Our ref: SPL222
Your ref: 13.2009.325.1
Noosa Iconic Panel
28 August 2009
Mr Andrew Stewart
Caloundra Building Approvals
PO Box 135
Golden Beach QLD 4551
Dear Mr Stewart
I wish to advise that on 28 August 2009 your application for a material change of use (detached
house) at 6 Allambi Rise, Noosa Heads, was approved by the Noosa Iconic Panel acting as the
assessment manager in the place of the Sunshine Coast Regional Council (the Council), in
accordance with the Iconic Queensland Places Act 2008, s52. The decision is detailed in this
Decision Notice.
As the application has been decided by the Noosa Iconic Panel, any representations you intend to
make about this decision notice must be made to the Noosa Iconic Panel. Also, any requests you
intend to make in the future, to change the development permit, or to change or cancel conditions of
this approval, must be made to the Noosa Iconic Panel. However, requests to change the relevant
period of approval must be made to the Council.
Decision Notice
iconic Queensland Places Act 2008, integrated Planning Act 1997
JAPPLICATION:DETAILS...* 7 <. 3 hee te es aa
Application No: 2009/325
Street address: 6 Allambi Rise, Noosa Heads
Real property description: Lot 2 RP 88575
Planning Scheme: The Noosa Plan
Relevant local government Sunshine Coast Regional Council
[2 --. NOOSA'ICONIC'PANEL’S'DECISION-DETAILS * a ae |
The following development approval is given, subject to conditions:
. Development Permit for Material Change of Use - Detached House
|3-. .;REEEVANT-PERIOD-OF APPROVAL *
The relevant period for this Preliminary Approval is identified in the conditions.
63 George Street
Brisbane
PO Box 15009 City East
Queensland 4002 Australia
Telephone + 61 7 3033 0596
Facsimile + 61 7 3225 2238
Website www.dip.qid.gov.au
ABN 25 166 523 889
Page 1 of 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 13 pages
Page 2
.» Noosa Iconic Panel Decision Notice - Development Permit Material change of use — detached house 6 Allambi Rise, Noosa Heads 28 August 2009 - “CONDITIONS © - mR] Approved Plans 1. Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table and as may be amended by these conditions. Plan'No. “Rev. ‘Plan'Name ~Preparediby ghee <e - : wn 1 of 9 E Site Plan & Perspective Views — MRA Design iJuly 2009 | 2 of 9 | E Floor Plans - MRA Design Ho 1July 2009 6 of 9 E Elevations & Roof Framing— MRA Design / 1July 2009 ; 7 of 9 E | Sections A-A, B-B & C-C — MRA Design a | ‘July 2009 | 8 of 9 E | Sections DD, E-E, G-G & F-F — MRA Design : 1July 2009 | ~ 1 Roof Overhang Diagram —- MRA Design 10 July 2009 2 Poot fence plan & Elevation— MRA Design 10 July 2000 | and as may be amended by these conditions. Security Bond 2. Security in the form of a cash bond or trading bank guarantee to the sum of $3,000 must be submitted to Council, to secure performance of all conditions of this approval, prior to the issue of a Development Permit for building works. The cash bond or trading bank guarantee will be returned on performance of the conditions of approval less any costs incurred by Council in respect of enforcing performance of this permit. General 3. The development must be undertaken and operated in a manner that causes no detrimental effect upon the amenity of the neighbourhood by reason of the creation of excessive noise, lighting nuisance or other emissions. The proposed development shall have all kitchen, laundry and bathroom fittings that comply with the AAA Water Conservation Rating System as defined by the AS/NZS 6400 (Water Efficient Products - Rating and Labelling 2003) and AS/NZS 3500 (National Plumbing and Drainage Standard Part 1.2), with toilets to comply with the AAAA Water Conservation Rating System. All tap ware and shower roses shall not exceed a maximum flow of 9 litres per min. Dishwashers and washing machines are excluded from this requirement. Buildings and structures (including swimming pools, sheds, tennis courts or outbuildings) shall not be constructed under overhead electricity transmission lines, or within any easements. External colours and finishes of the building shall comprise of muted/environmental tones that blend with the natural environment. Relevant Period 7. The Development Permit for a material change of use lapses if the use has not happened by 28 August 2013, unless an application to extend the currency is approved by Council. Page 2 of 7
Page 3
