20220230-CV-Set
Original PDF page 3, section 1. The text section number identifies this passage in the reader.
SEDIMENT CONTROL
1. ALL SEDIMENT AND EROSION CONTROL MEASURES TO BE IN ACCORDANCE WITH INTERNATIONAL EROSION CONTROL ASSOCIATION
(IECA) AUSTRALIA GUIDELINES AND THE SPECIFICATIONS.
135 1. SEDIMENT AND EROSION CONTROL DETAILS SHOWN ARE MINIMUM REQUIREMENTS. IT IS THE CONTRACTORS RESPONSIBILITY TO
INSTALL ADDITIONAL CONTROL MEASURES AS DEEMED NECESSARY THROUGHOUT CONSTRUCTION.
RP160425 2. THE CONTRACTOR IS RESPONSIBLE TO MAINTAIN ALL SEDIMENT CONTROL DEVICES IN A FUNCTIONAL ORDER AND REPLACE ALL
8
.7
|S|
BLOCKED SEDIMENT DEVICES AS REQUIRED UNTIL SUCCESSFUL OFF MAINTENANCE OF WORKS.
29
3. CONSTRUCTION OF ALL SEDIMENT MANAGEMENT DEVICES TO THE SATISFACTION OF THE SUPERINTENDENT. SHALL BE COMPLETED
AND EFFECTIVE PRIOR TO:
29
.41 a. STRIPPING OF TOPSOIL AND GRASS.
8
b. BULK EARTHWORKS TO THE SITE.
.8
|S|
29
c. SERVICES INSTALLATION.
d. PAVEMENT CONSTRUCTION
5. ALL SEDIMENT MANAGEMENT MEASURES ARE TO REMAIN IN PLACE UNTIL INSTRUCTION IS RECEIVED IN WRITING FROM THE
SUPERINTENDENT TO REMOVE ALL OR PART OF THE SILT CONTROL APPLICATIONS.
|S |
8
.0
6. THE BULK EARTHWORKS AND SEDIMENT CONTROL LAYOUT PLAN SHALL BE READ IN CONJUNCTION WITH THE APPROVED DRAWINGS.
30
7. PRIOR TO COMMENCEMENT OF CONSTRUCTION APPROVAL IS TO BE OBTAINED FROM THE SUPERINTENDENT FOR THE LOCATION OF
THE SITE ACCESS POINT AND WASH DOWN AREA WHICH ARE TO BE MAINTAINED THROUGHOUT THE CONSTRUCTION PERIOD.
7
.9
30
8. IF SEDIMENT AND EROSION CONTROL DEVICES HAVE BEEN FOUND TO BE DIFFERENT OR FAILED IN SERVICE, CORRECTIVE ACTION IS
09
9.
TO BE UNDERTAKEN IMMEDIATELY WHICH MAY INCLUDE AMENDMENTS' ADDITIONS TO THE ORIGINAL APPROVED EROSION CONTROL
|S2|
1
.8
PLANS. SUCH AMENDMENTS ARE TO BE APPROVED BY SUPERINTENDENT, IF DEEMED NECESSARY AND RELEVANT.
9
29
30
.2
8
.2
30
.9
7
30
30.83 9. OVERALL
30.79 a. TEMPORARY DRAINAGE CONTROL FLOWS SHOULD BE DIVERTED AROUND THE WORK SITE WHERE POSSIBLE.
|S|
b. ALL DRAINAGE, EROSION AND SEDIMENT CONTROLS TO BE INSTALLED AND BE OPERATIONAL BEFORE COMMENCING UP-SLOPE
Pool EARTHWORKS.
c. IN AREAS WHERE RUNOFF TURBIDITY IS TO BE CONTROLLED, EXPOSED SURFACES TO BE EITHER MULCHED, COVERED WITH
30.61
2
EROSION CONTROL BLANKETS OR TURFED IF EARTHWORKS ARE EXPECTED TO BE DELAYED FOR MORE THAN 14 DAYS.
.6
30
|S |
SEDIMENT FENCE
7
137
.6
30
10. FOR SEDIMENT FENCE STANDARD DETAIL AND SPECIFICATION REFER TO NOOSA SHIRE COUNCIL STANDARD DRAWING ESC-04 AND
RP160425
8
ESC-05, OR ALTERNATIVELY INTERNATIONAL EROSION CONTROL ASSOCIATION AUSTRALASIA (IECA) BEST PRACTICES STANDARD
.3
14
30
9.
DRAWINGS SF-01 AND SF-02 SEDIMENT FENCE.
|S2|
TEMPORARY CONSTRUCTION ENTRY/EXIT
5
.6
136
30
0
11. FOR CONSTRUCTION ENTRY / EXIT STANDARD DETAIL AND SPECIFICATION REFER TO NOOSA SHIRE COUNCIL STANDARD DRAWING
.2
0
.5
29
1
30
ESC-01, OR ALTERNATIVELY INTERNATIONAL EROSION CONTROL ASSOCIATION AUSTRALASIA (IECA) BEST PRACTICES STANDARD
.4
.0 |S|
30
30.27 DRAWINGS EXIT-01 AND EXIT-02 CONSTRUCTION EXIT - ROCK PAD (CONSTRUCTION SITES ONLY), EXIT-03 - ROCK PADS FOR BUILDING
1
SITES AND EXIT-04 AND EXIT-05 CONSTRUCTION EXIT - VIBRATION GRID.
