Council archive · source document
20517 App N.pdf [As Published] · 132007.1259
Very large file (10.4 MB): the original may take a few minutes to open or download. The page text below is quick to read.
APPENDIX N Acid Sulfate Soils Assessment Prepared by Bruce Butler and Associates 743 Ann Street, PO Box 1559, Fortitude Valley QLD 4006 Phone 07 3237 8899 Facsimile 07 3237 8833 Page 43 | 20517_PlReport_FINAL_FW MC.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 32 pages
Page 2
| a a a , = a = ACID SULFATE SOILS ASSESSMENT RESIDENTIAL DEVELOPMENT 215-219 DAVID LOW WAY PEREGIAN BEACH Prepared for Scanlon Properties Pty Ltd Project No. 07160 18 June 2007 GEOTECHNICAL AND GEO-ENVIRONMENTAL CONSULTANT S Butler Partners Pty Ltd Ph: 61 7 3852 3800 ABN 14 816 574 268 Fx: 61 7 3852 3808 79 Doggett Street P.O Box 2267 Newstead Fortitude Valley BC Queensland 4006 Queensland 4006
Page 3
TABLE OF CONTENTS
Page No
SECTION 1 = INTRODUCTION.......sssssssssssssssssssssssssessssssssssssssesssssssssssssssuusesececsssssssssssioisessesessssssssnsenseeeey 4
14 Project
1.2 Proposed Scope of Work .
1.3 IC OTTITAISS ICT eeeeeereseseateeectettettemeeseerrrttretreete ieee terete rer eeneetieestese rarer eterstrerts 1
SECTION 2 - THE SITE
2.1 Site Description
2.2 Geology.........
2.3 ASS Mapping
SECTION (3: ~FIELDWORK ....0-sccocinssccssscgeoceencsconsetecsensavensonursosnvevsuanssonsaeecsusesseeucsesoeetssmeeeuostitanrersneeeennerenavees 4
3A Drilling and Sampling Methods
3.2 Bore Locations and Supervision...
SECTION 4 - INVESTIGATION RESULTS ..ssecsssecserscessvasesveeceetsssnesnscsenavernrrotseonertennviestonnsacursraseernsatssnveasened 5
41 Results a0.
42 Subsurface Conditions . mG)
4.3 Groundwater 0)
44 Laboratory Testing 20
4.4.1 Screening Tests.... 5
4.4.2 Chromium Suite Analysis. 8)
SECTION 5 - COMMENTS ®
5.1 Assessment Criteria for Acid Sulfate Soils 9
5.2 Acid Sulfate Soils 0... eee a)
0
5,3 Neutralisation of Disturbed ASS
TABLES:
Table 1: Observed Groundwater Depths/Reduced Levels During Drilling
Table 2: Summary of Screening Test Results.
Table 3: Summary of Laboratory Results .. : .
Table 4: Action Criteria Based on ASS analysis ‘er Three Broad Tenure Categaries,
ATTACHMENTS:
Drawing No. 4 Locality Plan & Test Locations
Appendix A Bore Reports with Explanatory Notes
Appendix B Laboratory Report Sheets
Appendix C Draft Acid Sulfate Soil Management Plan
Residential Development
215-219 David Low Way, Peregian Beach
Project No. 07160 18 June 2007
Page 4
SECTION 1 - INTRODUCTION 1.1. Project It is understood that it is proposed to develop the site by the construction of a residential development partly suspended over a single level basement carpark at approximately RL 4.0m to RL 6.1m, involving approximately 2m maximum depth of bulk excavation. The location of the site and a potential layout for the development are shown approximately on Drawing No. 1 attached. 1.2 Proposed Scope of Work It was anticipated that the site ground conditions might comprise fill material, sands and silts overlying estuarine clays. Based on the scope of the proposed development, the anticipated ground conditions and the requirements of Sections 6 to 8 of the State Planning Policy 2/02 Guidelines - Planning & Managing Development Involving ASS, it was proposed to investigate the site at the same time as (but separate from) an Environmental Site Assessment (ESA) by: e collecting samples at 0.25m intervals from six bores to a depth of 2.5m, or prior refusal; e conducting acid sulfate soil (ASS) screening tests on all samples recovered from the bores; e undertaking Chromium Suite laboratory testing on selected soil samples; and e — preparation (if required) of an Acid Sulfate Soils Management Plan (ASSMP). 1.3 Commission Based on the proposed nature of the development, the anticipated subsurface conditions and the scope of work, a fee to undertake the assessment was presented in a proposal of 23 March 2007. Butler Partners was subsequently commissioned by Scanlon Properties Pty Ltd to undertake the assessment as proposed. Residential Development Page 1 of 10 215-219 David Low Way, Peregian Beach Project No. 07160 18 June 2007
Page 5
SECTION 2 - THE SITE 2.1 Site Description At the time of investigation the site was developed as a caravan park. A one and two storey ‘Manager's Residence/Office’ and a single storey ‘Amenities Block’ were located on the eastern side of the site, with the remainder of the site comprising caravan parking areas surrounded by grassed areas with medium to tall trees and a gravel and partly paved ‘ring-road’ around the site. Ground surface levels reduce non-uniformly across the site from east to west from a high at David Low Way of approximately RL10m to a low along the western boundary of approximately RL2.5m. Three general views of the site at the time of the investigation are given in Photographs 1 to 3. o md nee eS a E Photograph 2: General view of the site looking north from the south-western corner Residential Development Page 2 of 10 215-219 David Low Way, Peregian Beach Project No. 07160 18 June 2007
Page 6
2.2 Geology Reference to Queensland Department of Mines and Energy's 1:100,000 Gympie Special sheet indicates that the site is mapped in an area of Quaternary Parabolic Dunes comprising quartz sand and Estuarine Deposits comprising sandy mud, muddy sand and minor gravel. 2.3 ASS Mapping Reference to the Department of Natural Resources and Mines’ (DNR&M) Acid Sulfate Soils Redcliffe to Teewah Map 2 indicates that the site is located approximately on the boundary of areas mapped as “land >5m with low or negligible probability of ASS occurrence” and “land with limited field assessment, but where there is a reasonable probability of ASS occurrence”. Residential Development Page 3 of 10 215-219 David Low Way, Peregian Beach Project No. 07160 18 June 2007