Noosa Iconic Panel Decision Notice — Development Permit Material change of use — detached house 6 Allambi Rise, Noosa Heads 28 August 2009 Building Height 8. The building height shal! not exceed 8.0 metres above the natural ground level, finished ground level and 2 storeys. 9. A verification survey of the building is to be carried out by a Licensed Surveyor and a certificate lodged with Council at completion of the work confirming compliance with the maximum allowable building height as required by either the conditions of approval of the Planning Scheme. Landscaping 10. Aminimum of 20% of the site shall be retained as soft landscaping. 11. Existing trees within the road reserve shall be retained. 12. One Koala food tree shall be planted within the road reserve in accordance with Council's PSP 3 Landscaping Plants and Guidelines. 13. Existing trees on the site shall be retained, except where required to be removed due to building operations or the conduct of the approved use. 14. All other vegetation shall be protected from interference resulting from clearing or construction activities by: 14.1. Clearly marking vegetation to be retained with flagging tape; 14.2. _ Installing protective fencing around the drip line of the vegetation; 14.3. Stockpiling, storage and vehicle parking occurs in already cleared areas and does not cause interference with vegetation; and 14.4. Low impact construction techniques are used around vegetation to minimise interference with the vegetation 15. Cleared vegetation is to be suitably processed by one of the following methods and removed frorn the site: 45.1. Processing through a woodchipper or shredder. The resulting mulch is to be stockpiled loose in heaps of less than 1000 cubic metres, less than 2.5 metres high with a minimum of 10 metres between edges of heaps. 15.2. Disposal for firewood. 15.3. Disposal for landscaping purposes. 15.4. | Transport to alternative site for breaking down materials provided that all necessary permits have been obtained to allow the alternate site to be used for this purpose. 15.5. The applicant is advised that burning off is an unacceptable method of disposal Frontage Works 16. All redundant vehicular crossings to the site shall be removed and replaced by kerb & channel, footpath paving and landscaping such as trees and grasses in accordance with Council's Standard specifications prior to commencement of the use permitted by this permit. Roof Water & Stormwater Drainage 17. Roof runoff from any new building shall be directed to a rainwater storage system or tank that is installed to ensure water from the rainwater storage system or tank is used for external uses (such as watering gardens, irrigation, ornamental ponds, water features, topping-up swimming pools, outdoor cleaning, etc) and for internal (ground floor) use in washing machine cold taps and toilet cisterns. All rainwater tanks are to be designed and installed in accordance with the Queensland Development Code (QDC) current at the time of building approval, and shall be part of the plumbing application for approval. The location and capacity of the tanks shall be clearly shown on the plans submitted for Building Works Approval and any overflow shail be directed to Council's kerb and channel system in Allambi Rise. . Page 3 of 7
Page 4
Noosa Iconic Panel Decision Notice — Development Permit 18. 19. 20. 21, Material change of use — detached house 6 Allambi Rise, Noosa Heads 28 August 2009 All stormwater drainage (including roof water overflow from the rainwater storage system) shall be collected and discharged so there is no net increase in stormwater runoff from the site. Stormwater drainage permitted to drain from the site shall be as follows: Drainage of the driveway and basement area shall be undertaken generally in accordance with Drawing no. 781-02 issue C by Spice Consulting dated 1 July 2009. Building Works Approval must not be granted unless the final drainage design is accompanied by certification by a Registered Professional Civil Engineer that the drainage will not cause ponding to neighbouring properties and will not affect the foundations of the subject building. All balance drainage (i.e drainage from areas other than the driveway and basement area) shall drain to Council's kerb & channel street drainage system in Allambi Rise. Plans of the drainage design shall be prepared by a Registered Professional Civil Engineer and submitted prior to obtaining a Building Works Approval. The maximum discharge of stormwater drainage allowable to Council’s kerb & channel street drainage system at any one location is 25 litres /second. All site stormwater drainage shall be by means of a gravity system. Earthworks 22. 