09/0731 - Operational Works - (Jetty) [As Published] · 142009.731
sunshine Coast Checklist - Applications Involving Land Regional Council Development & Land Use Sections IDAS APPLICATION This checklist should be used for any !DAS application. Please check each of the following items before accepting an application at the counter. 1. APPLICATION FORMS 1.14 Form PartA 4.1.1 Ensure that the form is fully completed and is a current version. / 1.1.2. In the case of an MCU or Op Works below the high-water mark, owner's consent is required. 1.1.2.1 If there are multiple owners, the consent of each owner is required. 1.1.2.2 if the owner of the land is a company, either ACN No, Company name clearly indicated by signatory) or Company Seal required. 1.2 Form4 Part B-R Supporting Information 1.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B-R are attached. ~ 2. ~1DAS ASSESSMENT CHECKLIST e 2.1 Ensure that relevant sections have been checked and/or completed with regard to referrals 1.1.2.1 Ensure that each of Forms B-R which are attached are fully completed. 2.2 Ensure correct parts of Form 1 are provided where required (ie most common are Part J for Clearing Vegetation, Part N for Contaminated land and Part P for Prescribed Tidal Works) NK) NLS 3. ENVIRONMENTALLY RELEVANT ACTIVITIES 3.1. Ensure that Part G is completed if EPA referral is required. 3.2. Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application fee is paid and recorded on the application. (Refer Environmental Health for fees) 4, FORM 2-REQUEST TO CHANGE APPROVAL 4.1. Ensure that relevant items have been checked and/or completed including information regarding applicant details along with owners consent if not current owner of land as shown on Council records. If over multiple properties on one or more sites, consent of Body Corporate is required. 5. PLANS } 5.1 Ensure that generally at least 6 sets of the Plan of Development (5 for Reconfiguration and Operational Works) accompany the application. In addition ensure that each set is complete. le 5.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and is a unbound. 6. SUPPORTING INFORMATION 6.1 Ensure that generally at least 6 copies of any report accompanies the application (5 for Reconfiguration and Operationa! Works). if the application is accompanied by a covering letter, ensure that it is capable of reproduction. 6.2. In the case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound. r——t 6.3 Additionally an electronic version is preferred where possible for ease of electronic record keeping - 7. FEE. . . : : Tes L 7.1 Ensure that the application fee, as determined from the Council's adopted scale of fees, a accompanies the application or has been paid. ¢ Land Use MCU applications; MCU applications including a Lot reconfiguration, Prescribed Tidal Works; Operational Work if Jetty or if including Landscaping. ¢ Land Development Lot Reconfiguration applications and Operational Work not including ‘Landscaping Please DO NOT leave the application at the counter and DO NOT deliver the application to Records. NSC g:Manduse\administrative processes\application checklist.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 15 pages
Page 2
ADAS REFERRAL AGENCIES TRIGGERS (Most frequent referrals) ‘Please refer to IDAS Checklist for complete list YES” COMMENT Please lick v Department of Main Roads (Concurrence or Advice) e State Controlled Road Dept Natural Resources & Water e Acid sulphate soils (Advice) ¢ Clearing of native vegetation on freehold land (Concurrence) Environmental Protection Agency (Concurrence) ¢ Contaminated land * Environmental Management/Contaminated Land Register * UXO * Land recently used as a ‘notifiable activity’ * — Industrial land changed to sensitive uses (eg schoo!) ¢ Coastal related development. « Koala habitat e Wetlands (Advice only) ¢ Environmentally Relevant Activity (for non-devolved Council as EPA) Queensland Transport (Concurrence) ° Railway . Public Passenger Transport Energex or other responsible entity (Advice) . Electricity Easements/Substations DIP (Concurrence) . SEQ Regional plan VARIOUS < ° Conservation estate (Advice) ‘OTHER STATE AGENCIES + TRIGGERS ws nyt he. ), OWNER’S CONSENT (State land) : a ait: Department of Natural Resources and Mines EPA For further clarification refer to IDAS Guides prepared by Department of infrastructure & Planning. NSC g:\Manduse\administrative processes\application checklist.doc
Page 3
a.
INTEGRATED PLANNING ACT 1997 Part A, Version 3.L-aMaich 2008
Tea = , = " —
aS (ihe Agen
‘ph IMEIDAS Apion Form
cation, By ia is apatite Appicort
e 3
Pitot pte 9 ae ers gon anita Bal te ECE 3
Company/organisation name (if applicable) [Pite-t Ply Ltd tfa Noosa Jetty Builders
Individual appficantiContact person (if there is more than ane applicant, provide additional applicant details an an attachment to this form)
Title [Mrs First name Lastname |Reed
Postal address [Po Box 299, Noosaville. QLD 4566 |
Contact telephone number | (07) 5474 3480 | Mobile phone number 0408 137 526
Facsimile number (07) 5474 3480 e-mail address [email protected]
Be Te Wagon wick re compen popend me eee
4. Identify the premises by completing Table A, or Table B and/or Table C (ensure adequate information is given to identify the premises)
Table A {fthe application is for a mobile and temporary Environmentally Relevant Activity (ERA), complete Table A only. Then go to Q2.
c
| 1
OR
TableB Street address for the premises (tick applicable box/es below and insert property description in the table. Identify each lot in a separate row, )
ils othe promis
ta
() (CJ Street address Hot on plan for the premises (Appropriate for most applications including building applications): OF
(ji) [XJ Street address /lot on plan for the land adjoining or adjacent to the premises (Appropriate for development in water e.g. jelly,
pontoon etc} (Note: Loton plan detaifs may be oblained from tile decuments, a ‘Rate’ notice, or from the local government.)
