Skip to the record
The only place to find full transcripts.

Council archive · source document

Part 22 of 37 Appendix 20 - Earthcheck MCU12/0208

of 127

Text shows just the words. Original shows the document exactly as it was published.

Very large file (86.5 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

                                                                                                                   r SCC CORRESPONDENCE

                                                                     Place barcode here
                                                                                                                      1111111111111111111111111
                                                                                                                                80602709




                                                      Part d.~Of Sl


Deve:     _
              .,



                   .   <
                           Application number: \V\L’-.)\ ~ (O:J.,(jt!
              2 0 Cc:: 7. 0~7.
                                      C:lDocumerts   and SettingslejelDesk"toplMulti Pan Record Cover Sheet NEXT PART (3l.doc




  ,..,.       .......~l~....l__....
                                               I
  I



                                                                       Box:   .c:??\~.’1R: ...~......
                                                                                                                       ~
Full text of pages 2 to 88 (of 127)

Page 2

                      2012

THIS         IS TO CERTIFY THAT


              NOOSA ON WEYBA


HAS BEEN ASSESSED AND CERTIFIED AS MEETING THE REQUIREMENTS

  OF THE EARTHCHECK PRECINCT PLANNING & DESIGN STANDARD




                                                                 ASSESSED IN NOVEMBER 2012



CHAIRMAN


www.earthcheck.org                                            the planet deserves more than half measures

Page 3

                                                     ec:~)
                                                     EVAlUATE   COMMUNICATE   EVOLVE




EARTHCHECK




Environmental Sustainability
Development (ESD)Analysis
NOOSA ON WEYBA QUEENSLAND AUSTRALIA
Noosa on Weyba Concept Master Plan and Documentation Analysis




     Dr Richard Moore November 2012
     11/30/2012

Page 4

INTRODUCTION


Noosa    on    Weyba achieved Earthcheck Certification using the EC3 Global Precinct Planning
and   Design Standard (PPDS)for Ecological Performance Improvements on large mixed                             use


developments. PPDS is an integrated tool which                is the    significant outcome from 5 years of
research and testing at The Centre for Sustainable Design                          -

                                                                                       University of Queensland.
The work is a       federally funded initiative with the Sustainable Tourism Cooperative Research
Centre   (STCRC) and         is undertaken      in   collaboration     with    EC3      (Earthcheck) and several

industry partners. The integrated tool provides organisations with environmental design

frameworks, energy and water models, social and economic guidelines and checklists. These
enable the assessment of the development and its operations in terms of outcomes and overall

enhancement of total ecological or ’triple bottom line’ performance.




For Noosa      on   Weyba   to achieve an      Industry Best Practice level it gave environmental,
social   and    economic     commitments        to   establish    a    set    of   ’Environmentally Sustainable

Development’ (ESD)related goals to assist in aligning its development outcomes with ethical
and   socially responsible business principles. These have been translated                      into the following

’ESD Analysis’ which        provides an overview of the general criteria, specific issues and major
initiatives for this large mixed      use   precinct.



For a more detailed      report see   -
                                          Moore      R,   2012:       Noosa    on       Weyba   PPOS   Assessment

Certification Report, EC3 (Earthcheck)Brisbane Queensland Australia.




                                                          2

Page 5

CORE PRECINCT INITIATIVES




ENVIRONMENT



Criteria     Specific Issue     Major Initiative

              Noxious Species   All    noxious   environmentally
                                                      or                          invasive         species     to    be
 Flora and                                                                                           buffer
                                progressively removed generally                  in    bushland                zones

 Fauna
                                abutting the proposed urban footprint and in areas of future
                                compensatory planting.


              Exotic Species    Existing horticultural plantings of exotic species will generally
                                be removed as described above, except where they are not

                                environmentally invasive and have positive values in terms of
                                fauna       habitat         or      food,     aesthetic         significance         or

                                heritage/cultural conservation values.

              Landscape         Low total impermeable site coverage.

              Planting
                                Major regeneration plan for 8 hectares of environmentally
                                valuable     land      that   has    previously been cleared for rural
                                pursuits.

                                A     vegetation management plan involving thousands of new
                                trees, flora and fauna protection (most of which                         are   rare),
                                threatened       or    native habitats linked to          a    planting strategy
                                throughout the precinct aimed at the mitigation of emissions
                                creating a carbon neutral residential development.

                                The     landscape design and species selection to optimise year
                                round microclimate moderation.

                                Species requiring minimal watering                    once    established will be
                                selected.

                                No synthetic fertilisers, herbicides or pesticides will be used.

                                In    ground water saving and natural fertilizer products will be
                                used in all new landscape planting throughout the precinct.

                                Only recycled content compost, soil conditioners and mulches
                                made to Australian Standards AS4454, AS 3743, AS 4419 will
                                be used.


 Animals      Native            Reforestation and propagation of local native flora and fauna
                                and      habitat      pathways       to     encourage        wider      biodiversity
                                particularly Koala and other native animal species.

                                A ’Chemical Use’ plan for construction and post-occupancy
                                phases which dispenses with a need for the broad use of
                                surface fertilizers on infrastructure and open space.

                                A     set   biodegradable        chemicals       use     target      for     cleaning
                                chemicals,         pesticides,      and      herbicides       to    be     employed
                                throughout         the     precincts      educational,        resort,    retail     and
                                commercial buildings.



                                             3

Page 6

           Pets               Numbers and         types of domestic animals will be controlled
                              under the        requirements of the precincts Community Title
                              Scheme. All      marketing material and individual strata titles will
                              clearly indicate that domestic animals will be controlled by the
                              CTS particularly breeds predisposed to hunting.




Pests      Insects            Buildings will be sealed and caulked and points of entry will be
                              protected by adequate mechanical means from insect and
                              pest entry.

                              Properly fitting door seals will be provided on all exterior and
                              exposed hallway doors.

                              Implementation        of    an     environmentally          sensitive    program
                              regarding mosquito and insect control.

Landform   Cut and Fill       Excavations and          cut and        fill   operations   are    limited   to the

                              minimum       practicable with natural landforms being preserved
                              or     reinstated   to     the     greatest       degree     practicable     whilst

           Flooding and       ensuring minimal impact occurs to the local community.
           Drainage
                              Improvements to the existing flooding classification of the site
                              with    no   reduction in the flood storage                capacity of the site,
                              whilst also      improving the flood free access & egress for the
                              adjoining community.

Water      Conservation and   Roof water will be captured and directed to rainwater tanks

           impervious areas   for re-supply into precinct non potable water systems.

                              Rainwater tank overflow in storm events will be directed to

                              gravel infiltration trenches and dams and then infiltrated into
                              the    groundwater system               via    discharge    onto   the   proposed
                              future landscaping and environmental restoration areas.

                              No     impervious    areas       will   connect     directly   to the    drainage
                              system.      All such areas will be drained via:

                                        Rainwater tanks;
                                        Grassed bio-retention swales, buffer strips and basins;
                                        Porous driveways;
                                        Gravel infiltration       trenches; or Infiltration basins and
                                        dams.

                              Gravel infiltration trenches and                 dams will     fully   contain the
                              ’first flush’ from all car parks and driveways.

                              All drainage paths will be vegetated.


           Water Quality      Construction works to be guided                  by a comprehensive soil and
                              water management plan.


                              Discharge of storm water from the precinct will not exceed the
                              following ’pre-development’ criteria and in fact the developer
                              proposes that the project will       improve the quality of
                              stormwater runoff.




                                           4

Page 7

               Ground Water         Ground water will not be extracted or used for any purpose.


               Sewage Treatment     No sewage will be         stored, treated or disposed of on-site to
               and Disposal         ensure that the      adjoining environmental zones are protected.

                                    All   sewage      will   be   piped     via   a     new    rising   main    to   be
                                    constructed       and     linked      to    the     existing    Noosa      sewage
                                    treatment plant facilities.



               Potable Water        Potable water will be obtained from an improved existing town

                                    supply main, however the proposed                   100% capture and        reuse

                                    of roof stormwater will reduce town                   supplied potable water
                                    use   by 25 to 30%.

               Water Reticulation   The water reticulation system for the precinct will include both
                                    a   potable town water system and a separate system for the
                                    reticulation of reclaimed water from the:

                                          -
                                              100% capture and reuse of all roof water.




               Appliances           Only the highest star rated appliances that are commercially
                                    available (preferably 5 star) will be installed.


                                    Only low flow (91/min)shower heads and aerating taps will be
                                    installed.

                                    AAA   rated water fixtures to be used                  throughout the resort
                                    hotel and promoted in all precinct dwellings.


               Hot Water            Throughout the precinct all public buildings and facilities will
                                    have gas fired or solar HWS systems. Owner occupiers will be

                                    encouraged to also use energy efficient gas fired or solar HWS
                                    systems in their property designs.


               Toilet Flushing      Encouragement for the use of rainwater tanks (boosted by
                                    town water if required) will be used for toilet flushing.


                                    Only dual Flush 6/31 toilets will be installed in public buildings
                                    and facilities.


               Landscape            Irrigation systems will            be      water    efficient   drip type with
               Irrigation           automatic timers and rain/soil moisture sensor shut offs.

                                    Town water will NOT be used for irrigation.

                                    Reclaimed        stormwater     from       the     Integrated    Water     Cycling
                                    Management system will be used.


Construction   All Buildings        Lightweight, prefabricated, modular building techniques will
                                    be used wherever practicable to minimise site disturbance.


               Works                Construction works will            be   guided by      a   comprehensive soil
                                    and water management plan.




                                                 5

Page 8

                           Wherever      removed, existing topsoil on site will be stockpiled
                           and rehabilitated for reuse, except where so doing may cause
                           weed reinfestation.

                           Potential disturbance of acid sulphate soils is reduced by using
                           screw     piled foundations and minimising excavation depth for
                           sewerage        reticulation       and    other   utility services, plus   the
                           terrain of the precinct dictates a very low risk of Acid Sulphate
                           contamination.



Energy      Power          The    precinct will be connected to the mains power grid, but
                           will   incorporate photovoltaic panels on roofs throughout the
                           precinct where ever practical to do so.


            Lighting       Natural lighting by building design will be optimised.

                           Mean lighting power density will not exceed 2.5Wjm2jlOOlux.

                           All external lighting will have a maximum                upward component
                           of 2%.

                           The use of LED lighting will be promoted where suitable, such
                           as in   Common Area lighting.


            Comfort        Climatic comfort is provided              by passive ventilation design and
                           ceiling fans.

                           Landscape and precinct design to optimise access to winter
                           sun and summer          shading.

                           All    dwellings to be naturally cross ventilated and oriented to
                           capture cooling south          -

                                                              easterly summer breezes.

                           Air conditioning use will be kept to a                  minimum    by    smart

                           design and building covenants.

            Hot Water      Hot     water    will   be   supplied        from   energy   efficient   HWS.

                           Heating will be provided            by gas boosted solar panels or direct
                           gas heating where possible.


            Cooking        Gas     cooking appliances will be used (subject to gas supply
                           authority approval).


            Appliances     Only the highest star rated appliances that are commercially
                           available (preferably 5 star) will be installed.


            Cogeneration   Opportunities for the implementation of energy cogeneration
                           will be examined and implemented were appropriate.


Resources   Materials      Development    of   specific  ’Precinct   Architectural and

                           Landscaping Guidelines’ for residential building which offer
                           advice on how to minimize environmental impacts.

                           Construction materials and               products will be selected based on
                           balancing the following environmental criteria:




                                        6

Page 9

                                                Recyclability
                                                Sustainable sourcing

                                                Embodied energy

                                                Pollution from manufacturing

                                                Transport cost and local availability

                                                Durability and maintenance

                                                Toxicity

                                                Eco-Iabelling and certification
                                                Total life cycle energy use

                                 The proposed       buildings adopt a light weight architectural style
                                 that minimises the quantity of building materials employed in
                                 their construction.


              Fuel               Wood fuelled heaters will not be permitted.


              Noise              Sleeping areas of dwellings will be oriented away from roads
                                 and noise generating uses in other precincts.


              Demolition Waste   At least 70% by weight of any demolition material will be re-
                                 used or recycled, subject to local recycling availability.

                                 An     on-site    recycling     system     will   be   implemented     for
                                 demolition waste materials           (timber for re-use, concrete and
                                 bricks for crushing and steel and copper for recycling)


              Waste Collection   The  precinct will be served by a common garbage system
                                 provided by council with separate bins to permit two-way
                                 recycling of waste.

              ’Green’ Waste      All   common     property landscape green waste will be mulched
                                 for on-site re-use, unless contrary to an adopted Management
                                 Plan (e.g. noxious weed removal)


              Sewage             A low and      high pressure pumping system will collect sewage
                                 from    each     suite   in   the   precinct and pipe it   to   the   local
                                 council’s sewerage treatment plants.


SOCIAL



Archaeology   Aboriginal         If required, regular inspections will be undertaken          by suitably
                                 qualified personnel during any land surface disturbance.

                                 If any  aboriginal relics or sites are encountered, then the
                                 project archaeologist will be immediately informed. Work in
                                 thevicinity of the relic or site will cease until appropriate
                                 management strategies are developed and required permits
                                 obtained.




                                             7

Page 10

             Character            Low scale         village character consistent with unique lakeside
                                  setting.


             Quality of Life       Specific ’Quality of Life’ Guidelines developed for the precinct
                                  which       recognises the developments socio-economic goals.

             Movement             The    precinct will be provided with              secure     dedicated   bicycle
                                  and electrical buggy           pathways and parking stands located in
                                  safe, highly visible locations, to minimise the use of motor
                                  vehicles.


             Traffic Safety and   Appropriate low speed limits and road designs will apply
             Air Quality          throughout the precinct to protect wildlife.

             Crime and Public     All   public areas have been designed, and will be detailed and
             Safety               lit    in     response       to   crime      prevention       through      design
                                  recommendations.

                                  The     project will        include   on    site   security    as   part of the
                                  Community Title Scheme

             Noise and Visitor    Sleeping rooms in the precincts apartments will be oriented
             Comfort              away, and/or will be screened from                 sources    of noise such as
                                  car   parks, plant and outdoor dining/activity in other precincts.

Education    Programmes           An induction program will be               provided for all staff explaining
                                  the    ecological        sensitivities   of the    site, the environmental
                                  sustainability initiatives of the precinct and how to do their job
                                  sensitively. Future owners and visitors will be provided with a
                                  ’Precinct Information Pack’ explaining:



                                         ./     The ecological sensitivities of the site.
                                         ./    Implementing the environmental sustainability
                                                initiatives of the precinct.
                                         ./     Bushfire Evacuation Plan.

                                  Additional copies of the handbook will be                     publicly available
                                  from the precinct manager. Controls over resident and guest
                                  access      and    use   of environmental      areas   will be embedded in
                                  the CTS By Laws.


ECONOMIC


Investment   Inward Income        Part    of the      community title contribution              revenue     will   be

                                  payable       to the body      corporate to fund
                                                                              ongoing management
                                  of the      public domain, community facilities and bushland and
                                  wildlife management.

                                  The precincts will          augment patronage of businesses                in    the

                                  adjoining      town centres, local markets and           shopping malls and
                                  individual      shops,      restaurants      and    other     retail/commercial
                                  facilities.




                                                 8

Page 11

                                 Income    generation for the area will flow from the precincts
             Area Income
                                 fixed community and visitors in the form of rates,                   use   of
                                 services and patronage of regional facilities.



Employment   Opportunities       Local employment opportunities will be created in both the
                                 construction and ongoing management stages, particularly as

                                 managed facilities      will   lead   to   employment in      a    range of
                                 servicing capacities.


Ecological   Performance         The ongoing environmental, social and economic sustainability
                                 of the   precinct will set a     new    benchmark for environmental

                                 performance in the Noosa region and reinforce the marketing
                                 of Noosa on Weyba      as  an  ’ecological’ lifestyle change
                                 community and destination.


Community    Tenure and          The     proposed Community Title and           Strata Title       system of
             Ownership           tenure will establish     a    body corporate (or similar) that can
                                 equitably administer the levying and expenditure of funds
                                 required to manage common property, administer precinct
                                 facilities, provide  security,  and  implement    ongoing
                                 environmental      management programs in the conservation
                                 precinct whilst also policing the environmental protection By
                                 Laws 24/7 via full time on site management.



Funding      Revenue             Revenue       generated by the Community Title         Scheme levies
             Generation          withinthe precinct will contribute to the long term
                                 management of the rehabilitated environmental areas and
                                 costs    associated   with     the    public domain and       community
                                 facilities.




                                                       c

                         ( -(                              (           ~l
                                                       c::::

                          EVALUATE    COMMUNICATE              EVOLVE




                                               9

Page 12

                                                      ec
                                                      EVALUATE   COMMUNICATE   EVOLVE




                             Quality of Life
                                                        EARTHCHECK




Dr Richard Moore EC3 Global Earthcheck Assessor   Copyright August 2012

Page 13

     The Development of a Sustainable Precinct
                                            Community
     Content:

     Goals, Aims and Objectives

     Promoting ’Quality of Life’

     ’Quality of Life’ Guidelines

     Improving ’Quality of Life’

     Creating the Foundations

     Evaluation




[GOalS,      Aims and Objectives
                                                                                                                      I
The    proposal   is to build   a   lifestyle precinct creating   some   844 new   dwellings which    will   be   a

combination of private residences, townhouses, retirement/aged dwellings and apartments. All are
to be built within several distinct neighborhoods, around local open spaces and green squares. The
Precinct facilities include large areas of public and protected parks, extensive footpaths and
cycleways, a community centre/club house with leisure and recreational facilities. The site
encompasses some 303 hectares of land located on the shores of Lake Weyba and adjoining the
Noosa Heads National Park. The precinct is near the iconic resort of Noosa and market town of
Eumundi. Also close by is Tewantin which offers access to the Great Sandy National Park. At the
north end of the Sunshine Coast Queensland the area is renowned for its scenery and excellent
climate. It’s close to the popular tourist destinations of Caloundra and Maroochydore and enjoys
good road links to the growing Sunshine Coast Airport, the University of the Sunshine Coast and
the State Capital Brisbane. There is a vibrant local retail and commercial sector, high standards of
mixed tenure of residential housing and hospitable accommodation supported by a large
infrastructure of recreational facilities including shops and restaurants. It is a sought-after
destination with lush hinterland and a number of internationally renowned beaches complimented
by bays and coves.
In  planning and designing the precinct there is an overriding goal of improved ecological
performance. This has arisen from the Developer (Mantle) who is seeking to implement
’sustainability’ throughout the delivery process aimed at creating an iconic master planned
community using world best practice urban design principles. This it is believed will lead to the
precinct known as ’Noosa on Weyba’ becoming a good place to live, raise families, retire to and
or simply visit. Residents and visitors will be able to enjoy a healthy lifestyle within an environment

that provides both privacy and quiet along with opportunities for safe and possible inspiring
interaction with others. It is to be a place that will also encourage respect for the environment and
its bio diversity. To adhere to these aims, goals and objectives Earthcheck have created a series
of ’Quality of Life’ guidelines and checklists. These set the direction for the planning, design and
construction of the precinct and its facilities. They also seek to create the means by which
environmental, social and economic integration and equity can be achieved to the benefit of all the
precincts stakeholders. It is believed that this approach will create a high quality, well designed
and managed place. This outcome can playa crucial role in promoting individual well-being and
contribute positive social, economic and environmental value to the precinct providing benefits of
specific dimensions of quality of life such as health, safety and economic well-being.