23. Earthworks required on site shall be carried out in accordance with Council's Planning Scheme Ht Policy PSP5 Engineering Design Standards, so as not to cause the additional ponding of water on any adjoining lands or concentrate or direct overland flow on to an adjoining property. is Earthworks carried out on site shall not affect the structural integrity of any of the existing fences or structures that border the development site. In this regard a condition survey of all buildings or structures that border the site must be undertaken prior to commencement of excavation works. Site Stability 24, A Geotechnical Engineer or similar qualified expert shall assess the soil condition on site, determine the soil classification, establish whether any measures are required to protect the stability of adjoining buildings and/or structures and/or land, and make recommendations on the excavation methodology best suited for the proposed development. The recommendations : of this report shall be incorporated into the design and construction of the proposed ' development. Erosion and Sediment Control 25. Engineering - General 26. 27. 28. Any person acting on this permit shall prevent erosion and sediment export from leaving the site. Site control measures such as silt fencing, controlled gravel access to the site and controlled disposal of waste, will be necessary during construction. In this regard, plans detailing the methods of controlling erosion and sediment in accordance with the Healthy Waterways document and fact sheet series titled “Controlling Stormwater Pollution on your Building Site dated 2006” are required to be submitted with the application for a Building Works Permit. Any damage caused to any public utility during the course of construction shall be repaired to | Council's standards and at no cost to Council. ; Any alteration of any public utility or other facilities necessitated by the development of the land or associated construction works external to the site shall be at no cost to Council The transportation of all materials to and from the site shall be undertaken in a manner such that no particle matter escapes onto a public road. All vehicles carrying materials either to or from the site shall be covered to prevent materials including dust being windblown from the vehicle. Page 4 of 7
Page 5
Noosa tconic Pane! Decision Notice - Development Permit
Material change of use — detached house
6 Allambi Rise, Noosa Heads
28 August 2009
[5: REFERRAL AGENCY CONDITIONS _ . . ; oO |
The referral agencies applicable to this application are:
Referrat Trigger Referral Status | Referral Agency Referral Address
Nil _ | oe |
fé. APPROVED PLANSIDOCUMENTS __
The plans and / or documents recommended for approval are listed in the following table:
=
. Plan No. , | Rev. | Plan Name — Prepared by . " ' |.Date
10f9 E." } Site Plan & Perspective Views — MRA {July 2009 |
i a Design.
2.0f9 | E | Floor Plans + MRA Design’ _ “ "+4 AJuly 2009
6 ord E Elevations & Roof Framing— MRA | 1July 2009
. / _| Design 7 * aye ger os .
7of9. E Sections A- A, B-B & EC= MRA Design TJuly 2009 .
.8 of 9 JE. . Sections D-D, E E, c G& Fs F - MRA | tJuly 2009
a : Design — ' eS
1° Roof Overhang Diagram — MRA Design | 10 July 2009 .
| 2 Pool fence plan & Elevation— MRA | 10 July 2009
i Design :
: _ s . 1 _— . ood
\7..- ADVISORY.NOTES . . LETTER TET aT TL |
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
1. The requirements of the Environmental Protection Amendment Regulation (No. 2) 1999 and
Council's Local Law No. 12, prevents a builder or building contractor carrying out building
work on a building site in a way that makes or causes audible noise to be made from the
building work:
1.1. On a Sunday or public holiday, at any time; or
1.2. On a Saturday or a business day, before 7.00am or after 6.30pm.
A maximum penalty of $1,500 applies to an offence under this legislation.
You are advised that the site is identified as a Koala Living Area under the Nature
Conservation (Koala) Conservation Plan 2006 and Management Program 2006-2016 and
may contain koalas. The use of a Koala Spotter is encouraged in areas where koalas are
likely to occur, prior to the removal of Angophora, Corymbia, Eucalyptus, Lophostemon and
Melaleuca species. Further information can be obtained from the Environmental Protection
Agency at http:/Awww.epa.qid.gov.au or phone (07) 3227 8185.