Page 7
SECTION 3 - FIELDWORK 3.1 Drilling and Sampling Methods Fieldwork was undertaken on 14 May 2007 and comprised the drilling and sampling of six bores using a trailer- mounted Hydrapower Trekker drilling rig operating solid flight augers. Strata identification and sampling was from drill cuttings brought to the surface on the auger flights. All soil samples collected from the bores were placed in plastic bags that were sealed after removing as much air as possible and stored on ice prior to analysis. 3.2 Bore Locations and Supervision Bore locations were determined in the field by direct measurement from existing site features and are indicated approximately on the attached Drawing No. 1. The ground surface levels at the bore locations have been interpolated from contours given on PMM's Combined Detail Survey Plan (Drawing No. 7328-03, dated 18 April 2007). An experienced senior geotechnician set out the test locations, logged the stratigraphy encountered in the bores and directed the in-situ sampling and testing program. Residential Development Page 4 of 10 215-219 David Low Way, Peregian Beach Project No. 07160 18 June 2007
Page 8
SECTION 4 - INVESTIGATION RESULTS 41 Results The subsurface conditions encountered in the bores are given on Bore Report Sheets included in Appendix A, using classification and descriptive terms defined in the accompanying notes. Laboratory test report sheets are included in Appendix B. 4.2 Subsurface Conditions For a description of the stratigraphy encountered in the bores, the Bore Report sheets should be consulted. However, in broad summary, the subsurface conditions encountered in the bores generally comprised a surface layer of either fill material (in Bores 1 to 4) that varied up to a maximum depth of 0.8m, or silty sand (in Bores 5 and 6) to a maximum depth of 0.4m. In Bores 1 and 2 only, the fill was underlain by natural, dark grey-brown silty clays that were underlain in turn by silty sands that were indurated below 2m depth. In Bores 3 to 6, the surface fill or silty sand layer was underlain by sands. 43 Groundwater Free groundwater was encountered during the drilling of four of the six bores at the depths/RLs given in Table 1. It should be noted that groundwater levels can vary seasonally and with prevailing weather conditions. Table 1: Observed Groundwater Depths/Reduced Levels During Drilling ae | Groundwater Observations — Depth Reduced Level 1 0.8 RL 2.3m 2 0.8 RL 2.3m 3 1.5 RL 6.0m 4 Not encountered = 5 | 16 RL 5.9m ~ 6 | Notencountered 44 Laboratory Testing 4.4.1 Screening Tests Screening tests were undertaken on all soil samples collected from all bores. The screening tests comprised two small sub-samples of soil; one mixed with approximately 20 mL of distilled water, and the other mixed with approximately 20 mL of hydrogen peroxide, buffered to a pH of 5.0 with sodium hydroxide. Slurry pH was measured with a calibrated pH meter. The pH of the distilled water/soil slurry (pH) was measured approximately one hour after mixing, whilst the pH of the hydrogen peroxide/soil slurry (pHrox) was measured approximately one to two hours after mixing. Residential Development Page 5 of 10 215-219 David Low Way, Peregian Beach Project No. 07160 18 June 2007
Page 9
The pH screening tests can be used for preliminary identification of potential or actual ASS, using a combination of three trigger factors’ as follows: (a) The strength of the reaction with peroxide is a useful indicator but cannot be used alone. Organic matter and other soil constituents such as manganese oxides can also cause a reaction. (b) A pHrox value at least one unit below pH may indicate a potential acid sulfate soil (PASS). The greater the difference between the two measurements, the more indicative the value is of a PASS. The lower the final pHrox value the better the indication of a positive result. (c) If the pHrox <3, and the other two conditions apply, then it strongly indicates a PASS. The more the pHrox drops below 3, the more positive the presence of sulphides. The results of the screening tests undertaken on samples recovered from the bores are given in Table 2, together with an indication of which (if any) trigger factors were noted. Table 2: Summary of Screening Test Results Sample i Screening Test Indicators Material . 7 Bore | Depth Type Reaction | pHr | pHrox | Strong reaction pHe-pHroot | pHrox<3 (m) with peroxide 0.0-0.25 Fill Medium | 4.7) 2.0 v v 0.25-0.5 Fill Medium | 48) 29 v ne 0.5-0.75 Fill Strong 46) 14 v v v 0.75-1.0 Fill and Silty Clay Strong 55 | 12 ¥ v v 1 1.0-1.25 | Silty Clay and Silty Sand Strong 5.4 47 v v v 1.25-1.5 Silty Sand Weak 66} 23 v v 4.5-1.75 Silty Sand VeryWeak | 5.2} 1.9 v v 1.75-2.0 Silty Sand Very Weak | 5.0 28 v v 2.0-2.25 Silty Sand VeryWeak | 4.9} 28 v v 0.0-0.25 Fill Very Strong | 6.5 | 2.7 v v v 0.25-0.5 Fill Very Strong | 5.3 | 2.1 v v v 0.5-0.75 Fill Very Strong | 5.1 15 v v v 0.75-1.0 Fill and Silty Clay Strong 63 | 1.7 v v v 2 1.0-1.25 | Silty Clay and Silty Sand Strong 66] 1.3 v v v 1.25-1.5 Silty Sand Medium | 54] 19 v v 1.5-1.75 Silty Sand Medium | 5.7 | 2.4 v v 1.75-2.0 Silty Sand Medium 5.4 18 v v 2.0-2.25 Silty Sand Medium | 5.1 1.8 v v 1 Ahern C.R., Ahern M.R., Powell B. Guidelines for Sampling and Analysis of Lowland Acid Sulfate Soils (ASS) in Queensland 1988 Residential Development Page 6 of 10 215-219 David Low Way, Peregian Beach Project No. 07160 18 June 2007