                                                                                                             2
Dr Richard Moore EC3 Global Earthcheck Assessor                               Copyright August 2012

Page 14

                                                                                          l Quality     of Life   J
  Promoting Community ’Quality of Life’
                                                                                                (l)
INTRODUCTION
One of the key aims of a residential precinct development should be the promotion of a better
’Quality of Life’ for all of the eventual community stakeholders. Problematic is no true definition
of ’Quality of Life’ exists. Clarity would make the task of determining what measures are
needed to ensure its achievement much easier. For this proposal ’Quality of Life’ means a
general subjective feeling or attitude towards qualitative aspects of the physical or built
precinct and the softer social dynamics of the precinct. These feelings will reflect on their
characteristics and excellence in achieving the goals, aims and objectives noted earlier. In the
following ’Quality of Life’ plan (See Figure 1) are long held headline indicators universally
common to virtually all industrialised nations. They present a possible framework approach

which can be formulated to the issues of what constitutes ’Quality of Life’ at Noosa on Weyba.



                                         Community Safety

                                Transport                      Health

               The Built Environment                            Housing
                                            Quality
                               Waste
                                                   of            Equalities & Welfare

            Energy,Water and Pollution            Life         Jobs, Skills & the Local Economy

                      Nature Conservation                   Arts and Heritage

                                                  Leisure
                                           and Recreation




Figure 1 Quality of Life Plan

How these headline indicators diffuse into the precincts community and individual consciences
is of importance to the suggestion that ’Quality of Life’ can be measured under an independent
third party benchmarking and certification process. It is the intent of the Developer to seek
certification of Noosa on Weyba by undertaking a sustainability assessment by EC3 Global
(Earthcheck) an international research body, which strives amongst other things for
sustainability in precinct development.     It’s Precinct Planning and Design Standard
(PPDS}l is an internationally recognised standard developed at the University of Queensland
and University of New South Wales, in conjunction with the Sustainable Tourism Cooperative
Research Centre (STCRC) of Australia. This Standard underpins the global affiliation,
benchmarking and certification programmes of Earthcheck. The Standard seeks to interpret
resultant issues normally in the form of a listing of important topics such as employment,
transport, community safety, social equity and so on. An agreed plan conceived and developed
between Earthcheck and developers can then be implemented to tackle the issues associated
with the topics.


This plan seeks to identify a range of problems and solutions and how they may be resolved
and delivered respectively. The plan is likely to suggest that a community’s wellbeing and its
’Quality of Life’ would be enhanced and more sustainable if the shared social, economic and
environmental linkages common to more than one topic is taken into account. Critical to this
process is the need to determine key sustainability outcomes along with essential and desirable
characteristics of a sustainable community (see Table 1 and Figure 2).


                                                                                                                  3
Dr Richard Moore EC3 Global Earthcheck Assessor                                 Copyright August 2012

Page 15

Key Linkages and Outcomes


         Good Housing, shops and other facilities, which are accessible to all                   through
         high quality infrastructure and reliable public transport;

         A   flourishing local economy with access to the broader regional economy

         which   is both    ’mainstream’ and social economy, that stimulates local
                               a

         enterprise, meets local needs and helps to overcome poverty;

         Access to good primary and tertiary education and training opportunities;


         Bio Diversity appropriate to circumstances, good air, water and soil quality;

         Low energy use and waste, coupled with cool/warm homes and                             resource

         efficient businesses;

         Sustainable    lifestyles encouraged and facilitated by education, information
         and opportunities supporting behavior change;

         A   safe and   healthy environment, contributing to peoples physical, mental
         amend social wellbeing; A vibrant and creative local culture, characterised by
         thriving community groups and pride in the local community;

         High levels of public participation in decision making including by particular
         excluded groups; Governance and development: the mechanisms and means
         to facilitate on going improvements in the precinct and immediate area;


         High quality information enabling the monitoring of social, economic and
         environmental progress.




Table 1: Key linkages and outcomes (After SCANl


As stated it is important to consider just what a community should have as an initial measure
of its   sustainability supported bylisting of essential and desirable characteristics against
                                            a

which the sustainability of the community created can be evaluated. However it is worth noting
that what ever the indicators or measures and eventual guidelines are they will come with
caveats. For example:


   "Whilst there are, or should be, universal standards for all main social, economic and
   environmental indicators, there is of course no single formula to which all communities
   must      conform    in    order   to   be   sustainable.   Different   communities   have   different
   characteristics according to there    history, geography          and the sum of lifestyle choices
   made      by there inhabitants".  Further; "there is an almost infinitely extendable list of
   desirable characteristics of localities and communities, any of which would help to make
   them sustainable. It is difficult to establish characteristics or indicators that are all at the
   same      level of generality. Too     long a list would be impracticable, yet to short a list
   involves grouping         together issues each of which has a claim to being major factors in
                        3
   their own rights".


Accordingly the guidelines and associated checklists that are presented later provide a
compilation of items deemed to be both essential and desirable for the creation of a sustainable
precinct community at Noosa on Weyba. Underlying these guidelines are Key Area Indicators
and Measures of those factors which must be present for this precinct to be regarded as fully
sustainable in terms of its locational geography and proposed lifestyle.




                                                                                                            4
Dr Richard Moore EC3 Global Earthcheck Assessor                                 Copyright August 2012

Page 16

Essential and Desirable Characteristics




      Use energy, water and other natural reS()urces efficiently            Prudent use of resource
      and with care                                                            Energy use (gas and electricity) (1)
      Minimise waste, then re-use or recover it through recycling,             Domestic water use (2)
      composting or energy recovery and tln81ly dispose of "",hat is leEr      Household waste arisings (3)
                                                                              Recycling of household waste (4)

    . Limit pollution to leveb which do not damage natural system:>         Protection of the environment
      Value and protect the diversity of nature                             6. Number of clays of air pollution (5)
                                                                            6. Rivers of good or fair qua1ity (6)
                                                                            tJ. Net change i.n naturaVsemi-natural habitats (7)
                                                                            t. Changes ill populati.on of ::;elected
                                                                              characteristic species (8)

    (MEETSOCIAL NEEDS)                                                      SOCIAL

     .Protea human health and amenity through safe, clean,                  Better health and education for all

      pleasant environments                                                 6. Mortality by cause (9)

      Emphasis health serVlce prevention action 3S well as care                Qualifications of young people (10)
      Maximise everyone’s acces~ to the: skills and knowledge               t. Adult Cdllc<ltion (11)
      needed to plaY}1 full part in society

     .Ensure acce$!) to good foc.>d, water, housing and fuel at a           Acccs,_ to local services and travel
      re<lsoO[~ble C(1St                                                    6. Homes judged unfit to live in (l2)

      Encourage necessary access to facilities, services, goods and         6. HomeLessne.ss (13)
      other people in W:lys which make less use of the car and              6. Access to key services (14)

      minimise -impacts on the environment                                  6. Travel to work (l5}
     .Make opportunities for culture, leisure and recreation                6. How do school children travel to school? (16)

      readily available to all                                              6. Overall traffic volumes (17)
      Meet local needs locally wl erevcr possible
                                    -




      Create or enhnnce places, spaces and bu dings that work               Shaping our surroundings
      well, wem well Hnd look wen                                             New homes built on previm.lSly developed land (18)
     .Make settlements ’human’ in ~cale and form                              Public concern over noise (19)
     .Value and protect divel’~ity and local distincdvcness and             6. Recorded crime per 1000 population (20)

      strengthen local community and cultural identity                      6. Fear of crime (21)


I
     .
      Empower all sections of the community to participate in               Empowerment and participation
      decision ntak ing anJ cuns L1ct the social and corrununity            6. Social participatiun (22)

      impacts of clecisions                                                 6. Community well being (ZJ)
                                                                            ~ Tenant slltisfBctlon/participC\tion (24)


    !, (PROMOTEECONOMIC SUCCESS)                                             ECONOMIC

     .Create a vibrant local economy that gives access to                   Sustainable local economy
      satit,fying and rewarding work without damaging the                   6. EmploymentjUncmploymcnr (25)

      local, nationrtl or global env ronment                                6. Benefit recipients (26)
      Value unpaid work                                                     6. Business start lipS and closLlIes (27)

                                                                            ~ Companies with environment man::tgement

                                                                               system~ (28)
                                                                            6. Social and community entelvrises (29)



Figure 2: Characteristics and Indicators (after DETR)4

                                                                                                                                   5
Dr Richard Moore EC3 Global Earthcheck Assessor                                                  Copyright August 2012

Page 17

These types of menus and indicator frameworks are useful in offering         a means    of simplifying,
communicating and eventually measuring important areas and trends in a way that helps
people understand the key issues of sustainable development. They provide possible
benchmarks against which progress can be measured and compared. Useful pointers are also
given for people to determine their own responsibilities in achieving sustainable community
outcomes. Importantly they also show that developers, central and local government can not
deliver sustainability without the stakeholders of a community i.e. citizens, business,
employers, teachers, young and old persons, householders voluntary or community groups
                                                               5
taking part or having total responsibility for their community.

Broader Perspectives


Unfortunately many precinct developments (despite research) still tend to focus on simply
enhancing the economic outcome for those most directly involved. Whilst this approach may
result in raising some individual’s income and accrued wealth it has not tended to result in
higher levels of well-being. In fact, it has been suggested that whilst personal wealth for some
has nearly doubled over the last 30 years, measures indicating well-being have remained
static.6 It is recognized that the well being or ’Quality of Life’ of a precincts community is an
important concern in economic terms. However this measure which is largely linked to standard
of living dominates mainly because it is easy to measure. Other measures such as happiness,
health and community spirit are less so and therefore are somewhat marginalized. This has
lead to an inevitable imbalance in creating approaches that seek to encompass a wide range of
measures that may promote greater livability but are harder to assess and therefore predict.



The  proposed guidelines seek to achieve a balance and broader understanding of the
relationship between environmental, social and economic ecological impacts associated with the
development of a large mixed use precinct. This it is believed will provide lasting improvements
to the ’Quality of Life’ experienced by all the precincts stakeholders.


Defining the People and the Place

Regarding stakeholders the meaning is employed here to describe the permanent residents,
temporary residents and visitors, workers employed in the precincts businesses or services and
those group networks located within the precinct and the broader environmental, social and
economic footprint of the development. It is important to recognise that when using such a
                   7
’people in place’ approach there is considerable overlap with adjoining communities because
neither is mutually exclusive. This is because a community usually refers to a group of people
who interact and share certain things as a group, in which intent, beliefs, resources,
preferences, needs, risks and a number of other conditions may be present and common,
affecting the identity of the participants and their degree of adhesion. Such a community will
not be determined by a notional boundary of space or a particular place. This is important
because there is also no standard size for a precinct its community or neighborhoods. The
localised legal or administrative one used in most precincts simply defines an area within which
the actual physical construction infrastructure and operational administration will take place.
The more fluid social capital infrastructure will be less bound by this legally required defining of
the precinct.


Social Capital: Elusive Glue.


The role of social capital must be considered when    improved ’Quality of Life’ is fostered as the
major prize of a sustainable development.         While the term socialcapital has been used in
varied ways, it can be defined in context of these proposals as "the process and conditions of
social networking among people and organizations that lead to accomplishing a goal of mutual
social benefit, usually characterized by trust, cooperation, involvement in the community, and
sharing".8 Accordingly, "social capital can be understood as a resource to collective action,

                                                                                                     6
Dr Richard Moore EC3 Global Earthcheck Assessor                           Copyright August 2012

Page 18

which may lead to a broad range of outcomes, of varying social scale. For individuals, this can
mean access   to social connections that help the processes of getting by or getting ahead. For
communities, social capital reflects the ability of community members to participate, cooperate,
organise and interact".9 Included in this definition are a person’s family relationships, kinship
networks, friendships, acquaintances, civic attachments and institutional ties.10 It is argued
that social capital is an "elusive concept yet has also been heralded as the glue that holds
communities together. The essence of social capital is quality social relations. It is the quality of
relationships, understood through the use of the concept social capital, which affects the
capacity of people to come together to collectively resolve problems they face in common and
achieve outcomes of mutual benefit". Importantly in context of Noosa on Weyba is the belief
that "for communities, social capital reflects the ability of community members to participate,
                                                                                          11
cooperate, organise and interact critical to the success of a community’s sustainability".

Therefore conceptionally whilst ’Quality Of Life’ and social capital are closely related    they are
essentially different things. ’Quality of life’ is a broad concept which includes environmental,
social and economic dimensions. Social capital is an important ’hard or soft’ ingredient of
’Quality of Life’. Simply put ’hard’ ingredients represent the physicality of development
provision with ’soft’ ingredients being the ability to participate in the choice and evolution of the
community. Access to basic services such as schools, healthcare and retail offers, cleanliness in
streets, feeling safe to go out at night, accessible open space, habitats for wildlife, number of
trees and shrubs planted, community empowerment, life/work balance are recognisable social
capital elements. At the development level of a new community this could mean sponsorship by
the developer of such things as a range of social events, establishment of liaison forums to
represent local residents, even increased water pressure so that the existing adjoining
community occupiers can have a decent shower. The list can be extensive and ongoing.

No Guarantee of Success


All these ’soft’ ingredients along with the ’hard’ are aimed at engendering community wellbeing
and thus its sustainability. The noted dimensions of modern      living and many more are said to
be that which makes for ’Quality of life’. With all these actions it is hoped that they will improve
residents and other precinct stakeholder’s ’Quality of Life’. However at present there is no
guarantee of success therefore whilst a developer cannot directly make a precinct’s
stakeholders  happier or more engaged they can shape the culture and society in which the
precincts stakeholders live and work.

As stated  concentrating simply on the economic profile of a precinct has only a small effect on
well-being and may be achieved at the expense of other factors that have a greater effect on
well-being: work-life balance, the environment in which we live, and the vibrancy of local
communities. The wider approach suggested flows from an understanding of and contribution
to be made by Social capital. In terms of the development this should mean that people are
proud to live there, that they look out for their neighbors and come together to get things
done. With a growing body of research showing that ’Quality of Life’ is strongly influenced by
social capital it has been found that stakeholders value social capital as an end in itself and as a
                                                                                              12
firm reassurance against such things as crime and anti-social behavior (Moore 2005).             The
purpose   of the   guidelines is to provide a working explanation   of ’Quality of Life’ and  ’Social
Capital’, what they are and what they do. Most important of all however is they seek to
demonstrate how both can be promoted on a precinct such as Noosa on Weyba.


 "A sustainable      community accepts that communities are first and foremost for
 people and that the primary objective of the planning and development process is
 to  improve the quality of life of its residents, socially, economically,
 psychologically, and spiritually. It implements policies to achieve quality of life and
 does so in a fair, open and democratic manner"

                                                                             Geis and Kutzmark


                                                                                                   7
Dr Richard Moore EC3 Global Earthcheck Assessor                         Copyright August 2012

Page 19

                                                                                  l Quality of Life]
                 ’Quality of Life’ Guidelines
              Turning the concept into everyday use                                   &J
Social capital guru Robert Putman13 defines it as "features of social organization, such as trust,
norms   and networks that     can improve the efficiency of society by facilitating coordinated

actions".   For the proposed guidelines to achieve this improvement in social effectiveness there
must be willingness on all stakeholders particularly residents to get involved. This requires that
they have the abilities and skills and are afforded the necessary access to do so. The key to
this is to put the concepts into everyday language and use and then create the means by which
co-ordinated actions can take place.


The main features of everyday social capital include according to SCAN14 the following:


        Mutual Trust


People feel should feel that they can trust their neighbors or local organizations involved in
managing of their precinct or neighborhood and that these feelings are reciprocated.

        Social Connections


People should have a friendly relationship with their neighbors and a range of other people and
local organizations in the area. Importantly such connections (though not necessarily
friendships) should be facilitated by the built environment.

        Shared Values


People should share a set of common values and similar norms of behavior.

        Capacity

People and local organizations need to have the skills to organize themselves and act together
in a concerted manner.


        Vision


People should share a vision about the future of their precinct and immediate neighborhood.
They should have a sense of belonging and ownership.

        Safety

People should feel safe in their precinct or nr immediate neighborhood. Social interaction and
use of public facilities should not be restricted by fear and use of such facilities should actually

reinforce feelings of safety.


        Identity

People should identify with their home, neighbors and precinct or immediate neighborhood.
They should have a sense that they belong.

It is alsoimportant to recognise that if community willingness and ability are high
then    theamount of added quality of co-ordinated action is also likely to be
correspondingly high between all the stakeholders of a precinct.


                                                                                                   8
Dr Richard Moore EC3 Global Earthcheck Assessor                         Copyright August 2012

Page 20

                                                                                    l   Quality of Life
                                                                                                          J
                Improving ’Quality of Life’
               Examples of ’Social Capital’in Action
                                                                                         B
The range and number of examples is extensive. The following are some of those which would
be the hoped for community norms at Noosa on Weyba. If they are it could be claimed that the
building of social capital had been successful.

        Watching out for neighbors;
        Joining the local neighborhood watch scheme;
        Helping elderly or disabled neighbors;
        Organising social gatherings to welcome a new neighbor;
        Have children attending the local school;
        Volunteering for school input i.e. skills tutoring i.e. computers;
        Participating in fund raising for a local charity or school
        Helping prepare for or attending a local community or local school play;;
        Singing in a choir or playing in a local band;
        Helping run a community facility i.e. football, soccer, cricket, netball team;
        Volunteering for the local library or providing some skill to the library, i.e. story telling;
        Joining a carpool or car sharing scheme;
        Joining a local health and fitness club;
        Setting up a community skills exchange;
        Mentoring a local group of amateur artists, gardeners, walkers, cyclists;
        Attending local skills or interest courses;
        Setting up a new local business;
        Supporting local professionals, local tradesmen and merchants;
        Starting a local community garden or participating in a planting event;
        Participation in community or local political campaigns;
        Attending local meetings on issues regarding the precinct and local community.

From this list it is clear that there are different types and therefore means of generating social
capital within a precinct community. The three recognised forms are:

           Bonding

The features of these groups   are that they are made up of people who are similar in

background e.g. gender, race, ethnicity and socio-economic status. An example would be a
faith or church group.


           Bridging

This form of social capital is often felt to be more beneficial than that of bonding. Though it
provides support, it is less tight knit. This form has been described as ’weak ties’. Here more
diverse groups of people engage in an activity with one another including cross generational or
cross neighborhoods examples would be a dance club or keep fit classes.



           Linking

Linking social capital is less well known. It is about connecting unlike entities such as local
people, institutions like the council, police or importantly precinct developers and finding new
ways to work together in a positive and productive manner.