Te ! == [eoten plan description
So ee ee ee Ben iipe and
Ss ae ee oie be Plan Nuinber a “
[1 9 The Anchorage, Noosaville QLO 4566 810 RP910419 Sunshine Coast Regional Councit
AND/OR
TableC Coordinates and/or a map of the premises (Appropriate for development in remote areas, over part of a {ot, in water (e.g. channel dredging in Moreton
Bay) etc.}
iates:
Li]
2. _ Identify if any of the following apply to the premises by completing Tables D, E, or F. (Note: in most instances, the premises will not involve any of
the following characteristics, however some applications may involve one or more of these characteristics - complete only if applicable)
Page 4
4 ‘
INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008
Table D Complete if the premises are adjacent to or associated with a water body, watercourse or aquifer (e.g. river, creek, lake, canal)
fer (own a se
ir
3. Indicate the total area of the premises on which the development is proposed: (Note: The total area may include tand both above and below water)
TT +
Wistinng use of ihe prennses: ha ie Tee rf
O 4. Current use/s of the premises: (e.g. vacant land, house, townhouses, apartment building, shop, service station, school, sugar cane farming etc.)
[1 | Vacant Land ‘|
5, _ Are there any existing easements on the premises? (e.g. for vehicutar access, electricity, overland flow, water etc.)?
&M No o Yes - Ensure the type, location and dimensions of each easement are included in plans, submitted wah the application
er
apartment building, 30 lot residential subdivision, a bore, aquaculture)
oe
Timber jetty
7. Does the poposal include new buildings or operational work (including any services) on the premises?
(J) No 2) Yes - Ensure the nature, location and dimensions of the proposed works are included in plans, submitt
Resource eh feabiey | i baa he mee etiora ery MeO oe
8. Does the application involve taking or interfering with a State resource and therefore require a resource entitlement? (e.g. the application
involves State fand (leased and freehold), declared Fish Habiat areas, taking quarry material, taking or interfering with water under the Water Act 2000, etc.)
O ) No - Goto Q9 oO Yes - Complete Table G - provide details for each evidence required on a separate row, if applicable. Evidence of resource
allocation or entitlement must be submitted with the application. You do not need to answer Q9 - go to the next section.
ed with the application
EI TT a ETE
Complete Table H for applica’ use; reconfiguration of a lot; work on land below high-water mark and
not within a canal as defined under the Coastal Protection and Management Act 1995: or work an rail corridor land defined under the
Transport Infrastructure Act 1994 - provide details for each owner on a Separate row, ar an an attachment to this form if applicable.
bs e C premises:ow te é
Michelle Neylan VK,
1 Clo PO Box 299, 9 The Anchorage, Noosaville. QLD 4566 04/06/2009
Noosaville 4566 :
* Owner's signature cannot be provided on the form if you intend to submit the application etectronically. Owner's consent must be provided to the assessment manager on an
attachment containing appropriate written documentation of the ‘owner's consent. If the owner is a company, $127 of the Corporations Act 2007 ({Cwealth) detatis how a
company may sign as owners. Templates for the provision of owner's consent are available on the IPA website .
Table |
04-Jun-2009
Page 5
“
Part A, Version 3.1, 3 March 2008
INTEGRATED PLANNING ACT 1997
2 Checklist 04-Jun-2009 | over the counter
3 John Norden Plans 04-Jun-2009 | over the counter
iPortabl Service Leave {P levy (Appice “Ty carton Dan avd Conevucton work tafied over $80,000 omy) ee ee
40. The Portable Long Service Leave Levy {PLSL} is not applicable to this application if any of the following apply: ( Tick box if applicable)
(7 the application seeks a preliminary approval only;
{71 the application is not for building and construction work under the Building and Construction Industry (Portable Long Service
Leave) Act 1991, section 3AA {e.g. the application is only for a change of use. or for the following types of work carried out solely for
farming purposes: land clearing, site preparation, earthworks, fences, fodder harvesting, clearing of encroaching vegetation, clearing of
regrowth, thinning vegetation or controlling weeds or pests);
[X] all costs, that relate to the work both directly and indirectly, are less than $80,000, inclusive of GST; or
(C1 the work is being carried out under an owner-builder permit issued under the Queensland Building Services Authority Act 1991 -
Complete and submit a QLeave Notification and Payment Form (no payment required if ovmer-builder permit number stated). The receipted form must be
sighted by the assessment manager before a development permit can be given.
11. Ispayment of a PLSL levy applicable to this application? (Refer to Q10.and the Advice below for more information}?
oO BQ No - Endof Part A
(1 Yes - Answer Q12 betow
OFFICE USE ONLY (For use by the Assessment Manager / Private Certifier} (Optional)
Fee ($) Date received Reodhing oftea’s Reference
NOTIFICATION OF ENGAGEMENT OF PRIVATE CERHFIER’
Cs
To: ‘ouncil. | have been engaged as the private cettifier for the building work referred to in this application.
