Council archive · source document
09/0731 - Operational Works - (Jetty) [As Published] · 142009.731
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checkist, Version 22
c. operational work.
41 Is the proposed operational work assessable under any State planning regulatory provisions?
&No [J Yes
If no, is the proposed operational work assessable under the planning scheme?
[TJ No- Gotoas2 DX] Yes - Complete Form 1, Part E and answer 04 1.1 - 4.1.7 below
Pik anh BU fete - - : : ,
4.4.1 \s any part of the premises focated in part of a future State-contro!led road, or within 100m of a State-controlled road?
BaNo [] Yes
If no, is the proposed operational work for filling or excavating listed in integrated Planning Regulation 1998,
schedule 5 and does it exceed the threshold?
(J No -GotoQ412
oO Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
PRegi tor sefee’ "e e PRE.e 3B tee OP RoGte Paar ache cee baton bp!
ee
4.1.2 Js any of the operational work proposed in a local government area listed4’ in State Planning Policy 2/02: Planning and Managing
Development Involving Acid Sulfate Soils
No -Got0Q41.3 (1 Yes
4 Vpurukun, Bowen, Bnsbane, Broadsound, Bundaberg, Burdekin, Burke, Bumett, Cabootture, Cairns, Calliope, Caloundra, Cardwell, Carpentaria, Cook, Cooloola, Douglas,
Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrook, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Minum Vale, Mom:ngton, Noosa, Pine Rivers,
Redcliffe, Redland, Rockhampton. Sarina, Thuringowa, Tiara, Torres, Townsville, Whitsunday
QPilay Qe Bois ig ai Mt
W Rays Con sete fe 2 tone dt Stas Fi ny Doe capntat + sedi ig A, 2 9!
‘
Be
|s any of the proposed operational work for filling or excavation?
[K] No - Goto 04.1.4
(Yes
IP Regu tion shee 2, tebe 3 tem Kay IP Reguvient schedy's 2 table 3 tem Wi}
4.1.4 \s any part of the premises subject to an easement in favour of the holder of Pipeline Licence Number 1 issued under the
@ Petroleum Act 1923 for the construction or operation of the Moonie to Brisbane strategic pipeline under that Act?
BX] No -Gotoaa15 [_] Yes
2? Reg abt EL Re?
4.1.5 1s any of the proposed operational work listed in schedule 13C of the Integrated Planning Regulation 1998 and does itexceed the
specified threshold?
BX] No: Goto 04.1.6 CO Yes - This apptication must be referred to Queensiand Transport (QT) as Concurrence Agency.
IP Regulars vehudule 2 fia 3 thin M4
416 Is any of the proposed operational work listed in schedule 43D of the | Integrated Planning Regulation 7998 and does it exceed the "
specified threshold?
BX] No- Go to.04.1.7 [71 Yes - This apptication must be referred to QueenslandTransport (QT) as Concurrence Agency.
{8 Requaton ofedu eg tore Std
fen Sowa
417 Is any part of the premises in a koala conservation area or koala sustainability area, other than in an SEQ urban footprint area?
[EX No -Gowoas2 [(] Yes
IP Riguistan wheduie 7 lahe 3 tom 19
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/0731 - Operational Works - (Jetty) [As Published]Related documentApplication case desk ↗
001AD298.001.pdfRelated documentPublic source context ↗
About this file
- File size
- 1.1 MB (small file)
- File type
No other editions are linked here.