Page 10
Sample 2 Screening Test Indicators Material - Bore | Depth Type Reaction | pHr | pHrox | Strong reaction pHe-pHroot | pHrox<3 (m) with peroxide 0.0-0.25 Fill and Sand Weak 52| 3.0 ¥ 0.25-0.5 Sand Very Weak | 4.5 | 3.1 v 0.5-0.75 Sand Very Weak | 5.0 3.8 v 0.75-1.0 Sand Very Weak | 4.9 | 5.3 3 4.0-1.25 Sand Very Weak | 5.0 | 5.2 1.25-1.5 Sand Very Weak | 4.8 | 3.6 v 4.5-1.75 Sand “Very Weak | 5.3 | 5.1 1.75-2.0 Sand Very Weak | 5.6 5.8 2.0-2.25 Sand Very Weak | 5.9 5.8 2.25-2.5 Sand Very Weak | 6.1 5.9 0.0-0.25 Fill and Sand Weak 62) 48 wv 0.25-0.5 Sand Very Weak | 54} 4.1 v 0.5-0.75 Sand Very Weak | 5.3 | 5.5 0.75-1.0 Sand Very Weak | 4.9 | 5.2 4 4.0-1.25 Sand Very Weak | 5.7 5.6 1.25-1.5 Sand Very Weak | 5.9 | 5.1 4.5-1.75 Sand Very Weak | 5.5 5.5 1.75-2.0 Sand Very Weak | 5.9 | 5.5 2.0-2.25 Sand Very Weak | 6.0 | 5.5 2.25-2.5 Sand Very Weak | 5.9 5.6 0.0-0.25 Silty Sand Weak a ae) v v 0.25-0.5 Silty Sand and Sand Weak 5.7 | 24 v v 0.5-0.75 Sand Weak 6.1] 41 v 0.75-1.0 Sand Weak 58 | 43 v 5 1.0-1.25 Sand Very Weak | 5.0} 4.9 4.25-1.5 Sand Very Weak | 4.9 5.0 4.5-1.75 Sand Very Weak | 5.2 57 1.75-2.0 Sand Very Weak | 5.8 | 5.6 2.0-2.25 Sand Very Weak | 5.7 | 56 2.25-2.5 Sand Very Weak | 59 |} 5.6 0.0-0.25 Silty Sand Weak 6.2] 39 v 0.25-0.5 Silty Sand and Sand Very Weak | 6.3 5.0 v 0.5-0.75 Sand Very Weak | 5.9 |} 5.4 0.75-1.0 Sand Very Weak | 6.2 | 5.7 6 1.0-1.25 Sand Very Weak | 5.9 |} 4.4 wv 4.25-1.5 Sand Very Weak | 6.1 5.8 4.5-1.75 Sand Very Weak | 5.6 5.8 1.75-2.0 Sand Very Weak | 5.8 5.7 2.0-2.25 Sand Very Weak | 54} 5.1 2.25-2.5 Sand Very Weak | 5.9 oT The results of the screening tests indicate reactions ranging from very weak to very strong after the addition of hydrogen peroxide; pHrox values 1 pH unit below the pHr value measured in nearly all the samples analysed; and a significant number of samples analysed yielded pHrox values below 3 pH units. Residential Development 215-219 David Low Way, Peregian Beach Project No. 07160 Page 7 of 10 18 June 2007
Page 11
In summary, the results of the screening tests are considered to give a reasonably strong indication of possible ASS presence in Bores 1 and 2. However, it is considered that there was generally no strong indication of ASS presence (with some exceptions in the upper 1.5m depth) in Bores 3 to 6. As a result of the mixed screening test results, it was considered that Chromium Suite laboratory analysis should be conducted on selected samples. 4.4.2 Chromium Suite Analysis Based on the results of the screening test results, samples were selected for Chromium Suite analysis and were kept on ice until transported to Australian Laboratory Services Pty Ltd (ALS) under standard chain of custody protocol. A summary of the test results is given in Table 3. Table 3: Summary of Laboratory Results Titratable chromluny Net Liming Bore|; beet Material price | cece) eductble |e atiaity | Rater (m) Acidlty Sulfur - (Scr) %S (kglt) % S %S 0.25-0.5 Fill 56 | <0.02 <0.02 <0.02 2 1 | 1.04.25 |Silty Clay and Silty Sand] 5.4 | <0.02 <0.02 <0.02 - 2.25-2.5 Silty Sand 54 | <0.02 <0.02 “ <0.02 : 0.75-1.0 | FillandSilyClay | 54 | 0.02 0.02 0.04 2 2 | 154.75 Silty Sand 57 | <0.02 <0.02 <0.02 : 2.25-2.5 Silty Sand 56 | <0.02 <0.02 <0.02 5 3 | 05075 Sand 64 | <0.02 <0.02 <0.02 : 4 | 125-45 Sand 65 | <0.02 <0.02 <0.02 é 5 | 20-225 Sand 63 | <0.02 <0.02 <0.02 2 6 | 175-20 Sand 65 | <0.02 <0.02 <0.02 : Results in Bold exceed the QASSIT Action Criteria for disturbance of >1000 tonnes of soil (Section 5.1) * Based on the use of good quality fine ag-lime with a neutralising value of 100 % and incorporating a factor of safety of 1.5 to allow for inconsistencies in mixing during application Residential Development 215-219 David Low Way, Peregian Beach Project No. 07160 Page 8 of 10 18 June 2007
Page 12
SECTION 5 - COMMENTS
5.1 Assessment Criteria for Acid Sulfate Soils
ASS in Queensland are assessed in accordance with the Queensland Acid Sulfate Soils Investigation Team
(QASSIT) Guidelines for Sampling and Analysis of Lowland Acid Sulfate Soils (ASS) in Queensland 1998
(QASSIT Guidelines) and the State Planning Policy 2/02 Guideline Planning and Managing Development
Involving Acid Sulfate Soils. The State Planning Policy 2/02 Guideline provides Action Criteria for assessing the
results of laboratory testing quantifying the acid producing effects based on the sum of existing plus potential
acidity. These action criteria are presented in Table 4.
Table 4: Action Criteria Based on ASS Analysis for Three Broad Texture Categories
Action Criteria Action Criteria
Type of Material (1.- 1000 tonnes disturbed) (> 1000 tonnes disturbed)
Existing + Potential Acidity Existing + Potential Acidity
Equivalent Equivalent Acidity Equivalent Equivalent Acidity
Sulfur (%S) (mol H*/tonne) Sulfur (%S) (mol H*/tonne)
{oven-dry basis) | (oven-dry basis) | (oven-dry basis) | (oven-dry basis) _
Texture Range Approx. Clay
McDonald et al. (1990) Content (%)
Coarse Texture
Sands to loamy sands oe 9.03 18 0.03 18
Medium Texture
Sandy loams to light clays 5-40 0.06 36 0.03 18 ;
Fine Texture
_Medium to heavy clays, sity clays | __ 7° 2 oe i a
As the amount of natural soil to be disturbed during the proposed works is anticipated to exceed 1,000 tonnes of
soil, the ‘greater than 1000 tonne’ Action Criteria of 0.03 %S from Table 4 has been used as the basis for
assessment of site soils.
5.2 Acid Sulfate Soils
Samples tested from within the fill material and natural sands/silty sands reported net acidity levels less than
0.03% and these materials are therefore not considered to be ASS.
