Council archive · source document
08/1698 - Preliminary Building Appoval [As Published] · 172008.1698
FLOOR AREAS GROUND FLOOR FIRST FLOOR 270m? 224m? 494m? SITE COVER SITE AREA 611 m BUILDING FOOTPRINT _305.5m? SITE COVER 50% REAL PROPERTY DESCRIPTION Lot 14 on DP/SP 21842 LGA: Noosa Shire 30 Noosa Parade, NOOSA HEADS Q. 4567 GENERAL NOTES Toilet doors are to open outwards or be fitted with lift off hinges in accordance with part 3.8.3.3 of BCA Housing Provisions. All glazing in buildings to comply with the requirements of part 3.6 of BCA2006 Housing Provision and AS1288/2005. A glazing certificate from the manufacturer for compliance with AS1288 must be provided on completion. Where existing crossover is modified the builder shall construct Kerb & Channel to match adjacent and to local authority requirements. All Balustrading to Decks shall be engineer certified. Builder to allow for disposal from site all waste materials during demolition and construction period. Smoke alarms must comply with AS 3786 and be connected to the consumer mains power. Smoke alarms must be located in accordance {with part 3.7.2.3 of the building code of Australia. TANKING OF HABITABLE AREAS All steps in floors where retaining walls have been installed or where retaining walls are used as extemal walls of habitable rooms are to be waterproofed by an approved tanking system and installed by an accredited installer. The approved system is to be certified for compliance upon completion. BUILDING WORKS SETOUT Building Works to be setout by Licensed Surveyor. Identification and height verification survey to be carried out once fascia/gutter and ridge to roof has been erected to confirm no works encroach boundaries, other than those for which relaxation/ dispensation has been granted, and the building has been constructed in accordance with approved plans and height does not exceed 8.0m height limit as per the local planning scheme. EXCAVATIONS Any required sheet/ screw/ contiguous piling is to be designed and certified by RPEQ so as to support likely imposed loads and not cause or allow damage to adjacent building works or land. All boundary works, including temp. works not to encroach over boundary. Builder to make allowance to prop, shore and retain the sides of all excavations required for building construction. The builder shall satisfy himself as to acceptable methods to employ prior to commencing ‘any’ excavation. Any slippage or damage caused as a result of excavation shall be made good by builder. Adequate retention methods are the full responsibility of the builder. % eo, SURFACE WATER DRAINAGE The ground beneath suspended floors must be graded so that the area beneath the building is above the adjacent extemal finished ground level and surface water is prevented from ponding under the building. Refer figure 3.1.2.3 of BCA 2006 Housing Provisions. The extemal finished ground level surrounding the building must be graded to a slope not less than 50mm over the first 1.0m from the building in accordance with Figure 3.1.2.2 of BCA 2006 Housing Provisions. The finished ground level is to be a minimum of 150mm below ground floor level. TERMITE PROTECTION TERMITE PROTECTION The building shall be protected from subterranean termites by approved physical and/ or chemical barriers in accordance with AS3660.1. The precise method of protection shall be determined by the owner/ s and/ or builder only after consultation with a licensed pest control operator. This information then shall be advised to the Local Government or Licensed Certifier prior to, or at the time of lodgement of the Building Permit Application. Thereafter, the owners shall ensure that any physical barriers are kept clear of garden beds and/ or soil build up, that any chemical barriers remain undisturbed and that annual inspections (plus eradication as necessary ) are carried out thoughout the life of the building by a licensed pest control operator in accordance with AS3660.1. On the completion of the building prior to the final inspection by the licensed Building Certifier, a licensed Pest Controller is to inspect and confirm that the termite system installed has not been bridged or breached and the required visual barrier has been maintained. 