                                                                                                          9
Dr Richard Moore EC3 Global Earthcheck Assessor                           Copyright August 2012

Page 21

It is important to note that these types of social capital, especially bridging and  linking, are not
easy to generate.   Physical separation of say housing types and tenures in the same street can
cause segregation in a community. It needs to be stressed that developers have an important

role in overcoming these challenges, but there is only so much that they or local government
can do to ensure that social capital is built and used constructively. In this guide it is stressed

that their actions can facilitate social capital but these can-not be a substitute for citizen action
and endeavor. Developers cannot build social capital on behalf of the people      only with them.
                                                                                         -




A question that is sometimes asked is what are the advantages of seeking to engineer social
capital at the planning and design stage? Research suggests that precincts with high levels of
social capital introduced at this strategically critical time have         a   number of advantages over
those communities left to develop without a shared vision             or means    to create beneficial social
              is
interaction.       Also at this early   phase   of precinct development good       planning and design will
overcome      the evident risk of it becoming       unregulated, formless or haphazard, inefficient and
likely to lead directly to a range of negative environmental, economic and in particular social
impacts.16

At the more localized level it is also known17 that a high degree of social capital will lead to:


             Improvements in resident’s health

Social interaction can considerably strengthen people’s health. Isolation on the other hand can
lead   to    depression and general ill         health.   Evidence   of reduced    health    problems where
community cohesion is high exist as does incidences of increased health issues once that
cohesion is lost.18


             Lower crime and fear of crime


People look out for each other and take actions against vandalism. A Harvard University Study
showed that violent crimes were 40% lower where residents      willingly mingled compared to
areas where no such       interaction existed.


             Fewer and more easily resolved disputes


People who trust each other have fewer disputes and/or have the ability to settle conflicts
among themselves. This is particularly important when seeking to involve all members of a
community such as young persons who can sometimes be alienated by being seen as part of as
a problem not part of the solution.



             Community facilities are better managed

In   areas   withhigh levels of social capital, the community looks after facilities, parks or
community centres. Community groups or volunteer organizations can often manage these
facilities more cheaply and effectively than local authorities or private sector orgaisations.


             Less tension between diverse groups


Different cultural groups know each other and trust each other more


             Less isolation with greater social ties and safety nets


People who have local friends and acquaintances tend to be less isolated and get more support
in times of difficulty. For example uncollected mail or non attendance at local group activity will
normally raise an alarm.



                                                                                                          10
Dr Richard Moore EC3 Global Earthcheck Assessor                                 Copyright August 2012

Page 22

From these    gains it is worth noting that two major reasons exist for Developers to actively
pursue a programme of social capital implementation on their developments. These are:


           More socially attractive precincts


Places with open constructive forms of social capital are places where people want to live. It is
known that most      people want to live where there is a sense of community spirit and people
look out for each other.


           Promoting ’Quality of Life’

Social capital is increasingly seen     as an     important component in the promotion of ’Quality of
Life’. Often the only interaction between    Developers and residents is when something goes
wrong.  With social capital that encourages an active community involvement it is possible to
start a new type of relationship that is positive and more about moving forward in the creation
of a sustainable community.


Gains and the role of developers


It is important to recognise that social capital transcends socio economic barriers. It might be
felt that social  capital is more an issue of deprived areas where the lack of environmental
quality and economic wealth is compensated by friendship and extended families. This is not
                           19
borne out by research         which shows that whilst more affluent groups can make greater
choices regarding locality the preceeding development gains are still the driving reasons in
lifestyle choices of this group.

Therefore it would     seem   that social   capital   matters in both   deprived and affluent precincts
because it makes a crucial contribution to the ’Quality of Life’ in a precinct. If the gains from
this dynamic are to be fully realized the developer has to recognise the crucial role they have in
community development particularly when building large mixed use residential precincts.

It was noted earlier that it is not the role of a        developer to influence the willingness of the
precincts stakeholders come to together for a joint purpose. This is for the stakeholders to
decide on and act. However developers can and should promote the ability of the stakeholders
to make connections, to organize and undertake joint and mutually beneficial actions. This is
because precincts are not simply about buildings they are about people as well. The developer
can through early planning and design can participate at the forefront of creating social capital

and therefore determining the sustainability of the precinct. To achieve a developer need to
encourage a willingness on the part of the community to be engaged and ready to invest in
relationships and activity aimed at underpinning social capital. They also need to facilitate the
ability of the community to invest in relationships and make use of them.

Finally it must be recognized that a Developer can not take responsibility for the willingness of
people to connect and work together. However this Developer is determined to ensure that the
critical role of giving the stakeholders a helping hand in providing the incentives to take part by
providing the right physical and social infrastructure will be at the forefront of its planning and
design decision making process.




                                                                                                     11
Dr Richard Moore EC3 Global Earthcheck Assessor                              Copyright August 2012

Page 23

                                                                                    l Quality   of Life
                                                                                                          J
                 Creating the Foundations
                              ’Hard and Soft’
                                                                                         &J
As suggested the Developer can playa significant role in promoting the social capital needed to
influence the precincts ’Quality of Life’. The following is how this can be carried out at Pacific
Highlands. Providing the foundations necessary to create a cohesive and dynamic community
falls into two categories. First there are the ’hard’ foundations which are about the precincts
physical infrastructure and its design. Second are the ’soft’ foundations which refer to the
processes of living within the built environment.


It    important to recognise that others will influence and have responsibilities for the
     is
development of large mixed use precincts and their communities. However it is the developer
that by far has the leading role and should take the initiative. What the types of ’foundations’
are as follows:



     1.   Hard Foundations: Physical     buildings and design interventions, such as the layout of
          buildings and associated infrastructure including streets and landscaping. The overriding
          goal is to provide the means by which the community is able to come together.
          Importantly to support bridging social capital planning and design should help
          neighboring communities to overlap and provide opportunities for shared social
          interaction.


     2. Soft Foundations: These are about processes, such as the management of community
          facilities, setting up local groups and organizations and the participation of local
          stakeholders in the development and post occupancy process.


Social capital will be at its strongest when both    are   in   place without this neither will realise
their full potential. For example if hard foundations lack the soft inputs there will be a possible
lack of the sense of ownership within the community. Whilst facilities may bring the community
together it may not be in a spirit of mutual trust. This unfortunately can lead to a circumstance
of opposition to almost any plan put forward by the developer. Conversely without hard
foundations soft ones can be equally impotent. Stakeholders may be able to come together
through a management structure but if the design of the built environment places barriers
which encourage people to stay at home or requires them to use the car rather than to mingle
freely the opportunity will be lost.

Phasing of social capital is also a major issue for the developer particularly of large mixed use
                                                                      20
precincts because of their timescales. Importantly it has been noted     that those developments
that benefit from ongoing developer involvement normally respond with more positive social
capital outcomes. This is because opportunities to create, and improve on this building of social
capital occur throughout the pre and post development process.

At the  planning and design stage ideas for the development come together it is critical that
social capital is built in right from the beginning. After this phase it will be virtually
                                                                                       impossible
to turn bad decision around. The building phase is a difficult period particularly on large
developments simply because of the disruption and timings for implementation of what might
be important social capital infrastructure. Nuisance and delay can be extremely negative forces
as a   precinct evolves. The final occupation phase is slightly contradictory in that the
opportunities of laying down social capital have mostly passed by this phase. However it is also
the best time for social capital creation due to there being the key ingredients of residents and
other stakeholders in place and creating the living community.


                                                                                                          12
Dr Richard Moore EC3 Global Earthcheck Assessor                            Copyright August 2012

Page 24

                                                                                 can            make
                                                               numerous      interventions        to

   PARKLANDS AND TROPICAL GARDENS                              support social capital through
                                                               design and building. There are
                                                               five   important   components
                                                               that together to form the hard
HARD FOUNDATIONS FOR A PRECINCT
                                                               foundations for social capital
                                                               on a large mixed use precinct

                                                               development.
SHARED SPACES


Stakeholders need indoor and outdoor spaces where          they can meet and interact. These can
range from    a   retail mall with   health and fitness club, coffee shops restaurants to ’village
squares’, parks incorporating        sports fields and informal play areas with children’s play
equipment and seating. Such shared space needs to be carefully located and designed as it
can become a source of great local pride or a major point of contention. Further the challenge

of shared space is the number of users throughout the day that are encouraged to visit and
stay to meet friends, shop or take part in activities provided by the facilities of a particular
space. The vibrancy generated will create spaces that are lively and safe offering the possibility
of improving users ’Quality of Life’.


LIFESTYLE MIX AND USE


To encourage      an   active stakeholder involvement in   lifestyle precinct it should offer well
                                                           a

designed facilities providing for recreational, leisure and community activity. This is a crucial
issue in that the mix will be an important component of ensuring vibrancy in the precinct areas
at various times of the day. The mix needs to be aimed at encouraging local enterprise by
increasing the business base of the precincts development area. This increase particularly, new
businesses should be done by prioritiesing the precincts needs against the facilities of the
broader development area. This can ensure that there are no negative impacts on the viability
of the new and other local area businesses. This approach can in fact have the affect of
providing the catalyst for improvement in the local business provision. Any large mixed use
Precinct development must also provide health, spiritual and educational opportunities. The
major benefit from this will once again be the use of the precincts facilities by various groups of
stakeholders at different times of the day. That ’Quality of Life’ is improved by this attention to
more holistic needs is without question. Of importance is unhindered access and participation

for all generations and cultures.




                                                                                                   13
Dr Richard Moore EC3 Global Earthcheck Assessor                         Copyright August 2012

Page 25

DIVERSE HOUSING


Mixed-use precincts such as Noosa on Weyba can benefit from the provision of a wide range of
housing types and tenure. This approach encourages physical and social diversity a key
element of a vibrant community because it allows for a much broader mix of generations,
cultures and socio-economic groupings. This approach whilst not necessarily equating to a
socially coherent mixed community will offer a better opportunity of achieving social inclusion
of say key workers. These could include newly qualified teachers, chefs and gardeners all of
whom are crucial to the servicing and maintenance of the precincts facilities.


Also linked to this diversity is the phenomenon of more and more people working from home a
trend that many suggest should be encouraged because of the ’Quality of Life’ spin offs. This
calls for a greater variety in housing types that provide flexible and spacious enough
accommodation to allow for telecommunicating or low impact commercial demands.


STREET LEVEL CONTACT


The  Precinct must offer safe and attractive pedestrian environments which encourages
stakeholders into spaces be they malls or street locations. This is paramount for two reasons
firstly, in seeking to stimulate social interaction and secondly, to prevent door to door car
bound living so common in many of today’s communities.


Whilst recognizing the desire that many have for privacy within there own property boundary
this can be achieved  by good planning and design without the loss of street connectivity. A
vibrant street life, through a wide variety of spaces and opportunities for activities as well as
chances to meet, whether in a    garden or public space should be a primary objective. People
need to be visible and have the means to become known to each other despite the diverse and
busy roles many lead and have today.

SECURED BY DESIGN

                                                                                       21
A critical issue in modern society is that of personnel safety. Secured by Design     principles
highlight  the need  for natural surveillance and the creation of active precincts through the
planning and design of the built environment. Particular importance is given the creation of
connected movement networks and associated issues such as lighting. These are seen as
crucial to providing a means by which residents can be out and about with confidence.


It is worthnoting that usability and security aren’t contrary goals there is no need to sacrifice
one   for the sake of the other. Infact, a network that is difficult to understand and use will
almost certainly have security problems in practice. A more secure network is a more reliable,
more effective one and hence, a more usable network. Clear and direct routes through an area

for all forms of movement are desirable, however these should not undermine defensible
space, sense of ownership or responsibility inherent in well-designed precincts. Secured by
Design seeks to promote routes that are active and self-policing, and where leisure routes are
less busy to ensure that the design approach responds accordingly. The creation of underused
and lonely movement routes is to be avoided.


The approach advocated by Secured by Design can positively overcome the living behind locked
doors often   seen   in many communities. By      making people feel safer through the knowledge
that careful consideration has been given to their security in local centres, parks and on the
networks linking these spaces greater confidence in their use will result. The goal of this is to
achieve a safe community which are normally more stable and enjoy a better ’Quality of Life’.




                                                                                                14
Dr Richard Moore EC3 Global Earthcheck Assessor                        Copyright August 2012

Page 26

    Public transport linkages;
    Extensive infrastructure landscaping;
    Preservation of sensitive habitat;
    Koala protection measures;
    Protection of environmentally sensitive
    areas;
    Rehabilitation of existing habitats;
    Open space with children’s facilities;
    Community centre and club;
    Access to Lake Weyba foreshore;
    Bush walking trails;
    Integrated cycle pathways
    A wide range of housing choice and tenure;
    Energy efficient homes;
    Water harvesting and grey water reuse;           A SENSE OF COMMUNITY
    Secured by Design principles;
    Extensive footpaths;                             A   sense     of community often       comes     at the
    Village greens and open spaces;                  top of many people’s priorities when seeking
    Fitness trails and wellness stations;
                                                     to find a     place to live, raise a family, work,
    Lifestyle retail provision, i.e. coffee shop;
    Recreational facilities i.e. sailboard club;
                                                     retire   or    simply visit. The developer can
                                                     provide       the   ’hard’    foundation     for    the
    Employment opportunities i.e. maintenance
                                                     precinct      but   as   stated   earlier   he   cannot
    Training opportunities i.e. environment;
    Estate management office                         create  the    willingness   needed  by   a

                                                     community to organize and participate using
    ’HARD’FOUNDATIONS                                their own skills in creating community well
                                                     being and hence influencing its ’Quality of
                                                     Life’.



LAYING THE ’SOFT’FOUNDATIONS


A  Developer can support the community by giVing equal attention to those components that
are  not about the design and physical construction of the built environment. Important as these
are when it comes to how people will respond regarding lifestyle choices they are not the sum

of how they use the precincts facilities or participate in its social development. The aspects that
are more associated with people’s potential, behavior and response to motivations need as

careful consideration as does designing the listed ’hard foundations above. Laying down these
’soft’ foundations involves the developer in creating both the opportunities and in most cases
the means for a community to actively participate in its development and management. This
will involve determining how people come together and how any community facility is managed
once in place. Contexts obviously vary and these will affect what the developer can do and

what actions are the most relevant to the precinct.


There are no hard and fast rules or ready made tools for this aspect of precinct development or
at what   phase they should be introduced. Some will be appropriate at an early stage of
development whilst others will only be driven when sufficient numbers of residents live on the
precinct. Importantly it best to recognise that no single initiative will be enough it is likely that
a range of inputs will be required over time.



This begins to raise the issue of a developer’s long term commitment to a precinct and its
community’s sustainability. As noted before research has shown considerable social capital
gains where because of the timescales involved the management of the precinct stays with the
developer. This presence is not only at a strategic level but often calls for day to day
involvement. The developer will almost certainly be required to maintain standards particularly
throughout the infrastructure provision. Ongoing maintenance until adoption and pOSSible


                                                                                                          15
Dr Richard Moore EC3 Global Earthcheck Assessor                               Copyright August 2012

Page 27

beyond will feature in maintaining the quality of place achieved. The added value and
community gains of this commitment should not be underestimated.

There are a similar number of components to this aspect of community social capital:


LOCAL GROUPS


A  developer can initiate or support residents in organizing or setting up local groups and
organizations. This aid can be in the form of advice, small grants, sponsorship or simply a place
to meet. This help should be totally inclusive but should come with caveats such as obligations
regarding charters, management structures and responsibilities. In the case of financial aid
clear and precise accounting rules must be adopted.


Local groups and organizations can make stakeholder involvement practical and relevant to the
development of social capital at the precinct. This involvement is a major element and essential
means of input to the encouragement of social capital. Without this involvement it is difficult to

create or keep social capital going. However it should be noted that these groups can be a
hindrance as equally as they can be helpful. Open and transparent elective processes, well
managed structures, inclusive membership and clear aims and objectives are needed for them
to succeed. Also of great importance is their ability to have influence on the vision and direction
in which the community wishes to evolve.


PROMOTION OF A LOCAL IDENTITY


Local  identity is important to social capital. Not surprisingly stakeholders are most likely to
connect and   support each other if they share commonality in elements of identity. This shared
identity can be relatively easily facilitated but may not be self facilitating. Within a community a
sense of belonging to a group can be a positive force for the creation of long term social capital

reflecting a strong sense of local identity. Individual stakeholders who identify with these
groups normally dedicate considerable effort and time to achieving cohesiveness in the
betterment of the community and hence its identity. The developer will of course be seeking to
create an identity for the precinct. Whilst the marketing of the development drives this to some
extent attention should be given to supporting local processes. These can be local events which
promote local identity e.g. concerts, sports events and competitions. Active participation of the
developer and the community in these will encourage ownership and a sense of pride if
successfully managed and repeated.

LINKING PEOPLE AND INSTITUTIONS


A crucial issue for a  developer is to create mutual trust between it and the community. This is
best achieved    by delivering what has been agreed and by mediating between residents and
other organizations that will be involved in delivering the precinct and its facilities. Constructive
forms of participation that have a champion can help to connect the various stakeholders
involved to each other in a collective dialogue aimed at identifying responsibilities and rights.
This mutuality is at the core of social capital because it is where there is the greatest potential
to change how things are done. This allows for the potential of sharing decisions that influence
and shape the relationships between groups such as residents, the developer and say the local
authority. Th is viewi ng of how decisions a re made a nd the possi ble sha ri ng of decision ma ki ng
can have a major impact on a communities ’Quality of Life’ by overcoming mistrust and lack of

connection.


MANAGEMENT OF SHARED SPACES


It may be appropriate to enable and support residents in the management of community areas
and facilities and to transfer these assets to some form of community ownership. One example



                                                                                                   16
Dr Richard Moore EC3 Global Earthcheck Assessor                          Copyright August 2012

Page 28

of encouraging the use of the social capital provided   by the developer is to invest in different
approaches to the management of communal facilities such as sports fields, clubs and open
space. Management committees or other forms of inclusive organizational structures to run the
facilities could be employed. This giving of ownership can be a crucial element in the forming of
positive community groupings.

Such an approach may also help in overcoming a major issue for precincts regarding the use of
developer contributions to local authorities.    Statutory charges made against a development
by  the  local authority  tend  not  to  be   specific to a development or its infrastructure
maintenance. Large contributions do not guarantee increased or improved facilities service by
the authority, as they are normally distributed throughout the authorities region. This can be a
major source of irritation for developers and occupiers of developments seeking to maintain
standards. Undertaking to maintain infrastructure facilities, landscaping and roadway verges
themselves or to work as pressure groups to ensure standards are maintained by the local
authority may provide both social capital through both the management involvement and in
some cases the physical maintaining of standards in the precinct.



PARTICIPATION


At the heart of social capital is the enabling of a community to play an active role locally in
creating   new   kinds of democratic space in the   neighborhood. This option could be used to
create a local resident’s council, a liaison group forum or association and possibly a crime
prevention watch. (This last initiative is noted because there is clear correlation between lower
crimes when strong local community involvement is present).


Being able to play an active role in shaping the precinct and its ’Quality of Life’ is seen as
fundamental to a     community’s long term sustainability. Participation may be a sign of social
capital, but it is also important as a means of generating social capital. It is also very important
at the occupational phase in the life cycle of a development. This is because the incentive to
participate, to become involved will be much stronger when stakeholders live or work on the
precinct.

