Council archive · source document
Craven Duplex BA01_Rev A · MCU17/0565
Attached to the e-mail Duplex & Op Works - MCU17/0565 & OPW17/0599 -PAYMENT LINK SENT AWAITING OWNERS CONSENT.
600
OH 1
5.1 PARAPET PARTY WALL, FIRE SEPARATION;
ROOF INSULATION AS PER NCC REQUIREMENTS BLOCKWORK CONSTRUCTION TO
600 ENGINEERS DETAILS. ACCOUSTIC
TRIMDEK METAL ROOF SHEETING, COLORBOND REQUIREMENTS AS PER CSR REDBOOK
FINISH, FIXED TO MANUFACTURERS DETAIL OH
2.00° WIR METAL GUTTER, HALF ROUND PROFILE
CL2 M Design
PO Box 290
100mm PVC DOWNPIPE, PAINT FINISH Peregian Beach QLD 4573
BSA No. 1066058
FC SOFFIT LINING FIXED TO
MANUFACTURERS DETAIL, PAINT FINISH 9mm FC CLADDING, TIMBER COVER
STRIPS AT JOINTS, RANDOM AT 450 Contact: Michael Broeren
600 600
GLAZING AS PER SCHEDULE BED 1 CRS AS PER ELEVATIONS, PAINT FINISH t. 07 5471 2721
OH OH t. 0422 969 645
GATE & FENCE TO
DETAIL, PAINT FINISH ROOF INSULATION AS PER NCC REQUIREMENTS w. www.m-designs.com.au
UNIT 1
LEVEL 2
CL1
KITCHEN MEALS BATH
HALL BED 3
LIVING WALL INSULATION AS PER NCC REQUIREMENTS
© COPYRIGHT 2017 - M DESIGN
RETAINING WALL,
THE IDEAS AND CONCEPTS
EXTENTS TBC PLASTERBOARD LINING, FIX TO CONTAINED WITHIN THIS DOCUMENT
MANUFACTURERS DETAIL. PAINT FINISH AND THE DOCUMENT ITSELF REMAIN
THE INTELLECTUAL PROPERTY OF M
LEVEL 1 DESIGN AND MAY NOT BE COPIED
CL FLOOR BEAMS & JOISTS TO ENGINEERS DETAILS OR REPRODUCED IN PART OR IN
WHOLE WITHOUT EXPRESSED
WRITTEN PERMISSION FROM
GALV STEEL COL TO REVERSING PAD TO ENGINEERS DETAILS MICHAEL BROEREN OF M DESIGN.
ENGINEERS DETAILS
VISITOR
16.10.17
DATE
CUT & FILL AS PER NCC REQUIREMENTS GARAGE PARKING
WATERPROOF MEMBRANE AS PER
SPEC,INSTALLED TO MANUFACTURERS DETAIL
GF
DESCRIPTION
REINFORCED CONCRETE FOOTINGS 150 SAND BEDDING WITH
CUT & FILL AS PER NCC REQUIREMENTS
& SLAB TO ENGINEERS DETAILS. VAPOUR BARRIER TO SLAB BASE
COUNCIL APPROVAL
SECTION AA A
1 : 100 5.1
REV
B
PARAPET PARTY WALL, FIRE SEPARATION;
BLOCKWORK CONSTRUCTION TO ENGINEERS DETAILS. 600 600
ACCOUSTIC REQUIREMENTS AS PER CSR REDBOOK
OH OH
CL2
7 Parkedge Road, Sunshine Beach QLD
ROOF INSULATION AS PER NCC REQUIREMENTS
600 600
OH OH METAL GUTTER, HALF ROUND PROFILE
2.00° 2.00°
100mm PVC DOWNPIPE, PAINT FINISH
2.00° UNIT 2 UNIT 1
LEVEL 2 PLASTERBOARD LINING, FIX TO
MANUFACTURERS DETAIL. PAINT FINISH
CL1
PROPOSED DUPLEX
WALL INSULATION AS PER NCC REQUIREMENTS
LIVING LIVING
STAIR 2
STAIR 2
9mm FC CLADDING, TIMBER COVER
STRIPS AT JOINTS, RANDOM AT 450
CRS AS PER ELEVATIONS, PAINT FINISH
HALL HALL
FEATURE TIMBER CLADDING
JOINERY ITEM
PRELIMINARY - NOT FOR CONSTRUCTION
Project Address:
LEVEL 1
CL FLOOR BEAMS & JOISTS TO ENGINEERS DETAILS
Craven
RENDERED BLOCKWORK WALL TO ENGINEERS DETAILS
For:
STAIR 1
STAIR 1
STEEL PANEL LIFT DOOR
CUT & FILL AS PER NCC REQUIREMENTS VISITOR sheet title:
GARAGE
WATERPROOF MEMBRANE AS PER PARKING
SPEC,INSTALLED TO MANUFACTURERS DETAIL
GF SECTIONS
job no: drawn by:
REINFORCED CONCRETE FOOTINGS 150 SAND BEDDING WITH 1723 LBW
& SLAB TO ENGINEERS DETAILS. VAPOUR BARRIER TO SLAB BASE
date: 17/10/2017
SECTION BB 0 1 2 3 4m
12:54:32 PM
scale (A3): drawing no:
1 : 100 1:100
1 : 100 5.1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Craven Duplex BA01_Rev A.pdfRelated documentApplication case desk ↗
About this file
- File size
- 6.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.