Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

20517 App N.pdf [As Published] · 132007.1259

of 33

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (10.4 MB): the original may take a few minutes to open or download. The page text below is quick to read.

 

Residential Development

215-219 David Low Way, Peregian Beach

Draft Acid Sulfate Soil Management Plan (ASSMP)

 

 

 

 

 

Element Acid Sulfate Soil Management Plan
e — supervision of the mixing and soil amelioration process;
e modification of earthworks/construction procedures to comply with the ASSMP;
e presentation of proposed corrective action measures (if required) which will then be
approved by the project manager; and
e implementation of approved corrective actions.
Reporting The contractor shall report to the project manager representative on:

e the effectiveness of the operating strategies;
e problems in implementing the ASSMP management strategies;
e compliance with testing requirements, run-off control.and materials handling; and

 

e effectiveness of any corrective action adopted.

 

 

Residential Development Appendix C
215-219 David Low Way, Peregian Beach Page 3 of 3
Project No. 07160 18 June 2007

Used in these records

About this file

File size
10.4 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

20517 App N.pdf [As Published].pdf · 10.4 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.