Response to Council IR
Page 7
Item 32: In order for the Stormwater 360 device to be considered any further within this proposed
development, provide:
a) Independent verification from a suitably qualified and experienced professional to confirm
that the parameters within the node for the device in MUSIC modelling have been tested and
verified as per Stormwater Australia (2018) Stormwater Quality Improvement Device
Evaluation Protocol. Version 1.2 December 2018 to achieve the predicted outcomes in the
MUSIC model for the development. For the purpose of this information request, the suitably
qualified and experienced professional must be able to demonstrate a minimum 10 years
urban stormwater testing and modelling experience and be verified in writing by Stormwater
Australia as having an appropriate reputation and track record within the stormwater industry
to provide such independent advice.
b) A MUSIC model along with plans that demonstrates how a biobasin or other vegetated
stormwater quality treatment asset could be retrofit into the proposed development to
achieve the required pollutant reduction targets in the event the proprietary device fails to
perform under the local conditions.
c) Agreement that any proprietary device would be considered as a trial only with the view to
retrofit with a bio retention basin in the event the proprietary device fails to perform as
required under the local conditions.
Applicant’s Response to Item 33: Please refer to Attachment F - MPN Consulting Engineering
report and Attachment H – Updated Stormwater Management Plan.
Item 33: Demonstrate that on-site detention measures are wholly contained within the
developable areas of the site, clear of drainage lines and Open Space Precincts.
Applicant’s Response to Item 33: Please refer to Attachment F - MPN Consulting Engineering
report.
The applicant considers that they have now responded to Council’s information request. The Decision
Making Period has therefore commenced and we request that your Council proceeds with its
assessment of the application as soon as possible in accordance with the Planning Act 2016.
Please contact our Sunshine Coast office if you require any further information and/or clarification.
Yours faithfully,
Nadine Gorton
Senior Planner
martoo consulting pty ltd
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.