{1
Privacy Statement
The information collected on Form 1 will be used by the Department of Infrastructure and Planning (DIP) in accordance with the processing and assessment of your Application.
Your persona! details will not be disclosed for a purpose outside of the IDAS process, except where required by legislation (including the Freedom of information Act 1992) or as
requited by Parliament. This information may be stored in a DIP database. The information collected wil be retained as requited by the Public Records Act 2002.
Advice for completing Part A
General advice
e Part A of IDAS Development Application Form 1 must be completed and accompany all development applications. The applicant is responsible
for answering all questions fully and correctly, unless following a response there is a statement to go directly to another question. The
Assessment Manger may refuse to receive an application that is not property made.
le The IDAS Assessment Checklist must also be completed for all development applications, other than those requiring assessment against the
Building Act 1975 only, i.e. those applications requiring the completion of Parts A and B only.
Applicant details
je If the applicant is a company or organisation, a contact person must be nominated. The applicant's signature is not required to be provided
under the IPA.
Page 6
INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008
Details of the premises
The term ‘premises is defined by the IPA, schedule 10 to mean a building or other structure, and land (whether or not a building or other
structure is situated on the land). The term ‘tand’ is also defined to include the estate in, on, over or under the land.
Details of the land are not required if the application involves a mobile and temporary Environmentally Retevant Activity only. Instead comptete
Table A.
The premises may be identified in a number of ways —
Streat address and lot on pian are most common and will apply to most applications.
« Coordinates may provide the best means of accurately identifying the location of development proposed in waters, or ona relatively small
devetopment site distant from property boundaries on a large lot. Sufficient coordinates need to be provided to identify the boundary of the
premises the subject of the application. Eastings and northings using GDA94 datum is preferred, but longitude and tatitude and other
(specified) datum such as Zone Reference or GS84 may be provided.
The definition of ‘water body and ‘watercourse’ can vary from Act to Act.
StrategicPortLandis within a local government area but a local government's planning scheme does not apply onStrategicPortLand,
StrategicPortLandis declared under the Transport infrastructure Act 4994. For further information go to IDAS Guide 11 (Development on
strategic port land) and the Queenstand Transport (Ports) website.
“Tidal water’ is defined in the Coastal Protection and Management Act 1995 (Schedule) and ‘tidal area’ for a local government and for strategic
port land is defined in the IPA (schedule 10). Generally, the area below ‘high-water mark (defined by the Coastal Act in relation to high water
mark at spring tides) establishes the boundary ofatidal area. Land betow high water mark is not within a local government's area unless
provided for under the Local Govemment Act 1993. Unless otherwise provided for by legislation, a local government has no jurisdiction below
high water mark. A tidal area for strategic port land ts within the jurisdiction of the relevant port authority, while the Environmental Protection
Agency generally has jurisdiction for a focal government tidal area. However, the IPA gives local governments jurisdiction for assessing and
deciding applications for prescribed tidal works within the local goverment tidal area, and the planning scheme may be applied to that
assessment (to the extent provided for in the code for prescribed tidal work).
Resource entitlement
Section 3.2.1(5) of the 1PA requires evidence of resource entitlement be given for applications if they involve taking or interfering with a
prescribed State resource. Schedule 10 of the integrated Planning Regulation 1998 {IPR) prescribes the State resources, including State-
owned tand, where evidence is required to be given, and the evidence required to support the application. Link to Integrated Planning
Regulation. Section 3.2.4(10)(a)(fi) states an application cannot be taken to be properly made without the required evidence.
For applications involving the taking or interfering with water under the Water Act, the development apptication may be made at the same
time as the request for resource entitlement, and the Department of Natural Resources and Water will accept the application as property made.
For State-controlled roads, a resource entitlement is not required for an activity that is exempt ancillary works or encroachment (identified by
gazette notice under the Transport infrastructure Act 1994, section 50), or if the activity requires referral to the Department of Main Roads.
Evidence may be required from more than one Department responsible for a State-owned resource, e.g. from the Environmental Protection
Agency for quarry material below high water mark, and the Department of Natural Resources and Water in relation to the State-owned land
above high water mark.
Owner's consent
Section 3.2.1(3) of the IPA prescribes that an application must contain, or be supported by, the written consent of the land owner/s, if the
application involves: a material change of use, reconfiguration of a lot; work on land below high-water mark and not within a canal as defined
under the Coastal Protection and Management Act 1995, or work on rail corridor land defined under the Transport Infrastructure Act 1994,
Evidence of this consent may need to be provided before the application will be accepted as properly made by the Assessment Manager, during
the processes of the application or in the event of an appeal about the outcome of the application.
‘Owner for the purpose of a lodging an (DAS development application means the person at the time of lodging the application, entitled to
receive the rent for the land (or would be entitled to receive the rent for it if it were let to a tenant at a rent).
Templates are available from the IPA website for the provision of owner's consent as an attachment to this form. However other documentation
may be used for providing owner's consent provided it is clear the documentation relates to the development application for the premises.
Owner's consent, if required, must be provided even if the applicant is the owner. Owner's consent is not required for a mobile and temporary
ERA.
