Council archive · source document
09/0731 - Operational Works - (Jetty) [As Published] · 142009.731
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22
DAS. sc Yoperets App iecion bunt .. thei gp -oved Jorm iv." Haag Ny si nn pipe te!
POTTS berm tia koagede (ae. Pte.
amen th aol hom: Dargerbe sence diter oth yp athens. Tier tormers o' oft Porte ws bors 1d. p nds on
Tih ae yo ae et
food toe etete die DAS
1 oe.
Seefinn 1 omg athe erect sorbate of thr tS ater cater Che
leet Saf te Sh ayer? pears t cplale ¢ propa beret,
peony pent agent the Bacd
isahedt Ui kis) Gheb bmedtec heard tarinng Sioa owen’ anu 6 Jared
se ert Popef homtbet anttetie pps “an.
aot, eer teaben tt Deb dete, te
date tae. a. ofr Gecding
a9 Act 1a76or"y.
Pe ope choot faa Meet at “agp a tw dat ob eecarae ht Eg up Bn ates te MB te Ne,
ror Hadteathedas Bde! be AA Eppa wor tONa Bo Poi bol dhe WAS Ay. pLc ton Poa
Answering the following questions will assist you in determining which sections of the checklist must be completed for your application. If
unsure, phone or visit your local goverment or log onto the DIP website www.dip.qid.goy,au for help
For all IDAS development applications (except those for building work requiring assessment against the Building Act 1975 only} - complete Section 1 of this
checklist
Does the application seek approval to make @ material change of use of the premises?
ifyes - complete Section 2 of this checklist (Yes |{KINo
Does the application seek approval to reconfigure a ot?
ifyes - complete Section 3 of this checklist and Part F of IDAS Application Form 1. if the premises are completely within a single |C] Yes |[EXJNo
focal government area assessment is by the local government.
Does the application seek approval to carry out operational work?
if yes - complete Section 4 of this checklist Rives |LJNo
Does the application seek approval to carry out building work requiring assessment against the Fisheries Act 1994?
. . . CYes |KINo
ifyes - complete Section 5 of this checklist
Have you received a referral agency response under section 3.3.2.0f the IPA, in relation to this development application?
fyes - complete Section 6 of this checklist DYes [No
Does the application seek approval to carry out building work requiring assessment against a local government planning
scheme? Yes |CINo
ifyes - complete Form 1 Part E af IDAS Application Form 1. Assessment is by the focal government.
Does the application seek approval to carry out building work requiring assessment against the Building Act 1975?
ifyes - go to Appendix 1 of this checklist for advice on building referrals. Complete Part B of IDAS Application Form 1. (Yes |RINo
Assessment is by a building certifier
Do you wish the application to be assessed against a superseded planning scheme?
If yes - complete Form 1 Attachment 1 (Yes {No
Is the application for development completely or partly on Cairns and Mackay airport land under the Airport Assets
(Restructuring and Disposal) Act 20087
ifyes - Assessment is by the Department of Infrastructure and Planning. Complete Farm 1 Part D of IDAS Application Form 17 if the DYes |BgNo
application is for a material change of use, and Part E if for building or operational work. Also, the application must be referred to the
focal government as Advice Agency.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/0731 - Operational Works - (Jetty) [As Published]Related documentApplication case desk ↗
001AD298.001.pdfRelated documentPublic source context ↗
About this file
- File size
- 1.1 MB (small file)
- File type
No other editions are linked here.