Attachment 2 - Holland Traffic Consulting · MCU13/0251
Attached to the e-mail MCU13/0251 - Peregian Village Market response to information request.
settings of that package. The analysis indicated operation well below capacity with degrees of saturation
as follows (full movement summary output from the analysis is attached at Figures 2 and 3):
2024 Background (with high 3%pa growth rate) Degree of Saturation
AM peak 0.71
PM peak 0.56
Using the predictions of traffic generation for the development outlined in our 13 December 2013 report
(conservatively assuming all generated traffic is new traffic, without any discounts for drop-in traffic),
including an allowance for the full number of accommodation units that for part of the existing approval,
predicted 2024 peak hour traffic flows at the Heron Street roundabout with the development fully
operational are as follows:
2024 AM peak with development (high growth):
David Low Way
16 0 828 63
0 51
Hotel access 0 3 Heron St
0 90
3 625 92 57
David Low Way
2024 PM peak with development (high growth):
David Low Way
12 5 607 66
1 67
Hotel access 1 4 Heron St
3 137
13 637 105 85
David Low Way
Capacity analysis of the existing roundabout has been undertaken using the Sidra package, with the
same assumptions as previous. The analysis again indicates operation well below capacity with degrees
of saturation as follows (full movement summary output from the analysis is attached at Figures 4 and 5,
and results of analysis without the development are included in brackets for comparison):
Page - 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 2 - Holland Traffic Consulting.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.