Portable Long Service Leave (PLSL) Levy
The Building and Construction Industry Portable Long Service Leave Scheme provides long service leave entitlements to workers in the building
and construction industry who would be unlikely to accrue enough service with one employer to qualify for long service leave, To fund the
scheme, a Portable Long Service Leave Levy (PLSL levy) is collected on certain building and construction work carried out inQueensiand.
The PLSL levy amount and other prescribed percentages and rates for calculating the levy ere stated in the Building and Construction industry
(Portable Long Service Leave) Regulation 2002. included in the amount collected by QLeave is the Workptace Health and Safety Fee and the
Building and Construction IndustryTrainingLevy.
The Building and Construction Industry (Portable Long Service Leave) Act 1997 (PLSL Act} defines the building and construction work subject to
the PLSL levy and includes renovating, relocating, constructing, altering, demolishing, maintaining or repairing buildings, pools, roads, jetties,
pipelines, fences or earthworks, and works for subdividing, irrigating or draining land.
The PLSL levy need not be paid when the application is made, but the PLSL Act requires the levy to be paid before a development permit may
be issued.
The Assessment Manager must sight an approved form issued by QLeave advising of the status of the payment of the PLSL levy. Buitding and
Construction Industry Notification and Payment Forms are available from anyQueenslandpost office or agency, on request from QLeave, or can
be completed on the QLeave website at www, leave.qld.gov,au. For further information contact QLeave (Tel: 1800 803 481 Web:
www. gleave, ald. gov,au )
Page 7
INTEGRATED PLANNING ACT 1997 Part E, Version 3.2
Building &/or operational works assessable
against a planning scheme’
coal
NGucoewas, ee
1. Nature of work that requires assessment against a planning scheme:
(D1 Building work - Complete Table A DX Operational work - Complete Table 8
Table B
(i) What is the nature of the operational work?
{[] Roadworks (1) Stormwater LJ Water infrastructure L) Sewerage infrastructure
(7) Landscaping LD Earthworks (C1 Drainage Works CJ Signage
(CJ Clearing vegetation under the planning scheme Other - Specify below
Timber Jetty
ii) What type of approval is being sought? (NOTE: if you have indicated muttiple operational works in question (i) above and your answers to this
PI 1g pe yo
question would be different for different operational work, it may be more appropriate to provide these details in an attachment to this form)
[XJ Development Permit [LJ Preliminary approvel ) Both (specify below)
(iii) ts the operational work necessary to facilitate the creation of new lots (i.e. subdivision/?
BaNo [_] Yes - Specify the number of fots being created
(iv) Are there any current approvals associated with this application? (e.g. Development Permit or Preliminary Approval for MCU or reconfiguring
alot)
[XJ No [| Yes - Complete Table Bia)
2. Whatis the dollar value of this operational work? (ie. the total value including GST, materials and labour) |$ 15000
3 é
3. Confirm that the following mandatory information accompanies this application
Frans en if applicable, showing the nature ‘and location of the proposed works fincksding the ml Confirmed over the counter
OFFICE USE ONLY
Date Received Reference Numbers | _ |
Advice for completing Part E
General advice
° Part A must also be completed for all DAS development applications.
2 The applicant is responsible for answering all questions fully and correctly, unless following a response there is a statement to go directly 1o another question.
Page 8
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22
DAS. sc Yoperets App iecion bunt .. thei gp -oved Jorm iv." Haag Ny si nn pipe te!
POTTS berm tia koagede (ae. Pte.
amen th aol hom: Dargerbe sence diter oth yp athens. Tier tormers o' oft Porte ws bors 1d. p nds on
Tih ae yo ae et
food toe etete die DAS
1 oe.
Seefinn 1 omg athe erect sorbate of thr tS ater cater Che
leet Saf te Sh ayer? pears t cplale ¢ propa beret,
peony pent agent the Bacd
isahedt Ui kis) Gheb bmedtec heard tarinng Sioa owen’ anu 6 Jared
se ert Popef homtbet anttetie pps “an.
aot, eer teaben tt Deb dete, te
date tae. a. ofr Gecding
a9 Act 1a76or"y.
Pe ope choot faa Meet at “agp a tw dat ob eecarae ht Eg up Bn ates te MB te Ne,
ror Hadteathedas Bde! be AA Eppa wor tONa Bo Poi bol dhe WAS Ay. pLc ton Poa
Answering the following questions will assist you in determining which sections of the checklist must be completed for your application. If
unsure, phone or visit your local goverment or log onto the DIP website www.dip.qid.goy,au for help
For all IDAS development applications (except those for building work requiring assessment against the Building Act 1975 only} - complete Section 1 of this
checklist
Does the application seek approval to make @ material change of use of the premises?
ifyes - complete Section 2 of this checklist (Yes |{KINo
Does the application seek approval to reconfigure a ot?
ifyes - complete Section 3 of this checklist and Part F of IDAS Application Form 1. if the premises are completely within a single |C] Yes |[EXJNo
focal government area assessment is by the local government.
Does the application seek approval to carry out operational work?
if yes - complete Section 4 of this checklist Rives |LJNo
Does the application seek approval to carry out building work requiring assessment against the Fisheries Act 1994?
