Request to change development approval
Attached to the e-mail Request to change a development approval - MCU14/0102.05.
2.1 Change to Decision Notice
It is requested that Council re-insert reference to ‘Retail Business Type 6 Hardware store’ in Section
2, Decision Details in the Change to an Existing Approval decision notice.
2.2 Change to Conditions
Material Change of Use Conditions
Condition 2 currently reflects the endorsed plans of development. It is requested that the condition
be amended to reflect the new proposal plans as follows:
Plan No. Rev. Plan/Document Name Date
DA-01-01 V Site layout, prepared by Powe 17/02/2017
Architects
DA-01-02 J Site – Roof & Signage Location Plan, 25/02/2016
prepared by Powe Architects
DA-02-01 G Floor Plans, prepared by Powe 25/02/2016
Architects
DA-02-02 E Floor Plans, prepared by Powe 17/02/2017
Architects
DA-03-01 G Elevations, prepared by Powe 15/11/2016
Architects
DA-03-02 G Sections, prepared by Powe Architects 15/11/2016
SD-01 F Landscape Concept Plan and Section, 05/08/2015
prepared by DFS Group
SD-02 F Landscape Concept Plan and 05/08/2015
Elevation, prepared by DFS Group
SD-03 F Design Intent & Suggested Plan 05/08/2015
Palette, prepared by DFS Group
SK07 P8 Prop. Building Elevations & 22/02/2016
Perspectives, prepared by Verve
Building Design & Concepts
3.0 Sustainable Planning Act 2009
The Sustainable Planning Act 2009 permits an assessment manager to consider a change to an
approval where the change is a “permissible change”. The definition of "permissible change" is as
follows:
“1) A permissible change for a development approval, is a change to the approval that would not-
(a) result in a substantially different development; or
(b) if the application for the approval were remade including the change-
(i) require referral to additional concurrence agencies;
(ii) for an approval for assessable development that previously did not require impact assessment
- require impact assessment; or
(c) for an approval for assessable development that previously required impact assessment - be likely,
in the responsible entity’s opinion, to cause a person to make a properly made submission
objecting to the proposed change, it the circumstances allowed; or
(d) cause development to which the approval relates to include prohibited development”
In relation to the above definition, it is relevant to note the following: