Council archive · source document
Referral Agency Response - Planning RAP24 0049 (As Published) · RAP24/0049
Officer: Matthew Pinese
Direct Telephone: 07 5329 6245
Our Reference: RAP24/0049
Your Reference: n/a
6 March 2026
Cadcon Surveying & Town Planning
PO Box 5774
MAROOCHYDORE BC QLD 4558
[email protected]
Dear Sir/Madam,
Referral Agency Response
Planning Act 2016
I refer to your application and advise that Council, as a referral agency for the application,
completed its assessment of the application on 27 February 2026. You are advised that
Council requires conditions to be attached to any development approval. The conditions are
listed below.
1. APPLICATION DETAILS
Application No: RAP24/0049
Street address: 24 Mossman Ct, Noosa Heads Qld 4567
Real property description: Lot 152 N 21859
Planning Scheme: Noosa Plan 2020 (25 September 2020)
2. TYPE OF DEVELOPMENT
The applicant seeks the following type of referral agency response:
• Referral Agency Response for an Addition to Dwelling House (Horticultural feature with
the rear setbacks)
3. REFERRAL AGENCY CONDITIONS
PLANNING
When Conditions must be Complied With
1. Unless otherwise stated, all conditions of this Decision Notice must be complied with
prior to the use of the building commencing, and then compliance maintained at all times
while the use continues.
Currency Period for Referral Agency Response
2. This Concurrence Agency response is no longer valid if works have not substantially
started within 4 years of the date of this notice, unless otherwise extended in writing by
Council.
ABN 97.969.214.121 PO Box 141
noosa.qld.gov.au Tewantin QLD 4565
[email protected] 07 5329 6500
Page 1 of 4
Document Set ID: 24574747
Version: 4, Version Date: 06/03/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 3 pages
Page 2
Approved Plans
3. Development authorised by this approval must be undertaken generally in accordance
with the Approved Plans listed in the tables below. The plans must be amended to
incorporate the amendments listed within the table below and resubmitted to Council
prior to the issue of any Development Permit for Building Works.
Plan No. Rev. Plan/Document Name Date
2207 001 A Locality Plan prepared by Hong Henwood 14/06/2023
(Annotated by Noosa Council)
2207 110 A Proposed Ground Floor Plan prepared by Hong 14/06/2023
Henwood (Annotated by Noosa Council)
2207 111 A Proposed First Floor prepared by Hong Henwood 14/06/2023
(Annotated by Noosa Council)
2207 112 A Proposed Roof Plan prepared by Hong Henwood 14/06/2023
(Annotated by Noosa Council)
2207 613 A Horticultural Feature prepared by Hong Henwood 14/06/2023
(Annotated by Noosa Council)
Lighting Amenity
4. No flood lighting must be used on site. Any vertical illumination resulting from direct,
reflected or other incidental external lighting emanating from the site must not exceed 8
lux when measured at any point 1.5 metres outside the boundary and at any level from
ground level upward.
Environment
5. Sediment or any other material including building materials or waste products must not
be deposited or released into the road reserve, stormwater drain or adjacent properties.
6. Existing trees on the site must be retained, except where required to be removed to
accommodate the approved dwelling. In this regard, the removal of vegetation must not
extend beyond 3 metres of the building footprint.
7. Existing vegetation in the road reserve must be retained, unless written authorisation
from Council is granted for the clearing.
Flood Immunity and Earthworks
8. The minimum floor levels of all new habitable rooms must be at least 300 millimetres
above the Defined Flood Event – 1% AEP.
9. The disturbance and release of Acid Sulphate Soils must be avoided by:
a. Undertaking an Acid Sulfate Soils investigation and soil analysis pursuant to the
National Acid Sulfate Soils Guidance.
b. not excavating or otherwise removing soil or sediment containing ASS;
c. not permanently or temporarily extracting groundwater that results in the aeration
of previously saturated ASS; and
d. not undertaking filling on land at or below 5 metres AHD that results in:-
i. actual ASS being moved below the water table; or
ii. previously saturated ASS being aerated.
Page 2 of 4
Document Set ID: 24574747
Version: 4, Version Date: 06/03/2026
Page 3
Where potential or actual Acid Sulfate Soil is identified, all works must be caried out in
accordance with an Acid Sulfate Soils Management Plan prepared by a qualified
person*.
*(Refer to Advisory Note)
Stormwater Drainage
10. Stormwater runoff from the development must be discharged without causing scour or
damage to the subject site or any adjoining property.
Damage to Services and Assets
11. Any damage caused to existing services and assets because of the development works
must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and
assets must first be referred to the relevant service authority for approval.
4. REASONS FOR REFERRAL AGENCY’S DECISION
The proposal is subject to specific built form parameters outlined in The Noosa Plan.
5. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form
part of the referral agency conditions:
Infrastructure Charges
1. All developments and/or changes to existing developments may require payment of
“Infrastructure Charges” (as applicable) in accordance with Council’s “Charges
Resolution” made pursuant to the planning legislation and regulations current at the time
of issue. For further information, please refer to: https://www.noosa.qld.gov.au/Planning-
and-Development/Development-tools-and-guidelines/Infrastructure-Charges
Sustainability
2. Council encourages sustainable and energy efficient building design for all development.
including the use of sustainable building materials, energy efficient fittings, solar hot
water, photovoltaic systems (including the use of inverter/charges), solar panels, water
saving devices and rainwater harvesting.
Qualified Person
3. For the purpose of preparing an Acid Sulfate Soil and Groundwater Management Plan,
a qualified person is considered to be either:
a) a Registered Professional Engineer of Queensland (RPEQ); or
b) a soil scientist with a minimum of 5 years experience in the field of acid sulfate
soils.
Page 3 of 4
Document Set ID: 24574747
Version: 4, Version Date: 06/03/2026
Page 4
6. REPRESENTATIONS ABOUT REFERRAL AGENCY RESPONSE
The applicant may make representations to Council about this referral agency response at
any time before the application is decided pursuant to section 30 of the Development
Assessment Rules.
Yours faithfully
Matthew Pinese
Development Planner | Development Assessment
Development & Regulation
Enc: Approved Plans/Documents
Page 4 of 4
Document Set ID: 24574747
Version: 4, Version Date: 06/03/2026
Used in these records
Referral Agency Response - Planning RAP24 0049 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 105 KB (small file)
- File type
No other editions are linked here.