29
CATCH DRAIN
.4 .43
30
|S|
12. FOR CATCH DRAIN STANDARD DETAIL AND SPECIFICATION REFER TO INTERNATIONAL EROSION CONTROL ASSOCIATION AUSTRALASIA
7
30
(IECA) BEST PRACTICES STANDARD DRAWING CD-01 CATCH DRAINS AND CD-03 CATCH DRAINS - TURF LINED.
32
30.
.
30
0
REET
41
.3
30
GRASSED FILTER STRIP
13. FOR GRASS FILTER STRIP STANDARD DETAILS AND SPECIFICATION REFER TO INTERNATIONAL EROSION CONTROL ASSOCIATION
|S|
en
Existing Dwelling
f Kerb
AUSTRALASIA (IECA) BEST PRACTICES STANDARD DRAWING GFS-01 AND GFS-02 GRASS FILTER STRIPS.
f Bitum
Floor Level
RL29.37 REVEGETATION
.90
Back o
|S|28
14. FOR REVEGETATION STANDARD SPECIFICATION REFER TO INTERNATIONAL EROSION CONTROL ASSOCIATION AUSTRALASIA (IECA)
Edge o
ME ST
BEST PRACTICES STANDARD DRAWING R-01 REVEGETATION GENERAL.
30.2
9 OPERATION AND MAINTENANCE
7
34
.1
.
30
30
15. IN ACCORDANCE WITH NC ESC GUIDELINES, ALL ESC MEASURES SHALL BE INSPECTED:
|S|
· AT LEAST DAILY (WHEN WORK IS OCCURRING ON SITE) OR WEEKLY (WHEN WORK IS NOT OCCURRING ON SITE)
· WITHIN 24 HOURS OF EXPECTED RAIN; AND
· WITHIN 18 HOURS OF A RAINFALL EVENT (I.E. AN EVENT OF SUFFICIENT INTENSITY AND DURATION TO MOBILISE SEDIMENT ON SITE).
30
16. IN ACCORDANCE WITH NC ESC GUIDELINES, MAINTENANCE OF ESC MEASURES SHALL OCCUR IN ACCORDANCE WITH THE FOLLOWING
.14
TABLE:
21
|S|
.
30
DELOR
7
28.0|S|
30.13
30.06
|S| MAINTENANCE SCHEDULE
4
.9
|S| TIMEFRAME FOR COMPLETION
02
28
ESC MEASURES MAINTENANCE TRIGGER
|S|
.
OF MAINTENANCE
30
|S|
|S| SEDIMENT BASIN WHEN SETTLED SEDIMENT EXCEEDS THE WITHIN 7 DAYS OF THE
29.24 |S (WHERE UTILISED) VOLUME OF THE SEDIMENT STORAGE INSPECTION
| 29 ZONE (SEE COUNCIL'S SEDIMENT BASIN
|S|
01
27.23 |S|29. .73 DESIGN GUIDELINES
30.
63
Back o 89
29.
OTHER ESC MEASURES THE CAPACITY OF ESC MEASURES IS BY THE END OF THE DAY
f
Edge o Kerb
EXCEEDED
9
.0
27
f Bitum
en 28.3
8 29.83 REPORTING
29.72 17. CONTRACTOR IS TO PROVIDE AN UPDATED PROGRAM OF ESC MAINTENANCE AND CONTROL OF ALL STAGES OF WORK FOR APPROVAL
6
6
.2
.5
28
29
BY THE SUPERINTENDENT.
28
9
.2
29.24
.
30
27
6
29.4
2
.1
29
LEGEND
7
.4
28
SAFARI
|S| SEDIMENT FENCE
29.
50
STREET
CONSTRUCTION ENTRY
3
.4
STOCKPILE
30
6
.8
30
SEDIMENT AND EROSION CONTROL:
CONTRACTOR TO ALLOW FOR PROVISION OF ALL REQUIRED
SEDIMENT AND EROSION CONTROL DEVICES IN ACCORDANCE
WITH IECA AND NOOSA SHIRE COUNCIL POLICIES AND
GUIDELINES
SCALE: CLIENT: APPROVED BY: PROJECT NAME:
RESIDENTIAL DUPLEX AT 22 DELORME ST
1:100 TITLE: STATUS:
EROSION & SEDIMENT ISSUED FOR APPROVAL
© ABN 89 647 469 707 C 21/10/22 REISSUED FOR APPROVAL MVP BRP NW SANTIAGO NOMINEES NATHAN WAGSTAFF CONTROL PLAN
B 12/06/22 REVISED ARCH LAYOUT BRP BRP NW
37 MARY ST RPEQ: 26443
A 19/05/22 MCU ISSUE BRP BRP NW
NOOSAVILLE, QLD 4566 CPEng NER DRAWING NUMBER: PROJECT NUMBER: REV:
+61 7 5211 1003 REV DATE DESCRIPTION DWN CHK APP SHEET
DATE: 21/10/22 SIZE:
RECORCONSULTING.COM REVISIONS C20 20220130 A1 C
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.