Skip to the record
Every meeting, every word.

Council archive · source document

Amended Approved Plans - OPW22-0166 · OPW22/0166

of 23

Plans and drawings: the text below has words only, no drawings.

Very large file (12.3 MB): may take a few minutes to open.

Log in to see the plans as drawn

Original PDF page 4, section 1. The text section number identifies this passage in the reader.

                                                                                                                                                                                                                                                                                      CARPARK/ INTERNAL PAVEMENT NOTES                                                                                                                                        REINFORCED CONCRETE NOTES:
                                                                                                                                                                                                                                                                                          · THESE DRAWINGS SHALL BE READ IN CONJUNCTION WITH ALTA PROJECTS STANDARD                                                                                           GENERALLY, CONCRETE SHALL BE IN ACCORDANCE WITH AUSTRALIAN STANDARD SPECIFICATIONS
                                                                                                                                                                                                                                                                                          SPECIFICATIONS, IPWEAQ, LOCAL AUTHORITY AND DEPARTMENT OF TRANSPORT AND MAIN                                                                                        AS 3600 "SAA CONCRETE STRUCTURES CODE".




                                                                                SE
                                                                                                                                                                                                                                                                                          ROADS (DTMR) AND AUSTRALIA STANDARDS. ANY CONFLICTS SHALL BE REFERRED TO THE




                                                                                    RE
                                                                                                                                                                                                                                                                                          ENGINEER FOR CLARIFICATION.                                                                                                                                         IN ADDITION TO THE ABOVE CODE THE FOLLOWING AUSTRALIAN STANDARD
                                                                                                                                                                                                                                                                                        · ALTA PROJECTS HAVE NOT UNDERTAKEN A RISK ASSESSMENT OF THE PROPOSED CARPARK                                                                                         SPECIFICATIONS AND CODES OR THEIR LATEST REVISION SHALL APPLY:
                                                                                                                                        LOT 10




                                                                                           NIT
                                                                                                                                                                                                                                                                                                                                                                                                                                                              AS 1012              PTS 1-19 METHODS FOR THE TESTING OF CONCRETE (METRIC UNITS).
                                                                                                                                                                                                                                                                                          DESIGN AND LAYOUT WITH RESPECT TO TRAFFIC OR PEDESTRIAN SAFETY, TRIP HAZARDS,
                                                                                                                                       SP195871                                                                                                                                           WPHS REQUIREMENTS ETC. SPECIALIST ADVICE SHOULD BE SOUGHT IN THIS REGARD.
                                                                                                                                                                                                                                                                                                                                                                                                                                                              AS 3583.1,2,3,8      METHODS OF TEST FOR SUPPLEMENTARY CEMENTITIOUS.




                                                                                               Y
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   MATERIALS FOR USE WITH PORTLAND CEMENT.
                                                                                                                                                                                                                                                                                      SETOUT                                                                                                                                                                  AS 3582.1             SUPPLEMENTARY CEMENTITIOUS MATERIALS FOR USE WITH PORTLAND




                                                                                                  CL
                                                                                              E
                                                                                                                                                         10
                                                                                                                                                       SP195871                                                                                                                         · EXISTING SURFACE LEVELS AND CONTOURS SHOWN ARE BASED ON DIGITAL SURVEY                                                                                                                    CEMENT- FLY ASH.
                                                                                             SP m
                                                                                               19 t
                                                                                                 58 N
                                                                                                    71                                                                                                                                                                                    MODELS PROVIDED. EXISTING LEVELS MUST BE CONFIRMED ON SITE BY THE CONTRACTOR                                                                                        AS 1141              METHODS FOR SAMPLING AND TESTING AGGREGATES.
                                                                                                                                                                                                                                                                                          AND ANY DISCREPANCIES REFERRED TO THE ENGINEER.                                                                                                                     AS 1302               STEEL REINFORCING BARS FOR CONCRETE.
                                                                                                                        E mt
                                                                                                                       SP19    P
                                                                                                                            5871
                                                                                                                                                                                                                                                                                        · ALL CARPARK SETOUT TO BE AS PER DIGITAL CO-ORDINATES OR DIMENSIONED DRAWINGS                                                                                        AS 1303              HARD DRAWN STEEL REINFORCING WIRE FOR CONCRETE.
                                                                 LOT 100
                                                                                                                R02
                                                                                                                                                               S




