Council archive · source document
Referral Agency Response - Planning RAP24 0049 (As Published) · RAP24/0049
Where potential or actual Acid Sulfate Soil is identified, all works must be caried out in
accordance with an Acid Sulfate Soils Management Plan prepared by a qualified
person*.
*(Refer to Advisory Note)
Stormwater Drainage
10. Stormwater runoff from the development must be discharged without causing scour or
damage to the subject site or any adjoining property.
Damage to Services and Assets
11. Any damage caused to existing services and assets because of the development works
must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and
assets must first be referred to the relevant service authority for approval.
4. REASONS FOR REFERRAL AGENCY’S DECISION
The proposal is subject to specific built form parameters outlined in The Noosa Plan.
5. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form
part of the referral agency conditions:
Infrastructure Charges
1. All developments and/or changes to existing developments may require payment of
“Infrastructure Charges” (as applicable) in accordance with Council’s “Charges
Resolution” made pursuant to the planning legislation and regulations current at the time
of issue. For further information, please refer to: https://www.noosa.qld.gov.au/Planning-
and-Development/Development-tools-and-guidelines/Infrastructure-Charges
Sustainability
2. Council encourages sustainable and energy efficient building design for all development.
including the use of sustainable building materials, energy efficient fittings, solar hot
water, photovoltaic systems (including the use of inverter/charges), solar panels, water
saving devices and rainwater harvesting.
Qualified Person
3. For the purpose of preparing an Acid Sulfate Soil and Groundwater Management Plan,
a qualified person is considered to be either:
a) a Registered Professional Engineer of Queensland (RPEQ); or
b) a soil scientist with a minimum of 5 years experience in the field of acid sulfate
soils.
Page 3 of 4
Document Set ID: 24574747
Version: 4, Version Date: 06/03/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Referral Agency Response - Planning RAP24 0049 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 105 KB (small file)
- File type
No other editions are linked here.