Original source · versioned page text
SPCC03145211
Attached to the e-mail Concurrence agency response.
Department of Environment . and Resource Management N oti ce Concurrence Agency Response This notice is issued by the Department of Environment and Resource Management pursuant section 287 of the Sustainable Planning Act 2009 (“the Act”). Sunshine Coast Regional Council cc. Body Corporate for Noosa Harbour Locked Bag 72 C/- The Jetty Specialists Sunshine Coast Mail Centre QLD 4560 2 Industrial Avenue CALOUNDRA QLD 4551 Attention: Mark Lewis Our reference: SPCC03145211 / MCY2538 Re: Concurrence Agency Response 4. Application Details Assessment Manager ref: OPW 11/0322 Date application referred to DERM: 13 October 2010 Development approval applied for: Development Permit Aspect of development: Operational work — prescribed tidal works Sustainable Planning Regulation 2009 Schedule 7, table 2, item 13 Development description: Prescribed tidal works — being for the removal of an existing jetty and piles and the construction of a 8.7m catwalk and pontoon Property/Location description: Within the Noosa River attached to BUP 4021, otherwise known as 6 Quamby Place, NOOSA HEADS, QLD, 4567. 2. The Chief Executive, Department of Environment and Resource Management (DERM) concurrence agency response jurisdiction for the aspect of development involved with the application the subject of this Notice is to tell the assessment manager as follows: Conditions must attach to any development approval, and those conditions are attached to this Notice. : Page 1 of 3 + 091217 Department of Environment and Resource Management gs Queensland Government www.derm.qid.gov.au ABN 46 640 294 485 aa
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 5 pages
Page 2
Notice Concurrence Agency Response 4. Approved plans / specifications Plan/Document No. Plan/Document Name Date JSP-SJ-23480 SITE PLAN, LAYOUT & WATER ALLOCATION Se ated JSP-SJ-23481 ELEVATION See oct 5. General advice to assessment manager Pursuant to sections 334 and 363 of the Act, a copy of a decision notice or negotiated decision notice issued by the assessment manager must be forwarded to DERM as a referral agency for the relevant application at Sunshine Coast Office, PO Box 165, Cotton Tree QLD 4558 and an electronic copy to [email protected] State’s Native Title Work Procedures provide that responsibility for assessment of native title issues for an IDAS application rests with the assessment manager. Therefore, DERM as a referral agency for the relevant application has not provided notification to native title parties. 6. Additional comments or advice about the application Nil 7. Additional information for applicants Ni tee 4 oem Delegate Enquiries: Deena Rigby Department of Environment and Resource Delegate, Chief Executive administering the Coastal Management Protection and Management Act Sunshine Coast Office, PO Box 168, Cotton Tree Department of Environment and Resource Management QLD 4558 14 November 2011 Attachment: Approved Plans Enclosed: DERM Permit Number SPCC03145211 Phone: 07 5459 6132 Fax: 07 5459 6190 Email: [email protected] Page 2 of 3 + 091217 Department of Environment and Resource Management
Page 3
Attachment — Approved Plans
Notice
Concurrence Agency Response
PROPOSED PONTOON
cast ayy fFenoeR RUBBER ye
Foon CLEATS SovaL sbes Stig
s000——f-— BERTHING: _ l_
r “1 Moxnun wet vessel length ~ 7.00 a“ 2A —— | Te
= Maxirur wet vessel beam = 3in
| cS | aa
g bo Y | 00 i
7 Lor ot |
L L RP 170044
8518 azn
to 7 Fe Bs Ps
TaP & as
8 “Bowes HOSE HOLDER ‘ag SITE PLAN & 5
g Be WATER ALLOCATION
Fi SCALK 1:1000
z
: I
g Yee
o 23" 28515 |
REGGE
s foes ReWoreo ou
£ OY OTHERS MBY PLACE
t | TP +. — — QUAY LINE
pea a SIG carwanx ~~
oo i CATWAL —
+t _ >
z
3 2 LAYOUT PLAN 8
548 SCALE 1:100 3 |
LL EXSTKG CATWALK FOKEO TO "
3 Naw ASUIWENT BLOCK SE DGUN
ge INFRONT OF WALL TO. ALLOW?
| | Eee |
oF oni,
CLL HK ~ PROPERTY counaaay
8 EXISTING LOW TIMBER RETAINING WALL
7
|-1600 Ae
Connon PROPERTY
Existing struclures shown
in opprorimete pasion only.
