Original source · versioned page text
Appendix H. Planning Scheme Code Responses
Attached to the e-mail Retail Bus Type 5 & Type 2 & Op Works Economic Report & PScheme Code Response - MCU17/0572 & OPW17/0611.
BUSINESS USES CODE
Performance Criteria and Acceptable Solutions
PROBABLE SOLUTIONS COUNCIL USE
SPECIFIC OUTCOMES SOLUTIONS* COMMENTS
(IF CODE ASSESSABLE) ONLY
(a) there is a clear demonstrated need;
(b) no feasible and prudent alternatives
are available; and
(c) it can be demonstrated that the
intrinsic natural values and resources
of the river system can be managed
and protected in an ecologically
sustainable manner.
O60 Industrial business Type 3 No solution provided. N/A The proposal does not involve an industrial use.
Extractive are designed, located and
operated to ensure—
(a) haulage routes associated with
extractive resources—
(i) are located on roads where the
haulage route will minimise
adverse impacts on residential
and urban residential amenity;
(ii) are located on roads which are of
adequate construction and which
may be upgraded as part of the
utilisation of the extractive
resource; and
(iii) are adequately maintained as a
part of the utilisation of the
extractive resource; and
(b) the utilisation of any extractive
resource does not result in adverse
visual impacts from major roads; and
(c) the rehabilitation of extractive industry
sites, prior to or in conjunction with
land use changes on the site of the
resources or within buffers to the
resource.
1 Solution: = Acceptable Solution Appendix H
A/S = Alternative Solution
N/A = Not applicable to this proposal
PR137996-1 November 2017 Page 19
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.