     RESIDENTIAL DUPLEX DEVELOPMENT
     NOOSA HEADS
     22 DELORME STREET, NOOSA HEADS, QLD 4567
     Lot 136 RP 160425
     CIVIL WORKS


NOTE:
THE FOLLOWING INSPECTIONS MUST BE COMPLETED BY RECOR ENGINEERS BEFORE                     9.    CONTRACTOR TO UNDERTAKE ALL WORKS IN ACCORDANCE WITH ALL WORKPLACE
ENGINEERING CERTIFICATION WILL BE ISSUED. THE CONTRACTOR IS TO PROVIDE A MINIMUM                HEALTH AND SAFETY REQUIREMENTS.
OF 72 HOURS NOTICE TO RECOR FOR REQUIRED INSPECTIONS. SHOULD THE CONTRACTOR FAIL          10.   WHERE ANY EXCAVATION OR CONSTRUCTION WORKS ARE TO BE IN CLOSE PROXIMITY TO
TO REQUEST AN INSPECTION, THE CONTRACTOR WILL BE RESPONSIBLE FOR ALL COSTS TO                   NEIGHBOURING LOT BOUNDARIES OR INFRASTRUCTURE, CONTRACTOR TO ALLOW IN
ALLOW FOR THE WORKS TO BE INSPECTED TO THE SATISFACTION OF RECOR. ANY                           SCOPE OF WORKS TO PROVIDE ALL MEASURES NECESSARY TO ENSURE THE INTEGRITY
INSPECTIONS THAT FAIL ARE TO BE RE-INSPECTED WITH ALL REINSPECTION COSTS TO BE PAID             OF EXISTING BOUNDARIES AND INFRASTRUCTURE. THIS MAY INCLUDE THE USE OF LOW
BY THE CONTRACTOR.                                                                              VIBRATION EQUIPMENT, TRENCH SHORING ETC AS REQUIRED.
a.      PRESTART                                                                          11. PRIOR TO THE CONTRACTOR COMMENCING ANY WORKS DETAILED ON THESE DRAWINGS,
b.      EARTHWORKS - FINAL STRIPPING OF TOPSOIL, INSTALLATION OF SEDIMENT AND EROSION         THE CONTRACTOR IS TO NOTIFY RECOR AND RECEIVE WRITTEN CONFIRMATION THAT
        CONTROL MEASURES UNSUITABLE GROUND                                                    WORKS CAN COMMENCE.
c.      SIDE AND CUT OFF DRAINS                                                           12.   CONTRACTOR TO PROVIDE AS CONSTRUCTED DRAWINGS FOR ALL CONSTRUCTED WORKS
                                                                                                IN ACCORDANCE WITH LOCAL GOVERNMENT REQUIREMENTS. UNLESS OTHERWISE
d.      STORMWATER PIPE LAID ON BEDDING PRIOR TO BACKFILL                                       ADVISED BY RECOR CONTRACTOR TO NOTE COUNCILS ADAC REQUIREMENTS.
e.      STORMWATER TRENCH BACKFILLED PRIOR TO PAVEMENT PLACEMENT                          13.   CONTRACTOR TO UNDERTAKE ALL WORKS IN ACCORDANCE WITH RELEVANT APPROVALS.
f.      STORMWATER STRUCTURE BASE SLABS                                                   14.   CONTRACTOR TO ALLOW TO LIASE/CO-ORDINATE WITH ELECTRICAL, LANDSCAPE AND
g.      SEWER RETICULATION                                                                      OTHER SERVICE CONTRACTORS THROUGHOUT CIVIL CONSTRUCTION.

h.      WATER RETICULATION                                                                15.   CONTRACTOR TO ORGANISE ALL DEMOLITION PERMITS PRIOR DEMOLITION WORKS
                                                                                                COMMENCING ON SITE.
i.      PAVEMENT SUBGRADE
                                                                                          16.   CONTRACTOR TO ALLOW TO DEMOLISH ALL EXISTING STRUCTURES, ROADS AND
j.      PAVEMENT REINFORCING                                                                    SERVICES WITHIN LIMIT OF WORKS AND REMOVE FROM SITE U.N.O.
k.      PAVEMENT PRIOR TO SEALING (PRESEAL)                                               17.   CONTRACTOR TO UNDERTAKE DILAPIDATION REPORT FOR ADJOINING PROPERTIES AND
l.      RETAINING WALL FOOTING REINFORCING                                                      COUNCIL ROADS AND VERGES PRIOR TO COMMENCEMENT OF ANY WORKS ON SITE.