Samples tested from within the natural silty clays indicated levels of actual acidity below laboratory reporting
limits, with one exception. The silty clays are therefore considered to include an apparently limited amount of
ASS, potentially at isolated locations. Whilst the amount of ASS in the silty clay soils appears to be relatively
low, under State Planning Policy 2/02 they will nevertheless require management and treatment to neutralise
any net acidity, if they are to be disturbed. As such, an Acid Sulphate Soil Management Plan (ASSMP) is
required and a draft ASSMP is presented in Appendix C for consideration.
Residential Development Page 9 of 10
215-219 David Low Way, Peregian Beach
Project No. 07160 18 June 2007
Page 13
5.3 Neutralisation of Disturbed ASS The calculated liming rate for the natural silty clay soils based on the results of the Chromium Suite results is given in Table 3 (and on the laboratory report sheets included in Appendix B) and is 2 kg of ag-lime/tonne of dry natural silty clay soils, based on a factor of safety of 1.5 and the use of good quality fine ag-lime with a neutralising value of 100 %. It is suggested that consideration be given to the adoption of a neutralising value of 80 % in calculation of the required liming rate to allow for potential inconsistencies in the quality of the ag-lime. The calculated liming rate using a neutralising value of 80 % for the ag-lime would be approximately 3 kg dry natural silty clay soils. BUTLER PARTNERS PTY LTD Reviewed by BRUCE BUTLER MIKE NEIGHBOUR Principal Principal Residential Development Page 10 of 10 215-219 David Low Way, Peregian Beach Project No. 07160 18 June 2007
Page 14
Vv AY
} :ON ONIMVYC
09120 ‘ON LOAPONd
:G3AOUddY
di ‘AA NMVed
200@ SN ‘aLvd
(ev) 0001: ‘AIVOS
=
wor oe 02 OF 0
HLYON
2
S tm
2 128
a % ™m
sz
S 25
2 S
= | er
So 50
4 =< mm
m z =<
4 & oo
a
S 2 O
2 g UO
oq 2c =
S mi
& =
goge Zoe J 19 alywisoey
008e ZS8€ J 19 uOYdaja,
BIIENSNY 9OOy PuE|sUaEND
peaisman ‘jeans ye660q Ey
EEE ET!
a =)
GL Ald
SAILWIdOd NOINVOS
“1N3I70
Hom, Buyuipray.
3904/2009
sda
Auepunog ayig¢
alog >
QN3931
“S\N. (uonIp3 38}¢) €1)18u 62 de} ISe09 eulysung :eoualgey GEN
PIT Ald ssaud Jesuanlun yySutdog ‘uojssuvag ym peonpouday
>
3
&, j
gees; \“R
8 9 \"\
3s qj \
= 5
§ 3/
é
898MeIN
Let
? ~
es 4
32 j 5s & No,
ai EN 43
g 5,
3
\ 2
\S
spoquadog
Se
bury bay
Lr
B Wi a
Page 15
SALON ANOLVNV1dX4 HLIM SLYOday 3NOE V XIGNAddV i™ o™
Page 16
BORE REPORT Client: Scanlan Properties Pty Ltd Project: Residential Development Location: 215-219 David Low Way, Peregian Beach Project No: 07160 BORE 1 Page No: 1 of 1 Date: 8 June 2007 Ground Surface Level: RL 3.1m* iS 2 | 8 2 =e Description > e a 2 —£ = 8 2 2 £ = E Ss 2 So xe a a | s A E 3 a a a a n e 3.1 0 FILL 0 - grey-brown and yellow-brown, silty sand, traces of sandy clay, trace of sub- a D +. angular gravel | 0.25 4 D 4 05 1 D ] 0.75 SILTY CLAY (OH) D - dark grey-brown, with organics 14 1.0 2.04 D SILTY SAND (SM) 1.25 - dark grey-brown z| D 4.5 1 D | 1.75 D Qt b erate See ro - indurated sand a0 D | 2.25 4 D 25 | End of Bore at 2.5 m 35 D Disturbed Sample E Environmental Sample c NMLC Coring B- Bulk Sample S$ Standard Penetrometer Test (SPT) Is(50) Point Load Test Result (MPa) U_—_Undisturbed Tube (50mm diameter) HB SPT Hammer Bouncing (d) Diametral Point Load Strength Test pp Pocket Penetrometer Test (kPa) (.) No Sample Recovery (a) Axial Point Load Strength Test Rig: Hydrapower Trekker Drilling Method: Auger Groundwater: Free groundwater encountered at 0.8m depth Remarks: * Approximate ground surface level interpolated from PMM Group's Drawing No. 7328-03, dated 18 April 2007
Page 17
BORE REPORT Client: Scanlan Properties Pty Ltd Project: Residential Development Location: 215-219 David Low Way, Peregian Beach Project No: 07160 BORE 2 Page No: 1 of 4 Date: 8 June 2007 Ground Surface Level: RL 3.1m* S cs 2 | 3 2 Ez Description 4, 5 5 2 3 s E 3S 2 2 = s z|2| é 5 3 a ao | no no - 3.4 0 0.0 FILL - grey-brown and yellow-brown, silty sand, traces of sandy clay, trace of sub- “| D 4 angular gravel | 0.25 4 D 4 0.5 | D ] 0.75 SILTY CLAY (OH) D - dark grey-black, with organics 15 1.0 2.05 D SILTY SAND (SM) 1.25 - dark grey-brown sd D 15 | D | 1.75 D eee i - indurated sand 20 1.05 D | 2.25 4 D 25 | End of Bore at 2.5 m 34 D Disturbed Sample E Environmental Sample c NMLC Coring B_ Bulk Sample S$ Standard Penetrometer Test (SPT) |s(50) Point Load Test Result (MPa) U_—_Undisturbed Tube (50mm diameter) HB SPT Hammer Bouncing (d) Diametral Point Load Strength Test ( pp Pocket Penetrometer Test (kPa) ) No Sample Recovery (a) Axial Point Load Strength Test Rig: Hydrapower Trekker Drilling Method: Auger Groundwater: Free groundwater encountered at 0.8m depth Remarks: * Approximate ground surface level interpolated from PMM Group's Drawing No. 7328-03, dated 18 April 2007
Page 18