Establishing effective consultative mechanisms to ensure all sections of the community are able
to participate in developing and implementing environmental, social and economic strategies is
seen as an important issue for the long term success of the development. It is recognized that

there is a major communication issue for the developer as to which community does he
communicate with? Is it the existing or the proposed, the investor or the occupier, the long
term resident or the visitor? Whilst this may present a dilemma for developers, other
stakeholders and interested parties it is not insurmountable. The important issue here is the
willingness to explore and formulate possibilities that can be implemented at different phases
of the development process timescale.




 Participation for the community is claimed to be "a chance to constructively
 influence the future development of their area, instead of merely reacting to a
 proposal". For the developer it may be an opportunity to gain "a real insight into
 the needs and aspirations of the community". It is said that on many occasions
 developers can be rewarded through the community identifying valuable
 opportunities unforeseen by others.

                                                  ’Enquiry by Design’Redland Bay Queensland




                                                                                                 17
Dr Richard Moore EC3 Global Earthcheck Assessor                         Copyright August 2012

Page 29

                                                                                     l Quality of Life]
      Material Elements and Interactions

         Towards Creating a Sustainable Community                                           cYJ
The usual way of focusing on approaches creating communities has been to concentrate on well
recognised factors such as housing, employment and public services. These features are often
the only  measures taken as being reflective of what a community is and all that is needed to

ensure its social development. It is should be clear that this is not an appropriate manner in

which to accommodate the dynamic and complex relationships that exists between the ’hard’
built environment elements and the more ’soft’ human activity of a precinct. Overcoming this
problem is the main objective of the ’Guidelines’. Further they seek to create a vibrant and
sustainable community within which all stakeholders ’Quality of Life’ is enhanced. Extensive use
of the excellent work by SCAN has been incorporated in the following elements and
interactions. Amendment to their original text has been implemented so as to more closely
relate to the precinct known as Noosa on Weyba.

ELEMENTS AND PLANNING AND DESIGN INTERACTIONS (after SCAN)22


 1. Sustainable communities have     good housing, shops and other facilities, they
 also provides accessibility to all with the help of a high quality infrastructure of
 footpaths, cycleways, roads and reliable public transport.


1.1 Provision of good quality and affordable residential housing which contributes to

energy efficiency, public health and ’Quality of Life’.

        Provide a range of housing types and tenures to match a range of lifestyle choices i.e.
        family, single person, retirement and care, appropriate to local circumstances;
        Design housing that can be adapted, renewed or repaired according to needs and long
        term changing performance requirements;

        Ensure    abroad range of mixed tenure providing             affordable   private   ownership,
        temporary rented and/or holiday accommodation;

        Design for energy, water and resource efficiency during the construction and occupation
        phases.
1.2 Provision of       facilities, services and goods for people         to be achieved       without
damage to the environment or limited to extensive car usage.

        Create discernable centres within the      precinct providing a variety of open spaces and
        distinct areas i.e. lakefront, parkland;

        Ensure the  planning and design of the precinct offers access to a range of Local
        Authority and other agencies (i.e. post office) facilities, to Medical facilities i.e. Doctors,
        Dentists and Opticians, to legal advice and services and normal banking and credit
        systems;
1.3 Provision of       good infrastructure providing safe and convenient footpaths and
cycleways.

        Provide   a   well   designed, constructed and   easy to   maintain   footpath and cycleway
        network with extensive pedestrian crossings.

                                                                                                    18
Dr Richard Moore EC3 Global Earthcheck Assessor                           Copyright August 2012

Page 30

        Ensure green, pleasant and safe routes to all facilities i.e. school, centres, open space;

        Provide public seating and rest points on footpaths and cycleways;

1.4 Provision of an efficient road network and public transport system.


        Negotiate frequent and reliable public transport offering good geographical coverage;

        Negotiate affordable public transport with high quality vehicle.

  2. Sustainable communities have                a   flourishing local economy, both mainstream
  and   social which      encourages and             stimulates local enterprise by meeting local
  needs and aspirations.


2.1 Create the conditions in which           a    mainstream and social economy can flourish by
encouraging       and    stimulating     local        enterprise   to   the   benefit   of       the      precinct
stakeholders.

        Encourage a diverse and stable local economy;
        Offer good links to the wider regional rural, urban and coastal economies;

        Encourage local community enterprises providing employment and training using local
        skills to meet local needs;

        Encourage activities to retain wealth in the community such as an Artists Co-operative;
        Source and supply goods and services from within the local community and economy;

        Encourage the sourcing of local food products particularly organic.
2.1 Create the      employment opportunities within the precinct to increase the local
economic wealth, reduce transport needs and strengthen the community.


        Encourage inward investment into to the precinct and adjoining regional economy;
        Createopportunities to help local people to find and provide               secure        and     fairly paid
        employment;
        Provide opportunities and help to local businesses to set up and grow;

        Make provision     in the
                               design of housing and other facilities for home working and
        community enterprises respectively.

r-



 3. Sustainable communities have good
 education  and training access and
 opportunities for all stakeholders.



                                                                                             f\f’
                                                                                         -r’ t
                                                                                                 l   I




                        Training and Education

3.1 Provision of      high quality education and training both formally through schools
and informally through the community or workplace will be fundamental in creating a
sustainable Precinct.

        Provide access to high quality education;



                                                                                                                  19
Dr Richard Moore EC3 Global Earthcheck Assessor                                Copyright August 2012

Page 31

        Create a wide range of training opportunities both vocational and non vocational;

        Provide access to knowledge and information regarding skills acquisition;

        Provide access to a range of opportunities for participation in life long learning;

        Create opportunities and appropriate facilities for employment fairs;

        Encourage employers who support education and training in the workplace.



 4. Sustainable communities have                  bio
 diversity    appropriate      to  the
 geographical location. They also have
 good air, water and soil quality.




          Bio-diversity and connectivity

4.1 Provision of a diverse and vibrant local environment will contribute to people’s
health and well being. Also it will have a direct impact on a precincts ’Quality of Life’.

        Ensure natural areas and local bio diversity are protected and enhanced;

        Create high quality neighborhood green areas and open spaces;

        Create good access to green and open spaces which are managed        by the community;
        Ensure the maintenance of clean streets and footpaths and cycleways;

        Ensure low levels of litter, graffiti and dog mess;

        Encourage tree planting and floral displays along with tidy individual gardens;
        Provide advice and support for reducing water, noise and light pollution;

        Encourage schools and community organisations to introduce environmental education.


 5. Sustainable communities have low energy use and waste along                         with    low
 emissions coupled with cool/warm buildings that are resource efficient.



5.1 The  reduction in energy use, waste and emissions production is crucial if a
precinct is going to improve not only the ’Quality of Life’ of its residents but also
make a contribution to the well being of the adjoining region.


        Create partnerships between businesses, schools and community groups in supporting
        energy efficiency and waste minimization;

        Provide convenient facilities for recycling, repairs and shared resources;

        Support and encourage home and community composting;
        Provide access to advice and support for residents and businesses on energy and water
        efficiency;


                                                                                                  20
Dr Richard Moore EC3 Global Earthcheck Assessor                         Copyright August 2012

Page 32

        Use energy supplied from renewable or other green supply:

        Monitor energy usage throughout the precinct;

        Provide convenient and attractive alternative means to car use;

        Encourage resource efficient business, including        access   to   expertise in environmental
        performance.



 6. Sustainable communities have lifestyles facilitated by education and information
 which encourages and supports behavioral change.



6.1 The precinct should offer the opportunity for all to participate in creating a more
satisfying and sustainable lifestyle.
        Offer the means to become aware of sustainable development and lifestyles;

        Provide information and feed back         on   the environmental   impacts of people’s lifestyle
        and consumer choices;

        Give access to support for adopting a more sustainable lifestyle.




 7. Sustainable communities            provide safer and healthier environments. This can
 contribute to the physical, mental and well-being of residents.




7.1   Active   communities       can   be   effective    at   discouraging crime and anti social
behavior.


        Create through design and occupational management a high level of confidence in public
        safety;
        Ensure the perception of the community as a safe and secure place to live;

        Ensure that the community is one where children can play outside safely;

        Use Secured by Design principles throughout the precinct;

        Upgrade security services to residents with special needs i.e. disabled, elderly;
        Encourage to setting up of neighborhood watch schemes;
        Mentor young persons and       provide encouragement through activities aimed at reducing
        anti social behavior.

7.2 The  precinct should enable the residents and others an opportunity to enjoy a
high level of health and longevity of life.
        Ensure that adequate health and social welfare services are             available, accessible and
        responsive to the community;

        Encourage the provision of preventative and positive health measures;
        Encourage and support alternative health and related spiritual provision;
        Create strong formal and informal community care structures;

        Make available access to affordable fresh food suppliers;

        Encourage organic gardening and possible homegrown vegetable production;
        Promote dietary advice and local cooking clubs.



                                                                                                       21
Dr Richard Moore EC3 Global Earthcheck Assessor                               Copyright August 2012

Page 33

 8. Sustainable communities have a vibrant and creative local culture, characterised
 by thriving community groups and pride in the precinct and the local community.


8.1 In order to maintain the    willingness and commitment to bring about change
locally, people must value their community.

        Encourage a strong and supportive community spirit;
        Enable a strong sense of identity with the locality and shared with others;

        Create a place where parents wish to raise there children and can do so;

        Encourage the ability of residents to know and trust their neighbors;
        Create the    means    by which residents of all   ages   can   care   for and   be involved in
        community projects and events;
        Afford   protection and improvement for environmental places of importance.

8.2 Community initiatives, groups and organisations contribute to the precincts
networks   and  relationships. Individual and communal confidence can be
strengthened through a sharing of abilities and skills within the community

        Encourage the setting up of a range of diverse and active community groups;
        Provide ready access for advice and aid on setting up community groups;

        Support and encourage the representation of community groups;
        Provide the   means    for   networking forums and community development projects that
        facilitate connections and participations in decision making.


8.3 Communities thrive if    opportunities exist for all resident’s young and old, to
participate in creative and individual lifestyle activities.

        Provide the opportunity to create a vigorous cultural life;

        Create facilities for a range of clubs including   retiree, young family, youth, sports and
        art;

        Ensure easy access to leisure facilities and sports grounds;

        Within the Precinct ensure there are cr che and childcare opportunities and extensive
        play areas;
        Encourage events that provide a wide range of cultural diversity;
        Ensure that there is the opportunity to exercise a     lifestyle of choice such as yoga and
        meditation.



 9. Sustainable communities have             high levels of public participation in policy and
 decision making.



9.1 It is known that the more  a community participates in the processes of policy

making and the decisions that impact on them the more sustainable that community
will become.


        Encourage the development of community organisational skills;
        Provide the means for good communications through out the Precinct;

                                                                                                     22
Dr Richard Moore EC3 Global Earthcheck Assessor                           Copyright August 2012

Page 34

        Encourage the integration of procedural and administrative functions;

        Encourage high levels of participation by all sectors of the precinct in debates and
        decision making on local issues;

        Create a core of individuals with    experience of initiating and running community
        activities;

        Encourage young people to take part in shaping the precinct and its community.


 10. A sustainable community has governance and development: the mechanisms
 and means to facilitate on going improvements in the precinct.



10.1 It is argued that the stability of a community is a key to its sustainability. This
can  prove difficult with a large mixed use precinct development that primarily is
speculative. However if the precinct is perceived as a good place to live turnover in
stakeholders may not be extensive. Further some changes may be positive in that
they can bring in fresh ideas and energy (Figure.

        Encourage partnerships           between    all   stakeholders   involved   in   the   precinct’s
        development;
        Facilitate good communications between all the stakeholders;

        Encourage a low turnover in stakeholders;

        Encourage interaction between dispirit groups and organisations;
        Provide ongoing and stable management of the precinct;

        Seek to       make   lasting changes and improvements to all aspects of the precincts
        provisions;
        Ensure that public acceptance and         ultimately perceptions that improvements are being
        made for the long term benefit of the whole community.




 Thriving community groups           ~




                                                                                                      23
Dr Richard Moore EC3 Global Earthcheck Assessor                             Copyright August 2012

Page 35

             Evaluation and Implementation                                               l
                                                                                             Quality of
                                                                                                          Life]
               Measuring Performance and Progress
                                                                                              (2)
Within a sustainable community there will be high quality information to enable the monitoring
of social, economic and environmental progress. However the monitoring of progress towards
the achievement of a sustainable community must be meaningful to all the precincts
stakeholders. It is also fundamental to maintain         a   commitment to the process and to ensure
that the     original goal   is attained. The   monitoring   should   provide a proactive and accessible
information service. It will need to undertake to measure all sections of the community that are
benefiting from this service. Mapping community participation and the success of organisations
involvement is crucial as is the use of appropriate measurement tools to monitor overall
progress.


Ecological performance evaluation of which social progress is a critical component has already
started for Noosa on Weyba    by the use of an internationally recognised third party certification
process. Earthcheck’s Precinct Planning and Design Standard (PPDS)use Key Area Indicators
to measure and communicate important trends, events and issues within a development. It
sets out to assess the environmental, social and economic impacts of plans, designs,
strategies, techniques and other specifications in each of the Key Environmental, Social and
Economic Performance Areas. It does this by gathering data and comparing the environmental,
social and economic performance of the precinct master planning and design against the Sector
Benchmarking Indicators and measures for PPDS. The results are then communicated through
a series of reports to the developer. These reports seek to establish achievable and responsible

improvement targets where necessary, with the help of an External Reviewer or Third Party
Assessor to reduce adverse impacts and, where appropriate, to increase positive impacts in
the Key Performance Areas of the precinct.


PPDS  recognises that any guidelines for a new community will have different characteristics
according to history, geography and the sum of lifestyle choices made by the eventual
stakeholders. An almost infinitely extendable list of desirable characteristics can be provided,
any of which would help to make the precinct more sustainable. However any list that is
formulated should reflect the aims and objectives of the development and act as a checklist of
its translation into what has earlier been termed hard          or   soft foundations. These physical and
soft policies as noted earlier in this document are seen as being essential to the creation of a
sustainable community         leading to an improvement or maintenance of ’Quality of Life’ for the
whole community living, working or visiting the precinct.


The content of the attribute   listing that follows is typical of the wide and infinitely variable
factors that     need   to   be   considered
                                          by a development design team seeking to lay the
foundations for a sustainable precinct community plan. An essentials checklist and compliance
templates for indicator measurement of this large mixed use precinct have also been created.
These documents and in particular the template seek to foster continuous improvement in key
social areas. In this way the developer and design team will be able to continuously refine the
’modus operandi’ so that they can ultimately develop, construct and operate in a sustainable
manner.



The sustainable    planning and design performance will be benchmarked by Earthcheck to
facilitate   measurable  improvements. These improvements are assessed as part of the
certification process. However any improvements that are encouraged will be in a staged
manner consistent with       real world needs.



                                                                                                            24
Dr Richard Moore EC3 Global Earthcheck Assessor                                Copyright August 2012

Page 36

                 Planning and Design Tools and Templates

To help the planning and design team translate the guidelines into practical actions that reflect
in essential and desirable planning and                 design outcomes the following broad issues, checklists
and compliance tables are provided. These represent the factors selected to form the essential
ingredients of a sustainable community and the means by which                        its   performance     can   be
measured and benchmarked.


 Precinct Attributes for: Noosa on Weyba Queensland

 Within the precinct will there be:                      Yes         No               Comments

 A wide range of affordable housing and tenure?




 A diverse community created?




 Vibrant links to regional mainstream and local
 economies?




 A   vibrant     and   inclusive   community   centre
 provision?


 A diverse and inclusive spiritual community?




 A strong cultural provision?




 Safe and convenient infrastructure networks of
 pathways, cycleways and roads?


 A    clean    environment     with   extensive   bio
 diversity?


 A   choice of   quality education provision   in the
 form of schools and tertiary facilities?



 A choice of child care facilities?




 A range of healthcare facilities?




 A network of parks and open spaces?




 A network of recreational spaces and facilities?




 A ’safe and     secure’ management     plan for the
 community?


 A community management plan?




                                                                                                                 25
Dr Richard Moore EC3 Global Earthcheck Assessor                                    Copyright August 2012

Page 37

 Noosa on Weyba Queensland

 1.1 Planning and Design Compliance Template
 Precinct Planning and Design Needs Assessment
 Measure                                         Yes    No              Comments


 Has a needs assessment been carried
 out with the existing community
 and/or the proposed community?

 Has a ’Quality of Life’ Plan been
 developed?

 Has a proposal for the future
 administration of the precinct been
 developed (i.e. Community Title)



 Noosa on Weyba Queensland

 1.2    Planning & Design Compliance Template
 Possible ’Hard and Soft’ Strategies for Social Commitment following Community Needs Assessment
 Key Area Indicator                               Yes    No               Comments
 Will the precinct have discernible centres
 with large areas of public space and
 transport links?
 Will the streets within the precinct provide
 a   connected network with a
 comprehensive infrastructure of
 cycleways, footpaths and boardwalks
 linking facilities?
 Is most dwellings and other
 accommodation within walking distance of
 the precinct centres?
 Is there a variety of infrastructure

 including retail shops, commercial outlets
 and social facilities within the precinct?
 Is there are a wide variety of dwelling and
 tenure types in the precinct?
 Is there a range of leisure and educational
 facilities close enough so that children and
 adults can walk?
 Are there small playgrounds and picnic
 areas near all   precinct accommodation?
 Has consideration of user safety within all
 areas of the   precinct been reflected in the
 Master Plan?
 Are the streets pedestrian and cyclist
 friendly, relatively narrow and shared by
 rows of trees and other shading furniture

 providing good opportunities for safe social
 interaction between all members of the
 precinct’s community?
 Are certain prominent sites within the
 precinct reserved for civic buildings and
 other facilities serving the whole
 community integrated with leisure and
 recreational facilities and activity?
 Are there opportunities for the precinct
 Community to be self qoverninq?
 Is there provision for the continuing
 involvement of the Local Planning
 Authority?




                                                                                                  26
Dr Richard Moore EC3 Global Earthcheck Assessor                        Copyright August 2012

Page 38

 Noosa on Weyba Queensland


 Checklist (after SCAN)
 Key Area                                                                 Actioned            Comment
      1        Economic
               Low incidence of Social Exclusion.

               Diverse and stable local economy.

               Links to wider regional economy.

               Resource efficient businesses.

               Access to normal banking and credit systems.

               Support for the development of social economy.
      2        Housing, Education and Transport
               A range of dwelling types and tenures.

               Cool, warm and dry dwellings.
               Provision of educational opportunities and attainment.

               Opportunities for life long learning and life skills
               pa rtici pation.
               Frequent, safe, accessible and affordable public
               transport offering good geographical coverage.
               Well designed and maintained green, pleasant and
               safe pedestrian routes particular to school.

      3        Physicalr mental and social well-being and securit~
               Access to local authority services and other agencies.

               Access to medical facilities, social and welfare
               services.
               Affordable fresh foods readily available.

