Appendix H. Planning Scheme Code Responses
Attached to the e-mail Retail Bus Type 5 & Type 2 & Op Works Economic Report & PScheme Code Response - MCU17/0572 & OPW17/0611.
INDUSTRY ZONE CODE
Performance Criteria and Acceptable Solutions
Environmental Protection No solution provided. Complies with specific outcomes
O198 Industrial development is conducted As demonstrated by the submitted Civil Engineering
in an environmentally responsible manner, Report provided at Appendix F, the proposed
operating without deleterious impacts on development is able to achieve all requirements for
immediate, surrounding or downstream Stormwater Management Plans as described in QUDM
communities, environments and 2013 standards, as well as a pollutant load reduction as
environmental processes. required by the SPP 2017 and Noosa Shire Council
standards. In this regard, the site has been divided into
two (2) catchments, a high-risk area and a low-risk area
and recommends the implementation of a SPEL
Puraceptor unit to treat runoff from the high-risk area
before returning filtered run-off to the low risk drainage
system for further treatment. ADG as consulting
engineering’s for the proposed development also
recommend the implementation of StormSack, Gross
Pooluant Traps and First Flush Devices in accordance
with the Preliminary Engineering Services Layout Plan
provided at Appendix F.
1 Solution: = Acceptable Solution Appendix H
A/S = Alternative Solution
N/A = Not applicable to this proposal
PR137996-1 November 2017 Page 3