Skip to the record
The only place to find full transcripts.

Original source · versioned page text

2014-09-25 Ordinary Meeting Agenda

of 29

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

ORDINARY MEETING AGENDA                                                 25 SEPTEMBER 2014


        28.   Turf (verge): The applicant must ensure turf is in accordance with the following:
              a.   Turf species to be sustainable for local and design conditions without
                   requiring irrigation.
              b.   Turf is easily accessible and navigable by ride-on mowers with cutting
                   decks of 2.1 metres wide.
              c.   Be free of rocks and debris.
              d.   Turf is rolled and joined smoothly and level with adjoining surfaces.
              e.   Turf is pest, weed and disease free.
        Following Construction
        29.   Ongoing maintenance: The site must be maintained to aesthetically compliment
              the surrounding local area for the life of the development. The maintenance
              must include:
              a.   Regular mowing, weeding and fertilising of turf verge.
              b.   Replenishing of mulch to 100mm depth, fertilising and aeration of
                   landscape areas.
              c.   Cleaning of all external surfaces including prompt removal of graffiti.
              d.   Replacement of dead or poorly performing plants.
              e.   Inspection and assessment of all vegetation such that it does not
                   adversely affect adjoining property or pedestrians.
              f.   Remedial action if any vegetation poses a health or safety risk to site
                   users or adjoining property.
        Any repair work which proposes to alter the alignment or level of existing services
        and assets must first be referred to the relevant service authority for approval.
        UNITYWATER
        During Construction
        30.   Water meters must be installed to each lot of the development in accordance
              with Unitywater requirements and SEQ Standard Drawings.
        31.   Electrical pillars must be located on alternative boundaries to water meters.
        32.   A minimum horizontal clearance of 1.0 metre must be maintained between
              stormwater pipes greater than 225mm diameter and Unitywater water supply or
              sewerage infrastructure.
        33.   Stormwater filtration/retention systems and gross pollutant traps must maintain
              a minimum of 1.5 metres horizontal clearance from a sewerage main or sewer
              house connection point.
        34.   A minimum of 0.5 metres separation must be maintained between the
              outermost edge of  sewer access chambers or sewerage mains and the
              property boundary.
        35.   Easements of between 3 and 10 metres must be provided over all Unitywater
              sewers located within property boundaries in accordance with the SEQ
              standards. Easements shall be centred over the pipe. Easement terms shall be
              the most current registered dealing held by the Department of Natural
              Resources & Mines and shall not be altered or amended.




                                                                                 Page 17 of 29
Log in to download the original file

2014-09-25 Ordinary Meeting Agenda(PDF, 495KB).pdf · 507 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.