990 Gonna 's ENERGY EFFICIENCY REQUIREMENT Pro Therm “Reffecta Cell” 7mm insulation to be installed to all roof spaces (excluding decks) to manufacturer's direction. Pro Therm "Reflecta Shield” 4mm insulation to be installed to all exterior framed walls and framed floors in accordance with manufacturer's direction All extemal doors and windows to be fitted with a Seal to restrict air infiltration Hot water systems shall be fitted with a heat trap within one metre of the outlet of the heater and before the first branch. All exhaust fans to conditioned spaces to be fitted with a self closing damper. SUB-FLOOR VENTILATION The sub-floor space beneath the suspended floor of a building must be designed and constructed in accordance with Part 3.4.1.2 of BCA 2006 Housing Provisions. WATER SUPPLY Water Supply: Connect to estate mains in accordance with development approval and local authority requirements If mains water pressure exceeds or could exceed 500kPa, a water pressure limiting device shall be installed to ensure that the maximum operating pressure at any outlet within the boundaries of the property does not exceed 500 kPa. WATER_ PROOFING WET AREAS Waterproofing of wet areas to comply with AS3740-2004. A certificate including, but not limited to, bathrooms, WC and laundry from an approved waterproofing applicator will be required before a final certificate can be issued. STORMWATER Roof & surface stormwater to be disposed of in accordance with local authority requirements SEDIMENT CONTROL Alocal authority/ EPA compliant silt arrestor is to be installed to the full length of the downward slope of the site, and all other boundaries where material may be lost, including any vehicular crossings, until project completion or landscaping has been completed and matured to a sufficient stage to retain sediment during storm events SEWERAGE carried out in accordance with local authority requirements ELECTRICITY Contractor to supply and install earth leakage, lightning arrestor and power surge protector ARCHITECTURAL DRAWING SET 100 series drawings - SITE PLANS WD 101 - Cover Sheet WD 102 - Existing Site PLan WD 103 - Site Cover & Setout Plan 200 series drawings - PLANS WD 201 - Sub Floor Plan WD 202 - Ground Floor Plan WD 203 - First Floor Plan WD 204 - Roof Plans WD 205 - Ground Floor Dimension Plan 300 series drawings - CEILING PLANS WD 301 - RCP Sub & Ground Floor WD 302 - RCP First floor 400 series drawings - ELECTRICAL PLANS WD 401 - Sub Floor & Ground Floor Electrical Plans WD 402 - First Floor Electrical Plans 500 series drawings - ELEVATIONS WD 501 - Elevations NW &SW WD 502 - Elevations NE & SE WD 503 - Boundary wall Elevations 600 series drawings - SECTIONS WD 601 - Sections A&B WD 602- Sections D,E &F WD 603 - Sections G,H & WD 604 - Sections C&J 700 series drawings - DETAILS WD 701 - Details 1 WD 702 - Details 2 WD 703 - Details 3 WD 704 - Details 4 WD 708 - Details 5 800 series dwgs - JOINERY WD 801 - Cellar & Entrance study WD 802 - Laundry WD 803 - Kitchen WD 804 - Kitchen WD 805 - Kitchen WD 806 - Bedroom 5 WD 807 - Bedroom 5 WD 808 - PWD / Bath / Fire WD 809 - PDR / Bathroom WD 810 - Ens 1 & robes WD 811 - Ens 1 & robes WD 812-Ens 1 & 3 & robes WD 813 - Ens 3 & robes WD 814 - Ens 3 & 4 & robes WD 815 - Ens 4 & robes WD 816 - Ens 4 & 2 & robes WD 817 - Ens 2 & robes WD 818 - Ens 2 & Robes WD 819 - Office & Extemial WD 820 - Extemal BBQ 900 - series - SCHEDULES WD 901 - Door & Gate schedules WD 902 - Window Schedules 1 of 2 WD 903 - Window Schedules 2 of 2 &2ZZ4 RC Block Reinforced Concrete <== Timber Framed Wail Structural Floor Level generally +s.3.500 Spot Level r.3500 Reduced Level Top of Wall level FeL3600 Finished Floor Level Te} il kidd +CO designers 20 Duke Street Sunshine Beach QLD 4567 PO Box 262 Noosa Heads QLD 4567 07 5447 5633 07 5447 5833 Telephone Facsimile [email protected] www.kiddco.com.au This drawing is to be Tead in conjunction with Engineers Drawings & T2 Issued for Building Approval 26.11.07 T1 Issued for tender 16.11.07 PS General revision 18.10.07 P4 General revision 13.09.07 P3 General revision 15.08.07 P2 General revision, Issued for development approval 23.04.07 PA Issued for development aproval 23.04.07 Project PROPOSED pe SIOENC Location 30 NOOSA PARADE NOOSA HEADS Client TAYLOR Drawing Tie COVER SHEET Scale Date as shown Mar.'07 Drawn By Job No: 0705 LF/IEW Drawing No. Issue No. WD.101 (cr)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1698 - Preliminary Building Appoval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.9 MB (small file)
- File type
No other editions are linked here.