Landscape Specification
SCOPE OF WORKS
Landscape works to include the following:
+ Exeavation and drainage
+ Topsoil supply and placement
+ Turf supply and lay
+ Street tree pfanting area edging
+ Planting bed shaping
© Containerised plant material - supply and installation
+ Organic mutch - supply and Installation
+ 12 month maintenance of landscape works
. Attendance at Council pre-start, on and off-maintenance meetings
Contractor shall take full account of documentation of Civil Engineering, Hydraulic and Electrical
Engineering Works,
EXCAVATION AND DRAINAGE
Break up and remove any debris from construction works to achieve required planting depths.
Excavate to bring the subsoil to a minimurn of 300 mm below finished design levels. Shape the
subsoil to fall to subsoil drains where applicable. Break up the subsoil to a further depth of 100
Tim. Drainage is ta be incorporated to all planting areas that are enclosed by hard edging and
not otherwise drained.
‘TOPSOIL - SUPPLY AND PLACEMENT
Planting areas are to be filled with a premium grade blended organic garden soil mix toa
minimum of 300 mm depth compliant with AS4419. Soil supplier, as well as intended mixis to
be nominated prior to start of works and approved by superintendent. Soilis to be maunded
to facilitate good drainage to hardstand areas {max 1:3 grade) and is to finish 150 mm below
edging after settlement. Organic additive such as ‘Dynamic tifter'is to be incorporated
throughout the soil mix at the recommended rate. Aslow release fertiliser such as ‘Osmocote!
‘or equivalent is also to be incorporated with individual planting in accordance with the
‘manufacturers recommendations, To improve the water holding capacity of the dry and well
drained soils on site, the adding of a moisture holding product such as 'Hydrocelf' or 'Rainsaver’
is recommended following manufacturers guidelines.
TURF - SUPPLY AND LAY
Turf must be "A” grade couch with minimum sod depth of 2 mm. Turf must be installed within
24 hours of being cut. Runs must butt hard against each other and seams topdressed with
topsoil. Any depressions / damage within turf areas are to be replaced or top dressed with
clean river sand as directed by superintendent.
SHAPING OF PLANTING AREAS
Planting areas are to be finished In a gently mounded fashion to facilitate drainage of excess
water and to show planting to best advantage, Contractor is to seek confirmation of finished
levels prior to final plantings and application of mutch.
CONTAINERISED PLANT MATERIAL
Superintendent to approve plant material prior ta planting. Planting is tobe
carried out in a manner consistent with good horticultural practice, All 300
pot and larger piant material is to be guyed and staked as per Tree Planting
Detail. Smaller plant stack is to be staked as necessary. Stakes shall not pass
through the roothall of plant at time of planting or any time thereafter.
Stock may be rejected if plants are:
a) undersized proportional to specified container size or if
the root system is underdeveloped
b) oversized proportional to specified container size or
severely root bound
c) unbalanced or uncharacteristic of normal or specified
growth pattern for the species
| not suitably acclimatised for the specific environment
€) diseased, infested with pests or suffering from other
form of significant stress
4} ree stock is not compliant with NATSPEC: Specifying Trees and Is not
certified as compliant by level § Arborist
MULCH
Supply organic mulch which is aged composted produced by chipper being a combination
of leaf and bark. Place mulch toa depth of 100 mm and rake to an even surface 8mm.
below the surrounding finished levels. Avoid placement against green plant stems and
keep below street tree trunk flares. Soil laden tub grindings will not be accepted. Mulch to
finish SOmm below adjoining edging.
STREET TREE EDGING
Street tree edging to be concrete edging.
MAINTENANCE
a) Monitor plant performance and stress constantly and
take appropriate remedial action. Soil moisture fevels
are critical during early establishment.
b} Mow turf fortnightly,
) Prune shrubs and trees as required,
d) Remove all stakes at 90-day inspection,
e) Fertilise all plants at three months,
{) Replace damaged / failed trees and plants.