Prior to the commencement of the development, a plumbing assessment must be obtained
from Sunshine Coast Regional Council's Plumbing Services Section in accordance with the
Plumbing & Drainage Act 2002 (as applicable).
Pursuant to the Building and Construction Industry (Portable Long Service Leave) Act 1997 if
the cost of operational works exceeds $80,000, then a portable long service leave levy is
required to be paid. In accordance with Section 77.(1) of the Act, Council is required to sight
the approved form issued by the Building and Construction Industry (Portable Long Service
Leave) Authority that confirms that the requirements of the Act have been satisfied. A
statutory declaration outlining the cost of the operational works must be submitted to Council
with the lodgement of any application for operational works over the site.
Page 5 of 7
Page 6
Noosa Iconic Panel Decision Notice — Development Permit Material change of use — detached house 6 Allambi Rise, Noosa Heads 28 August 2009 Aboriginal Cultural Heritage Act 2003 There may be a requirement to establish a Cultural Heritage Management Pian and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act). The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries out an activity must take all reasonable and practicable measures to ensure the activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value of Aboriginal cultural heritage. You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any obligations under the ACH Act. 18. [PROPERTYjNOTES <=? eek OME ER geo age PE et eee Not applicable [9-~_- PRELIMINARY APPROVAL OVERRIDING:SCHEME = ic Not applicable [10.. “FURTHER DEVELOPMENT PERMITS REQUIRED. | Type of Development Permit required - | Subject of the required: Development Permit : Development Permit for Building Works All Building Works [41._ ‘SELF. ASSESSABLE‘CODES "3 The developer must comply with the following codes for self-assessable development related to the development approved under this Decision Notice: Not applicable [12, SUBMISSIONS, “yee Be ee | Not applicable [43. REASONS /'GROUNDS.FOR APPROVAL DESPITE CONFLICT-WITH SCHEME. =... «| Not applicable fid. OTHERDETALS shy A copy of all supporting and common material for the application, including Council's planning assessment report is available on PD Online at http://rrif. noosa. qld. gov.au/masterviewpublic/modules/applicationmaster/default.aspx?page=wrapper &key=013.2009.00000325.001 }15:. “APPEALS? te “| The applicant is entitled to appeal against this decision. A copy of the relevant appeal provisions from the Integrated Planning Act 1997 are attached. During the appeal period, the applicant may make written representations to the Noosa Iconic Panel, about the conditions contained within the decision notice. If the Noosa Iconic Panel agrees or partly agrees with the representations, a “negotiated decision notice” will be issued. Only one “negotiated decision notice" may be given. Taking this step will defer your appeal period, which will continue after the Noosa Iconic Panel makes its decision. (Refer to section 3.5.17 and 3.5.18 of the integrated Planning Act 1997). Page 6 of 7
Page 7