THE MARINA /GleN: BODY CORP FOR NOOSA HARGOUR | TRE SITE PLAN, LAYOUT
TUoNe JS OTGESITIS 2 MOUSTRAE A Gardne xc omm Lot + (6) QUAMBY PLC
Wee SORA cece Rae VA py (a) 3385 S802 IKOOSA HEADS
So tI est fe as
PR Pron fo 5928 East ‘PROKECT: PROPOSED PONTOON & CATWALK
a (Gy Si te
CC
Pana SINCE coqMection sRACstT a
FABRIGATED TO BOL? ERO EXISTING CATWALK
TING 6409 CATWALK: EXISTING JETTY & PILES
fO'sE newoveo
BY omens
PAE RL 30m
8700
| APPROX. can
saan 7 |
gilt Y 4
POPROK PLE RL 1.8m — .
cool \ pest oe mB m L
1000 TO FACE OF NEW ABUTWENT Fi
We uN SS CAST HL BOLTS : :
JO MATCH EXISTING BRACKETS i 3
BFACH | i HAT RL 058m
AHS RA 038m : >
wass, concRETE AsunvenT soci
MbluroReeD Wi G44Sn MESH CASE “AMD RL 0.0m LEVEL DATUM
2 MLW.S RL 0.280
be Chatee Socatm
eg
B2y
ay
z |
3158 46 kNm RC. INST ~
ae wit ALONE HEADSTOCK J
ed
aise asin ——| ge
no. WSR PRES ek
egh .
Bg
az
E
GET: BODY CORP FOR NOOSA HARBOUR] MME — ELEVATION.
Gerdne vex oss oreasa 1a 4 402% (6) QUEMBY PLC
Ses PE (Pm (02) Sma $822,
ley geen gmaco eee ful te NOOSA HEADS
la eect ge)
» boy eos wo. a
oe Sa
Page 3 of 3 + 091217
Department of Environment and Resource Management
Page 4
Page 5
Department of Environment and Resource Management Sustainable Planning Act 2009 DERM Permit ‘number: SPCC03145211 Assessment manager reference (if any): Date application received: Permit type: Date of decision: Decision: Relevant laws and policies: Jurisdiction(s): OPW1 1/0322 13 October 2011 Concurrence agency response 14 November 2011 For a concurrence agency response conditions that must attach to any development approval Coastal Protection and Management Act 1995 and any subordinate legislation. Operational work - Tidal works, or development in a coastal management district Sustainable Planning Regulation 2009 - Schedule 7, table 2, item 13 Development Description(s) Property/Location Development Within the Noosa River, attached BUP4021, otherwise known as 6 Quamby Place, NOOSA HEADS, QLD, 4567. Prescribed tidal works being for the removal of an existing jetty and piles, and the construction of a new catwalk and pontoon. (Jee Delegate Deena Rigby Delegate, Chief Executive administering the Coastal Protection and Management Act 1995 Department of Environment and Resource Management 14 November 2011 4 Permit includes licences, approvals, permits, authorisations, certificates, sanctions or equivalent/similar as required by legislation administered by the Department of Environment and Resource Management. Page 1 of 2 © 091217 Department of Environment and Resource Management g Queensland Government www.derm.qid.gov.au ABN 46 640 294 485
Page 6
DERM Permit number: SPCC03145211 CONDITIONS 4 All works are to be constructed in accordance with the following drawings: - JSP-SJ-23480 C prepared by Cardno (Qid) Pty Ltd and dated 09/07/10 - JSP-SJ-23481 B prepared by Cardno (Qld) Pty Ltd and dated 23/06/11 2 Access must be designed and constructed in compliance with Australian Standards. 3 The chief executive administering the Coastal Protection and Management Act 1995 may order the works to be removed or modified, within a reasonable time, if the works have or are likely to have a significant effect on coastal management because the works: (a) create a navigation hazard or other danger to the public; or (b) cause erosion or land degradation; or (c) are unstable or have not been constructed according to the approved plans. 4 Any erosion or loss of sand surrounding the works that occurs because of changes caused by the works must be rectified. 5 Contaminants must not be released from the site to any waters or the bed and banks of any waters (including groundwater) unless authorised by the administering authority. 6 There is to be no visible sediment plume greater than 30 metres from the proposed structure. If a visible plume exists 30 metres from the proposed structure, works must immediately cease and a sediment curtain must be positioned around the plume until it has settled and is no longer visible. DEFINITIONS Words and phrases used throughout this permit’ are defined below. Where a definition for a term used in this permit’ is sought and the term is not defined within this permit! the definitions provided in the relevant legislation shall be used. “administering authority" means the Department of Environment and Resource Management or its successor. “approval” means ‘notice of development application decision’ or 'notice of concurrence agency response’ under the Sustainable Planning Act 2009. “site” means land or tidal waters on or in which it is proposed to carry out the development approved under this development approval. “waters” includes river, stream, lake, lagoon, pond, swamp, wetland, unconfined surface water, unconfined water natural or artificial watercourse, bed and bank of any waters, dams, non-tidal or tidal waters (including the sea), stormwater channel, stormwater drain, roadside gutter, stormwater run-off, and groundwater and any part- thereof. “works” or "operation" means the development approved under this development approval. "you" means the holder of this development approval or owner / occupier of the land which is the subject of this development approval. END OF CONDITIONS Page 2 of 2" 091217 Department of Environment and Resource Management