                                                                                                                                                                                                                                                                                          PROVIDED. CONTRACTOR MUST NOT RELY ON DIGITAL DRAWING FILES OR SCALING OF                                                                                           AS 1304              HARD DRAWN STEEL WIRE REINFORCING FABRIC FOR CONCRETE.
                                                                SP305332                                                                                                                                                                                                                  DRAWINGS.                                                                                                                                                           AS 3972              PORTLAND AND BLENDED CEMENTS.
                                                                                 100                                                                                   605
                                                                                                                                                                                                                                                                                      SUBGRADE                                                                                                                                                                AS 1379              READY-MIXED CONCRETE (METRIC UNITS)
                                                                                SP305332                                                                              SP195871

                                                                                                                                                                                                                                                                                        · SUBGRADE SHALL BE OF SOAKED CBR 15 MATERIAL OR BETTER, FREE FROM TOPSOIL,                                                                                           AS 2758              PART 1 CONCRETE AGGREGATES.
                                                                                                                                                                                                                                                                                          ORGANIC OR OTHER DELETERIOUS MATERIAL.                                                                                                                              AS 1478, 1479         CODE OF PRACTICE FOR USE OF CHEMICAL ADMIXTURES IN CONCRETE.
                                                                                                                                                                                                                                                                                        · SUBGRADE SHALL BE COMPACTED TO 98% MDD (AS 1289 E1.1) AND SHALL NOT SHOW                                                                                            AS 3610              FORMWORK FOR CONCRETE.
                                                                                                                   9
                                                                                                                SP195871
                                                                                                                                                                                       602
                                                                                                                                                                                                                                                                                          MARKED DEFLECTION UNDER 8 TONNE AXLE LOAD AT PROOF ROLL.                                                                                                            SUPPLY:
                                                                                                LOT 9                                                                                SP188268




                                                                                                                                                22 A
                                                                                                                                                  65
                                                                                                                                                                                                                                                                                                                                                                                                                                                         ·    ALL CONCRETE IS TO BE SUPPLIED BY A LICENSED READY MIXED CONCRETE MANUFACTURER. NO ON SITE




                                                                                                                                           RP mt
                                                                                                                                                                                                                                                                                        · ANY SOFT SPOTS SHALL BE EXCAVATED TO COMPETENT MATERIAL AND REPLACED WITH