BORE REPORT Client: Scanlan Properties Pty Ltd BORE 3 Project: Residential Development Page No: 1 of 1 Location: 215-219 David Low Way, Peregian Beach Date: 8 June 2007 Project No: 07160 Ground Surface Level: RL 7.5m* =z g & 2 Ee Description > ec a 3 = ee 3 2 2 3 s E 3° 2 2. eo a 7 = € £ BD a — = Oo o oa a xr a no no = 1S 0 0.0 FILL - grey-brown, sandy fine sub-angular gravel 7 D SAND (SP) 0.25 - light grey-brown, fine grained a 7.04 05 | D | 0.75 D 14 1.0 D ] 1.25 4 D }------------------ -~~-----------------------------------------4 6.044 15 - medium to coarse grained | D | 1:78 D 24 2.0 D | 2.25 4 D 5.0 25 4 End of Bore at 2.5 m 344 D Disturbed Sample E Environmental Sample C —_-NMLC Coring B Bulk Sample S Standard Penetrometer Test (SPT) 1s(50) Point Load Test Result (MPa) U_—_Undisturbed Tube (50mm diameter) HB SPT Hammer Bouncing (d) Diametral Point Load Strength Test pp Pocket Penetrometer Test (kPa) (.) No Sample Recovery (a) Axial Point Load Strength Test Rig: Hydrapower Trekker Drilling Method: Auger Groundwater: Free groundwater encountered at 1.5m depth Remarks: * Approximate ground surface level interpolated from PMM Group's Drawing No. 7328-03, dated 18 April 2007
Page 19
BORE REPORT Client: Scanlan Properties Pty Ltd Project: Residential Development Location: 215-219 David Low Way, Peregian Beach Project No: 07160 BORE 4 Page No: 1 of 1 Date: 8 June 2007 Ground Surface Level: RL 6.0m* Ez 2 = 2 E Description > - 4 3 £ = EY 2 2 2 =| = Ss 2 2 = a a = 5 5 3 a a a on on e 0 oe 0.0 FILL - grey-brown and orange, sandy fine to medium sub-angular gravel D SAND (SP) 0.25 - light grey-brown, fine grained p 0.5 | D | 0.75 D 14 5.04 1.0 D | 1.28 4 D 1.5 | D 4.75 D 244 4.04 2.0 D ] 2.25 4 D 25 J End of Bore at 2.5 m I 35 3.04 D Disturbed Sample E Environmental Sample c NMLC Coring B_ Bulk Sample $S Standard Penetrometer Test (SPT) Is(50) Point Load Test Result (MPa) U_—_Undisturbed Tube (50mm diameter) HB SPT Hammer Bouncing (d) Diametral Point Load Strength Test ( pp Pocket Penetrometer Test (kPa) ) No Sample Recovery (a) Axial Point Load Strength Test Rig: Hydrapower Trekker Drilling Method: Auger Groundwater: No free groundwater encountered during auger drilling Remarks: * Approximate ground surface level interpolated from PMM Group's Drawing No. 7328-03, dated 18 April 2007
Page 20
BORE REPORT Client: Scanlan Properties Pty Ltd Project: Residential Development Location: 215-219 David Low Way, Peregian Beach Project No: 07160 BORE 5 Page No: 1 of 1 Date: 8 June 2007 Ground Surface Level: RL 7.5m* = 2 | € 2 = Description 5 ce a ze = = 6 2 2 2 £ € S 2 2 fe s 3 | 5 § 8 a a = on n re 0 75 0.0 SILTY SAND (SM) - dark grey-brown, fine grained D ] 0.25 D SAND (SP) - light grey-brown, fine grained 705 05 | D | 0.75 D 14 1.0 D | 4.25 4 D 6.0 1.5 D | 1.76 D 254 2.0 D | 225 4 D 5.0 25) 4 End of Bore at 2.5m 34 D Disturbed Sample E Environmental Sample C —_-NMLC Coring B- Bulk Sample S Standard Penetrometer Test (SPT) ls(50) Point Load Test Result (MPa) U_—_Undisturbed Tube (50mm diameter) SPT Hammer Bouncing (d) Diametral Point Load Strength Test pp Pocket Penetrometer Test (kPa) () No Sample Recovery (a) Axial Point Load Strength Test Rig: Hydrapower Trekker Drilling Method: Auger Groundwater: Free groundwater encountered at 1.6m depth Remarks: * Approximate ground surface level interpolated from PMM Group's Drawing No. 7328-03, dated 18 April 2007
Page 21
BORE REPORT Client: Scanlan Properties Pty Ltd Project: Residential Development Location: 215-219 David Low Way, Peregian Beach Project No: 07160 BORE 6 Page No: 1 of 4 Date: 8 June 2007 Ground Surface Level: RL 9.0m* E a) 2 g =e Description 3 ec a 2 = = 6 2 2 2 = = s 2 2 fe S + |. 5 Ee 3 a a a no on e 0. My 0.0 SILTY SAND (SM) - dark grey-brown, fine grained D ] 0.25 SAND (SP) b | _ =light grey-brown, fine grained 0.5 | D | 0.75 D 14 8.04 1.0 D | 1.28 4 D 41.5 | D | 41.75 D 254 7.04 2.0 D 1 2.25 4 D 2.5 J End of Bore at 2.5m 4 35 6.05 D Disturbed Sample E Environmental Sample Cc NMLC Coring B Bulk Sample S$ Standard Penetrometer Test (SPT) Is(50) Point Load Test Result (MPa) U_—_Undisturbed Tube (50mm diameter) HB SPT Hammer Bouncing (d) Diametral Point Load Strength Test pp Pocket Penetrometer Test (kPa) (.) No Sample Recovery (a) Axial Point Load Strength Test Rig: Hydrapower Trekker Drilling Method: Auger Groundwater: No free groundwater encountered during auger drilling Remarks: * Approximate ground surface level interpolated from PMM Group's Drawing No. 7328-03, dated 18 April 2007
Page 22
Notes on Description and Classification of Soil The methods of description and classification of soils used in this report are generally based on Australian Standard AS1726-1993 “Geotechnical Site Investigations”. Soil description is based on an assessment of disturbed samples, as recovered from bores and excavations, or from undisturbed materials as seen in excavations and exposures or in undisturbed samples. Descriptions given on report sheets are an interpretation of the conditions encountered at the time of investigation. In the case of cone or piezocone penetrometer tests, actual soil samples are not recovered and soil description is inferred based on published correlations, past experience and comparison with bore and/or test pit data (if available). Soil classification is based on the particle size distribution of the soil and the plasticity of the portion of the material finer than 0.425mm. The description of particle size distribution and plasticity is based on the results of visual field estimation, laboratory testing or both. When assessed in the field, the properties of the soil are estimated; precise description will always require laboratory testing to define soil properties. Where soil can be clearly identified as