Noosa Iconic Panel Decision Notice — Development Permit Material change of use — detached house 6 Allambi Rise, Noosa Heads 28 August 2009 Please note that Sunshine Coast Regional Council may appeal the decision as if it had been a submitter for the application. Accordingly, any notice of appeal must also be forwarded to Council. This development approval takes effect - e if the applicant does not appeal the decision, the earlier date of either: — when the submitter’s appeal period ends; or ~ the day the last submitter gives the assessment manager written notice that the submitter wil] not be appealing the decision. OR ¢ subject to the decision of the court, when the appeal is finally decided, if an appeal is made to the court. If you have any queries in relation to this decision notice, please contact me on (07)3033 0596. Yours sincerely Andrew Foley Manager Regional Planning Systems Planning Services Page 7 of 7 te a
Page 8
\
h
a ,
all
_]) Aiconerescron To Comey wry re wuR.DIN CODE OF
: a = hay . -
AS APPUOVED 87 176 LOCAL AUTON ND BU ACOORONE SLY my jos « 90°00'00" 40.891 j Fence 0.40 West
ERLRE he GROMMD LEVEL FALLS VAN 1.20 ODM AMAY FROM o 7 x ~ At " a Peg Pld
PROVIDE AND MAINTAIN EROSION AND BEDEKENT CONTROL, , ! / e . 3" Highsst Point RL ”
‘SL, VEGPY ALL ODAEGIOND, BETEACKGS AND LEVELS OF mS ef - ms =>
FRR S REET RN OE ys f “ft 2 e - Fished Pad
‘TERMITE PROTECTION TBM r Level 49.800
PERUIETLR OF BAB eo nus Pee EO ons ts orton : . / + . VES} we
R/S in Kerb |! ea ee | ae
TATARIOENTS To Buc beso uc a8 Downs prea wut NEA RL 48.676 AHD Se eee
(OF THE BARRIER EVETES OGSCFOGED FTES MAT. MUST BE
(BE PROMOED TO Th ATTACHMENT. REGARDLERS OF THG ACE OF
Sees ra un met rhe oot i : suspondid Concrete Sav | | RAE Sree perenne
Seo : eee ES To Eng. Specs, +£8.00 RL ian
Cin COMRADES PG) |
%
SOROS TET roses x
= 8
Paorecrion or sree @ Recuamin shai erm ACCORDANCE ~ : an FFL 53.200 = FFL 49,900
Upper Floor = Ground Ftoor
1
Hy
i
‘|
i
He
GINail pid
in top fence post
0.017 m ‘ 40
clear of .
boundary
Peg Pid /) Edge of Conc Driveway TTT cage 1 ga°00'00" \, 47.556 \ cre Wall
/ ye
|| Salat. te rane riper eran constavcron ; fy 44,056 Sat OutDim \ s
tis eeereraee an /* ° : \ Existing Block Wall 3.4-high
: . fp / Banksia Existing Block Wall 0.60 Kigh
‘Abiee0 - POOL FENN pig ~ . 0.204H .
RP52918
Site Plan _. 1:100
FO OLINS uervcruneKs wnnecarHFOR. . \ .
SOIC ences OPE FOR ‘
(FUN CONGRTE DOA CONTRACTORS BPECEATION FOR.
STRATA DOSN OF UOENEROAAD CONCRETE
WATER TANK {
OOK PRs 28. OF Tra GUCENSLAND
PERSPECTIVE VIEWS NOT FOR CONSTRUCTION PURPOSES
‘Dene crirga rena copes eC URADwon df *
Page 9
GENERAL FINISHES SCHEDULE i eee ee SS a qe Ground Floor Plan, N00SA ICOMEC PANEL PLANS APPRO Signature: DS
Page 10
Ad Hacorata & Baisvads To.
1:100
SR OR
Hit
INU UiR
cL
weoow
(Gay 60 ak TORE CAPE ON TE
urn mt
NOOSA
PLAN
Signature: {>
ICONSC PANEL
REFER ENGINEERS DOCUMENTATION FOR ALL FRAMING SIZES
REFER ENGINEERS DOCUMENTATION FOR POINT LOADS.
ALL ROOF BEAMS TO BE CONCEALED IN ROOF SPACE. ALL PULINS TO BUTT JOIN INTO BEAMS)
ENGINEERS DESIGN TO TAKE PRECEDENCE
mena Teste Lr Yo 9. Go
Tok “Teter Lemeeened Menor Ud
(Hote): Bax Gutter To Comply With B.C. Section 3.5.2 & Eng. Specs,
Confirm All Parapet Roofs Gear Truss/rafters Behind
: Ali Downpipes To Be 100mm Dia
Hytroulic Consultants Design To Take Precedence
Page 11
CS ‘Eumpercied Concente Stab Win Soran Burd se 200 Deep T Arsured Petenate Te Erg Spas.