               Adequate, effective and community friendly policing.
               Designs for low incidence of crime and high levels of
               confidence in public safety.

      4        Environmental quality and sustainable lifestyles
               High quality neighborhood environments.
               Open spaces that are pleasant and safe for all.
               Natural areas with bio-diversity protected and
               enhanced.
               Facilities to maximize recycling.

               Precinct strategies to encourage sustainable lifestyles
               by all precinct stakeholders.
      5        Good Local Governance
               Effective and dynamic Precinct management
               delivering good quality services.
               A social climate which encourages all the precincts
               stakeholders to care for the area and participate in
               community affairs and activities.
               A range of diverse and active community groups,
               offering a wide variety of association for the precincts
               stakeholders.
               An infrastructure of organizational support for the

               community groups and in particular voluntary
               associations.
               Facilities for specific sections of the community, such
               as children   young persons and older residents.
               Involvement of all the precincts stakeholders in the
               policy and decision making
               A high level of interaction amongst the community

               groups, associations and outside agencies.




                                                                                                             27
Dr Richard Moore EC3 Global Earthcheck Assessor                                      Copyright August 2012

Page 39

Noosa on Weyba Queensland


Planning & Design Compliance Template
Table for measurinq the planninq and desiqn impacts on a larqe mixed use Precinct development with extensive infrastructure facilities.
Key Area Indicator and
Measure                                  Score of 2             Score of 4                 Score of 6               Score of 8               Score of 10             Total

1.1 The precinct has discernible         Access to outlying     Shared centre with         A shared centre with     A memorable square       A busy centre and
centres with   large areas of public     centres with           square and transport       a green and square       or green   with many     memorable square
space and transport links                transport links and    links and                  with transport links     transport links and      or green   with many
                                         opportunities for      opportunities for          and opportunities for    opportunities for        transport links and
                                         community activities   community activity         community activities     community                opportunities for
                                                                                                                    activities.              community
                                                                                                                                             activities.


1.2 The streets within the precinct      Street network         Street network which       Street network which     Interconnected           Interconnected
are a connected   network with a         which offers limited   gives pedestrian           reduces the distance     street network           street network

comprehensive infrastructure of          pedestrian access to   access to the precinct     for pedestrians to the   which reduces the        which reduces the
cycleway, footpaths and boardwalks       the precinct centre    centre and other           precinct centre and      distance to the          distance to the
linking the precincts facilities.        and other              community activities.      other community          precinct centre and      precinct centre and
                                         community activities   (i.e. no road              activities. (i.e. some   other community          other community
                                         (i.e. road edge        crossings required         road edge footpaths      activities by            activities with
                                         footpaths common       but road edge              but no road crossings    independent              provision for
                                         and road crossings     footpaths common)          required)                cycleway and             informal social
                                         required)                                                                  footpaths with traffic   meetings and
                                                                                                                    dispersion.              dispersion of
                                                                                                                                             traffic.


1.3 Most of the precincts dwellings      30 min walk for all    25 min walk for all        20 min walk for all      15 min walk for all      10 min walk for all
and accommodation is within              pedestrians to the     pedestrians to the         pedestrians to the       pedestrians to the       pedestrians to the
walking distance of the precinct         centre.                centre.                    centre.                  centre.                  centre.
centres.


1.4 There is a variety of                The precinct centre    The precinct centre        The precinct centre      The precinct centre      The precinct centre
infrastructure including retail shops,   has a few outlets      has a limited choice       has some choice of       has choice of outlets    has a varied choice
commercial outlets and social            sufficient to meet     of outlets sufficient to   outlets sufficient to    sufficient to meet       and size of outlets
facilities within the precinct           only limited daily     meet only the daily        meet only the daily      the weekly needs of      sufficient to meet
                                         needs of some          needs of some              needs of many            most households.         the weekly needs
                                         households.            households.                households.                                       of many
                                                                                                                                             households.


1.5 There are a variety of dwelling      20% in at least two    40% in at least three      60% in at least four     80% in at least five     A full and wide
and tenure types in the precinct         sectors of tenure      sectors of tenure          sectors of tenure        sectors of tenure        range of
along with support staff                 available.             available.                 available.               available.               opportunities for all
accommodation                                                                                                                                sectors of the
                                                                                                                                             community to find
                                                                                                                                             accommodation.


1.6 There is a range of leisure and      Distances more than    Distances not   more       Distances not   more     Distances not     more   Distances not
educational facilities close enough so   1.5km but no           than 1.5km                 than 1.25km              than 1.0km               more than 0.5 to

that children and adults can walk.       greater than 5km                                                                                    0.75km



 Dr Richard Moore EC3 Global Earthcheck Assessor                                                     CopyrightAugu~2012

Page 40

1.7 There are small playgrounds          The distances are     The distances will not   The distances will not    The distances will      The distances will
and picnic areas near all the precinct   more than   1.0km     be more than 1.0km.      be more than 700m.        not be more than        not be more than
accommodation.                           but no greater than                                                      400m.                   200m.
                                         5km.


1.8 User safety (i.e. Safety by          Safety issues to be   Safety issues to be      Safety issues noted in    Safety by Design        Safety by Design
Design, Homezones, etc. or similar)      assessed at Design    addressed at the         master planning of        Tools used in master    Tools used in
is reflected in the Master Plan.         and Construct         Detailed Design Stage    Precinct and to be        planning of Precinct    master planning of
                                         Stage.                of Precinct Planning.    addressed at Detailed     with commitment to      Precinct and also
                                                                                        Design Stage of           involve local           local organisations
                                                                                        Precinct Planning.        organisations.          i.e. surf club, police
                                                                                                                                          involved in the
                                                                                                                                          master planning
                                                                                                                                          process.


1.9 The streets are pedestrian and       Streetscape           Streetscape providing    Streetscape providing     Streetscape             Streetscape
cycle friendly, relatively narrow and    providing shade and   shade and helping to     shade and helping to      providing shade and     hierarchy providing
shared by rows of trees and other        helping to slow       slow traffic             slow traffic              helping to slow         shade and helping
shading furniture and offer good         traffic movement      movement                 movement                  traffic movement        to slow traffic
integration opportunities for the        encouraging use by    encouraging use by       encouraging use by        encouraging use by      movement
whole of the precinct’s community.       pedestrians and       pedestrians and          pedestrians and           pedestrians and         encouraging
                                         cyclists.             cyclists.                cyclists.                 cyclists.               informal social
                                                                                                                                          meetings, play by
                                                                                                                                          children and use by
                                                                                                                                          pedestrians and
                                                                                                                                          cyclists.

1.10 Certain prominent sites are         Shared buildings      Building made            Dedicated building        Dedicated buildings     Several buildings
reserved for major key buildings         and public space      available for            made available for        and public space        and public space
serving the whole of the precinct’s      made available for    meetings, education      meetings, education       available for           created for
community.                               meetings, education   and leisure gives an     and leisure, gives an     meetings, education     meetings,
                                         and leisure.          opportu n ity.           opportunity for civic     and leisure, give an    education and
                                                                                        involvement and           opportunity for civic   leisure, which give
                                                                                        pride.                    involvement and         an opportunity for
                                                                                                                  pride.                  civic involvement
                                                                                                                                          and pride.


1.11 The precinct is organised to be     Limited community     Some community           Extensive community       Community               Early community
self governing                           involvement           involvement              involvement               organisations           involvement
                                         encouraged during     encouraged during        encouraged during         formed at beginning     encouraged and
                                         the development       the development          the development           of development          accommodated in
                                         process.              process to take part     process to take part      process to allow        the governance of
                                                               in some of the           in the decisions          opportunities for the   the Precinct
                                                               decisions affecting      affecting the precinct.   community to play       particularly in
                                                               the precinct.                                      an   active role in     decisions selecting
                                                                                                                  such matters as         sustainable
                                                                                                                  change, security and    development
                                                                                                                  maintenance.            options at every
                                                                                                                                          stage of the
                                                                                                                                          development
                                                                                                                                          process.


                                                                                                                                                                   29
    Dr Richard Moore EC3 Global Earthcheck Assessor                                        CopyrightAugu~2012

Page 41

1.12   Continuing involvement of   Recommended            Voluntary               Implementation of       Implementation of      Implementation of
Local Planning Authority           performance            performance             agreed performance      agreed performance     agreed
                                   standards i.e.         standards i.e. Design   standards i.e. Design   standards i.e.         performance
                                   Design Codes,          Codes, environmental    Codes, environmental    Design Codes,          standards i.e.
                                   environmental          performance criteria    performance criteria    environmental          Design Codes,
                                   performance criteria   conditioned in          conditioned in          performance criteria   environmental
                                   conditioned in         Developers Contract     Developers Contract     conditioned in         performance
                                   Developers Contract    Documentation.          Documentation.          Development            criteria conditioned
                                   Documentation.                                                         Approval.              in Development
                                                                                                                                 Approval and
                                                                                                                                 governed by legal
                                                                                                                                 procedures binding
                                                                                                                                 all parties.




                                                                                                                                                        30
    Dr Richard Moore EC3 Global Earthcheck Assessor                                  CopyrightAugu~2012

Page 42

Noosa on Weyba Queensland



Post Occupancy Key Area Indicator measure for ’Social Capital’ (after NEF)
Issue                                  Key Area Indicator                                                   Measure
1     Livability                       % of people and other precinct stakeholders who feel that this
                                       is a good place to live and work


2     Caring For Each Other            % of neiqhbors who look out for the welfare of others


3     Knowing People                   % of people who residents and other precinct stakeholders
                                       state they are friendly with


4     Making Friends                   % of people who state that it is easy to make new friends


5     Relationships With Neighbors     The extent to which residents feel comfortable asking a
                                       neighbor to do some act i.e. collect a prescription

6     Pride                            % of residents and other precinct stakeholders who take pride
                                       in their area


7     Community Activity               The extent to which households and other precinct
                                       stakeholders participate in community-based activities and
                                       events i.e. Sports and youth clubs


8     Safety at Night                  % of residents and other precinct stakeholders who feel safe
                                       out and about at niqht


9     Safety and Children              % of residents and other precinct stakeholders who feel safe
                                       allowing their children out on their own

10    Safety and Property              % of residents and other precinct stakeholders that feel safe
                                       leavinq their property unquarded


11    Security and Policing            % of residents and other precinct stakeholders who feel there
                                       is sufficient local security and policinq


12    Open Space                       % of residents and other precinct stakeholders who state that
                                       there is qood access to areas of open space


13    Transport                        The extent to which residents and other precinct stakeholders
                                       feel there is good access to roads and highways and to public
                                       transport


14    Health                           % of residents who feel that there is good access to health
                                       care facilities



15    Facilities for Young People      The extent to which residents and other precinct stakeholders
                                       feel that there is qood facilities for younq persons


16    Facilities to Meet               % of residents and other precinct stakeholders feel that there
                                       is good facilities for meeting people and organizing events


17    Leisure                          % of residents and other precinct stakeholders feel that there
                                       is qood access to leisure and recreational facilities


18    Local Shops                      % of residents and other precinct stakeholders that feel there
                                       is a good choice of local shops


19    Local Decision Making            The extent to which residents and other precinct stakeholders
                                       feel that had or have a chance to influence the development of
                                       their area and the extent to which they are involved in the
                                       decision making process




Dr Richard Moore EC3 Global Earthcheck Assessor                                                Copyright August 2012

Page 43

Economic outcomes are closely linked to environmental and social   performance and impacts can
be  (as with the other two development factors) both positive and negative. Inward investment
with increased employment and business opportunities are some of the possible improvements to
be seen. However, the greater dependency on such investment and companies, instability in
labour markets and diversion of investment from other development areas can have detrimental
effects. Achieving a well-integrated approach that creates a ’win-win’ situation will be an aim of
the developer.


The Mantle Groups objectives are to include the:


     .   Creation and maintenance of high and stable levels of economic growth and stability;
     .   Social progress which recognises the needs of everyone;
     .   Effective development and protection of the existing economic environment;
     .   Prudent use of existing resources.


To achieve these it is proposed that the development will encourage economic growth and create
business opportunities for the existing and        proposed community. That will also be employment
and training opportunities for the existing and proposed community. Of importance will be the
level of inward investment to the area during and after development of the precinct. Also crucial
will be the increase in the business base of the area, particularly   new    businesses along with the
improvement of the viability of the existing businesses in the area of the development.

The numbers of permanent and part time employment opportunities created by the development
at all levels of operation are an important indicator of development success. These figures along
with the training and long term career opportunities for local people particularly young persons
and the disabled and related environmental and social linked job opportunities are measures and
outcomes that should be recorded. The following Guidelines and Checklists are proposed for this

purpose.


 Noosa on Weyba Queensland


 Economic Precinct Attributes                                  Yes      No            Comments
 Will the development attract inward investment and
 increase existing business viability?
 Will the development increase the business base in
 the area?
 Will the development increase property values in and
 close to the development?
 Will the development result in increased viability of
 existing businesses and transport?
 Is the development likely to increase the provision of
 permanent employment opportunities in the area?
 Are there proposals to train local people, particularly
 the younq and disabled?
 Will any new jobs be created to protect or manage
 the local environment?
 Will any new jobs be created to enhance and maintain
 the social aspects of the development and the
 existing and proposed community?

It is important that the local business community is engaged in               a   pa rtnership   with   the
development if the outcomes are to be beneficial to the region or area.


                                                                                                         32
 Dr Richard Moore EC3 Global Earthcheck Assessor                         Copyright August 2012

Page 44

 Noosa on Weyba Queensland


 Local Business Community                                        Yes       No             Comments
 Is the Local Business Community involved in the
 Development’s Business case?
 Are Regional and Local Community Organisations
 involved in the development process?




A final   measure   of success at Noosa      Weyba will be the levels of economic attributes and
                                            on

their outcomes resulting from the development. Measurement of these during       development and
post occupancy   will be crucial in determining firstly any adjustments required and secondly the
overall success of the strategies adopted at the planning and design phase.




 Noosa on Weyba Queensland


 Levels of economic performance achieved


 Key Area Indicator                                Best Practice                                Score


 Is the development likely to attract              The development is likely to attract
 inward investment?                                large inward investment to the region
                                                   and area via mainly new private and
                                                   public investors.
 Is the development likely to improve the          The development has a strong potential
 diversity of the regional or area business        to improve the diversity of the regional
 base diversity?                                   and local area business base.
 Is the development likely to improve              The development has a strong potential
 existing businesses viability?                    to improve the diversity of the regional
                                                   and local area business base.
 Is the development likely to improve              The development has a strong potential
 property values?                                  to improve and maintain   property
                                                   values in and around the Precinct
 Is the development likely to create               The development has a strong potential
 permanent jobs?                                   to create permanent jobs.
 Is the development likely to undertake            The development will be providing
 training?                                         extensive training particularly to the
                                                   _y_oufl9 and lonq term unemplQyed.
 Is the development likely to create               The development has a strong potential
 permanent or part time employment in              to create permanent and part time
 Environmental Protection or Management            employment in Environmental
 (EMP)areas?                                       Protection or Management (EMP)areas?
 Is the development likely to create               The development has a strong potential
 permanent or part time employment in              to create permanent and part time
 the social protection or management               employment in social protection or
 areas?                                            management areas?




                                                                                                        33
 Dr Richard Moore EC3 Global Earthcheck Assessor                             Copyright August 2012

Page 45

                  Summary and References                                                  l
                                                                                              Quality of
                                                                                                           Life]
                 Building Precincts and Communities                                            cS
The implications for a   developer engaging with social capital are profound. Its promotion is an
effective    means   to   broaden
                                the existing role of building a precinct to that of building a
community. Developing     a guide for promoting social capital during the planning and design phase
of the development process has the potential to be influential in the debate regarding ’Quality of
Life’ on the precinct. The drive to create appropriate guidelines and toolkits is in response to the
proposition that the potential for influencing the ’Quality of Life’ of a community and thus its
sustainability via planning and design decisions is considerable. It is a proposition which needs to
be recognised and responded to by those involved in Precinct development. The developer has
taken on the challenge.


It is currently impossible to offer a model that will guarantee long term success. There is no
blueprint for building communities. Sensitivity is required and ultimately Mantle and its advisors
will need to use professional judgment to work out as to what exactly promotes positive social
capital and how best to implement it into Noosa on Weyba? However they and other developers
who want to make the difference by engaging in building a community would do well to consider
the following:


    1.   Do a stocktaking of what already has been done to achieve successful communities. There
         are   practices and experiences within the Development Industry that offer guidance and
         proven ways of achieving frameworks for implementing social capital.


    2.   Undertake to create a social capital  plan with strategies for specific developments. Such
         plans  should be based     on feasibility study, particularly a needs assessment and the
                                         a

         laying down   of actions on how   the community will be promoted during the planning,
         building and occupying phases  of the development.

    3.   Ring fence budgets for promoting social capital. The earlier these are agreed and put aside
         in the planning process the better.


    4.   Create supportive management systems to ensure that social capital does not get
         compromised by the planning and implementation process. The checklist becomes crucial
         during these stages. The content can help explore the possible outcomes of decisions on
         social capital and the community. A monitoring and reporting system is also required and
         will allow the developer to communicate more effectively the actions and outcomes of
         decisions impacting on the community.


    5.   Employ dedicated staff with the necessary skills and expertise required for understanding
         community needs and identifying appropriate actions.

The developer is seeking to establish        a   good ecological track record   in the   building of what it
believes to be sustainable precinct and community has done just that. The development master
plan shows what is, a very large scale mixed use precincts offering new residential homes and
units with a variety of tenures. It also details a planned range of facilities perceived as essential

in giving lifestyle choices such as schools, retail outlets, shops, community buildings, health,
commercial and employment opportunities and leisure activities. Combined with these are
accessible open spaces including structural landscaping, recreational facilities such as bikeways
and footpaths, children’s play areas and equipment.



                                                                                                             34
 Dr Richard Moore EC3 Global Earthcheck Assessor                            Copyright August 2012

Page 46

The   main objective of this document is to provide guidance on policy making and the
development of strategies to improve the delivery of these master planned undertakings. This
objective is based on the fact that the Developer has recognized that ’a developer does not just
build houses, but creates physical space in which human and social interactions are to take
place’. The well being of people living in these areas depends amongst other things, on the
design and the overall quality of the physical space that is being used for the development and
the social and personal space that is being created. From this perspective a ’sustainable space’ is
one that allows people to achieve their aims and wants in that space at minimal environmental
        23
cost.


The proceeding document content also concerned itself with the measurement systems relevant
to  the eventual development activity. The current methods employed by many in the
development and construction industries are strong on measuring environmental and economic
issues but not so at highlighting the social impacts of development. Developers have to address
this grey area. The development of a measurement framework and assessment of the social and
related economic impacts at Pacific Highlands is an imperative if the ’Quality of Life’ agenda is to
be implemented. The aim of the assessment is to help the developer and design team to
understand how building homes and associated community infrastructure translates in building
communities.