                                                                                                                                             20
                                                                                                                                           E
                                                                    D
                                                                                              SP195871                                                                                                                                                                                                                                                                                                                                                        BATCHING IS ACCEPTABLE.
                                                                 SP195871
                                                                                                                                                                                                                                                                                          SELECT MATERIAL FROM SITE OR TYPE 2.5 GRAVEL AT THE ENGINEER'S DIRECTION.                                                                                      ·    MANUFACTURERS MUST HAVE AN APPROVED AND CERTIFIED QUALITY ASSURANCE PROGRAM IN PLACE AND
                                                                                                                                                              606
                                                                                                                                                                                                                                                                                        · SUBGRADE SHALL BE GRADED TO PROFILES MATCHING FINISHED SURFACE AND ALL AREAS                                                                                        BE APPROVED BY THE ENGINEER PRIOR TO SUPPLY OF ANY CONCRETE.
                                                                                                                                                           SP195871
                                                                                                                                                                                                                                                                                          SHALL DRAIN TO SUBSOIL DRAINS.                                                                                                                                 ·    ALL MATERIALS, STORAGE, BATCHING, ETC. TO CONFORM TO THE REQUIREMENTS OF THE RELEVANT
                                                                                                  E
                                                                                             SP195871
                                                                                                                                          LOT 606                                                                                                                                       · SUBSEQUENT PAVEMENT LAYERS MUST NOT BE PLACED UNTIL THE ENGINEER HAS                                                                                                AUSTRALIAN STANDARDS.
                                                                                                                                                                                                                                                                                          APPROVED ALL TEST RESULTS, SUCCESSFUL PROOF ROLL HAS BEEN CARRIED OUT AND THE                                                                                  ·    ALL CONCRETE TO BE NORMAL-CLASS IN ACCORDANCE WITH AS 3600 UNLESS NOTED OTHERWISE.
                                                                                                                                         SP195871                                                                                                                                         ENGINEER HAS PROVIDED WRITTEN APPROVAL TO PROCEED.                                                                                                             ·    ALL CONCRETE SHALL HAVE A SHRINKAGE STRAIN NOT EXCEEDING 600 MICROSTRAIN.
                                                                                                                                                                                                                                                                                                                                                                                                                                                         ·    ALL CONCRETE IS SPECIFIED BY 28 DAY COMPRESSIVE STRENGTH UNLESS NOTED OTHERWISE.
                                                                                                                                                                                                                                                                                      GRANULAR PAVEMENT                                                                                                                                                  ·    ALL REINFORCEMENT TO BE SUPPLIED BY A REGISTERED MANUFACTURER WITH AN APPROVED AND
                                                                                                                                                                                                                                                                                                                                                                                                                                                              CERTIFIED QUALITY ASSURANCE PROGRAM IN PLACE. ALL REINFORCEMENT IS TO COMPLY WITH THE
                                                                                                                                                                                                                                                                                        · FINAL PAVEMENT DESIGN SHALL BE DETERMINED BY THE ENGINEER UPON RECEIPT OF                                                                                           REQUIREMENTS OF AS 1302, AS 1303 AND AS 1304 AS APPLICABLE.
                                                                                                                                                                                                                                                                                          SUBGRADE SOAKED CBR RESULTS AFTER THE COMPLETION OF BULK EARTHWORKS.                                                                                           ·    ALL REINFORCEMENT IS TO BE DELIVERED TO SITE FREE FROM OIL, GREASE OR OTHER SURFACE
                                                                                                                                                                                                                                                                                        · ALL GRANULAR PAVEMENT SHALL COMPLY STRICTLY WITH ALL CURRENT DTMR QUALITY                                                                                           COATINGS WHICH MAY IMPAIR BOND TO CONCRETE.
                                                                                                                                                                                                                                                                                          STANDARDS FOR THE NOMINATED PAVEMENT TYPE AND SHALL BE SUPPLIED BY A DTMR                                                                                      ·    ALL REINFORCEMENT TO BE 500 MPA MINIMUM YIELD UNLESS NOTED OTHERWISE.
                                                                                                                                                                                                                                                                                          ACCREDITED QUARRY.