m.      RETAINING WALL BLOCKWORK PRIOR TO CORE FILL                                       18.   CONTRACTOR TO CLEAR AND GRUB ALL VEGETATION ON SITE AS IDENTIFIED IN THE
                                                                                                APPROVED VEGETATION MANAGEMENT PLAN. CONTRACTOR TO ENSURE ALL TREE ROOTS
n.      STEEL REINFORCEMENT OF CONCRETE STRUCTURES                                              AND STUMPS ARE COMPLETELY REMOVED AND BACKFILLED TO LEVEL 1 SUPERVISION.
o.      PRACTICAL COMPLETION                                                                    CONTRACTOR TO ALLOW TO MULCH ALL CLEARED VEGETATION AND STOCKPILE ON SITE
                                                                                                OR REMOVE FROM SITE AS DIRECTED.
p.      ON MAINTENANCE
                                                                                          19. DRAWINGS TO BE READ IN CONJUNCTION WITH THE FOLLOWING
q.      OFF MAINTENANCE                                                                       CONSULTANTS/CONTRACTORS DRAWINGS:
r.      ANY OTHER INSPECTION AS SPECIFIED BY LOCAL COUNCIL (REFER DEVELOPMENT                          SURVEYOR: NOOSA COOLOOLA LAND SURVEYS PTY LTD
        APPROVAL)                                                                                                                                                                                                              LOCALITY PLAN
                                                                                                       ARCHITECT: BLACK WOOD ARCHITECTURE & DESIGN
s.      ANY OTHER INSPECTION AS REQUIRED BY UNITY WATER AND WHERE RELEVANT TO THEIR
                                                                                                       HYDRAULICS: TBC                                                                                                         NOT TO SCALE
        CERTIFICATION SCHEME
                                                                                                       STRUCTURAL: TBC

