Item 32: In order for the Stormwater 360 device to be considered any further within this proposed
development, provide:

      a)   Independent verification from a suitably qualified and experienced professional to confirm
          that the parameters within the node for the device in MUSIC modelling have been tested and
          verified as per Stormwater Australia (2018) Stormwater Quality Improvement Device
          Evaluation Protocol. Version 1.2 December 2018 to achieve the predicted outcomes in the
          MUSIC model for the development. For the purpose of this information request, the suitably
          qualified and experienced professional must be able to demonstrate a minimum 10 years
          urban stormwater testing and modelling experience and be verified in writing by Stormwater
          Australia as having an appropriate reputation and track record within the stormwater industry
          to provide such independent advice.
      b) A MUSIC model along with plans that demonstrates how a biobasin or other vegetated
          stormwater quality treatment asset could be retrofit into the proposed development to
          achieve the required pollutant reduction targets in the event the proprietary device fails to
          perform under the local conditions.
      c) Agreement that any proprietary device would be considered as a trial only with the view to
          retrofit with a bio retention basin in the event the proprietary device fails to perform as
          required under the local conditions.


Applicant’s Response to Item 33: Please refer to Attachment F - MPN Consulting Engineering
report and Attachment H – Updated Stormwater Management Plan.



Item 33:       Demonstrate that on-site detention measures are wholly contained within the
developable areas of the site, clear of drainage lines and Open Space Precincts.
Applicant’s Response to Item 33: Please refer to Attachment F - MPN Consulting Engineering
report.


The applicant considers that they have now responded to Council’s information request. The Decision
Making Period has therefore commenced and we request that your Council proceeds with its
assessment of the application as soon as possible in accordance with the Planning Act 2016.

Please contact our Sunshine Coast office if you require any further information and/or clarification.


Yours faithfully,




Nadine Gorton
Senior Planner
martoo consulting pty ltd
Log in to download the original file

Response to Council IR.pdf · 416 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.