FILL this will be noted as the main soil type followed by a description of the composition of the fill (eg. FILL — yellow- brown, fine to coarse grained gravelly clay fill with concrete rubble). If the soil is assessed as possibly being fill this will be noted as an additional observation. Soils are generally described using the following sequence of terms. In certain instances, not all of the terms will be included in the soil description. MAIN SOIL TYPE (CLASSIFICATION GROUP SYMBOL) - strength/density, colour, structure/grain size, secondary and minor components, additional observations Information on the definition of descriptive and classification terms follows. SOIL TYPE and CLASSIFICATION GROUP SYMBOLS Major Divisions Particle Size Classification Typical Names Group Symbol BOULDERS > 200mm COBBLES 63 - 200mm GRAVELS Coarse: 20 - 63 mm GW Well graded gravels, gravel-sand mixtures, little COARSE (more than half of coarse} Medium: 6 - 20 mm lor no fines. GRAINED SOILS fraction is larger than] Fine: 2.36-6mm GP Poorly graded gravels and gravel-sand mixtures, (more than half of material is}238 ™m) little or no fines, uniform gravels. larger than 0.075 mm) GM Silly gravels, gravel-sand-silt mixtures. GC Clayey gravels, gravel-sand-clay mixtures. SANDS Coarse: 0.6 - 2.36 mm SW Well graded sands, gravelly sands, little or no (more than half of coarse} Medium: 0.2 - 0.6 mm fines. fraction is smaller than] Fine: 0.075-0.2 mm SP Poorly graded sands and gravelly sands; little or 2.36mm) no fines, uniform sands. SM Silty sands, sand-silt mixtures. SC Clayey sands, sand-clay mixtures. SILTS & CLAYS ML Inorganic silts and very fine sands, silty/clayey (liquid limit <50 %) fine sands or clayey silts with low plasticity. FINE CLand Cl Inorganic clays of low to medium plasticity, GRAINED SOILS gravelly clays, sandy clays, silty clays. (more than half of material is OL Organic silts and organic silty clays of low| smaller than 0.075 mm) plasticity. SILTS & CLAYS MH Inorganic silts, micaceous or diatomaceous fine (liquid limit >50 %) sandy or silty soils. CH Inorganic clays of high plasticity. OH Organic clays of medium to high plasticity, organic silts. HIGHLY ORGANIC Pt Peat and other highly organic soils. SOILS Notes on Description and Classification of Soil Revision 2, November 2001 Page 1 of 2
Page 23
Notes on Description and Classification of Soil DESCRIPTIVE TERMS FOR MATERIAL PROPORTIONS Coarse Grained Soils Fine Grained Soils % Fines Modifier % Coarse Modifier <5 Omit, or use ‘trace’ <15 Omit, or use trace. 5-12 — |Describe as ‘with clay/silt’ as applicable. 15-30 |Describe as ‘with sand/gravel’ as applicable. >12 Prefix soil as ‘silty/clayey’ as applicable > 30 Prefix soil as ‘sandy/gravelly’ as applicable. STRENGTH TERMS ~ COHESIVE SOILS Strength Undrained Shear Field Guide to Strength Term Strength Very soft <12 kPa Exudes between the fingers when squeezed in hand. Soft 12-25 kPa Can be moulded by light finger pressure. Firm 25 - 50 kPa Can be moulded by strong finger pressure. Stiff 50-100 kPa Cannot be moulded by fingers, can be indented by thumb. Very stiff 100 - 200 kPa Can be indented by thumb nail. Hard > 200 kPa Can be indented with difficulty by thumb nail. DENSITY TERMS ~ NON COHESIVE SOILS Density Density SPT “N” CPT Cone Term Index Resistance Very loose <15% 0-5 0-2MPa Loose 15-35 % 5-10 2-5 MPa Medium dense 35 - 65 % 10-30 5-15 MPa Dense 65-85% 30-50 15-25 MPa Very dense > 85% > 50 > 25 MPa COLOUR The colour of a soil will generally be described in a ‘moist’ condition using simple colour terms (eg. black, grey, red, brown etc.) modified as necessary by “pale”, “dark”, “light” or “mottled”. Borderline colours will be described as a combination of colours (eg. grey-brown). EXAMPLE eg: CLAYEY SAND (SC) - medium dense, grey-brown, fine to medium grained with silt. Indicates a medium dense, grey-brown, fine to medium grained clayey sand with silt. Notes on Description and Classification of Soil Revision 2, November 2001
Page 24
S13HS LYOdaY AYOLVYORVT €@ XIGNAddV
Page 25
ALS Environmental CSAS) CERTIFICATE OF ANALYSIS Client : BUTLER PARTNERS PTY LTD Laboratory : Environmental Division Brisbane Page / 10f5 Contact : MR BRUCE BUTLER Contact : Tim Kilmister Wer Orden * EB0706355 Address : P O BOX 2267 FORTITUDE VALLEY BC QLD Address ! 32 Shand Street Stafford QLD Australia 4053 AUSTRALIA 4006 E-mail : [email protected] E-mail : [email protected] Telephone ! 38523800 Telephone ! 61-7-3243 7222 Facsimile : 38523808 Facsimile ! 61-7-3243 7259 Project : 07160 Quote number : BN/217/06 Date received : 8 Jun 2007 Order number / BW83 Date issued : 15 Jun 2007 C-O-C number : - Not provided - No. of samples - Received : 10 Site : - Not provided - Analysed 10 ALSE - Excellence in Analytical Testing RATA Accredited Laboratory This document has been electronically signed by those names that appear on this report and are the authorised signatories. Electronic oo signing has been carried out in compliance with procedures specified in 21 CFR Part 11. This document is issued in Signatory Position - Department NA T A eel Lea-Ellen Catt Laboratory Technician - Acid Sulphate Inorganics - NATA 825 (818 - Brisbane) Ww accreditation requirements. Soils WORLD REGOGHIEED Accredited for compliance with ACCREINTATION ISO/IEC 17025.
