending from the end of the current formation
                  in Edward Street to the property boundary,
             b.   A 4m wide sealed access for the full length of the proposed access
                  easement including a 5.5m wide passing bay located between the
                  Edward Street frontage and the access to Lots 1 and 2,
             c.   Sealed access driveways to Lots 1 and 2 extending from the edge of the
                  shared access driveway to the boundary of Lots 1 and 2, and
             d.   Underground service conduits for all utility services.




                                                                                Page 25 of 29

Section 26

ORDINARY MEETING AGENDA                                                 25 SEPTEMBER 2014


        Stormwater Drainage
        8.    The site must be provided with a stormwater drainage system connecting to a
              lawful point of discharge. The works must be undertaken in accordance with an
              Operational Works approval and must include in particular:
              a.   An interallotment drainage system extending from the boundary of Lot 1
                   to James Street;
              b.   the use of gravity stormwater drainage.

        Electricity and Telecommunication Services
        9.    Reticulated electricity and telecommunication services must be provided to
              each lot in accordance with an approval for Operational Works and the
              standards and requirements of the relevant service provider.
        10.   Unless otherwise stipulated by telecommunications legislation at the time of
              construction, the development must be provided with all necessary conduits,
              pits and pipes to accommodate the future connection of optic fibre technology
              telecommunications.
        11.   Certification must be submitted to Council from all relevant service providers
              which certifies that the development has met the requirements of this Decision
              Notice and all applicable legislation at the time of construction.
        Easements
        12.   An easement for drainage purposes must be registered against the title of
              proposed Lot 2 in favour of Council over the land area identified as being below
              the 1%AEP flood level on the subject site.
        13.   For the purpose of this permit the 1%AEP flood level means the 1%AEP level
              as described in a current Flood Certificate issued by Council.
        14.   An easement for access and services purposes must be registered against the
              title of the Lot 3 SP155477 in favour of proposed Lots 1 and 2. The easement
              must be located generally in accordance with the approved plan and have a
              minimum width of 10 metres.
        15.   An easement for interallotment drainage must be registered against the title of
              proposed Lot 2 in favour of proposed Lot 1. The easement must extend from
              the common boundary of Lots 1 and 2 to the James Street frontage.
        16.   Unless otherwise agreed in writing by the relevant service provider, any public
              or third party infrastructure located on the subject site must be placed within an
              easement registered against the title of the property.
        17.   All easements must be designed in accordance with the planning scheme and
              granted at no cost to the Grantee. Where the Grantee is Council or a service
              authority, the easement documentation must be in accordance with the
              Grantee’s standard easement terms. Draft easement documentation must be
              submitted to Council for endorsement.
        18.   All works must be kept clear of any existing or proposed easements on the
              subject land, unless agreed otherwise in writing by the Grantee.
        Earthworks and Retaining Walls
        19.   All fill and associated batters must be undertaken in accordance with an
              Operational Works approval, and contained entirely within the subject site
              unless written permission from the respective landowner(s) is provided to
              Council.


                                                                                 Page 26 of 29

Section 27

ORDINARY MEETING AGENDA                                                    25 SEPTEMBER 2014


        Damage to Services and Assets
        20.   Any damage caused to existing services and assets as a result of the
              development works must be repaired at no cost to the asset owner at the
              following times:
              a.    where the damage would cause a hazard to pedestrian or vehicle safety,
                    immediately; or
              b.    where otherwise, upon completion of the works associated with the
                    development.
              Any repair work which proposes to alter the alignment or level of existing
              services and assets must first be referred to the relevant service authority for
              approval.
        UNITYWATER
        Important Advisory Note - The following Unitywater conditions are applied in accordance
        with the Chapter 4c, part 7 and sections 135 and 140(c) South East Queensland (Distribution
        and Retail) Restructuring Act 2009 and Unitywater’s Interim Connections Policy. The
        conditions below form part of a water connection aspect which are taken to be a water
        approval for a staged connection. You are entitled to appeal against the water connection
        aspects of this application in accordance with section 99BRAY and Chapter 4c, part 4,
        Divisions 1 and 2 of the South East Queensland (Distribution and Retail) Restructuring Act
        2009. Unitywater can be contacted as follows:
        Phone: 1300 0 Unity (1300 086 489)
        Email: [email protected]
        Web: www.unitywater.com.
        Water Connections
        21.   Reticulated water must be provided to each lot in the development. This must
              include:
              a.    Ensuring that existing internal water pipes are wholly contained within the
                    lot they will serve;
              b.    An approved water meter for each lot in accordance with Unitywater and
                    SEQ Standard Drawings;
              c.    Provision of a water service from the existing 150 mm diameter water
                    main that runs across the lot to service all proposed and future lots in
                    accordance with Unitywater and SEQ Standard Drawings.
        22.   Tree plantings must maintain a minimum horizontal clearance of 1.0 metre from
              Unitywater water mains. Landscaping plants within these clearances must be
              low growing when mature and suitable Unitywater approved varieties.
        23.   Written approval to enter and construct must be obtained from the owners of
              properties through which external water mains will traverse. This must include
              approval for a 3 meter wide easement over the mains, and be submitted with
              lodgement of the associated development application for Operational Works.
        24.   Construction works undertaken in the vicinity of Unitywater water supply or
              sewerage infrastructure must not adversely affect the integrity of the
              infrastructure. All costs associated with repair, replacement or alteration of
              infrastructure must be met by the applicant.