                                                                                                                                                                                                                                                                                                                                                                                                                                                              FORMWORK:
                                                                                                                                                                                                                                                                                        · PAVEMENT PLACEMENT SHALL NOT COMMENCE UNTIL MATERIAL QUALITY TEST RESULTS
                                                                   OVERALL SITE PLAN                                                                                                                                                                                                      HAVE BEEN APPROVED BY THE ENGINEER.
                                                                                                                                                                                                                                                                                                                                                                                                                                                         ·    ALL CONCRETE OTHER THAN CAST AGAINST GROUND, SHALL BE PLACED AGAINST TIMBER, PLYWOOD
                                                                                                                                                                                                                                                                                                                                                                                                                                                              OR STEEL FORMS.
                                                                    SCALE 1:1000 A1                                                                                                                                                                                                     · PAVEMENTS SHALL BE PLACED AT DEPTHS NOT EXCEEDING 200mm AND SHALL BE                                                                                           ·    ALL FORMWORK SHALL COMPLY WITH THE REQUIREMENTS OF AS 1509 AND AS 1510.
                                                                                                                                                                                                                                                                                          COMPACTED TO 100% MDD (AS 1289 E1.1), SLURRIED AND TRIMMED TO PROFILE REFLECTING                                                                               ·    REFER ARCHITECT'S DRAWINGS FOR REQUIRED FORMWORK CLASS WHERE APPLICABLE. CLASS B
                                                                                                                                                                                                                                                                                          FINAL DESIGN SUCH THAT A TIGHT PAVEMENT MATRIX IS ACHIEVED.                                                                                                         FORMWORK SHALL BE ADOPTED UNLESS NOTED OTHERWISE.
                                                                                                                                                                                                                                                                                        · WHERE CEMENT TREATMENT IS NOMINATED BY THE ENGINEER CEMENT DESIGN AT THE                                                                                       ·    ALL TEMPORARY FORMWORK, FALSEWORK, PROPPING, BRACING, TO BE DESIGNED AND CERTIFIED
                                                                                                                                                                                                                                                                                          NOMINATED RATE MUST TAKE PLACE AT AN ACCREDITED PUG MILL. NO ON-SITE CEMENT                                                                                         BY A REGISTERED PROFESSIONAL ENGINEER (RPEQ) PRIOR TO ERECTION.
                                                                                                                                                                                                                                                                                                                                                                                                                                                         ·    ALL REINFORCEMENT TO BE SUPPORTED OFF FORMS WITH PLASTIC OR PLASTIC TIPPED WIRE CHAIRS
                                                                                                                                                                                                                                                                                          TREATMENT WILL BE ACCEPTED.
                                                                                                                                                                                                                                                                                                                                                                                                                                                              TO PROVIDE THE SPECIFIED COVER. ALL CONCRETE CAST AGAINST GROUND TO BE UNDERLAIN BY
                                                                                                                                                                                                                                                                                        · ASPHALT PRIME SHALL NOT BE PLACED OVER BASE COARSE PAVEMENT UNTIL:                                                                                                  WATERPROOF MEMBRANE.
                                                                                                                                                                                                                                                                                          - ALL TEST RESULTS HAVE BEEN APPROVED.
                                                                                                                                                                                                                                                                                          - A SUCCESSFUL PROOF ROLL HAS BEEN CARRIED OUT.                                                                                                                      TRANSPORT:
                                                                                                                                                                                                                                                                                          - AS CONSTRUCTED SURVEY HAS BEEN APPROVED.                                                                                                                     ·    ALL CONCRETE IS TO BE TRANSPORTED TO SITE IN AGITATOR TRUCKS.
                                                                                                                                                                                                                                                                                                                                                                                                                                                         ·    CONCRETE NOT PLACED WITHIN ONE HOUR AFTER BATCHING MAY BE REJECTED AT
                                                                                                                                                                                                                                                                                          - ENGINEERS WRITTEN DIRECTION TO PROCEED IS OBTAINED.                                                                                                               THE ENGINEER'S DISCRETION.