. . . CYes |KINo
ifyes - complete Section 5 of this checklist
Have you received a referral agency response under section 3.3.2.0f the IPA, in relation to this development application?
fyes - complete Section 6 of this checklist DYes [No
Does the application seek approval to carry out building work requiring assessment against a local government planning
scheme? Yes |CINo
ifyes - complete Form 1 Part E af IDAS Application Form 1. Assessment is by the focal government.
Does the application seek approval to carry out building work requiring assessment against the Building Act 1975?
ifyes - go to Appendix 1 of this checklist for advice on building referrals. Complete Part B of IDAS Application Form 1. (Yes |RINo
Assessment is by a building certifier
Do you wish the application to be assessed against a superseded planning scheme?
If yes - complete Form 1 Attachment 1 (Yes {No
Is the application for development completely or partly on Cairns and Mackay airport land under the Airport Assets
(Restructuring and Disposal) Act 20087
ifyes - Assessment is by the Department of Infrastructure and Planning. Complete Farm 1 Part D of IDAS Application Form 17 if the DYes |BgNo
application is for a material change of use, and Part E if for building or operational work. Also, the application must be referred to the
focal government as Advice Agency.
Page 9
INTEGRATED PLANNING ACT 1997 IDAS Assessment Check st, Vetc.on 22 epee OM ae : i ' setts 1 414A Is any part of the proposal intended to be carried out on a Queensiand heritage place under the Queensland Hertage Act 1992? BAI No-ows1s = (_] Yes 4.18 Does the proposal! involve development intended to be carried out on a place entered in a local heritage register under part 11 of the Queensland Heritage Act 1992, other than if the place is on Caims or Mackay airport land? [K}No cGotoarz (7) Yes 4.2 Does the proposal involve removing quarry material from a watercourse of lake as defined under the Water Act 2000? BX} No-Gooara [] Yes wee 1.3 Does the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity? BXJNo-cowars [(] Yes " . soto tebe . sete hy toa : coe 14 Is any part of the premises within the limits of a port under the Transport Infrastructure Act 1994? KI No - Gotoars CD Yes eR oe Mee. sog ah os ie 15 Does any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994? [XJ No - Goto. a1.6 (71 Yes - f answers to questions in other sections of this checkist indicate that the proposed development is assessable under IPA, schedule 8, this appication requires assessment by the Department of Primary industries and Fisheries (DPI&F). if DPI&F is not the Assessment Manager for the appiication, the agency has jurisdiction as Advice Agency. aR ea we et 1.6 \s any part of the premises designated for community infrastructure? [KX] No -Gotoar? CO Yes UK a 17 Does the proposal involve the establishment or expansion of a waste water disposal system? [XI No - End of Secton1 [[] Yes
Page 10
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checkist, Version 22
c. operational work.
41 Is the proposed operational work assessable under any State planning regulatory provisions?
&No [J Yes
If no, is the proposed operational work assessable under the planning scheme?
[TJ No- Gotoas2 DX] Yes - Complete Form 1, Part E and answer 04 1.1 - 4.1.7 below
Pik anh BU fete - - : : ,
4.4.1 \s any part of the premises focated in part of a future State-contro!led road, or within 100m of a State-controlled road?
BaNo [] Yes
If no, is the proposed operational work for filling or excavating listed in integrated Planning Regulation 1998,
schedule 5 and does it exceed the threshold?
(J No -GotoQ412
oO Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
PRegi tor sefee’ "e e PRE.e 3B tee OP RoGte Paar ache cee baton bp!
ee
4.1.2 Js any of the operational work proposed in a local government area listed4’ in State Planning Policy 2/02: Planning and Managing
Development Involving Acid Sulfate Soils
No -Got0Q41.3 (1 Yes
4 Vpurukun, Bowen, Bnsbane, Broadsound, Bundaberg, Burdekin, Burke, Bumett, Cabootture, Cairns, Calliope, Caloundra, Cardwell, Carpentaria, Cook, Cooloola, Douglas,
Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrook, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Minum Vale, Mom:ngton, Noosa, Pine Rivers,
Redcliffe, Redland, Rockhampton. Sarina, Thuringowa, Tiara, Torres, Townsville, Whitsunday
QPilay Qe Bois ig ai Mt
W Rays Con sete fe 2 tone dt Stas Fi ny Doe capntat + sedi ig A, 2 9!
‘
Be
|s any of the proposed operational work for filling or excavation?
[K] No - Goto 04.1.4
(Yes
IP Regu tion shee 2, tebe 3 tem Kay IP Reguvient schedy's 2 table 3 tem Wi}
4.1.4 \s any part of the premises subject to an easement in favour of the holder of Pipeline Licence Number 1 issued under the
@ Petroleum Act 1923 for the construction or operation of the Moonie to Brisbane strategic pipeline under that Act?
BX] No -Gotoaa15 [_] Yes
2? Reg abt EL Re?
4.1.5 1s any of the proposed operational work listed in schedule 13C of the Integrated Planning Regulation 1998 and does itexceed the
specified threshold?
BX] No: Goto 04.1.6 CO Yes - This apptication must be referred to Queensiand Transport (QT) as Concurrence Agency.
