ORDINARY MEETING AGENDA 25 SEPTEMBER 2014
14. The driveway must be constructed so as not to concentrate stormwater runoff
onto neighbouring properties or cause ponding of water within the road reserve
Earthworks
15. The finished surface level of the site must be graded and shaped to ensure that
all surface runoff is directed to Nannygai Street and not directed on to any
adjoining property.
16. All earthworks shall be undertaken in accordance with the provisions of AS
3798 Guidelines on Earthworks for Commercial and Residential Development.
Certification shall be provided by an RPEQ and submitted to Council the issue
of the Certificate of Classification for the building.
Service Conduits under Existing Road Features
17. Electrical conduits or other services proposed to be installed under existing
sealed carriageways, concrete pathways or concrete/sealed driveways must be
installed by boring. Trenching is not permitted, unless specifically approved by
Council.
Erosion and Sediment Control
18. Prescribed Water Contaminants (as defined in the Environmental Protection Act
1994) must not be released from the site or to waters within the site, or be likely
to be released should rainfall occur, unless all reasonable and practicable
measures are taken to prevent or minimise the release and concentration of
contamination.
19. Erosion and sediment control measures must be installed and maintained to
minimise erosion on the site and to minimise the export of sediment and
associated pollutants from the site. The erosion and sediment control measures
must be designed, installed and maintained in accordance with current best
practice standards (refer to advisory notes).
20. Prior to the issue of the Certificate of Classification, all site surfaces must be
effectively stabilised using methods which have achieved effective short-term
stabilisation and which will continue to achieve effective stabilisation in the
medium to long-term (refer to advisory notes). For the purpose of this condition,
an effectively stabilised surface is defined as one that does not, or is not likely
to result in visible evidence of soil loss caused by sheet, rill or gully erosion or
lead to sedimentation, or lead to water contamination.
21. Any exposed areas must be effectively stabilised without delay and prior to
rainfall occurring.
Supervision/Certification
22. Upon completion of the work a certificate must be issued by an RPEQ certifying
that the works have been constructed in accordance with the Operational
Works permit.
23. All municipal works must be accepted ‘On Maintenance’ by Council in
accordance with Council’s relevant Planning Scheme Policy prior to plan
sealing. To achieve ‘On Maintenance’, the supervising RPEQ must submit to
council:
a. certification that all works have been undertaken and completed in
accordance with the requirements of this Permit
b. As Constructed details in accordance with Council’s Planning Scheme
Policy
c. Maintenance and operational manuals for all proprietary devices
Page 15 of 29
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.