@) Reinstate any damaged landscape works damaged during the maintenance pariad,
h) Contractor shall record inspections in a written log
book,
Street Tree Detail - Back of Kerb
1 NATSPEC compliant tree stock with arborist certification,
Species and pat size as per schedule. Rootball mounded
100-150mm above surrounding finished level to facilitate
improved drainage,
2 100 mm composted forest mulch as specified avoiding contact
with tree stem,
3 Excavated planting hole 2x width of rootball with sloping sides,
backfilled with site soil mixed with imported AS4419 compliant
Ale N topsoil, Soil gently mounded to top of root plate.
4 Socked §Omm dia. agricultural pipe wrapped around base of
roatball and connected to kerb subsoil drainage filter media, or
sand / screenings drain connecting tree pit to kerb filtration
media
Subsoit
Lightly compacted soil under root package to prevent tree from
stumping
Cancrete kerb to Eng, detail
Road pavement
Kerb Filtration Material
100mm dia slotted PVC pipe
Concrete Footpath / edge as specified on plans
mgeen
Street Tree Detail -
Proposed Park
NATSPEC compliant tree stock with arborist certification,
Species and pat size as per schedule, Roatball mounded
100-150mm above surrounding finished level to facilitate
improved drainage.
100 mm composted forest mulch as specified avoiding contact
with ee stem,
Excavated planting hole 2x width of rootball with sloping sides,
backfilled with site soil mixed with imported AS4419 compliant
topsoil, Soil gently maunded to top of root plate.
Socked 50mm dia, agricultural pipe wrapped around base of
football and connected to kerb subsoil drainage filter media, or
sand / screenings drain connecting tree pit to kerb filtration
pilot hole
7 Planting area
media
Lightly compacted soil under root package to prevent tree from
slumping.
Provide spray edge
Chamfer to
remove
sharp edges
1 Selected garden bed mulch (100mm arin,
depth ta finish 25mm below timber edge
Oressed 50xL00mm Hardwood edge
Turf as specified
Topsoil as specified
Compacted sub-grade
Treated Timber Stake min, $0x300mm,
Secured with Gal, decking. Screw through
kerb
AW
no under planting Concrete Path (refer Eng. Plans) timber edge
Street Tree Bed - Layout
Edge of path
Park Street Tree - Layout
50
t= Chamfer to \
Temove
sharp edgos
re ep
8) /4
4 1
| Treated Timber Stake - Galvinlsed fixings!
Aq—to finish below edging border pre-dilled holes
and be Inconspicuausly
covered by Bark, Cy
‘sl
SIDE ELEVATION PLAN
NOTES:
Timber edging to be 80 x 100mm
dressed F14 Hardwood finished
flush with grassed area,
Timbers shall be secured via
treated limber stakes & galvinised fixings.
‘Timbers to rest on compacted earth bed,
Timber Edging Detail
Check oll dimensions before commencement of work.
Check Site boundary dimensions from the Title plons
Check Building Boundary clearances by set out.
Notwilhsfonding the information supplied on this drowing,
the location, depth ond extent of underground or overhead
services are to be confirmed ond protected on ste by the
contractor prior to commencement of works.
“Approved . .
Checked - ALP 2 Consulting Civil & Drawing title - Project - BUNNINGS WAREHOUSE | site - Project 111246 Sheet No. LAOS of 5
Design - ALP Drown - J.W a Structural Engineers Kev GVEY Ba cPEgMEArLSPENAPER- 1823 SPECIFICATIONS LANDSCAPING EUMUNDI NOOSA Digitol Ref :15 sPecincaTON Issue:
, (Hons) ~
Seales — NTS Date MAR 11 COVEY ’ Priect sonagement| Sr aurea (07) sus 7777 Ciet- H,. TROON PTY LTD ROAD, NOOSA This Document is copyright ond shall nat be copied
Document Stage = Ie PREY SUE Gw| ASSCCIATESPTYLTD 4 blanning Fo Bo 16 Re gun 4ssa (07) S443 7577 without written cpproval, rior shall it be used except
gt APPROVAL [rote Desripton ay |__ 2 7 805 ae ere oe etae com ou for the Development ond the Site Specified.
ON QUOBS\ 11\111246\Landscaping\DWG\LAS SPECIFICATION.dwg
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 2 of 2Related documentApplication case desk ↗
About this file
- File size
- 5.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.