IP Regulars vehudule 2 fia 3 thin M4
416 Is any of the proposed operational work listed in schedule 43D of the | Integrated Planning Regulation 7998 and does it exceed the "
specified threshold?
BX] No- Go to.04.1.7 [71 Yes - This apptication must be referred to QueenslandTransport (QT) as Concurrence Agency.
{8 Requaton ofedu eg tore Std
fen Sowa
417 Is any part of the premises in a koala conservation area or koala sustainability area, other than in an SEQ urban footprint area?
[EX No -Gowoas2 [(] Yes
IP Riguistan wheduie 7 lahe 3 tom 19
Page 11
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22
WILDRIVER AREA: T Although legislation provides for assessment-of Operational works for residential, cominercial andindustial -
idévelopment for the pumpgses of the Whid Rivers Act 2005, currently no dectarations for any of the wid river ardas apply the Wild Ri
cGde 10 that type of developmieht, "3 Se eee
ai} oe.
sane ae. - bole
42 Is any of the proposed operational work associated with reconfiguring a fot and the reconfiguration is also assessable?
Bq No -cotoas3 [[] Yes
IPA, schedule 8, part 7, table 4, item 2, IP Regulation, schedule 1, part 2, table 5, item 1(c)
Wild Rivers code (Note: the code does not currently contain applicable provisions for residential, industrial or commercial development inside a designated urban
area)
IKOATA CONSERVATION (Inside SEQ urban footprint) ss. we
4.3A Is any part of the premises in an interim koala habitat protection area?
[I No -Gotoas.38 [] Yes
IP Regulation, schedule 2, table 2, tem 34A
@ VEGETATION CLEARING; KOALA CONSERVATION: WILD RIVER AREAS eG ae .
4.38 Is any of the proposed operational work for the clearing of native vegetation to which the Vegetation Management Act 1999
applies?
Dx] No -cotoass [] Yes
IPA, schedule 8, part 1, table 4, items 1A-1G; IP Regulation, schedule 2, table 2, item 5 (vegetation clearing); IP Regulation, schedule 2, table 2, item 34 (koala
conservation); IP Regulation, schedule 1, part 3, table 4, item (vegetation clearinghuild river area}; Vegetation Management Act 1999, section 22A (vegetation
clearing/witd river area): Wild Rivers Act 2005, sections 31F and 43A
FAKING OF INTERFERING WITH WATER: WILD RIVER AREA,
44 \s any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with water from a watercourse, Jake or spring (other than using a water truck to pump water; and other than under
the Water Act 2000, section 20(2), (3) or (5)), or from a dam constructed on a watercourse or lake?
No -Gotoa4s ([] Yes - Answer (a) and (b) below
JPA, schedule 8, part 1, lable 4, tems Sta}; IP Reyedation, schedule 2, lable 7, lem 8; JP Regulatin, schedule 1, past 3, table 4, items 2 and 3A; Water Act 2000, section 956A (wikt rivet
atea); Wild Rivers Act 2005, section 43/; relevant wild river declaration: Wid Rivers Code
45 {s any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with artesian water (other than using a water truck to pump water)?
@ K No GotoQ4.6 Oo Yes - (Complete Form 1, Part K,) This application requires assessment by the Department of Natural Resources and Water
(NRW). IFNRW is not the Assessment Manager for the application, the agency has. jurisdiction as Concurrence Agency.
IPA, schedule 8, part 1, table 4, item 3(b): IP Regulation, schedule 2, table 2, tem 8; IP Regulation, schedule 1, part 3, table 4, item a
Wild Rivers code (Note: the cade does not currently contain applicable provisions for taking or interfering with artesian water)
46 is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking
overland flow water (other than using a water truck to pump water)?
[X] No - Goto 04.7 (7 Yes - Answer (a) and (b) befow
IPA, schedute 8, patt 1, lable 4, tem 3ic)(P; IP Regulation, schedule 2, table 2, ilein 8 IP Regutavon, schedule 1, part 3, fable 4, tem 3; Water Act 2000, section 966A (valid fiver area);
Wild Rivers Act 2005, section 43A; relevant wild river declaration: Wild Rivers Cade,
47 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with subartesian water (other than using a water truck to pump water)?
[I No -cotoase [_] Yes
IPA, schedule 8, part 1, table 4, iter 3(c) ii): IP Regulation, schedule 2, table 2, item 8: IP Regulation, schedule 1, part 3, table 4, item 3
Water Act 2000, section 966A (wild river area}{Note: no current Wild River declaration identifies taking or interfering with subartesian water as assessable}
Wild River cade (Note: the code does not currently contain applicable provisions for sub artesian water}
48 Does any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for
interfering with overland flow water (other than using a water truck to pump watery?
[XJ No - Goto 04.9 (1 Yes - Answer both (a) and (b) below
JPA, schedule 8, part 1, table 4, tems cj) andl 3(d}; IP Regulation, schedule 2. table 2, tem 9: IP Regulalon, schedule 1, part 3. table 4, item 3A; Water Act 2000, section O66B (wid
iver area); relevant wild river declaration: wild Rivers Code.
Page 12
INTEGRATED PLANNING ACT 1897 IDAS Assessment Checklist, Version 22
49 \s the proposed operational work for the following?
