Bushfire Management PlanA3-FINAL 280319

Attached to the e-mail Operation Works Application - OPW19/0266 - 215 David Low Way, Peregian Beach (EMAIL 3/3) - Fauna Management, Landscaping, Bushfire Management, Environmental Management, Waste & Preliminary Construction Management Plan.

of 3

Page text shows just the words. Original shows the document exactly as it was published.

                                                                                              Therefore, the Bushfire Management Plan has established a set of actions for Stage 1
       Bushfire Management Plan –                                                             and then stage 2 which will incorporate the actions for stage 1.
                                                                                                                                                                                             Vegetation Management
       Essence of Peregian Beach                                                              Site description                                                                               1. All vegetation within the development footprint is to be removed as a natural
                                                                                              The site is located at 215 David Low Way, Peregian beach and is to the west of the                consequence of the bulk earthworks.
Introduction                                                                                  Peregian Village Shopping Centre and the Peregian Beach Hotel, both of which are to the        2. All landscaping around the Hotel is to consist of plant species that is considered to be
                                                                                              west of the David low Way.                                                                        less flammable plant species. These will be specified in the approved Landscape
This Bushfire Management Plan has been prepared as part of the Conditional Approval                                                                                                             Management Plan.
for the development as contained in the final Negotiated Agreement between Thomco                                                                                                            3. No clearing or other removal of vegetation within the conservation area is to be
                                                                                              The site is accessed from Sandpiper Court via a combined access road with the Peregian
(No. 2087) Pty Ltd and Noosa Council in the Planning and Environment Court.                                                                                                                     undertaken unless prior approval from Noosa Council is obtained.
                                                                                              Village Markets.
Conditions 46 to 48 relate to bushfire management and certification for the development.                                                                                                     Fire hydrants
                                                                                              To the west is an area of Council managed Open space/Conservation Area and further
This Bushfire Management Plan responds to Condition 46.
                                                                                              west is part of the Noosa National Park – Lake Weyba Section.
                                                                                                                                                                                             1. Hydrant stand pipes are to be located at the following locations to assist with bushfire
Approved development                                                                          Landform and Vegetation                                                                           suppression: -
                                                                                                                                                                                                a. At the south-western corner of the Hotel
The Negotiated Agreement and Court decision allowed for the following to be constructed                                                                                                         b. At the north-western corner of the Hotel
                                                                                              The site has a gradual slope from west to east at a gradient of less than 5% slope.
within the Essence of Peregian beach development: -                                                                                                                                             c. Other hydrants will be located as part of the Stage 2 development.
                                                                                              While the development site will be cleared of all existing vegetation, the vegetation within
   The approval is for 19 x 3+ bedrooms Visitor accommodation Type 4 dwelling units,         the Council managed Open space/conservation area is mapped by the State                        Access for Emergency Services
    1 x manager’s unit and a Visitor accommodation Type 4 motel building which contains       Governments Regulated Vegetation Management Supporting Map as the Regional
    10 x 2 bedrooms dwelling units and 22 x 1 bedroom accommodation units.                    Ecosystem 12.2.15 - Gahnia sieberiana, Empodisma minus, Gleichenia spp. closed                 1. The approval has included a 3 metre wide Emergency access roadway between the
   The manager’s unit is for permanent occupation by the manager of the approved             sedgeland in coastal swamps and 12.2.12 - Closed heath on seasonally waterlogged sand             hotel and the car park for the Peregian Village Markets will be constructed as part of
    Visitor accommodation Type 4 dwelling units.                                              plains.                                                                                           Stage 1 works
   The approved units must be used for short term visitors only. The approved units                                                                                                         2. This access easement is not for Emergency Service vehicles/appliances but to provide
    must not be occupied by persons for continuous occupation in excess of 90 days for                                                                                                          an emergency access roadway so the main roadway will not be cause conflicts for
                                                                                              It is noted a narrow belt of Melaleuca quinquenervia, Glochidion ferdinandi and Hibiscus
    each calendar year. A register of occupation must be kept by the body corporate and                                                                                                         Emergency Services responding to a vegetation or structural fire.
                                                                                              tiliaceus as well as a number of environmental weed species is located to the south of the
    made available to Council upon request. The requirements of this condition must be                                                                                                       3. This emergency roadway is to be one way from the internal roadway to the entrance
                                                                                              site behind the Peregian Beach Hardware Store and Sandpiper Court.
    included in the Community Management Statement for any, body corporate for the                                                                                                              road (north to south) and is to be gated to prevent it being used ad-hockly for day to
    subject site. If the development is to be staged the motel must be built in the first                                                                                                       day traffic.
                                                                                              A vegetated buffer containing less flammable plant species will be planted along the
    stage.                                                                                                                                                                                   4. All Emergency vehicles/appliances are to use the main internal roadway to gain
                                                                                              western edge of the development footprint and stormwater detention basin.
   The development will be access from David Low Way via Sandpiper Court with a                                                                                                                access to the development area.
    combined entry point with the Peregian Village Markets Shopping Centre.                                                                                                                  5. Pull in areas will be located on the western side of the road for Emergency Vehicles
                                                                                              Additionally, the landscape management plan which will be prepared as part of the                 which attend a vegetation within the Noosa National Park – Weyba Section or
   The units will be serviced by 6 and 6.5 metre wide internal private roadways.             Operational Works approval will list a range of species for plantings within the
   The site will also contain two recreation areas and a detention basin and a batter to                                                                                                       structural fire within the Stage 1 development.
                                                                                              development
    an area of wet heath/’sedgeland to the west of the development.
   This area of wet heath/sedgeland was dedicated to Council as Open                                                                                                                        Bushfire Alert and Response
    Space/Conservation Area as part of the Peregian Village Markets Shopping centre           Bushfire Hazard Mapping
    development approval. To the west of this Conservation Area is the Noosa National                                                                                                        1. An Emergency Response Plan is to be prepared in conjunction with this Bushfire
    Park – Lake Weyba Section managed by the Queensland Parks and Wildlife Service            The Noosa Plan, Bushfire Hazard Overlay Mapping maps the vegetation to the west as                Management Plan to provide a set of actions to be undertaken by the site manager
   A 3 metre wide Emergency Access internal roadway has also been planned for which          an area of Medium bushfire hazard with much of the development area covered by a 100              should they become aware of a bushfire which may threaten the Essence of Peregian
    will provide an emergency exit way for any visitors to the site if and when the site is   metre wide Potential impact buffer covering virtually all of the development site.                Beach development.
    threaten by a fire which would be burning within the Noosa National Park. Lake                                                                                                           2. The Hotel emergency evacuation route is via the rear fire stairs of the Hotel and along
                                                                                                                                                                                                the pathway to the Peregian Village Markets which is to be the designated assembly