Page 26
Page Number 5 20f5 Client : BUTLER PARTNERS PTY LTD ALS Work Order : EB0706355 ALS Enuwironmental Comments This report for the ALSE reference EB0706355 supersedes any previous reports with this reference. Results apply to the samples as submitted. All pages of this report have been checked and approved for release. This report contains the following information: e Analytical Results for Samples Submitted @ Surrogate Recovery Data The analytical procedures used by ALS Environmental have been developed from established internationally-recognized procedures such as those published by the US EPA, APHA, AS and NEPM. In house developed procedures are employed in the absence of documented standards or by client request. The following report provides brief descriptions of the analytical procedures employed for results reported herein. Reference methods from which ALSE methods are based are provided in parenthesis. When moisture determination has been performed, results are reported on a dry weight basis. When a reported ‘less than’ result is higher than the LOR, this may be due to primary sample extracts/digestion dilution and/or insuffient sample amount for analysis. Surrogate Recovery Limits are static and based on USEPA SW846 or ALS-QWI/EN38 (in the absence of specified USEPA limits). Where LOR of reported result differ from standard LOR, this may be due to high moisture, reduced sample amount or matrix interference. When date(s) and/or time(s) are shown bracketed, these have been assumed by the laboratory for process purposes. Abbreviations: CAS number = Chemical Abstract Services number, LOR = Limit of Reporting. * Indicates failed Surrogate Recoveries. Specific comments for Work Order EB0706355 Liming rate is calculated and reported on a dry weight basis assuming use of fine agricultural lime (CaCO3) and using a safety factor of 1.5 to allow for non-homogeneous mixing and poor reactivity of lime. Conversion to liming rate in kg/m3 = kg/t x wet bulk density in t/m3. Retained Acidity not required because pH KCI greater than or equal to 4.5
Page 27
Aueduwog peuiry sieyioig joqdwed ¥ b> z b> b> > yeooro by 1 ayey Buwy OL Lx ce OLl> Ol> y/+H OW OL _ zo'0> ¥0'0 z0'0> zo"0> z0'0> S% 200 sh sb sb sb sh s‘0 Jojoe4 sseusul} ONY Buyunosoy aseg ploy -3-ec0V4 7 (azz-e) OL> ZL Ol> Ol OL> 1/+Ha]OW OL AnyINg aiqonpey WniWosYD - AypIoe | z0'0> z0'0 z0'0> z0'0> z0'0> S% 200 (azz) snying aiqionpey wniw0sYyo, Aupioy jenuaiod :g-ee0Va - — - (62-8) z0'0> z0'0> ___20°0> zo'0> z0'0> sawkd% ZOO Aypioy jenoy eiqeyesiiy - o1pyins _ v Lb ze 6 9 Y/+H ejow 7% (4€2) Auploy jenoy aiqeyety Lg vs vs vs 9S wun Hd 40 (vez) Om Hd Aupioy lenyoy :y-ec0va s00-sse90.083 vo0-sse902084 £00-Ss¢902084 200-SS€90L083 -o0-sse902084 ue woy, eS. saeuy. QI ajdwes Aioyesoge7, 00:1 00:r1 00:r1 00:r1 00:r1 200z unr 8 zZ00z unr 8 2002 unr 8 2o0z unr 8 2002 unr 8 Pew, / 12q aes 5 110s 10s 110s 110s 10s uoyduosag / adh xujeW ajdweg SL'L-S"| @# 3NOS O'L-SZ'0 7# ANOS G'2-S7'% L# ANOS SZ'L-0"L L# ANOS $'0-SZ'0 L1# 3NOS : | ajdwieg yuayD syinsey jeopfjeuy PRISONS ST SSe90204 - 4JOPIC. HOM G11 Ald SYANLYVd YATLNE - quad S17 gsoe: 4aquinn e6eq
Page 28
1 seyjaug aqdweo y bo 6 Pp > \> yeooeo By} ayey Buu o> oL> Ol> OL> | OL> V/+H a]ow OL (stun Ayipoe) Apioy JN z0'0> zo'0> Z0'0> Z0'0> Z0'0> S% 200 (sun anyins) Aupioy 18N sb sb sb sh sb sO Joyjoe4 Sseueul4 ONY Buyunosoy aseg ploy 3-E£0Va - (Lv6-s) Lo"0> _ Lo"0> a = sawkd% 10°0 __ Aysedeo Bulsiesjnan ploy - o1pyins _ (Lw61-e) OL> i OL> — _— }/+H9e]0W OL _ Aedeo Bursieqnan ploy - Aypioe 10'0> — Loo> = — £0080 % 10°0 (L¥6L) Ayoedeo Bulsieqnen ploy Ayoeded Bursijesynan ploy :0-e0Va - (azz-e) O1> O1> OL> 01> O1> 1/+He]OW OL AnyINS eiqionpey WnIWOEIYD - AypIoe z0'0> z0'0> z0'0> Z0°0> z0'0> $% 200 (a2z) snying aiqionpey Wn!W0sYyD, ____ Auproy renueiod :a-ecova - _ — (ez-s) zo'0> zo'0> z0"0> z0'0> : 00> s awd % 200 Aypioy lemoy aigeyesiy - oIpyins ze a 2 a 9 V/+HeoW Z (3€z) Auploy remoy eiqeyenu s9 9 s9 v9 9S wun Hd 10 (vez) IOM Hd Aypioy lenjoy :y-ec0Va 010-sse90z084 600-SS¢902084 800-Sse902084 200-SS€902084 900-Ss¢902084 san won, PUNE, maetiy, 1 QI ajdwes Auoyesoqe7, 00:r1 00°r1 00°r1 00:r1 00:r1 Zo0z unr 8 Zo0z unr g 200z unr g 2002 unr 8 200z unr 8 FOWL / aq e|dwes : uond! dA di Ios Tos ___Tlos ___los ___llos uonduosag / adAl xijeW) ejdwes synsay jeonAjeuy 0'2-S2"| 9# JOS Sz'z-0'2 S# JOS G'L-S2"L b# ANOS SZ'0-S'0 €# SOS G'2-S2'2 7# ANOS : g| afdwies yuar|D RUSRUOINUS ST ssego.0ga - JEPIO YOM GL1 Ald SMANLYWd YSTLNG ¢ wad S17 GJOV: 4aquiny e6eq
Page 29
Aueduiog paywry sieyjoig yaqdueg y Z0'e YNVOO : UoIsien yodex “yoda, siy} uo juaseaid sayeBouns ON @ sy] [04JU0D azeBo1ins UBUD ST sse90z0ga : APIO HON S1v G11 Ald SYANLUVd HATLNG : que S40'G 3 dequiny ebed
Page 30
NV1d LNSWA9VNVW TI0S aLV47Ns aiov Lavud J XIGNAddV
Page 31
Residential Development 215-219 David Low Way, Peregian Beach Draft Acid Sulfate Soil Management Plan (ASSMP) Element Acid Sulfate Soil Management Plan Objective/Target The objective of the ASSMP is to control net acidity levels within soils disturbed during site development works, and to restrict to an acceptable level any potential on-site and off-site environmental impacts during site redevelopment. ASS Management Strategy To mitigate and manage potential environmental impacts associated with ASS during the redevelopment works: This will be achieved by having a materials handling and management strategy in place, as well as procedures for either on-site lime treatment of soils or, the appropriate off-site treatment of soils (if a suitably sized and appropriately located space is not available for on-site treatment). Tasks/Actions An ASS investigation has been carried out to assess the soils within the redevelopment site, to a maximum depth of 2.5m below the existing surface level. Fill materials, sands and silty sands have been shown to contain negligible levels of net acidity and do not require treatment for ASS. However, the natural dark grey-brown, silty clays encountered in Bores 1 and 2 have been shown (in Bore 2) to contain levels of net acidity that exceed the State Planning Policy 2/02 Action, Criteria of 0.03 %S. The natural silty clays will therefore require treatment as follows: If on-site treatment is undertaken then lime treatment of the soils will be undertaken as described below. e Where on-site treatment is not possible the silty clays will be excavated, then transported in a sealed truck to an appropriately designed off-site treatment area for