                                                                                                                                                                                                                                                                                        ROADWORKS NOTES:                                                                                                                                                      PLACEMENT, COMPACTION AND FINISHING:
                                                                                                                                                                                                                                                                                                                                                                                                                                                         ·    CONCRETE TO BE PLACED IN FORMS BY HORIZONTAL 'CHUTING' NO MORE THAN 3M, CONCRETE
                                                                                                                                                                                                                                                                                       1. THESE DRAWINGS ARE TO BE READ IN CONJUNCTION WITH IPWEAQ & NOOSA SHIRE COUNCIL                                                                                      PUMPING OR KIBBLING.
                                                                                                                                                                                                                                                                                          STANDARDS.                                                                                                                                                     ·    UNDER NO CIRCUMSTANCES SHALL CONCRETE BE INDUCED TO FLOW HORIZONTALLY BY USE OF
                                                                                                                                                                                                                                                                                       2. THESE DRAWINGS ARE TO BE READ IN CONJUNCTION WITH THE LANDSCAPE ARCHITECT'S                                                                                         VIBRATORS.
                                                                                                                                                                                                                                                                                          DESIGN DRAWINGS.                                                                                                                                               ·    ALL CONCRETE SHALL BE PLACED CONTINUOUSLY BETWEEN CONSTRUCTION JOINTS AS DETAILED
                                                                                                                                                                                                                                                                                       3. SEDIMENTATION CONTROL DEVICES TO BE PROVIDED IN ACCORDANCE WITH THE                                                                                                 IN SUCH A MANNER AS TO AVOID 'COLD JOINTS'. CONSTRUCTION JOINTS SHALL BE LOCATED AS
                                                                                                                                                                                                                                                                                          ENVIRONMENTAL MANAGEMENT PLAN.                                                                                                                                      DETAILED ON DRAWINGS OR AS INSTRUCTED IN WRITING BY THE ENGINEER.
                                                                                                                                                                                                                                                                                                                                                                                                                                                         ·    ALL CONCRETE IS TO BE COMPACTED UPON PLACEMENT USING 50mm DIAMETER VIBRATORS.
                                                                                                                                                                                                                                                                                       4. ROAD PAVEMENTS TO BE COMPACTED TO ACHIEVE A MINIMUM DRY DENSITY RATIO (M.D.D.R.) OF
                                                                                                                                                                                                                                                                                                                                                                                                                                                         ·    SLABS AND BEAMS ARE TO HAVE A FILM OF APPROVED ALPHATIC ALCOHOL APPLIED TO THE
                                                                                                                                                                                                                                                                                          100% STD.                                                                                                                                                           SURFACE,
                                                                                                                                                                                                                                                                                       5. ALL CONDUITS TO BE IDENTIFIED BY BRASS PLAQUES ON KERB AND CHANNEL AS PER IPWEAQ                                                                                    DIRECTLY AFTER SCREEDING, PRIOR TO FLOATING, REGARDLESS OF WEATHER CONDITIONS.
                                                                                                                                                                                                                                                                                          STANDARD DRAWING R-0160 U.N.O.                                                                                                                                 ·    ADDITIONAL PROTECTIVE MEASURES SUCH AS CHILLED MIX WATER, SHADING PLACEMENT AREAS,
                                                                                                                                                                                                                                                                                       6. WHERE CONCRETE DRIVEWAYS ABUT KERB & CHANNEL, THE CONTRACTOR IS TO CONSTRUCT A                                                                                      WIND BREAKS, ETC. MAY BE REQUIRED BY THE ENGINEER IF PLACING CONCRETE DURING
                                                                                                                                                                                                                                                                                          COMMERCIAL CROSS-OVER IN ACCORDANCE WITH IPWEAQ STANDARD DRAWING RS-051.                                                                                            UNUSUALLY HOT, DRY OR WINDY CONDITIONS.
                                                                                                                                                                                                                                                                                       7. PROVIDE ENERGEX AND TELSTRA CONDUITS UNDER DRIVEWAYS & FOOTPATHS (IF REQUIRED).                                                                                ·    ALL CONCRETE SLABS SHALL BE STEEL TROWEL FINISHED UNLESS NOTED OTHERWISE.
                                                                                                                                                                                                                                                                                       8. ALL WORK IS TO BE COMPLETED IN ACCORDANCE WITH ALTA PROJECTS STANDARD                                                                                          ·    BROOM FINISHING, WHERE SPECIFIED, SHALL BE CARRIED OUT AFTER STEEL TROWEL FINISHING.
                                                                                                                                                                                                                                                                                                                                                                                                                                                         ·    ALL CONCRETE TO BE ORDERED AND PLACED AT 80MM SLUMP UNLESS NOTED OTHERWISE.
                                                                                                                                                                                                                                                                                          SPECIFICATION.                                                                                                                                                 ·    NO WATER TO BE ADDED ON SITE UNLESS APPROVED BY THE ENGINEER.
                                                                                                                                                                                                                                                                                       9. ROADWORKS AND DRAINAGE SET-OUT INFORMATION IS AVAILABLE FOR THE CONTRACTOR VIA
                                                                                                                                                                                                                                                                                          COMPUTER MODEL PROVIDED BY ALTA PROJECTS. HOWEVER, ALTA PROJECTS ACCEPTS NO                                                                                          TESTING:
                                                                                                                                                                                                                                                                                          RESPONSIBILITY FOR INCORRECT SETOUT FROM THE DATA PROVIDED. CONTRACTOR SHOULD                                                                                  ·    ALL CONCRETE TESTING IS TO BE CARRIED OUT BY A NATA REGISTERED LABORATORY,