Finally it is hoped that when the measures of the PPDS Key Area Indicator Social Commitment-




are  used that this will raise not only the quality of the scheme but raise the profile of the
Developer and advisors to a position of leading future development evolution in terms of planning
and delivery. The proposed social audit is a framework that should help the team to understand
measure and report on its social performance at Noosa on Weyba. The ultimate aim is of

improving that performance.

The guidelines, checklists templates and social auditing            can   be used to strengthen    relationships
and demonstrate multi stakeholder              accountability.   There is   a   growing belief that sustainable
development approaches will become the business model of the future and there is no doubt that
those that get left behind will find themselves lost in the new economic landscape.  In making

progress on the journey towards more sustainable patterns of development Mantle has sought to
understand how people live, work and play on developments. The task itself is surprisingly quite
simple; to recognise where practical steps can be taken.

In essence it is all about putting people first.


                                              .11 ’L...
                                           t---,---   -":-
                                                      ’




                                          ’,"\’,’]’:’, !
                                      ~\,iA




                                                                                                             35
 Dr Richard Moore EC3 Global Earthcheck Assessor                                    Copyright August 2012

Page 47

Bibliography and References

Geis D. and Kutzmark T, 2006: Developing Sustainable Communities: The Future is Know,
www.freshstart.neat.org

Moore R, 2006: Pilot Study Redland Bay Retirement Community, Earthcheck Qeensland Australia



1
 Hyde R. Moore R., Et al 2006: Precinct Planning and Design Standard’ (PPDS)EC3 Global
(Earthcheck) Brisbane and Canberra Australia
2
    SCAN 2999: Towards a blueprint for a sustainable community, Sustainable Communities
Agencies Network, UK
3
     Ibid
4
  DETR 2000: Local Quality of Life            counts      -
                                                              in a   nutshell, Department of Environment and
Transport London UK. London
5
     DETR 1999: Building a Better Quality of Life         -
                                                              A strategy for sustainable development in the UK;

Department of Environment and Transport London UK. London
6
    NEF, 2006: A Well Being Manifesto, New Economics Foundation London UK
7
     Ziller A, 2004: The Community is not a place and why it matters Urban                 Policy and Research;
NSW Australia
8
    CDC, 2005: Social Capital Definitions      -

                                                   www.cdc.gov.healthyplaces
9
    Stone Wand     Hughes J. 2002: Social Capital, AFIS Melbourne Australia
10
     Putman R, 2000: Bowling Alone, Simon and Schuster New York USA
11
     Stone W, 2001: Measuring Social Capital, AFIS Melbourne Australia

12
     Moore R, 2006: Auditing Quality of Life        -
                                                        ANZAScA Adelaide Australia
13
     Putman Op Cit 10

14
     SCAN Op Cit 2
15
     Moore Op Cit 12
16
     R Hyde, R Moore Et al. Op Cit 1

17
     NEF 1998: Communities Count’, New Economics Foundation London UK

18
     Wilkinson R, 1996: Unhealthy Societies, Routledge London UK
19
     Moore Op Cit 12
20
     Moore R, 2011: Delivering Ecological Visions             -
                                                                  A Case Study in Sustainable Development, The
International Journal of Environmental, Cultural, Economic and Social Sustainability, Vol 7 April
2011 USA
21
     SBD 2006: The concept of Secured by Design,                  www.securebydesign.com
22
     SCAN Op Cit 2




                                                                                                             36
    Dr Richard Moore EC3 Global Earthcheck Assessor                                 Copyright August 2012

Page 48

                                                                                                                  "
                                                                                     ec                           ~

                                                                                     EVALUATE   COMMUNICATE   EVOLVE




             Sustainability Opportunities

                                                                                         EARTHCHECK




                                           ---".
                                                   ’-=-_____"",._,....




                                                                         _-___




Dr Richard Moore EC3 Global Earthcheck Assessor                                  Copyright 2012        1

Page 49

            The Development of a Sustainable Precinct
                                                Community
     Content:

     Goals, Aims and Objectives
I
     Promoting Sustainability
     Achieving Sustainability

     Ecological Sustainable Performance
     Principles for Sustainable Opportunities
     Sustainability Opportunities
     Evaluation Summary




~oals, Aims and Objectives                                                                                      J
    It is proposed to build   a   medium sized lifestyle precinct creating a minimum of 876 new dwellings
    which will be   a   combination of     private residences, townhouses, retirement/aged dwellings and
    apartments and a boutique retail and caf          village centre. All are to be built within several distinct
    neighborhoods, around local open spaces and green squares. The Precinct facilities include large
    areas of public and protected parks, extensive footpaths and cycleways, a community resident’s

    facility with leisure and recreational uses. The site encompasses some 303 hectares of land located
    on the shores of Lake Weyba and adjoining the Noosa Heads National Park. The proposed precinct

    is near the iconic coastal resort town of Noosa and the hinterland market town of Eumundi. Also
    close by is Tewantin where entry by river crossing to the Great Sandy National Park is found.

    At the north end of the sedate Sunshine Coast Queensland the area is renowned for its scenery
    and excellent climate. It is close to the popular tourist destinations of Caloundra and Maroochydore
    and   enjoys good road access with the growing Sunshine Coast Airport. Other road links provide
    excellent connectivity to the local campus of the University of the Sunshine Coast and the State
    Capital Brisbane with     its many economic and social facilities. There is a vibrant local retail and
    commercial    sector, high      standards   of    mixed   tenure   of   residential   housing and
                                                                                           hospitable
    accommodation    supported by     large
                                       a        infrastructure of recreational facilities including
                                                                                           shops and
    restaurants. It is a sought-after destination with lush hinterland and a number of internationally
    renowned beaches complimented by bays and coves.

    Transportation and infrastructure planning, sensitive urban drainage design, water management,
    energy and other resources conservation are areas that the experienced integrated planning and
    design team are giving considerable input to all with the aim of achieving a ’sustainable’ precinct
    and community. The overriding goal of improved ecological performance has arisen from the
    Developer Northbrook seeking to implement ’sustainability’ throughout the delivery process of
    what is to become an iconic master planned community using world best practice urban design
    principles. This it is believed will lead to the precinct known as Noosa on Weyba becoming a
    good place to live, raise families, retire to and or simply visit. Residents and visitors will be able to
    enjoy a healthy lifestyle within an environment that provides both privacy and quiet along with
    opportunities for safe and possible inspiring interaction with others. It is to be a place that will also
    encourage respect for the environment and its bio diversity. To adhere to these aims, goals and
    objectives EC3 Global (Earthcheck)have created a series of guidelines and checklists. These set
    the direction for the planning, design and construction of the precinct and its facilities. They also
    seek to create the means by which environmental, social and economic integration and equity can
    be achieved to the benefit of all the precincts stakeholders.



    Dr Richard Moore EC3 Global Earthcheck Assessor                                        Copyright 2012   2

Page 50

               ’Promoting Sustainability’
                               Tota/lntegration                                                           ~
INTRODUCTION


To   achieve the   goals of sustainability total integration of development and                           construction
processes are critical. Solutions will arise out of the overlapping and integration of disciplines
and expertise. A dynamic relationship on a macro and a micro scale will need to exist between
the inputs and outputs if the value of a built environment is to extend beyond simple financial
accounting and offer true social and environmental responsiveness. Accordingly it is critical
there is a recognition that the development and construction industries in all their guises

impact more than most and hold key positions in the often stated objective of progressing
toward sustainable buildings, precincts and cities.


Sustainability is without doubt a complex subject the term itself is often misunderstood and
misused.    For many it appears to be no more than being environmentally friendly or a
mechanical means of responding to a government or regulators instruction. This very limited
view must be expanded and given a broader translation. Simply seeking the reduction of
energy usage, the possible recycling of waste and the protection of wildlife species will not aid
in the progress towards achieving greater sustainable patterns of development.


A more appropriate understanding is to recognise that sustainability is a journey which can be
closely identified with development and allied construction undertakings and aimed in particular
at the crucial activity of planning and design. It is also important for those involved in
development and construction to accept sustainability as a dynamic process which offers the
potential to improve the interrelated and highly desirable ’Quality of Life’ of all whilst
simultaneously protecting and enhancing support systems be they environmental, social or
economic (Figure 1).




                                                                                                     ’.




                                                  .~:
                                                        ’~.~.:.
                                                        ,
                                                        _,’,   ,
                                                                    ’M.
                                                                   ..




                                                                   .~
                                                                          ;
                                                                          .....L_.
                                                                                 -t,:J
                                                                                         _-:e:;..\




Figure 1: Achieving environmental, social and economic integration.


Dr Richard Moore EC3 Global Earthcheck Assessor                                                 Copyright 2012       3

Page 51

Added to this understanding is the need to recognise that sustainability requires an awareness
of  how everything natural and man made works. Further there needs to be an equal
understanding of what will be the likely effects and outcomes of development planning and
design decisions and eventual actions on the process. Without this understanding there can be
no possibility of overcoming what is known as the ’Circle of Blame’ (Figure 2). This broader

perspective and acceptance of responsibility by all involved in the development process is
paramount in achieving sustainable planning, design and eventual building outcomes. It can be
said that sustainability and the critically linked improved ecological performance are part of a
woven fabric which impacts on all aspects of our lives. They are constantly challenging us to

seek and pragmatically apply new metrics and solutions in the decisions being made daily
particularly on large scale precincts.



                                                                              -.~
                                             ~.-----                                     ---’-_
                                                             Investors
                                                                                                  -.~.......\
                                   (       We would fund more sustainable Drecincts and
                                              buildinas if there was a demand for them
                                                                                                    ./

                                                     Aooroval Aaencv

                                             We do not have the codes to recoanize
                                 and aoorove best Dractice for sustainable orecinct desian



                          Develooers                                                               Occuoiers

         We would develoD sustainable Drecincts and
                                                          --........"   We would like to have more sustainable Drecincts
         buildinas but investors will not Dav for them            J        and buildinas to fulfill our corDorate Dolicv
           and we aain no recoanition or advantaae               /               commitments but there is little
                    durina the develoDment                                              choice of orooerties
                        aDDroval Drocess                                                                                   -~~~

                                                           Community

                                        The develoDers. authorities and other aaencies
                                        do not Drovide us with sustainable communities




                                        ------~-                                         -~



                                                           Constructors                      --~~--...."
                                                                                                                \
                                     We can build sustainable Drecincts. infrastructure and
                                        buildinas but the develoDers do not ask for them                ../




                                                                                     1
Figure 2: Circle of Blame (After Sustainable Task Force)

Accordingly sustainable development has without doubt become the primary and most
demanding business challenge of this decade. Whilst the business case for sustainability is all
but proven many still waiver. However demands are continuing to increase especially with
national and state governments pressing business and industry to increase their energy
efficiency and reduce the damaging affects to the environment caused by greenhouse gas
emissions. Many in their strategies seek to provide clear direction on how to shape and support
cleaner environments and promote more effective land usage. Matching these aspirations are
the drives toward smarter designs and construction practices aimed at improved resource
utilization. Crucially many also recognize the critical factor of business certainty. All aim to
ensure sensitive, sustainable planning albeit on the coast, rural or urban areas. Many argue

that by these demands they are creating the means for ensuring a sustainable future for
regional communities by protecting the environment and creating security for industry. In
doing so they claim to be bringing the people a choice in the way they live and work, focusing
on housing options, transport infrastructure, recreational facilities and business opportunities.



Noosa on Weyba is determined to meet all these challenges and demands.



Dr Richard Moore EC3 Global Earthcheck Assessor                                                                     Copyright 2012   4

Page 52

                 ’Achieving Sustainability’
            The Environmental, Social and Economic Case                               ~
ACHIEVING ENVIRONMENTAL, SOCIAL AND ECONOMIC EQUITY


The  regulation of precinct development outcomes linking environmental, social and economic
agendas is a significant topic at federal, state, regional and local level. Since the mid 1990’s
there has been a prolific growth in sustainable strategies and policies. The translation of these
agendas now covers a whole spectrum from environmental stewardship, social equity and
sustainable communities, economic ethics and sustainable industries. Many of the resultant
medium and long term initiatives have filtered down and been translated into sustainability
indexes, quality of life plans, social and ethical standards, benchmarking and certification
programs, checklists and other equally aspiration driven codes. Despite the number the one
common thread they all have is that "at the heart of sustainable development is the simple

idea of ensuring a better quality of life for everyone, now and for generations to come".2 For
the development and construction industries this "means achieving social, economic and
environmental objectives at the same time".3 Other examples of the growth of sustainable
agendas are readily available at the national and state level. Many offer a clear recognition of
the long known fact that "environmental damage causes financial losses at a stupendous
scale".4 Linked to this is an economic desire to conserve an acceptable standard of living for all
people throughout Australia at the same time as conserving or restoring the viability of the
natural environment and hence the very basis of human life.


There   is also now an abundance of publications both regulatory and advisory aimed at
specifically identifying the role of the industry in this quest to achieve sustainable objectives
such as:


        Effective protection of the environment;

        Social progress which recognizes the needs of everyone;

        Prudent use of natural resources;

        Maintenance of high and stable levels of economic growth and employment.



Specific publications have spelt out the national and state government’s requirement for the
development and construction industries to take up the challenge of sustainability throughout
all its activities. The documents seek to offer frameworks within which the industries would
make    a   stronger contribution to better the quality of life strategies being signaled. However
many would suggest that there has to be more than theory to meet the radical change of
attitude needed throughout the development and construction industries. Accordingly at Noosa
on Weyba the developer has been encouraged to overcome any sense of unattainable rhetoric.
This is done   by the notion that integration of sustainable development, construction and
operation is not only about corporate social responsibility but supports an en-lightened self-
interest regarding competitiveness and survival. All of which makes good business sense.


Most developers and assembled    planning and design teams normally deal in specifics, at Noosa
on Weyba they are setting out to make practical sense of the ’sustainability’ demands that
now accompany any medium sized mixed use precinct development. On this front they have

had plenty of help in recent years because many have been required to guard against the
increasingly stringent environmental liability to which they are becoming subject to at national
and local activity. It is recognised that virtually any development activity can lead to
environmental, social and economic disruption in an area. This may lead to concerns being


Dr Richard Moore EC3 Global Earthcheck Assessor                               Copyright 2012    5

Page 53

raised by the local and broader community. Many developers have begun taking steps to
introduce  comprehensive and transparent environmental management systems into their
management structures and processes. At Noosa on Weyba this can be seen in the integrated
team of professionals. Further there has been an open book policy due to the benchmarking
and certification of the development’s processes by the third party international accreditation
body Earthcheck.

BUSINESS CASE


Unfortunately many in the Development Industry at large have found that a business case
for the social and some economic aspects of sustainability difficult to develop. However such
argument holds little credence given the long known impacts on national and global resources
and   pollution by the development and            construction   activity. The global perspective of the
resources used   and wasted     as first   reflected in statistics such as those noted in Figure 3 alone
seem to   leave little doubt that a business case that can be mounted.


      Global Resource             Building Use               Global Pollution       Building Related

 Energy                          50%                  Air Quality (Cities)          24%
 Water                           42%                     Global warming gases       50%
 Materials by bulk               50%                     Drinking water pollution   40%
Agriculture Land Loss            48%                     Landfill waste             20%
 Coral Reef Destruction          50% (indirect)          CFCs/HCFCs                 50%


FIGURE 3: Impacts on Global Resources and Pollution (After Edwards: 2001 :31)


It just takes the right questions to be askedparticularly as many are now suggesting that the
ongoing     environment   and improved ecological performance sought provide a significant
opportunity  for technological and managerial innovation linked to profitable enterprise (See
figure 4). Many such opportunities will present at Noosa on Weyba. The stakeholders should
explore steps which encourage innovative approaches to achieve best practice outcomes in
environmental, social and economic implementation.




                                             investment




                                                      Return on investment from savings

      Cost:




         /
                                                  Time




Figure 4: Opportunities by return on investment



Dr Richard Moore EC3 Global Earthcheck Assessor                                     Copyright 2012     6

Page 54

To take the business case even further there needs to be a description provided of some of the
principle benefits of sustainable development which establish the broad parameters of a triple
bottom    line business approach. In attempting this it becomes clear that sustainable
development is an inherently rigorous undertaking. There is a requirement to provide clear and
specific expressions of environmental, social and economic objectives both separately and in
integration within the development processes. Also required is a means by which to measure
and learn from actual performance. The advantages for a developer have been recognized as
offering an opportunity to maintain and improve outcomes for all the stakeholders of a
proposed precinct community.

Further there appears to be a means by which a reduction in the environmental impact can be
achieved along with a beneficial improvement in the overall financial performance outcomes of
the development. This should lead to the following:


         Broader operational recognition of commitment to sustainable development;

         Increased reputation and brand;

         Improved strategic capacity and overall performance capabilities;
         Greater creativity, innovation and learning;

         Increased professional and stakeholder motivation;

         Continuing reductions in whole life costs.

Developers have also responded to the recognition that relationships with clients, regulators,
the public and   suppliers can be improved with effective and more sustainable practices. It is
also recognized by the developer that legislators are increasingly applying financial incentive
based approaches to legislation, regulation and taxation. Whilst limited, there is on offer
financial incentives for encompassing a sustainability development agenda. What should be
noted is the link between investor’s particularly the large funding institutions who are taking
greater interest in environmental, ethical and social performance and being screened for
sustainability credentials. This attention is significant as these institutions are themselves being
monitored regarding their own ecological performance. It is clear that there are major benefits
being gained by these pressures in habitat and endangered species protection (Figure 5).




Figure 5: Habitat and wildlife protection



Dr Richard Moore EC3 Global Earthcheck Assessor                                Copyright 2012     7

Page 55

     ’Ecological Sustainable Performance’
                   Using a Process Performance Tool                                           ~
MEETING THE DEMANDS WITH A NEW PROCESS TOOL


The demands flowing from such         business, legislative and moral imperatives plus the scale of
potential development generated by growing demographic population shifts is in itself stimulus
enough to seek sustainable solutions. The question is how do developers deliver them on
medium to large precinct developments? What tools do they employ to ensure that they meet
the challenge that "has arisen from a number of forces at work within society to address
concerns for the problems of environmental degradation of the planet".5 This is particularly

relevant because it can be argued that many existing standards, checklists and guides are
limited in their ability to deliver meaningful long term performance based outcomes. Also few of
the tools currently in use are able to provide meaningful evidence that environmental
improvement by a development has been achieved.

This is evidenced by noting that even many highly regarded and comprehensive frameworks or
sustainability checklists limit themselves        to   only providing   a   means   to   consider positive
measures that can be taken to reduce environmental impact or enhance social and economic

benefits on schemes. They do not usually provide mechanisms within the tool by which
developers or other stakeholders can measure the possible or actual outcomes of their planning
and design decisions. This means that many of the sustainability tools aimed at developers
tend toward a self-assessment points evaluation of environmental initiatives or impacts on
individual buildings and their immediate surrounds.     Further, the third party certification
systems used by these tools normally only provide a reactive process for reviewing (via
documentation    provided) the points claimed. Such checklists and rating tools rarely
accommodate the broader, and quite often difficult to translate socio economic approach
advocated for Noosa on Weyba.