    Weyba Section.
    Additional pedestrian access is also provided into the Peregian Village Markets           Bushfire Management Plan                                                                          area.
    Shopping Centre and to the northern boundary and an existing concrete pedestrian
    pathway, Rufus Lane along the site’s northern boundary. this pathway provides             The purpose of this Bushfire Management Plan is to provide guidance for bushfire               Stage 2 – Residential Units
    pedestrian access to David Low Way to the east and Rufus Street at its western end.       planning and mitigation of the effects of a bushfire which may involve, at some stage in
                                                                                              the future, the vegetation to the west of the Essence of Peregian Beach development.           Vegetation Management
Staging
                                                                                              Stage 1                                                                                        1. All landscaping within 50 metres of the Conservation area is to be restricted to less
                                                                                                                                                                                                flammable plant species.
In accordance with the amended approval, the Essence of Peregian Beach can be
                                                                                              Stage 1 of the Essence of Peregian beach consists of the Essence of Peregian beach             2. Suggested less flammable species includes: -
constructed in two stages, Stage 1 will consist of the Essence of Peregian Beach Hotel
                                                                                              Hotel building. The internal roadway which will service the holiday self-contained units as       a. Cupaniopsis anacardioides
and Stage 2 will consist of the 20 self-contained short stay holiday units.
                                                                                              well as the associated infrastructure will not be constructed as part of the Stage 1              b. Jagera pseudorhus
                                                                                              development.                                                                                      c. Cryptocarya laevis
                                                                                                                                                                                                d. Alyxia ruscifolia
Bushfire Management Plan - 215 David Low Way, Peregian Beach – Essence of Peregian Beach                                                                                                                                                                             19 March 2019
Log in to download the original file

