Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

20210153 - Maple Street SWMP

of 67

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 10, section 1. The text section number identifies this passage in the reader.

The configuration of the catchment areas for pre-development and post-development areas are
shown in Figure 3.2 – DRAINS Pre-development catchment, Figure 3.3 – DRAINS Post-development
catchment respectively.




                                  Figure 3.2 – DRAINS Pre-development catchment




                                 Figure 3.3 – DRAINS Post-development catchments


The results of the modelling against the range of design storms for the development under the
existing and proposed development conditions are shown in Table 3.1 Existing and proposed
unmitigated site peak discharge rates.




Project number 20210153
File RECOR Preliminary Stormwater Management Report - 20210153.docx, 2022-03-31                                 Page 10 of 26
Revision 0

P +61 7 5211 1003                A 37 Mary St, Noosaville Qld 4566                E [email protected]   recorconsulting.com

Log in to download the original (20210153 - Maple Street SWMP.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.