It is argued that ’Life Cycle Assessment’ limits itself to environmental impacts and outcomes
and "should be used in      conjunction with other environmental assessment, management and
decision making tools".6 This should not be accorded that these are criticism of the tools. Their
shortcomings are due to the lead in time of underpinning research, shifts in demands and
resultant performance pressures faced by the development and construction industries over the
last two decades. Consequentially this means that current best practice is not measured by
actual performance but is more to do with predicted outcomes. Consequently whilst there are a
range of tools they do not offer a whole system view of the total development process (See
Figure 6) and therefore fail to provide a proactive, integrated and comprehensive common
framework for developers, authorities and other stakeholders.


To   meet these challenges at Noosa on Weyba the process based Earthcheck Precinct
                                     7
Planning and Design Standard           (PPDS) incorporating benchmarking and certification of
best practice performance provides the model to be used for progress in the delivering of a
sustainable development. Implicit to this document is the view that planning and design has a
key role to play in resolving many of the conflicts that such precinct developments may
generate. In the absence of good planning and design unregulated development will be an
evident risk. It is likely the development will become formless or haphazard, inefficient and
likely to lead directly to a range of negative economic, social and environmental impacts. The
developer (and in particular the advisors) have responded when planning and designing the
new precinct to the task of achieving sustainability by recognizing this critical importance.




Dr Richard Moore EC3 Global Earthcheck Assessor                                      Copyright 2012     8

Page 56

                                 - - -   -   - --              - -   -   - -   - - - -   - -- - -   -   - - -   -   -   -   - -                                     -   - - - -   - -   - - -   -   - -   - - -   -   - -- - -   -   -




 .....--- -G~-~~~;’-’;;~;’t-;;                      :;;~~:~                                                                       -;.-.-.-----------------..;;:_-                                                      Phase 3           ---.......
.
          National, State,                     .’            Environmental, Social a"nd Ethical Policy’,                                                                                                                                           ,



           Regional and                                  :           i               Assess&ent: and Accreditation
                Local                                 Phase 2.                              .




              Policies
                                                             Integrat~g Precinct Process lIotanagement
                                                               :
                                                 _~_____’=..._-_~-~~-------
             Realms
                                                I Life CY~le Costing ’Social
                                                                             Ca~tal’ Foundations Standards, ~rameworks and Checklists I
                 of
                                                I Maste~Planning       Communiiv Consultations      Plannin~ Design and Construct     I
            Influence                           I Sustai~abilitY Indexation     :                     Benct!marking Indicators        I
                                                I:                              :  Predicted                                          I                                     Contracts
             Strategies                           Financtal Strategy            :Performance
                                                I’Locati        n
                                                                                :
                                                                                                                             .




                                                                                                                                      ..
   Legal Frameworks                             I        ;                                                                            I
   Phase 1
                    p~’:n~~g ~I                              Re~?n:,ive                                                 _’
                                                                                                                                   Precinct                       .=        Collection                                       ......1                  .




  Stewardship         11~1.:
                       ~
                            .::.1:’;;~~~:: :::...~I~~~,:;;~::;~~~~                        ::
                                                                                                                                   ~
                                                                                                                                                        :::w:’   .~: :::~;~~:~::: ::’4:-:-:-:~:.rl
                                               .:"                                                                                ..
                                                                                                                                                                 .


                                                                                                                                                                 .’_                                                               ~
                                                                                                                                                                                                                                 ~-,
       Development                                    :::a                                                                                                                  Governance

        Champion                                I"’g.                      Interpretation                                                                          ~:                                                                          I
                                                                                                                                                                              Transfer
             Agendas                            I g.                                                                                   Measured:
                                                                                                                                       Outputs                                                                                                 I
                                                                           Assessments
                                                                                                                                                              FacilitSr Management
                                                I ~                                                                                                                                                                                            I
                                                I                          Post Occupational
                                                                                                                             ~aluation                  Use       c?ccupation                                                                  I
                                                I                                                                                                   Operation St4ndards                                                                        I
                                                                                          Assessment                         af,d Accreditation                                                                                                I
                                                I
                                                I:                    :                                                                                         co~munitY               Standards                 +-
                                                                                                                                                                                                                                               I
                                              :      --:.._---~------~:_-------
                                                             ..........=
                                              ..                                                                                                                    :
           Recognition                        :              P~se 5
--:rotal Development.Process
                                              ~.
                                                                                                         Phase 4
                                                                                                                    <i....    ~                     I
                                                                                                                                                          _
                                                                                                                                                             ;
                                                                                                                                                        Tlmes ale
                                                                                                                                                                /                                                                               /
  ...__._____.__.._._.._.._..__.~t.:~_.._....__..__....._...._..~:.________________.~~__....__._.._.._..__.._....___.-



Figure 6: A Whole system view of the development process for ’Noosa on Weyba’

UNDERLYING THEMES


The underlying sustainability themes laid down are met by the use of the standards ’Key Area
Indicators,8: widely accepted as a practical and meaningful way to help developers progress
towards sustainable outcomes. Further performance measurement and                                                                                                             benchmarking with its
potential to bring          greater levels of accountability and ideas for better ways of doing things, can
provide one of the most effective drivers for improvement in areas of governance. It is
accepted that sustainability has a broad and complex nature which may make it difficult to
reconcile all the endless possibilities for indicators and measures.  PPDS subscribes to a
common view regarding their appropriate level for them to be meaningful and consistency with

these views has helped in developing the standard into a practical tool with indicators that
measure the sustainability of a precinct development (both buildings and infrastructure) at

several levels.


PPDS    provides a means by which developers and their advisors can achieve sustainable
planning and design goals and in doing so, helps them conform to independent third party
certification. A critical dimension of this certification is the ongoing input to the developer’s
processes following the initial phase of planning and design. This will ensure compliance and
maintain recognition for a developer who is seeking to enhance its sustainability record. A
further aspect will be the integration and possible incorporation of other standards which cover
construction, operational and community outcomes. The standard provides essential
sustainability information for all the stakeholders involved in the development process. This
broad and inclusive approach is a means to secure possible early statutory approvals and
development delivery. It elaborates on the mechanisms of sustainability assessment and offers
support tools such as ’Sector Benchmarking Indicators and Measures’. It also describes
the process and requirements of undertaking benchmarking and obtaining certification status
respectively. Finally and most critically it provides a realistic picture of possible outcomes to
developers and their advisors by linking indicators to the development process and the crucial
decision-making stages of the planning and design process.

Dr Richard Moore EC3 Global Earthcheck Assessor                                                                                                                                          Copyright 2012                                               9

Page 57

ACHIEVING TANGABLE BENEFITS


As stated  previously the developer and planning and design team at Noosa on Weyba have to
deal   with specifics due to the very nature of development. It is recognised that the
sustainability agenda is becoming more tangible as developers and their advisors respond to
and seek the economic potential inherent in their aims and objectives. However developers will
not innovate if it is not possible to predict benefits such as recognition and reward. Further
resistance is probable if major returns like earlier development approvals are not on offer. To
meet this challenge the process based standard PPDS is linked to an international third party
benchmarking and certification organization to give credibility. Also the standard uses
appropriate indicators and measures as a mainstay in providing accurate information to aid in
decision making, implementation of solutions, improving planning and design and management
outputs and performance outcomes.

PPDS seeks to consider the sustainability of a whole area or community (rather than impacts of
individual buildings). The tool has been integrated into a whole process view of development
adopted at Noosa on Weyba. Accordingly it is able to adjust to a range of influences and
requirements. In particular it will respond to environmental, social and economic problems
which vary greatly from area to area within the precinct as will the answers. Related research
at University Queensland on behalf of EC3 Global created the guidelines and tools including
indicators and associated measures to help tackle these and other development issues.


As previously noted    employing indicators is now widely accepted as a practical and meaningful
way to evaluate      performance in order to help a developer’s progress towards and achieve
sustainability by:

        Providing effective protection of the environment;
        Making prudent use of natural resources, especially scarce and important ones;
        Helping to integrate other industries i.e. tourism alongside other economic sectors;
        Beneficially influencing physical patterns of development.


However it must be    recognised that indicators are not a one-time procedure. They are most
useful when measured    repeatedly and consistently through a long term independent monitoring
program. Recognition   of this need has been given at Noosa on Weyba through the early and
continuing  involvement  of an advisor charged with creating the means for measuring actual

outcomes during and after actual physical development implementation. It is argued that by
giving focus to ’best practice’ planning and design around sustainability principles this will
bring high calibre results in the form of more efficient operation and management and
increased quality of service. Some of the key premises of the PPDS programme are that sound
principles build strong foundations and that good planning and design should be followed by
good management. Also being smart, resourceful and efficient saves time and money along
with the balancing the needs of people, place and economic returns which ultimately creates
partnerships which benefit all.

PPDS is a significant step in the development of sustainability tools. This has in part been the
reason for its adoption at Noosa on Weyba. Of particular importance is its interface between

developer inputs and authorities statutory requirements. It is also an integrated aid in meeting
the  increasingly critical tasks facing the planning and design team as it comes under ever
increasing demands and resultant pressure, to ensure that its future activities meet the
growing agenda for ecological sustainable outcomes. PPDS has adopted the following principles
to define sustainable planning and design. The precinct’s development team will be using these
as preliminary guidelines to set objectives and select appropriate processes to fulfill the




Dr Richard Moore EC3 Global Earthcheck Assessor                              Copyright 2012    10

Page 58

requirements of this Standard. Planning and designing for sustainability integrates Agenda 21
principles through appropriate statements in the Concept Master Plan covering:

        Planning and design approach and application of sustainability policies;
        Location and siti ng;

        Conservation of energy and water resources;

        Selection of appropriate materials and processes;

        Protection of air, earth and water;

        Planning for sustainability in the construction and operation phase of the development;
        Social and locational issues.



KEY AREA INDICATORS AND MEASURE’S UNDERLYING THE STANDARD.


There are 10 Indicators using 50 measures underlying the PPDS Key Sector Areas. Each Key
Area   Indicator is supported by on average five measures which are fully described in
documents made available to     developers. The primary source of information is the PPDS
Handbook which includes examples of guidelines, compliance tables and actual case study
material. This documentation becomes available via Earthcheck when developers enter the
benchmarking and certification process.

The Key Context and Area Sector Benchmarking Indicators are presented here for ease
of reference.


Context: Sustainable Master Planning Approach (See Figure 7)

       This key context is concerned with the understanding, introduction and management of
       project aims, goals and scope with respect to sustainability.
1: Precinct Location and Siting Planning

       This key area indicator and its measures major on the precincts location with respect to
       regional services and infrastructure and its bearing on environmental impact in terms of
        resource use   -



                           energy, water, waste and transportation.

2: Energy Efficiency and Conservation

       This key area indicator and measures consider the developers ’whole of systems’ view
        and approach during master planning the principle of sustainable energy design.

3: Water Conservation and Management

       This key    area   indicator and its measures are designed to consider the minimisation of
        water usage and on site water treatment prior to use.

4: Solid and Other Waste Management

   .   This   key area indicator seeks to         measure   reductions of   development infrastructure,
        building and operational waste.
S: Resource Conservation (Materials)

       This key area indicator and its measures consider the reduction of new materials and the
       use of   reclaimed, recycled, and green materials on a precinct.
6: Chemical Use

       This key area indicator and     measures     review the Chemical Use Strategy of a        precinct
       and aids in the identification and setting of targets for use of biodegradable alternative.


Dr Richard Moore EC3 Global Earthcheck Assessor                                     Copyright 2012    11

Page 59

7: Wastewater Management

        This     key      area      indicator and            its         management and
                                                                    measures           seek to         consider the
        treatment of wastewater in such a way that treatment requirements are reduced in
        terms of tankage, energy and chemical requirements, and that treated wastewater is
        able to be reused for non-potable uses.

8: Storm water Management

        This     key      area      indicator and            its    measures          encourage           and      reward          the             idea         of the
        environmental   sustainability in terms of dealing with stormwater generated                                                                            in               the
        Precinct as opposed to discharging it for treatment elsewhere.

9: Social Commitment ’Quality of Life’ Approach

         This key area indicator and its measures reviews the physical and soft policies seen as
         being essential to the creation of a sustainable community leading to an improvement or
         maintenance of ’Quality of Life’. (with ’Quality of Life’ meaning a shared vision of the
         future for the whole community)

10: Economic Commitment

        This key area indicator and measures seek to review the developers approach in terms of
        positive inward investment, business opportunity and economic equity.


  PROPOSED MASTER PLAN


  The proposed uban development foolprirt represents oriy 19% ofthe total site area. and leu than 35% ofthe BDOA Receive site.




                                                                                                                                              Sel’ld Site

                                                                                                                                              ~eceive Site

                                                                                                                                              .API BOUMOr)’


                                                                                                                             I AND l!Sf AREAS                  HECTARES

                                                                                                                             Send land/t-.E!wNohooal Part            139..s

                                                                                                                             En vron mental Protection              n    ,
                                                                                                                                                                             7
                                                                                                                             Land on ~eceive Site

                                                                                                                             unon FOO1rpril"lt                      57.07

                                                                                                                             Pa~                                    8.06


                                                                                                                                                                    sos.s


                                                                                                                             PRODUCTSUM’vI’\RY                 DWELUN GS

                                                                                                                             R e~dentiol                            499

                                                                                                                             R etiremen flAged Core O’lAelln g5 2:20

                                                                                                                             TO\l’l.flhoo:s                          107

                                                                                                                                                                    SO

                                                                                                                                                                    876
                                                                                                                             .rdICOIW ~d j<.tlJlltod~loll~d dli’l   ’"




                                                                                                                                                                         Mtto~Qle




Figure 7: Master planning a whole community including infrastructure and individual lots.


Dr Richard Moore EC3 Global Earthcheck Assessor                                                                              Copyright 2012                                      12

Page 60

    Principles for ’Sustainable Opportunities’
                       ’The PPDS Handbook at Rise’



USING THE PRINCIPLES OF PPDS FOR SUSTAINBILITY OPPORTUNITIES


The following ’Sustainability Opportunities’ guidelines presented in this document (see also
accompanying development ’Quality of Life’ and ’Architectural and Landscaping’
guidelines) provide a compilation of items deemed to be both essential and desirable for the
creation of a sustainable precinct community at Noosa on Weyba. Underlying these guidelines
(See Figure 8 for the underlying principles of PPDS) are indicators and measures of those
factors which must be present for this precinct to be regarded as fully sustainable in terms of
its locational geography and proposed lifestyle. They are also required to be present to meet
the benchmarking and certification process and criteria of Earthcheck.




                          DEDICATED ESD
                                                        Elwtr mn.ftta’ SU.tllftlbll DlIIgI\
   ’1.Energy EfficieQcy                                       R8fttctlng Age"21
    2.WaterConserva1ion
    3.Design and LMng                                    mas aar.egf)nzed ,byEiWP:
    ...Universal Resort Planning
                                                         f. L Jl~d i’Jld [le!,1.EI,oprn.en(;
    5.Safety
                                                         2. R:f)J’:ii i’_f.Jld _FaLmi..’~
    6.Serity                                             3. Bp hJ War.eF;
    7.Management                                         .f’ StomrWii’.ter QLI’ality:
    8.Trusport                                           $. SeWge T            8Jiml!J1r(.-
                                                         6.        iooi’JlcQ!. Sedin:f.efJr[iETOOl;
    9.Emissions
                                                         r rrWl’i’c i’JJla rf;iiflSpart;-
   ,10.Materials                                         8.PlWSi:! Cf)Jlrtl~f)];
    11.Land Use and Ecology                              fl.   r   QlJlity;
                                                         1(1. Visual Ameurty;.
    12.11ea1th and WellJeing
                                                         11. C::lJJrunIReritaige_;
    13.Community and Social Aspects                      f2. W.aste M_n-ig~.en’(; i’I.Jld
                                                         13. R~:;e MJl1sgernet:l’t.




                                                  ErwIfoamanbl .....gemalll:.....


                  Economic Inputs ,nd Outcomes

Figure 8: Underlying principles of PPDS.

Accordingly this document and the other guidelines should be used in conjunction with the
Precinct Planning and Design Handbook.9 (The following notes and details are taken from
the handbook for ease of reference). The PPDS handbook uses a prescriptive approach to


Dr Richard Moore EC3 Global Earthcheck Assessor                                               Copyright 2012   13

Page 61

establish sustainable visions, early planning and design processes and decisions, and a
performance-based approach to assess, benchmark, measure and                  reward  positive
environmental performance (actual or potential).         This would include, for example, the
measurable or predicted reduction in the generation of greenhouse gases by taking appropriate
planning and design decisions.       The outcome should be an overall enhancement of a
developer’s planning and design intent and the environmental, social and economic
performance of the precinct’s planning, design and related infrastructure construction. The
Handbook is specifically aimed at those involved in the planning and design of mixed use
precincts where there is a variety of residential tenure, education, recreation and health,
commercial, retail and tourism facilities forming the major elements of the development. It
provides help at the strategic and detailed precinct site level.

By using the handbook it will: (after BRE)10

        Offer developers, their planners and designers better           awareness   of how    to     ensure

        sustainability in their precincts;
        Provide frameworks for assessing the precinct;

        Provide guidance on appropriate standards, indicators and measures;

        Be capable of adaptation to local circumstances;

        Provide a tool for developers and planning authorities to ascertain that sustainability has
        been addressed;

        Help planning authorities to specify           sustainability   in   supplementary      planning
        gUidance/development codes, etc.;
        Provide planners with     a   method of assessing the sustainability aspects of development
        proposals consistently.

When considering the sustainability of precincts, wider social and economic issues will need to
be addressed. These issues are as critical to the success of any related precinct community as
are   environmental imperatives. The handbook recognises this and offers guidance on how to
address such diverse inputs. It is also structured  in such a way as to address the key

components of PPDS these are itemised as follows:

       Sustainable Precinct Design, Planning and Infrastructure Construction Policy;

       Regulatory Framework;
       Sustainable Assessment;

       Sustainable Planning & Design Management System;

       Sustainable Infrastructure Construction Process Management;

        Community and Stakeholder Consultation and Performance Reporting.

These will   help to focus the development team on the process which           is clearly not   mutually
exclusive but interrelated. The handbook’s Key Area Sector Benchmarking Indicators
tackle, through positive measures, the underlying sustainability principles recognised as critical
to any development. It works by seeking to enhance benefits in social and economic outcomes
whilst ensuring minimal impacts on the environment. The indicators and measures and
suggested (but not exclusive approaches) in the handbook are structured so as to recognise
the vast diversity that can be experienced on projects and allow for appropriateness to be
determined without undue difficulty. The standards set are recognised ranges of performances
achieved on other developments or determined by consensus. The handbook’s indicators and
measures are also written to be flexible and provide opportunities to aid in the writing and

demonstration of;



Dr Richard Moore EC3 Global Earthcheck Assessor                                     Copyright 2012      14

Page 62

       Master plans, development briefs or proposals;

       The sustainability aspects of the development proposals i.e. energy strategy plans;

       The  specification of sustainability standards               i.e.   landscape and      building codes   or

       guidelines;
       The numerical performance evaluation of the development proposals;

       Infrastructure management strategies;

       Legal   covenants    for   the   implementation         of    environmental, social        and   economic
       strategies.