                                                                                                                                                                                                                                                                                          CONFIRM THE CORRECT COORDINATES WITH THE HORIZONTAL CURVE DATA PROVIDED ON                                                                                          IN STRICT ACCORDANCE WITH THE REQUIREMENTS OF AS 1012.
                                                                                                                                                                                                                                                                                          THESE DRAWINGS.                                                                                                                                                ·    THE FOLLOWING TESTING SCHEDULE IS TO BE ADOPTED IN ADDITION TO THE REQUIREMENTS
                                              -                                                                                                                                                                                                                                                                                                                                                                                                               OF THE MANUFACTURER'S QUALITY ASSURANCE PROGRAM :
                           APPROVED PLAN                                                                                                                                                                                                                                                GENERAL NOTES:
                                                                                                                                                                                                                                                                                                                                                                                                                                                              - A MINIMUM OF ONE TEST (3 CYLINDERS) TO BE TAKEN FROM EACH ELEMENT CAST ON ANY
                                                                                                                                                                                                                                                                                                                                                                                                                                                              GIVEN DAY (EG. COLUMNS, FOOTINGS, ETC)
                              OPW22/0166                                                                                                                                                                                                                                                1. NOT ALL SERVICES HAVE NECESSARILY BEEN RECORDED AND SHOWN ON THE DRAWINGS. THE
                                                                                                                                                                                                                                                                                                                                                                                                                                                              - A MINIMUM OF ONE TEST (3 CYLINDERS) TO BE TAKEN FROM EACH CONCRETE STRENGTH
                                                                                                                                                                                                                                                                                                                                                                                                                                                              GRADE CAST ON ANY GIVEN DAY.
                           NOOSA COUNCIL                                                                                                                                                                                                                                                   CONTRACTOR IS RESPONSIBLE TO LIAISE WITH THE RELEVANT SERVICE AUTHORITY PRIOR TO                                                                                   - A MINIMUM OF ONE TEST (3 CYLINDERS) TO BE TAKEN FROM EACH 50m³ OR PART THERE OF
                          18 NOVEMBER 2022                                                                                                                                                                                                                                                 COMMENCEMENT OF CONSTRUCTION TO DETERMINE THE LOCATION AND LEVEL OF ALL
                                                                                                                                                                                                                                                                                           EXISTING SERVICE UTILITIES. THE CONTRACTOR SHALL BEAR THE COST OF ANY DAMAGE TO                                                                               ·
                                                                                                                                                                                                                                                                                                                                                                                                                                                              CAST ON A GIVEN DAY FOR EACH STRENGTH GRADE.
                                                                                                                                                                                                                                                                                                                                                                                                                                                              ALL SAMPLES ARE TO BE TAKEN FROM THE AGITATOR, ON SITE.
                                                                                                                                                                                                                                                                                           EXISTING SERVICES.                                                                                                                                            ·    IF WATER IS ADDED ON SITE, WITH THE ENGINEER'S PERMISSION, SAMPLES FOR TESTING
                                                                                                                                                                                                                                                                                                                                                                                                                                                              SHALL BE TAKEN AFTER THE ADDITION OF WATER.
                                                                                                                                                                                                                                                                                         2. THE CONTRACTOR SHALL OBTAIN ALL AS-CONSTRUCTED SURVEY FOR ROADWORKS, DRAINAGE
                                                                                                                                                                                                                                                                                            WORKS, SERVICE CONDUITS ETC. PRIOR TO BACKFILLING. ALL SURVEY TO BE CARRIED OUT BY A                                                                              CURING:
                                                                                                                                                                                                                                                                                                                                                                                                                                                              ALL CONCRETE IS TO BE CURED BY AN APPROVED METHOD FOR A MINIMUM OF 28 DAYS AFTER FINISHING.
                                                                                                                                                                                                                                                                                            LICENCED SURVEYOR TO THE REQUIREMENTS OF THE SHIRE ENGINEER.
                                                                                                                                                                                                                                                                                                                                                                                                                                                         ·    CURING METHOD IS TO BE APPROVED BY THE ENGINEER PRIOR TO CONCRETE PLACEMENT AND SHALL
                                                                                                                                                                                                0      20           40              60             80           100m                                                                                                                                                                                          GENERALLY CONSIST OF ONE OR A COMBINATION OF THE FOLLOWING METHODS :
                                                                                                                                                                                                                                                                                         3. SURFACE LEVELS SHOWN ARE INTERPOLATED FROM A SPOT LEVEL SURVEY, THEREFORE                                                                                          - CONTINUOUS WATER PONDING.
                                                                                                                                                                                                                                                                                            DESIGN LEVELS BASED ON THIS INFORMATION MAY BE VARIED BY THE SUPERINTENDENT ON                                                                                     - COMPLETE ENCASEMENT IN A WATERPROOF FILM (EG. POLYTHENE).
                                                                                                                                                                                                            SCALE 1:1000 A1, 1:2000 A3                                                      SITE.                                                                                                                                                              - APPLICATION OF AN APPROVED CURING COMPOUND.