GENERAL NOTES                                                                                          LANDSCAPE: TBC

1.      ALL DIMENSIONS SHOWN ARE IN METERS UNLESS OTHERWISE SHOWN.                        20. CONTRACTOR TO PREPARE AND HAVE APPROVED BY RELEVANT AUTHORITY: ROAD
                                                                                              OPENING PERMIT AND TRAFFIC MANAGEMENT PLAN FOR ALL WORKS WITHIN COUNCIL
2.      ALL SETOUT ON SITE IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR. CONTRACTOR           ROAD RESERVES. CONTRACTOR TO ALLOW FOR ALL COSTS ASSOCIATED WITH
        TO ALLOW FOR ALL MEANS NECESSARY TO ACCURATELY SETOUT THE WORKS.                      IMPLEMENTATION OF THE TMP.                                                                                     DRAWING SCHEDULE
3.      ALL WORKS TO BE CONSTRUCTED IN ACCORDANCE WITH PROJECT SPECIFICATIONS AND
        WHERE FURTHER DETAILS ARE REQUIRED THE CONTRACTOR SHALL REFER TO NOOSA
                                                                                          21. ALL WORKS TO BE COMPLETED IN ACCORDANCE WITH ALL LOCAL AUTHORITY APPROVALS
                                                                                              RECEIVED FOR THE PROJECT
                                                                                                                                                                                            DRAWING NUMBER                      DRAWING TITLE
        SHIRE COUNCIL DEVELOPMENT GUIDELINES, LOCAL WATER AUTHORITY GUIDELINES,
                                                                                          22. CONTRACTOR TO UNDERTAKE ALL WORKS IN ACCORDANCE WITH OPW APPROVALS BY
                                                                                                                                                                                                  C01                  COVER SHEET AND LOCALITY PLAN
        ASSOCIATED STANDARD DRAWINGS AND SPECIFICATIONS U.N.O.
4.      SHOULD ANY OF THE CONSTRUCTED WORKS BE CONSTRUCTED OUTSIDE OF THE
                                                                                              COUNCIL.                                                                                            C10                    EXISTING SITE SERVICES PLAN
                                                                                          23. NO WORKS ARE TO BE UNDERTAKEN ON LAND OUTSIDE OF THE SITE BOUNDARY WITHOUT
        TOLERANCES SPECIFIED WITHIN THE PROJECT SPECIFICATION AND LOCAL AUTHORITY
                                                                                              FORMAL APPROVAL BY THE OWNER/CUSTODIAN OF THAT LAND INCLUDING BUT NOT                               C20                 EROSION SEDIMENT CONTROL PLAN
        REQUIREMENTS, THE CONTRACTOR WILL RECTIFY AT THEIR COST INCLUSIVE OF ANY
        ADDITIONAL COSTS INCURRED BY RECOR.                                                   LIMITED TO PRIVATE PROPERTY, ROAD RESERVE, PARKS/OPENSPACE, EASEMENTS.                              C21                EROSION SEDIMENT CONTROL DETAILS
                                                                                          24. THE CONTRACTOR SHALL HAVE AN APPROVED SET OF CONSTRUCTION DRAWINGS AND
5.      EXISTING SERVICES HAVE BEEN PLOTTED FROM SUPPLIED DATA AND AS SUCH THEIR
                                                                                              APPROVALS ON SITE AT ALL TIMES.                                                                     C30                      BULK EARTHWORKS PLAN
        ACCURACY CANNOT BE GUARANTEED. NO RESPONSIBILITY IS TAKEN BY RECOR OR THE
        PRINCIPAL FOR THE ACCURACY AND COMPLETENESS OF THIS INFORMATION. IT IS THE        25. ALL WATER AND SEWER RETICULATION WORKS TO BE CONSTRUCTED IN ACCORDANCE                              C31                    BULK EARTHWORKS SECTIONS
        RESPONSIBILITY OF THE CONTRACTOR TO ACCURATELY ESTABLISH THE LOCATION AND             WITH THE SEQ WATER SUPPLY AND SEWERAGE DESIGN AND CONSTRUCTION CODE (2013).
        LEVEL OF ALL EXISTING SERVICES PRIOR THE COMMENCEMENT OF ANY WORKS. ANY                                                                                                                   C40                 ROADS AND DRAINAGE LAYOUT PLAN
        DISCREPANCIES SHALL BE REPORTED TO THE SUPERINTENDENT. CONTRACTOR TO
        LOCATE AND PROTECT SERVICES AS REQUIRED DURING PROPOSED WORKS.                                                                                                                            C41                    ROADS AND DRAINAGE DETAILS
6.      THE CONTRACTOR IS TO CHECK THROUGH LOCATING, POTHOLING AND SURVEY ALL                                                                                                                     C42                        DRIVEWAY SECTIONS
        CRITICAL CONNECTION POINTS FOR ALL CIVIL WORKS SHOWN ON THE DRAWINGS
        INCLUDING ANY POTENTIAL EXISTING SERVICES CLASHES PRIOR TO COMMENCEMENT OF                                                                                                                C43                   STORMWATER CATCHMENT PLAN
        CIVIL WORKS. CONTRACTOR TO IMMEDIATELY REPORT ANY DISCREPANCIES TO RECOR
        AND AWAIT FORMAL DIRECTION PRIOR TO COMMENCING CIVIL WORKS.
                                                                                                                                                                                                  C44                 STORMWATER DRAINAGE SECTIONS
7.      ON COMPLETION OF SERVICES INSTALLATION, ALL DISTURBED AREAS SHALL BE                                                                                                                      C45                         SWEPT PATH PLAN
        RESTORED TO ORIGINAL LEVEL, INCLUDING KERBS, FOOTPATHS, CONCRETE AREAS,
        GRAVEL AREAS, GRASSED AREAS AND ROAD PAVEMENTS.
8.      CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR OF ANY DAMAGE TO
        AUTHORITY/COUNCIL'S INFRASTRUCTURE. SUCH REPAIR OR REINSTATEMENT TO BE
        CARRIED OUT IMMEDIATELY TO THE SATISFACTION OF INFRASTRUCTURE
        OWNER/MANAGER / AUTHORITY/COUNCIL.




                                                                                                               SCALE:                                                        CLIENT:                            APPROVED BY:                   PROJECT NAME:

                                                                                                                                                                                                                                               RESIDENTIAL DUPLEX AT 22 DELORME ST
                                                                                                                                         N.T.S.                                                                                                TITLE:                 STATUS:

                                               D    06/12/22   RFI UPDATE               BRP      BRP     NW                                                                                                                                    COVER SHEET & LOCALITY ISSUED FOR APPROVAL
      © ABN 89 647 469 707                     C    21/10/22   REISSUED FOR APPROVAL    MVP      BRP     NW                                                                            SANTIAGO NOMINEES              NATHAN WAGSTAFF
                                               B    12/06/22   REVISED ARCH LAYOUT      BRP      BRP     NW
         37 MARY ST                                                                                                                                                                                                      RPEQ: 26443
                                               A    19/05/22   MCU ISSUE                BRP      BRP     NW
     NOOSAVILLE, QLD 4566                                                                                                                                                                                                CPEng NER             DRAWING NUMBER:        PROJECT NUMBER:            REV:
        +61 7 5211 1003                       REV   DATE                DESCRIPTION     DWN     CHK     APP                                                                                                                                                                             SHEET
                                                                                                                                                                                                                        DATE: 06/12/22                                                   SIZE:
RECORCONSULTING.COM                                                         REVISIONS                                                                                                                                                          C01                    20220130          A1 D
Log in to download the original file

20220230-CV-Set.pdf · 4.3 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.