                                                                                   Page 27 of 29

Section 28

ORDINARY MEETING AGENDA                                                         25 SEPTEMBER 2014


           ADVISORY NOTES
           Building and Construction Industry (Portable Long Service Leave) Levy
           1.    The QLeave levy must be paid prior to the issue of a development permit where
                 it is required. Council will not be able to issue a Decision Notice without receipt
                 of details that the Levy has been paid. QLeave contact: 1800 803 481 (free
                 call) or (07) 3212 6855.
           Unitywater
           2.    Connection to the Unitywater live water supply and live sewerage system must
                 be undertaken by Unitywater at the applicant’s cost.

    B.     Apply the following property note to new Lot 2:
           1.    Building Envelope/s have been specified for this property for the construction of
                 a house or any habitable buildings. Details can be obtained from Council.


    REVIEWED REPORT
    A report regarding development application REC14/0002 was included as Item 4, page 93,
    of the Planning & Organisation Committee Agenda dated 16 September 2014. The report
    was referred to and considered at the General Committee meeting on 22 September 2014,
    which resolved:
    That Council note the report by the Senior Development Planner to the Planning &
    Organisation Committee Meeting dated 16 September 2014 regarding Application No.
    REC14/0002 to Reconfigure a Lot (1 lot into 2 lots and an access easement) and provide a
    further report to the Council Ordinary Meeting on 25 September 2014 advising proposed
    conditions to support the approval of this application on the basis of a minimum lot size of
    2000m2.
    During the course of the discussion at the General Committee meeting, Councillors
    indicated they did not support the proposed development because Lot 1 does not meet the
    minimum lot size for unsewered lots within the locality under The Noosa Plan. The
    Committee indicated the development would only be supported where the lots met the
    prescribed minimum lot size and requested additional conditions addressing this issue.
    The alternate motion above has been drafted for that purpose. Specifically, Condition 3
    has been added to ensure the minimum lot size is maintained and Condition 2 has been
    altered to note the required amendments to the plan of development.
    Officer Recommendation
    Staff maintain the previous recommendation for this application detailed in the original
    report.

    Departments/Sections Consulted:
         Community Services                                X   Planning & Infrastructure
         Disaster Management & Public Order                x   Building & Plumbing Services
         Waste & Environmental Health                      x   DA Planning
         Community Facilities                              x   Strategic Land Use Planning
         Cultural Facilities                                   Asset Design & Investigations
                                                               Asset Planning
                                                               Civil Operations
                                                               Environment

         Executive Office                                      Corporate Services
         Community Engagement                                  Finance
         Customer Service                                      ICT
         Executive Support                                     Procurement & Fleet
         Governance                                            Property & Facilities
         Human Resources                                       Revenue Services

                                                                                          Page 28 of 29

Section 29

ORDINARY MEETING AGENDA                                            25 SEPTEMBER 2014


7    PETITIONS




8    CLOSED SESSION

     Nil.




9    NEXT MEETING

     The next Ordinary Meeting will be held on 23 October, 2014 in the Council Chambers,
     9 Pelican Street, Tewantin commencing at 6pm.




10   MEETING CLOSURE




                                                                          Page 29 of 29

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.