Skip to the record
Accept no substitutions.

Original source · versioned page text

Appendix H. Planning Scheme Code Responses

Attached to the e-mail Retail Bus Type 5 & Type 2 & Op Works Economic Report & PScheme Code Response - MCU17/0572 & OPW17/0611.

of 69

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

                                                                                                                                                    BUSINESS USES CODE
                                                                                                                             Performance Criteria and Acceptable Solutions



                                                    PROBABLE SOLUTIONS                                                                                   COUNCIL       USE
    SPECIFIC OUTCOMES                                                                 SOLUTIONS*   COMMENTS
                                                    (IF CODE ASSESSABLE)                                                                                 ONLY
    (a) there is a clear demonstrated need;
    (b) no feasible and prudent alternatives
        are available; and
    (c) it can be demonstrated that the
        intrinsic natural values and resources
        of the river system can be managed
        and protected in an ecologically
        sustainable manner.
    O60 Industrial business Type 3                  No solution provided.                   N/A    The proposal does not involve an industrial use.
    Extractive are designed, located and
    operated to ensure—
    (a) haulage routes associated with
        extractive resources—
        (i) are located on roads where the
              haulage route will minimise
              adverse impacts on residential
              and urban residential amenity;
        (ii) are located on roads which are of
              adequate construction and which
              may be upgraded as part of the
              utilisation of the extractive
              resource; and
        (iii) are adequately maintained as a
              part of the utilisation of the
              extractive resource; and
    (b) the utilisation of any extractive
        resource does not result in adverse
        visual impacts from major roads; and
    (c) the rehabilitation of extractive industry
        sites, prior to or in conjunction with
        land use changes on the site of the
        resources or within buffers to the
        resource.




1       Solution:  = Acceptable Solution                                                                                                                      Appendix H
                  A/S = Alternative Solution
                  N/A = Not applicable to this proposal

PR137996-1                                                                  November 2017                                                                         Page 19
Log in to download the original file

Appendix H. Planning Scheme Code Responses.pdf · 1.1 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.