Original source · versioned page text
Proposal plans
Plans and drawings: the text below has words only, no drawings.
Original PDF page 2, section 3. The text section number identifies this passage in the reader.
0.
. 00"
.2
48.8
11
SP197517
12
0.
2
61
5
5
44
9.
0.
0
4
12
90
27
grade
11
0
0.
9.
SHEET INDEX - WORKING DRAWINGS A1 COM
P t y
90
55
7
11
L
9.
W
Sheet No. Sheet Name Rev Description Date
ANDS
35
at
12
e
1 COVER
r
CONTAINER
0.
TENANCY 06G.F TENANCY 07G.F TENANCY 08G.F TENANCY 09G.F TENANCY 10G.F
p
25
70
LAYDOWN
2 Site Plan
lo
G.F : 98.4 m2 G.F : 97.2 m2 G.F : 66.4 m2 G.F : 77.2 m2 G.F : 76.8 m2
t
12
RETAI
26
27
28
t
12
e
LANDSCAPING
CAPI
FFL 120,500 FFL 120,500 FFL 120,500 FFL 120,500 3 Parking Plan
PDW
FFL 120,500
0.
d
RETAI
12
0.
Ba
44
80
fro
4 Floor Plans A
0.
19
ck
20
81
NING
m
5 Floor Plans A
o
TENANCY 11G.F
NING
f
DB
NG
l a
G.F : 77.8 m2 6 Elevations
12
Y
yb
WALL
D
PROPOSED UNDERGROUND
0.
11
FFL 120,500
ac
7 Floor Plans B
T
MH WATER TANK REF. CIVIL ENG.
WALL
a
22
e
9.
11 .02
k
n
ls
11
06
8 Floor Plans B
d
8.
ke
t
H o l d i n g s
11
11
r
9
12
s
90
ap
r
ur
8.
116.07
11
5
9 Floor Plans B
b
0
.6
96
fa
.6
7.
l
11
21
o
C O U R T
116
3
3
3
10 Floor Plans B
c
tt
24
PROPOSED
e
9.
7.
23
e
12 .50
91
MH
d
f
77
11 Elevations
e
12
0.
12
fro
atu
SP197517
11
11
INDUSTRIAL A
H
52
0
EMT D
BIORE
12 Elevations
0.
9.
ATCH TENTION B
m
2
1
9.
r
10
62
es
20.4
.
43
8m C
DB
13 Floor Plans C
11
11
9.
9.
TENANCY 01G.F
Y
14 Floor Plans C
33
DENO
DSIL 118.5 el RL1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.