(i) For the construction of 2 referable dam as defined under the Water Supply (Safety and Reliability) BI No LD Yes
Act 2008
(i) To increase the storage capacity of a referable dam by more than 10% No (] Yes
if yes to either or both (i) or (ii) above - (Comptete Form 1, Patt Ks) This application requires assessment by the Department of Natural Resources and
Water (NRW). If NRWis not the Assessment Manager for the application, the agency has jurisdiction as
Conastence Agency.
IPA, schedule 8, part 1, table 4, item 4: IP Regulation, schedule 2, table 2, item 10
4.10 Is any of the proposed operational work tidal work, other than excluded work defined under the IPA?
DQ No -Gotoas.s7 (] Yes - Answer (a) and (0) below
IPA, schedule 8, part 1, table 4, item 5; IP Regulation, schedule 2, table 2, items 12, 14 and 17; 1P Regulation, schedule 1, part 3, table 4, items 4A and 5
Coastal Protection and Management Act 1995, section 104A (wild river area)
(COASTAL MANAGEMENT DISTRICT: WILD. RIVER AREA. 32°:
4.14 {s any of the operational work proposed to be carried out within a coastal management district?
No -Gotoa4.12 [(] Yes
IPA, schedule 8, part 1, table 4, item 5; IP Regulation, schedule 2, table 2, items 12 and 14; IP Regulation, schedule 1, part 3, table 4, items 4A and 5
Coastal Protection and Management Act 1995 Act 1995, section 104A {wid river area); Wid Rivers Act 2005, section 43A
WATERWAY BARRIER WORKS: WILD. RIVER AREA Bc. eae aoe Scie 2 ‘
4.12 Is any of the proposed operational work for constructing or raising waterway barrier works under the Fisheries Act 1994?
EK] No -Gotoas13 (| Yes
IPA, schedute 8, part 1, table 4, iter 6: IPA, schedule 8, purt 2, table 4, tem 2: Fishenes Regeéation 1995 s 113A (self assessable codes); IP Reguiaton, schedule 2, table 2, nem 28; If
Regulation, schadute 1, par 3, table 4, tern 6: Fisheries Act 1904, section 76D (vail aver arcs): Wild Revels Act 2005, section 43A
var
h
w As ete ot ghey OD
out completely or partly within a declared fish habitat area under the
JECLARED FISH HABIT AE AREA: WILD RIVER AREA
4.13 Is any of the operational work proposed to be carried
Fisheries Act 1994?
[IX] No - Goto 04.14
C1 Yes
JPA, schedule B, part 1, table 4, tem 7; IPA, schedule 8, part 2, table 4. item 3, Fisheries Rezutation 1995 $1134 (self assessable codes); IP Regulation, schedule 2, fable 2, tein 25; 1
Regulavon. schedule 1, part 3, table 4, dem 7; Wild Rivers Act 2005, sections ASA; Fisheries Act, section 76DC (wikt river area).
he
4.14 Is any of the proposed operational work removing, destroying or damaging marine plants under the Fisheries Act 1994?
DQ No -Gotoas15 {_] Yes
IPA, schedule 8, patt 1, table 4, item 8; IPA, scherhile 8, part 2, table 4, wen 4: Fisheries Requiation 1995 8113 (sef assessable codes): iP Regitation, schedule 2, table 2, tem 20; 1F
Reguiatian, schedule 1, patt 3, tatve 4, tem 8; Fishentes Act 1994, section 76D8 (uakd iver area); Wiki Rivars Act 2008, section 43/: relevant wik! nver declaration; Wild Rivers Code
ED RIVERIAREA: 5 2) woe
4.45 |s any of the operational work proposed to be carried out in a wild river area declared under the Wild River Act 2005?
PXI No -Gotoas1e [_] Yes
IPA, schedule 8. part 1, table 4, item 10; IP Regulation, scheduie 2, table 2, item 37; Wild Rivers Act 2005, sections 42, 43A
sails
ee ee
AAG Is any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?