Bushfire Management PlanA3-FINAL 280319.pdf · 273 KB (small file)

Full text of the other 2 pages

Page 2

`

   e. Cordyline rubra
   f. Symplocos harroldii
                                                                                                Plan provision and revision
3. Additional species may be included in the planting schedules in the Landscape
                                                                                                1. A copy of this plan is to be located with the site manager,
   Management Plan for the site.
                                                                                                2. A copy of the plan is to be provided to the local area Qld Fire and Emergency Service
4. No clearing or other removal of vegetation within the conservation area is to be
                                                                                                   Command Centre
   undertaken unless prior approval from Noosa Council is obtained.
                                                                                                3. A copy of this plan is to be provided to Asset Management Section of Noosa Council
5. Plantings around the two recreation areas is to be restricted to grasses and low
                                                                                                4. A copy of this plan is to be provided to the Local national Parks Management Office
   herbaceous species.
                                                                                                   for the Noosa National Park.
                                                                                                5. The Bushfire Management Plan is to be reviewed every 6 years to ensure that it is
Fire hydrants                                                                                      current with the level of risk presented by the vegetation within the Council
                                                                                                   Conservation Are and the Noosa National Park.
1. Hydrant stand pipes are to be located at the following locations to assist with bushfire
   suppression: -
   a. At the visitor parking areas adjacent to the southern recreation area and swimming        Building compliance
      pool,
   b. At the corner of the internal roadway adjacent to the northern recreation area and        1. All Class 1, 2, 3 and 10a structures within the development are to be assessed against
      swimming pool.                                                                               AS3959 – Construction of Buildings in Bushfire Prone Areas at the time of
                                                                                                   construction.
Access for Emergency Services
1. The approval 3 metre wide emergency access roadway between the hotel and the car
   park for the Peregian Village Markets will be constructed as part of Stage 1 works.
   This Emergency access roadway will be opened following the completion of Stage 2
   development works.
2. This access easement is not for Emergency Service vehicles/appliances but to provide
   an emergency access roadway so the main roadway will not be cause conflicts for
   Emergency Services responding to a vegetation or structural fire.
3. This emergency roadway is to be one way from the internal roadway to the entrance
   road (north to south) and is to be gated to prevent it being used ad-hockly for day to
   day traffic.
4. All Emergency vehicles/appliances are to use the main internal roadway to gain
   access to the development area.
5. An additional, Pull in area will be located on the western side of the road for Emergency
   Vehicles which attend a vegetation within the Noosa National Park – Weyba Section
   or structural fire within the Essence of Peregian Beach site.

Bushfire Alert and Response
1. An Emergency Response Plan is to be prepared in conjunction with this Bushfire
   Management Plan to provide a set of actions to be undertaken by the site manager
   should they become aware of a bushfire which may threaten the Essence of Peregian
   Beach Residential area (Stage 2).
2. The residential emergency evacuation route is via the internal roadways to the
   emergency egress roadway between the Hotel and the Peregian Village Market and
   out onto Sandpiper Court on onto the David Low Way for vehicles.
3. Pedestrian evacuation is via the internal footpaths to the Peregian Village Markets to
   an assembly point. An alternative pedestrian egress point is via the pathway between
   Units 13 and 14 onto Rufus Lane and east to the David Low Way.

Fencing
1. A 2.4 metre high non-flammable fence with steel posts and panels is to be constructed
   along the northern boundary of Lots 9 and 10.
2. This fence is to wrap around the western boundary of Lot 9, between the northern
   recreation area and Lot 9, to a line with the front of the building on Lot 9.
3. No other fencing for bushfire mitigation is required within the residential/Stage 2 of the
   development.

Page 3

Figure 1 – Approved Development Layout with Fire hydrant & Fence locations




                                                                                           Possible Hydrant stand pipe location
                                                                                           (to be finalised by the Hydraulic
                                                                                           Engineers in consultation with QFES
                                                                                           and Noosa Council)



                                                                                                   Non-flammable Fence




Bushfire Management Plan - 215 David Low Way, Peregian Beach – Essence of Peregian Beach                                    19 March 2019

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.