     NOTE: ONLY DRAWINGS MARKED "FOR CONSTRUCTION" AND BEARING AN ORIGINAL SIGNATURE SHALL BE USED FOR CONSTRUCTION Design:
                                                                                                                    PURPOSES.
                                                                                                                            PBL                                                                                                                                                                                                                           PROJECT:                                                                                                                                        DRAWING TITLE:
                                                                                                                                                                                                                                                                                               Brah 101 pty ltd t/a Alta Projects
                                                                                                                                                                             Drawn: PBL
                                                                                                                                                                                                                                                                                               A.B.N. 91 611 354 511                                                                                                                                                                                      ROADWORKS SITE PLAN AND NOTES
                                                                                                                FOR APPROVAL                                                  Date: JUNE 2021                                                                                                  26 Memorial Avenue, Cotton Tree                            PROPOSED RESIDENTIAL DEVELOPMENT LOT 9
                                                                                                                               NOT FOR CONSTRUCTION                                                                                                                                            PO Box 559, Cotton Tree, QLD, 4558                                                                                                                                                                                                                Revision    Sheet
                                                                                                                                                                       Checked:. . . . . . . . . . .
                                                                                                                                                                                                                                                                                               Tel (07) 5475 4125 Fax (07) 5479 1607                      at SERENITY CLOSE, NOOSA                                                                                                                        DRAWING No:
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               A6107/22/L9/R01     A        1 of 1
                                                                                                                            STEVEN HARRISON
                                                                                                                                                                                                                                                                                               Email: [email protected]
       A    20/06/2022   ISSUE FOR APPROVAL                                            PBL               S.H.
                                                                                                                .......................
                                                                                                                    DIRECTOR APPROVAL                                            Datum AHD
                                                                                                                                                                                                                                                                                               Web: http://www.alta.net.au                                for CAPE BOUVARD DEVELOPMENTS
      REV    DATE                                 DESCRIPTION                          BY             CHKD          RPEQ - 4784                                                  A1 SHEET SIZE          FILENAME : a6107-22-L9-R01.dwg - DATE : 20/6/22 - 12:36pm - XREF's: X-BASE; X-ARCH LOWER GROUND; X-ARCH UPPER GROUND; X-ARCH STG4B LANDSCAPE; X-ARCH STG4B LANDSCAPE LEVELS; X-ARCH STG4B LEVEL1; X-ARCH STG4B BASEMENT; X-SURVEY; X-LANDSCAPECouncil Ref:
                                                                                                                                                                                                                                                                                                                                                                                                                                                      LOWER; X-LANDSCAPE UPPER; 2017008 landscape base; H-Approved-SH; H-Checked-SH


Document Set ID: 22166551
Version: 1, Version Date: 08/11/2022

Used in these records

About this file

File size
12.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Amended Approved Plans - OPW22-0166.pdf · 12.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.