Page 12
Section G-G : 1:100 Section F-F : 1:100
7 1 Window Detail 1:20
COimen Staines Stal Ds: Type Spacer
I Fdng For Giaxs- t
“ {Bibvon Jainad Mikisection Pakington
‘CrerGreerrGues, ree
manwaSiaae
Hoar te ppd Get. OS Oomcoice oon Het eyed Gab. UB
Flaed MAW Cag. Datata, Cowngipa > 4 Sr knacpro bemier Eom rad in AW EG. Spec,
Be Conowaied i OS-Form Concrete Win? Wen BCAPat 3912302 ee ®
kwvy Guiees Sal One Tipe
t Fang us Guasea be Woe
1 ' Marutcaaree Space.
Beemer cure 1 — < Cons Sam ,
Fad Down Fars Of Sty Windom, tt | Er gt Ret smi Ok Tye ge Sates Window Detail 1:20
Cocme uecory Saved ut 25025 ret Doped Ga UB
Ero Specs rt } Suapenced Corer Site fe btcanisn
‘Pst ZS Hol Dipped Ge. US Rese San. -
road in AW Eng. Goes. Growted SOmen Rebate To S2>
Ep bcm Ge tt :
a. ——_—J (i Feira oo ee 6 sam Set Oy Soe
Goes tata Ba AW ASL2ED — Fang Fer Gaze i
cea Sabie Sel One Tips
1 Fag bus Caame bhaee
- Nenare Sea
Wall/Box Gutter Detall 4:20 Water Feature Detail #420 Handrail Detail 1:20 som ates nes or Sain
i
i
‘200mm Suspencad Conc ‘Sab Proven
ite Ov Uncerse OFS Eng
Otome
.
\ Window Detail 1:20
7
3 | l
Page 13
—
Spa Wall Max 2000 High 90°00'00" 40.891
a a * - Q& “
= Oo ~ Highest Point RL pe
Finshed Pad
Level 49.800
pended Concrete Sab :
Eng. S | $55,800 RL
ng. Specs. +5 A +ACross Hatched Area
Denotes Overhang
‘ v WV otal Percentage’ !Of
Overhang = 80.70%
Suspended Concrete Sab .
To Eng. Specs. -¢56,400 RL Slab
Vv
FALL
FFL 53.200
Upper Floor
Proposed
Residence
FFL 49.900
Ground Floor
57,050 Top Of Bund
Removable Window Hood +9770 OH
onniann { Wire Fence °
90°00'00 . . Cnr Wall PLANY APPROVED
t Out Dim 0 017 m Signature: $-..
Existing Block; Wall 3.4high ‘
Banksia Existing Block Wall 0.60 Aigh : clear of Date: ... DK XE
(
Roof Overhang Diagram : 1:100
) mrre
M P/7 07 5493 6906 QBSALIc. No, 1135156
Lot 2 No 6 Allambi Rise -Little Cove-
ne em
Page 14
es ee ee i
t
) High Rendered Concrete Masonry Block Well cn cee weeussuz -n2000 High Rendered Concrete Masonry Block Wall.
Be
Water Proofed & Orained
Manner
sorcce ey nye ae i
RL-TOP OF SLAB
SLAB FL 49.900
Pool Fencing Plan 1:100
All Handrails & Balustrade To :
Comply With BCA Part 3.9.1. & 3.9.2 !
Seca — ae | | SSE RD DU NOOSA
sl eee — EE a ae pended eee —--------- 4-H ICONIC PANEL
3
my SO}
oe
NI
russ _ 7) a eS | ee tt i iedeal eee ee ee
_ calgon: — ee ee ee de er —
doinery
Selected Tiles Over Concrete
Masonry Wall To Eng. Specs.
2
si
° Frameless Glass Pool Fencing
In AW AS 1926
7 Fm 190 Concrete Masonry
fo Eng. Specs. Approx. Height
ns * 2000mm
Pool Fencé Elevation 1:100
° Prac Ne:
No
+ 180
2
Lot 2 No 6 Allambi Rise -Little Cove- ERTICTEYMONTSIT #17 07 6493 5008 OBSALic, No, 1135158
“—
Used in these records
SUPERSEDED 09/0325 - Decision Notice & Approved Plans - Noosa Iconic Panel [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.6 MB (small file)
- File type
No other editions are linked here.