Council archive · source document
Att 1_Architectural Plans · MCU13/0081.01
Plans and drawings: the text below has words only, no drawings.
Very large file (64.9 MB): may take a few minutes to open.
Original PDF page 23, section 1. The text section number identifies this passage in the reader.
New awning to balconies below. 200 x 50 REV DESCRIPTION DRN DATE
New raised tiled surface on
powdercoated aluminium frame cantilevered
Select new aluminium flashing or zinc 'VersiPave®' pedestals or other A MCU DA Issue MS 25.02.20
off existing profiled roof slab and supported by
panel roof sheeting at equal centres proprietary type adjustable paver
RHS stub columns off existing party walls. B MCU DA Issue MS 02.03.20
over existing profiled roof slab supports. FFL of Building A to
Provide 50 x 20 battens to underside of frame, C MCU DA Issue MS 06.03.20
match FFL of Building B
select polycarbonate roof sheeting over
D Client Revisions MS 14.04.20
4800 4800 4800 4800 4800
New Roof
New Roof
2575
5°
5°
Valley gutter Valley gutter
OVF OVF OVF OVF OVF
Fall
Fall
FWG FWG FWG 200 x 50 powdercoated aluminium FWG FWG
New frameless glass balustrade with
portal frame to future detail,
anodised aluminium channels top
supported by RHS columns with
and bottom, fixed to edge of profiled
select powdercoated 'timber-look'
roof slab / new roof structure
aluminium battens over and 50 x 50
SHS capping to top of frame
4800 4225 250 5870 5175 4790 4755 4845
U411 Terrace U412 Terrace U413 Terrace U414 Terrace
U408 Terrace
3500
U409 Terrace U410 Terrace
Generally throughout:
- New render and paint finish to all external walls
3020 - New anodised aluminium (25µm coating)
Shower sliding doors to terraces / balconies
- New anodised aluminium (25µm coating) windows
- New frameless glass balustrade with
anodised aluminium (25µm coating) uprights
- New tiles to walkways, terraces and balconies
00
20
200 x 50 powdercoated
aluminium portal frame to shower
60
New bar and shelving
area, supported by RHS columns
0
joinery unit to future detail
with selected laser cut feature
screen to top and short sides
2475 3040 3080
1460
1050
1500
Gate Gate Gate Gate Gate
Shower 600 1420 300 600 1970 300
Shower Shower
750
Shower Shower
Gate
New powdercoated aluminium
Gate Select timber plank surface
gate and side screen to Fully tiled mass concrete seat
to entry and shower area
Gate Gate recessed roof terrace entry
Suite 2,
Shower
Cnr Gard
Alexand
PO Box
LEVEL 4 / ROOF TERRACE
Scale 1:50 P 07 54
admin@
200 x 50 powdercoated aluminium portal New raised tiled surface on 200 x 50 powdercoated aluminium frame
200 x 50 powdercoated aluminium Select new aluminium New frameless glass balustrade with
frame to future detail, supported by RHS 'VersiPave®' pedestals or other cantilevered off existing profiled roof slab and
portal frame to shower area, supported flashing or zinc panel roof anodised aluminium channels top New bar and shelving
columns with select powdercoated proprietary type adjustable paver Existing services stack supported by RHS stub columns off existing part
by RHS columns with selected laser cut sheeting at equal centres and bottom, fixed to edge of profiled joinery unit to future detail
'timber-look' aluminium battens over and supports. FFL of Building A to walls. Provide 50 x 20 battens to underside of SUNCOAST RESORT BUSINESS CENTRE
feature screen to top and short sides over existing profiled roof slab roof slab / new roof structure
50 x 50 SHS capping to top of frame match FFL of Building B frame, select polycarbonate roof sheeting over SUITE 2 CNR GARDAK ST & SURF RD
ALEXANDRA HEADLAND Qld 4572
PO BOX 6232 MAROOCHYDORE BC Qld 4558
PH : 07 5443 5028 FAX:07 5479 2380
ABN 23 123 917 724
EMAIL: [email protected]
project
PROPOSED ALTERATIONS &
ADDITIONS TO EXISTING
RESORT BUILDING
for
NETANYA RESORT
at
75 HASTINGS STREET
NOOSA HEADS
drawing
DETAILED AREA - ROOF
TERRACE / FEATURE AWNING
AS SHOWN
date 14/04/2020 drawn JP scale @A1
drawing no. 19021 SD60.06 revision D
Copyright of this document remains the exclusive
N
property of SPROUT ARCHITECTS PTY LTD
ABN 23 123 917 724.
Contractors are to verify all dimensions and levels on
site prior to commencing. Report all discrepancies to
the Architect. Use figured dimensions in preference
0 5 10 to scaled.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Att 1_Architectural Plans.pdfRelated documentApplication case desk ↗
Att 1_Architectural Plans.pdfRelated documentApplication case desk ↗
Att 1_Architectural Plans.pdfRelated documentApplication case desk ↗
Att 1_Architectural Plans.pdfRelated documentApplication case desk ↗
Att 1_Architectural Plans.pdfRelated documentApplication case desk ↗
Att 1_Architectural Plans.pdfRelated documentApplication case desk ↗
About this file
- File size
- 64.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.