001 ECM_22816452_v8_Decision Notice - Other Change - Council Meeting Decision 132005 638 03

Attached to the e-mail Representations to Development Approval (132005_638_03) - Material Change of Use -Expansion of Special Purpose (Waste Disposal &.

of 24

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

                 26.    The sites supervising engineer must ensure that the sediment and erosion control
                        measures have:
                        a.      Been duly designed by an RPEQ or CPESC and constructed in accordance with
                                "best practise" methods,
                        b.      Been revised by an RPEQ or CPESC to address the issues raised by changes in
                                the projected construction schedule and/or methods,
                        c.      Been revised to address predicted rainfall events, and
                        d.      Achieve the desired environmental outcomes.
                 27.    The erosion and sediment control measures must be designed, installed, and
                        maintained in accordance with the current best practice standards.
                 28.    Certification must be submitted to Council from a qualified person* which certifies that
                        the subject works have been undertaken in accordance with the Sediment and Erosion
                        Control Plan.
                        *(Refer to Advisory Note)
                 29.    A Vegetation Removal & Fauna Management Plan must be prepared by a suitably
                        qualified person to mitigate the risk of clearing impacts to all native fauna and adjoining
                        vegetation. The sequential clearing requirements specified under the Nature
                        Conservation (Koala) Conservation Plan 2017 are to be adopted in the Plan.
                 30.    A suitably qualified person must be engaged to manage flora and fauna prior and during
                        clearing to ensure works are carried out in accordance with the Vegetation Removal and
                        Fauna Management Plan (required as part of this approval) and the Nature
                        Conservation Act 1992.
                 31.    Certification must be submitted to Council from a qualified person* which certifies that
                        the subject works have been undertaken in accordance with the approved Vegetation
                        Removal & Fauna Management Plan.
                        *(Refer to Advisory Note)
                 32.    An Arborist Assessment must be completed by a suitably qualified and experienced
                        Level 5 consulting arborist of the trees likely to be impacted along the edge of the
                        earthworks footprint and any recommendations made are adopted. Disturbance to
                        retained remnant vegetation and tree root protection zones of large, retained habitat
                        trees (trees with dbh >300mm) that occur next to the clearing area is to be avoided as
                        far as practicable.
                 33.    Certification must be submitted to Council from a qualified person* which certifies that
                        the subject works have been undertaken in accordance with the approved Arborist
                        assessment.
                        *(Refer to Advisory Note)
                        Bushfire management
                 34.    A bushfire hazard assessment must be prepared in accordance with the SPP 2019
                        Guidelines: Natural hazards Risk and Resilience Bushfire 2019 and the QFES Bushfire
                        Resilience Community 2019 for the development.
                 35.    The development must be carried out in accordance with the requirements and
                        recommendations of the Bushfire Management Plan. Certification must be submitted to
                        Council from a qualified person* which certifies that the subject works have been
                        undertaken in accordance with the approved Bushfire Management Plan.
                        *(Refer to Advisory Note)
                 36.    A copy of the Bushfire Management Plan must be provided to the nearest fire authority



                                                                                                         Page 5 of 24
Document Set ID: 22816452
Version: 8, Version Date: 22/02/2024
Log in to download the original file

001 ECM_22816452_v8_Decision Notice - Other Change - Council Meeting Decision 132005 638 03.pdf · 1.0 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.