neutralisation. ASS Treatment On-Site e Any silty clays exposed in the base of the basement excavation will require an application of ag-lime at a rate of 5 kg/square metre. e Where excavated silty clay soils are to be treated on-site, a suitably sized dedicated treatment area will be created. Soils to be treated shall be placed on the treatment area in layers not thicker than 0.3m. e Bunding will be constructed around the perimeter of the designated treatment area to intercept and contain run-off from the area during the soil treatment operations. e The base of the treatment area is to be lime treated prior to placement of each layer of excavated material. Re-treatment with ag-lime is required prior to placement of each new layer of excavated material to be treated, and at the conclusion of all treatment. The base of the treatment pad shall have a minimum ag-lime application of 5 kg/square metre. e Ag-lime will be applied evenly over the surface of the treatment area and thoroughly blended into the ASS at a rate of 3 kg of ag-lime/tonne of dry silty clay soil. This liming rate is based on a factor of safety of 1.5 and the use of good quality fine ag- lime with a neutralising value of not less than 80 %. e When incorporation of the lime is complete, chromium suite validation testing of the treated spoil will be carried out to establish that sufficient ag-lime has been added to neutralise the acid generation potential of the spoil. Where validation testing fails to meet performance indicators, application of additional ag-lime will be required until a satisfactory net acidity validation result has been achieved. e Once ag-lime treatment is complete, the treated spoil may then be stockpiled for later use or off-site disposal (as appropriate). e Should the proposed depth of disturbance extend below 2.5m in depth from surface level, then additional ASS testing will be required. e Lime-treated, stockpiled soil shall have sediment fences and/or hay bales placed downslope to intercept any eroded material. Earthen bunds shall be constructed downslope of stockpile areas to divert run-off/drainage to a collection sump. The water quality of the sump is to be monitored against the water quality objective Residential Development Appendix C 215-219 David Low Way, Peregian Beach Page 1 of 3 Project No. 07160 18 June 2007
Page 32
Residential Development 215-219 David Low Way, Peregian Beach Draft Acid Sulfate Soil Management Plan (ASSMP) Element Acid Sulfate Soil Management Plan Tasks/Actions (cont'd) criteria for a tidal estuary. ASS Treatment Off-Site Where soils are required to be treated off-site, treatment of the soils will be undertaken either: e in accordance with the provisions of this ASSMP for on-site treatment, modified as necessary for use at an accessible alternative off-site treatment area; or e in accordance with the ASSMP for the designated off-site treatment area. Performance Indicators Retained Water Laboratory testing of the water encountered during basement excavation will be carried out for pH, dissolved oxygen and, turbidity. These parameters will be assessed against the equivalent water quality objective criteria for a tidal estuary as follows: pH 6.5-8.5 Disturbed Oxygen 80-100% saturation Turbidity 20NTU Treated Soil Chromium suite testing carried out for validation, of applied liming rates will be deemed to be acceptable if the net acidity level recorded is <0,02%S. Frequency/Timing Retained Water Water quality within basement excavations will be monitored regularly during soil removal and particularly following substantial rainfall events. Treated ASS The sampling and testing of any lime treated soils will be subject to validation testing ata rate of one test per 400m* of treated soil, which will be repeated until satisfactory results are obtained. Contingency Plan If lime treatment of soils is unsuccessful whereby performance targets are not being met as indicated by the validation testing and water quality testing procedures then: e the soil removal schedule will be reassessed and action taken to determine the problems causing the unsuccessful performance; e if the problems are related to ineffective implementation of the ASSMP, then the plan will be audited by a person nominated by the project manager to ensure improved implementation (monitoring and testing will be increased to ensure compliance with the established standards); and e any significant changes to the ASSMP will be subject to discussions with the relevant regulatory authorities. Responsibility Responsibility (cont'd) The satisfactory implementation of the ASSMP by the contractor will be the responsibility of the project manager, who will ensure: e the contractor is made aware of site specific conditions and implications for the management of sediments within the site; e the contractor complies with the elements of the ASSMP and erosion control measures proposed; e correct methods for the collection of samples and testing are employed and that the results are reported to the relevant site authorities; and e corrective action measures proposed by the contractor are approved. The contractor's responsibilities will include: e awareness of site conditions and requirements for the implementation of the ASSMP; Residential Development Appendix C 215-219 David Low Way, Peregian Beach Page 2 of 3 Project No. 07160 18 June 2007
Page 33
Residential Development 215-219 David Low Way, Peregian Beach Draft Acid Sulfate Soil Management Plan (ASSMP) Element Acid Sulfate Soil Management Plan e — supervision of the mixing and soil amelioration process; e modification of earthworks/construction procedures to comply with the ASSMP; e presentation of proposed corrective action measures (if required) which will then be approved by the project manager; and e implementation of approved corrective actions. Reporting The contractor shall report to the project manager representative on: e the effectiveness of the operating strategies; e problems in implementing the ASSMP management strategies; e compliance with testing requirements, run-off control.and materials handling; and e effectiveness of any corrective action adopted. Residential Development Appendix C 215-219 David Low Way, Peregian Beach Page 3 of 3 Project No. 07160 18 June 2007
Used in these records
20517 App N.pdf [As Published]Related documentApplication case desk ↗
About this file
- File size
- 10.4 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.