PX] No -Endofsections [_] Yes
IP Regulation, schedule 2, table 2. item 3
Page 13
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22 Disclaimer: While the Department of Infrastructure and Planning (DIP) believes that this information contained on this form and provided as part of this process will be of assistance to you, itis provided on the basis that you will not rely on the information without first making your own enquiries regarding the interpretation and application of the applicable legislation to your circumstances. To the full extent permitted by law DIP expressly disclaims all liability (inctuding but not limited to liability for negligence) for errors or omissions of any kind or for any toss (including direct and indirect losses), damage or other consequence which may arise from your reliance on this process and the information contained on this form
Page 14
Regional Council Sunshine Coast LAND USE SECTION FEES RECEIPT TYPE SALE OF DOCUMENTS Superseded Planning Scheme Documentation 520 Copy of Permit/Approval Letter 110 The Noosa Plan Documentation 111 APPLICATION FEES Material Change of Use - Code/Impact . Consistent 521 Inconsistent 521 Assessment under Superseded Planning Scheme 521 Modification to a Development Permit 521 Extension of a Currency Period §21 Operational Works - Landscaping §21 e@ Bldg Work assessable against the Planning Scheme. 521 PRE LODGEMENT REVIEW Half Hour §22 One Hour §22° ADVERTISING Purchase Advertised Applications §23 JETTIES . . . : Jetty Application Fee - [3°70 524 Jetty Bond Soo. 51 : : (Category 4) BONDS Performance Bond 51 . (Category 9) SIGNS . Registration Fee . 222 Meu FEE Search of Land Use Section file. 112 Liquor Licensing Request 113 total $ / € Fo_ NAME: eet Pte ADDRESS: PO Bae [tob% NID SAV ee Yse3 : FILE NO: ot/73 -- DATE: itl efog RECEIPT NO: SLO. Signature of TP Officer: Some AUTHORITY NO: C/ Me] reer] 731 |
Page 15
CALCULATION OF FEES APPLICATION FEE TOTAL FEES MCU - CODE ASSESSMENT Details of Development Consistent 1.0 Inconsistent 3.0 FEE CALCULATION MCU - IMPACT ASSESSMENT Details of Development Consistent 1.0 Inconsistent 3.0 FEE CALCULATION t OPERATIONAL WORKS Details of Development FEE CALCULATION | TOTAL FEES
Page 16
TOP OF WALL
RL 1.0 AHD
DECK
MAXIMUM RECORDED FLOOD LEVEL RL 2.00 AHD~
MINIMUM WATER RL 0.44 AHD
DECK
RL 1.0 AHD |
PILES:
ALL PILES SHALL BE APPROVED HARDWOOD
AND TREATED TO HAZARD 6.
ALL PILES SHALL BE INSTALLED IN ACCORDANCE
WITH AS 2159 - PILING CODE
JETTY USE:
SINGLE USER, PRIVATE
NO VEHICULAR ACCESS
THE ANCHORAGE
47424 a ~
WALKWAY DECK VERTICAL ~ eo err
DESIGN LIVE LOAD - 2.0 kPa Aga ©
\
MAXIMUM MOORED VESSEL - 5m :
BERTHING VELOCITY - 0.5 m/sec |
(
\
\
|
| LOT 810
wo wo | 810
_ ~ .
| m4 4 \
ig 8 |
Wx 125 F144 HWO FLXED : ws 1
TO BEARERS WITH
TWO STAINLESS STEEL
SCREWS EACH END
he
||
PLES: | oe | ' _ __
@ 200 NIN TREATED 4 T
HWD POLES
7638 — —
ee @ + tae
Pf x
8 2.
~ 3 REAL PROPERTY |
PROPOSED
| | | “ DESCRIPTION | JETTY
; | LOT 810
RP 910419
200 x7 PARISH WEYBA
> COUNTY MARCH war
S4Y
<1)
FRAMING LAYOUT 1x
SITE PLAN OO +—4
1-200
| L
. | “ELEVATION 2
eS ,
HUCKER:
76 x 38 HWD
UTE x NO14 TYPE. 17
STAINLESS STEEL
SCREWS G 460 CRS
PILES:
@ 200 H6 MARINE HWD POLES
NOTE THAT ALL POLES TO COMPLY
WITH AS 2156 - PILING CODE
TYPICAL SECTION
\ 120
160 x 75 HWD -
M16 SS
2M16 SS
PWES:
© 200 16 MARUNE HWD POLES
{ NOTE THAT ALL POLES TO COMPLY
WITH AS 2160 - PWUING COOE
200 x 75 HWO
DETAIL /41 \
1. UNLESS NOTED OTHERWISE ALL TIMBER SHALL BE DURABILITY CLASS 1 OF APPROVED SPECIES
AND HAVE A STRESS GRADE OF F14 MIN.
NOTES:
2. UNLESS NOTED OTHERWISE ALL CONSTRUCTION SHALL COMPLY WITH THE ENVIRONMENTAL
PROTECTION AGENCYS’ OPERATIONAL POUCY - “BUILDING AND ENGINEERING STANDARDS FOR TIDAL
WORKS.
3. ALL STAINLESS STEEL BOLTS. ROOS, ETC.. SHALL BE APPROVED MARINE GRADE 316 Ail OTHER
STEELWORK INCLUDING NUTS. BOLTS, WASHERS, SCREWS, NAILS, ETC., SHALL BE HOT DIPPED
GALVANISED OR STAINLESS STEEL
4. TOP OF PILES SHALL BE SEALED AND FULLY CAP FLASHED OR FuNGED.
5. DIMENSIONS AND LEVELS SHALL NOT BE SCALED FROM THE ORAWINGS.
BUILDERS
cence No 723720
ABN 55 000 036 736
28 Sunest Ore Prax 07 64564782
Moose 0408 137526
0417 746644
PROPOSED JETTY
LOT 810
(No.3)
THE ANCHORAGE
NOOSA WATERS
RABARINK PTY LTO T/A
John Norden
& Associates
ACN 010 263 877
‘Sxrucourei / Covi Demgn Engmeers
Sue 16 Tewantin Paze*
Panaene Avenue / PO Box 206
Towanan Q 4566
Ph: 07 50607137 Fax 07 54467172
=
Used in these records
09/0731 - Operational Works - (Jetty) [As Published]Related documentApplication case desk ↗
001AD298.001.pdfRelated documentPublic source context ↗
About this file
- File size
- 1.1 MB (small file)
- File type
No other editions are linked here.