THE PROCESS


To become Earthcheck ’Certified’, most of the requirements of the standard are met as a part
of the benchmarking, measurement and assessment process. There are five sections to PPDS
and complying with all five sections will lead to ’Certification’. The handbook provides
assistance for each of the sections and           in   doing   so    sets the       template for identifying the
’sustainability opportunities’ at Noosa on Weyba. The development team can use these sections
as  preliminary guidelines to set objectives and select sustainable practices to achieve
sustainable planning, design and infrastructure construction to fulfill the requirements of the
standard. They are briefly outlined as follows:


SUSTAINABLE PRECINCT PLANNING & DESIGN POLICY

The  principal objective of this critical section is to describe a developer’s commitment to a
Sustainable Precinct     Planning and Design Approach and have it contained in a formal
policy statement. This section assists in clarifying and declaring the planning and design
intentions and having a well-documented commitment to the goals and objectives (as set out
below) immediately from the outset of the development process.

       Have a written Environment and Social Sustainable Precinct Planning and Design
       Policy for the project that incorporates the points mentioned in this section and is
       appropriate to the precinct and its infrastructure design’s environmental and local social
       footprint. Contextual factors such as location, climate and design brief should be taken
       into account when planning the required nature and scale of activities. The policy shall
       have regard to the sustainable planning and design guidelines as described in preface of
       the Standard;

       Declare an intent to make appropriate changes and improvements in design to achieve
       sustainability performance using indicators and measures at, or better than, the
       Earthcheck ’Best Practice Level’;

       Have a commitment to comply with relevant environmental                       legislation and regulations,
       and with other requirements to which the planning and design should conform;

       Have    a   commitment to   give preference to indigenous planning and design strategies,
       infrastructure construction practices and   products/services of local origin, which endorse
       the planning and design’s sustainable vision;

       Have    a    commitment     to   promote the Sustainable Policy and Vision in the
       infrastructure construction      phase and integrate within the infrastructure construction
       ma nagement system;


       Have a commitment to communicate the aims of the Earthcheck PPDS program to the
       infrastructure construction team, other builders and material suppliers;

       Have a commitment to give special consideration                     to the   long term employment and
       training of persons living in nearby communities.

Dr Richard Moore EC3 Global Earthcheck Assessor                                              Copyright 2012    15

Page 63

REGULATORY FRAMEWORK


Compliance with legislation is a fundamental part of a development. PPDS seeks to ensure that
there is a compliance with the relevant legislation, plans, regulations and other commitments
that   are   critical for   responsible development of the precinct, its environmental, social and
economic infrastructure and its         physical construction. This section includes three items that
require particular attention:

1   Earthcheck      assumes          development process will have thorough inclusion and
                                that the
    accountability     for the
                            regulatory requirements and developers would have used this
    information to help frame their environmental and social policies;

2   For the purpose of participating in the program, Earthcheck            is   seeking evidence that
    developers will actually complete this work;
3   An  up-to-date register of relevant legislation providing evidence of compliance must be
    provided.

ENVIRONMENTAL AND SOCIAL SUSTAINABILITY PERFORMANCE


There are 4 subsections of the PPDS, which focus on the Earthcheck environmental and social
key performance areas and the corresponding precinct planning and design issues that need to
be addressed for the desired level of performance against the key performance areas. These
subsections support the benchmarking process and suggest a systematic and planned approach
to collect benchmarking information and dealing with improvement recommendations arising
from the benchmarking process. External review or reviews (which are subject to the scale of
the precinct) of the final precinct design are an essential part of the benchmarking process.


ECONOMIC SUSTAINABILITY PERFORMANCE


Whilst Earthcheck is primarily concerned with the environmental and social performance of
developments, it recognises that economic performance and its impacts are critical. To this end
it encourages those developers wishing to encompass the ’triple bottom line’ principles to
take the opportunity of showing that their project will bring sustainable economic prosperity to
the existing and proposed communities. This demonstration can be by means of addressing the
’Economic Commitment’ key area indicator and measures.


SUSTAINABLE PRECINCT PLANNING & DESIGN MANAGEMENT SYSTEM AND
SUSTAINABLE CONSTRUCTION PROCESS MANAGEMENT SYSTEM


These two sections are closely interrelated and assist in achieving the most efficient system to
obtain   ahigh performance level of the final planning and design stages. These assist in
establishing systems, procedures, assigning responsibilities to ensure that the environmental
vision is fully integrated into the planning and design development process and eventual
i nfrastructu re construction process.


Having an efficient Sustainable Precinct Planning and Design Management Policy and
System is important in following an integrated approach. The early design decisions in a
development process are crucial for the overall performance outcome of the design. The policy
or   system assists in establishing these goals and tasks, organizing resources and
responsibilities for implementing these and documenting the process for detecting shortcoming
and facilitating improvements. Whilst it is recognised that the PPDS benchmarking and
certification process is primarily aimed at planning and design outcomes (not actual physical
implementation), impacts of planning and design decisions on precinct infrastructure cannot be
ignored in the assessment. Sustainable infrastructure construction process management
policies and/or systems are seen as a sustainable approach for the eventual day-to-day


Dr Richard Moore EC3 Global Earthcheck Assessor                                   Copyright 2012   16

Page 64

management of the project and         are essential in maintaining and achieving the precincts

sustainable vision.   Specifically, they help in identifying the role, responsibilities and goals for
the whole infrastructure construction process. Further they outline the tasks and actions to be
taken in implementing and operating both policy and/or system. For the purpose of
certification, Earthcheck will assess the quality of these management policies and systems and
demonstrated performance against the tasks identified in the policy and/or system framework.
However, it is to be remembered that the ’sustainability assessment’ and real
environmental improvements form the basis of the Earthcheck system and not just the
management process.

       A    Sustainable      Precinct     Planning           and    Design       Management System and
       Sustainable Infrastructure Construction                     Process      Management System should
       include the following actions and tasks:

       A   description of the purpose of the management policy and/or system; identification of
       the principal environmental issues that need to be addressed. These should be prepared
       in the context of the PPDS and Agenda 21;

       Key issues need      to beanalyzed and planning, design and infrastructure construction
       issues identified so that they can be considered for the desirable performance evaluation
       against the KPAs;
       Environmental improvement targets and goals should be set along with    a description of

       actions that need to be taken. These actions would  normally be placed in priority order
       and would be budgeted for as part of the routine budget planning process;

       Implementation plans and procedures should be developed. This would include training
       and development to help implement actions prescribed by the policy and/or system;

       A section dealing with ’working with the local community’ to help achieve environmental

       improvements and community benefits;
       A checklist should be made for any corrective actions;

       Once the policies and/or systems are implemented, the implementation progress would
       be regularly monitored. In particular, environmental improvement actions that have
       been    benchmarked     will
                                 be regularly checked to assess their performance. Such
       monitoring would provide the proof necessary for the certification process;
       Results   of   the   monitoring    will    be    communicated           to   ensure   there   is   continuous
       improvement.

STAKEHOLDER CONSULTATION AND COMMUNICATION (Figure 9)

This section focuses on the importance of dealing with stakeholders and customers along with
social and economic issues.       This aspect of social and economic commitment is present in all
the sections of the standard in       some   way       or   other, because it is a critical area          in terms of

meeting the requirements of Agenda 21.

        Establish effective consultative mechanisms and strategies to ensure all sections of the
        community are able to participate in developing and implementing the environmental,
        social and economic strategy;

        Communicate to the stakeholders and       community in a simple, clear, obvious and
        regularly updated manner, their environmental, social and economic performance based
        on their sustainability assessment and their related activities resulting from participating

        in the Earthcheck program;

        Encourage     customers     and   suppliers         to   engage   in   the   environmental, social and
        economic programs;




Dr Richard Moore EC3 Global Earthcheck Assessor                                               Copyright 2012      17

Page 65

       Encourage and respond to positive and negative feedback from the community on the
       environmental, social and economic sustainability policy and related performance
       targets;
        Maintain records of community consultations and communications;

        Be proactive in raising stakeholder awareness of local and global environmental issues;

        Regularly produce and distribute a community sustainability report in an appropriate
       format.




Figure 9: Community consultation and governance




Dr Richard Moore EC3 Global Earthcheck Assessor                             Copyright 2012    18

Page 66

              ’Sustainability Opportunities’
               Strategies, Guidelines and Checklists


TASKS AND TOOLS


The  following ’guidelines and checklists’ are an attempt to provide through a range of
identified ’Sustainability Opportunities’ the best outcomes for the environmental, social and
economic environments both        now   and into the future at Noosa      on    Weyba. The opportunities
relate to the continuity of these triple bottom line aspects of human society, as well as the non-
human environment.


The  planning, design and eventual construction outcomes need to manifest as sustainable
physical objects which comply with the principles of economic, social, and ecological
sustainability. At the precinct these will range from the designing of major infrastructure,
individual buildings and related spaces for a wide range of functions through to the designing of
small objects for individual everyday use. When undertaking the critical activities related to this
phase of the development process steps must be taken to avoid irreversible damages to natural
capital in the long term. There must be a clear reconciliation of the development projects short
term benefits with the regenerative capacity of the natural environment.


The guidelines and checklists are documents aimed at streamlining the sustainability   planning
and  design process. They provide in the case of the guidelines protocols for governing the
inputs procedures needed to comply with the requirements of Earthcheck benchmarking and
certification. They are also a means by which the developments ecological performance and
quality can be predicted, measured and improved. The checklists are essential tools in meeting
the need for consistency and completeness in the task of achieving sustainable outcomes


GUIDELINES


Translation of the principles of sustainability into practical performance based opportunities will
be the intent of the following documentation. These documents aim to provide guidance and a
range of options to help the planning and design team deliver practical actions that reflect
essential and desirable sustainable outcomes. Broad issues, guidelines, checklists and
compliance tables are provided. These represent the factors selected to form the essential
ingredients of a sustainable precinct development and the means by which its performance can
be measured and benchmarked.


In creating a model or framework for Noosa on Weyba it is important to determine that there is
a   broad consensus amongst the development team as to what is the sustainability commitment
of the developer. The precinct is a major undertaking and resultant impacts will be felt within
its own boundary much further afield. Therefore it is essential that all those involved ascribe to
a common set of principles and          commitments which        reflect the    original goals, aims and
objectives of the development.

Accordingly   it is relevant to note these down      in   a   form that   can   be
                                                                        clearly identified and
assessed. This assessment is important not only for the developer, the    planning and design
team and other stakeholders but is also needed to align the precincts overall goals with those
of the Precinct Planning and Design Standard (PPDS). The following Guidelines and Checklists
are a commitment at Noosa on Weyba to sustainable master planning            and design. The
overriding driver of these documents is to achieve at the precinct a sustainable development
through an ecological performance process that has the capability of ensuring and enhancing
the continuation of natural and human systems over time.



Dr Richard Moore EC3 Global Earthcheck Assessor                                      Copyright 2012   19

Page 67

The developer is committed to the goal of using world class planning and       design practices at
Noosa   on  Weyba, with the responsibility of delivery falling on the planning and design
development team. They are charged with delivering an innovative mixed use precinct with a
wide range of stakeholders. This precinct is to be environmentally, socially and economically
sustainable. The challenge is site specific given the precincts unique location and geography. To
achieve the goals, aims and objectives noted it is important that there is total integration of the
practical dimensions of planning and design delivery. However equally important is the need for
commitment from all members of the development team to the principles of sustainability.


To achieve this: the       Development Champion (See Figure 6) will be required              to start the

process of commitment by completing sections of the following guidelines and checklists. This
presentation of directives and requirements will amend over time during the phases of total
development. This early whole system review is an indication of awareness by the developer
regarding the need for integration and appropriate decision taking at the critical planning and
design phase.

1. COMMITMENTS (After Hanover Principlesi1


 Precinct Sustainability at Noosa on Weyba Queensland

 Commitment to ’Sustainability Principles’
                                                                                                     V’
  1     To provide a      healthy, supportive, diverse and sustainable built environment
        for the built and natural environment
  2     To   adopt    a   broad,   interactive   and   interdependent planning and design
        approach to the Master Planning of the precinct.
  3     To   use   ’triple bottom line’ philosophy regarding planning and design inputs
        and outcomes
  4     To determine       responsibility for and consequences of planning and design
        decisions.
  5     To ensure     long term safety, low maintenance and added value throughout
        the precinct and adjoining area.
  6     To  eliminate waste by using ’life cycle’ approaches when            planning and
        designing all aspects of the precincts products and processes.
  7     To utilize energy     sources   that are from ’green’ sources and sustainable in
        the longer term.
  8     To seek to ensure the long term evolution of the precinct in        a   positive and
        sustainable manner.
  9     To  provide an open and sharing planning and           design process that is both
        ethical and integrative of all stakeholders.
 10     To seek constant improvements through            knowledge transfer throughout the
        planning and design process.

2. ACTIONS (AfterAIAi2


 Precinct Sustainability at Noosa on Weyba Queensland


 Commitment to Action Sustainability Principles
                                                                                                     ../
  1     Ensure environmental, social and economic sustainability are at the core of
        the precincts qoals aims and objectives.
  2     Adopt sustainable planning and design practices, procedures and standards
        in deliverinq the Master Plan.



Dr Richard Moore EC3 Global Earthcheck Assessor                                     Copyright 2012         20

Page 68

  3    Create wide educational value in the integration of sustainable planning and
       design at the precinct.
  4    Undertake a planning and design approach which is aimed at meeting and
       changing statutory regulatory requirements regarding sustainable outcomes.
  5    Deliver performance outcomes that improve the new and existing built
       environment at and surroundinq the precinct.


The   developer has determined that the planning and design of the precinct                       must   give
consideration to ecological sustainability through a range of broad strategies and principles and
practical planning and design inputs. These include at the practical level orientation, energy
efficiency, water conservation and management, waste and resources management. For the
broader precinct development level connectivity to adjoining economic and social infrastructure
is considered critical. However whilst reference is made in the following guidelines and
checklists the majority of the equally important broad and practical social and economic inputs
are to be found in an accompanying document entitled quality of life guidelines.



Noosa on Weyba is a mixed use precinct with a range of residential dwellings and tenure and
community facilities. There are also extensive open spaces. All of these are to be supported by
infrastructure and services. The scale of the development allows for a variety of neighborhoods
to be created within the boundaries of the precinct. Accordingly the following guidelines and
checklists   have   been   created   to   accommodate   in   the   first   instance   a   broad   range    of
sustainability opportunities. These will encompass the whole of the precinct and attempt to
determine an aggregated balance for the undertaking. The second suite of documents will
consider individual areas and buildings. This approach it is suggested will provide a means to
achieve wider sustainable outcomes.


Regarding the benchmarking and certification it is essential for there to be full and concise
descriptions of the development, its location, proposals and participations if the process is to
work efficiently and economically. Of critical importance is single point contact. These details
and other relevant facts should be identified in a project profile or executive summary or by
using a ’Pre Commitment Questionnaire’ that is required for all developments seeking to
undertake PPDS benchmarking and certification. This document’s questions which are
reproduced here seek to determine a developers project aims, goals and scope with respect to
sustainability. As this is normally requested at the feasibility stage of a project it is also a
means by which a developer can begin to foster a policy for an inclusive planning approach,

which prioritizes sustainability, and increases the probability that sustainable outcomes are
achieved in the project. In addition, its use is a way to begin the process of establishing
planning targets with a performance basis for master planning, ensuring possible reductions in
greenhouse gas emissions and other key areas such as waste and water use.

3. PRE COMMITMENT AND ACTIONS ASSESSMENT


Pre commitment assessment of development (planning, design and infrastructure construction)
against The EC3 Global (Earthcheck) Precinct Planning and Design Standard (PPDS):


 (PPDS)KEY AREAS                            YES / NO    RESPONSIBILITY                    COMMENTS




 1: Sustainable planning, design and infrastructure construction approach


 Will the Planning Report and Master
 Plan contain a sustainability vision
 and appropriate aims and
 objectives?


Dr Richard Moore EC3 Global Earthcheck Assessor                                       Copyright 2012      21

Page 69

 Will the Precinct Development
 Design Guidelines reflect the
 sustainability vision, aims and
 objectives?
 Will the Precinct Design Guidelines,
 Sustainability Briefs, etc., be
 submitted with the Development
 Application
 Will an interdisciplinary and
 coordinated approach between all
 design professionals been adopted?
 Will there be clear evidence of an
 undertaking to implement an
 effective Environmental
 Management System (EMS)?
 Will there be a statement or plan
 committing to or outlining the
 procedures for a post development
 environmental and social
 assessment of the development?

 Will a Life Cycle Cost Plan
 approach be used in the
 determination of Total Precinct
 Development Cost?
 Will Total Precinct Development
 Cost include a budget for non-
 negotiable sustainable strategies
 and measures?

 Will there be an Infrastructure
 Construction Process Management
 Policy in place for environmentally
 responsible construction?
 Will there be a policy/set of criteria
 in place to judge an infrastructure
 contractor’s experience (i.e.
 environment management skills)
 prior to job assignment?
 Will there be a contractual
 agreement with the constructor, to
 include sustainable infrastructure
 construction standards and a
 sustainable infrastructure
 construction management policy?

 Will there be a policy for the
 selection of green materials,
 technologies and processes for
 achievement of low environmental
 impacts?




Dr Richard Moore EC3 Global Earthcheck Assessor   Copyright 2012   22

Page 70

 Will there be Is there a policy for the
 selection and purchase of Ecolabel
 products?

 2: Energy Efficiency and Conservation


 Will Passive Design Strategies be
 used?

 Will there be information available
 regarding the annual total energy
 consumption for the development?
 Will there be information available
 regarding the gross CO2 emissions
 for the development?

 Will reduction targets be set for CO2
 emissions?

 Will there be information available
 regarding non-renewable and
 renewable energy consumption?

 Will there be information available
 regarding cogeneration techniques
 to be employed throughout the
 precinct development?
 Will targets be set for the optimal
 siting of infrastructure, allotments
 and buildings?

 Will targets be set for the use of
 energy efficient equipment in the
 development of the precinct
 i nfrastru ctu re?


 3: Potable Water Consumption


 Will a comprehensive Water
 Management Strategy be in place
 during the development of the
 precinct?
 Will a methodology be in place to
 calculate the annual potable water
 consumed?

 Will reduction targets be set for
 potable water consumption?
 Will a methodology be in place to
 calculate the annual potable water
 consumed for environmental
 functions?

 Will targets be set for water
 harvesting and the reduction of
 auxiliary water consumption?


Dr Richard Moore EC3 Global Earthcheck Assessor   Copyright 2012   23

Page 71

 4: Solid Waste Production


 Will a Waste Management Plan be
 in place throughout the development
 of the precinct?

 Will targets be set to reduce the
 amount of waste generated during
 the development of the precinct?

 Will targets be set for recycling
 during the development of the
 precinct?

 5: Social &. Economic Commitment

 Will a ’Quality of Life’ plan be
 prepared and submitted with the
 Development Application?
 Will there be a statement or plan
 committing to or outlining the
 procedures for a post development
 environmental and social
 assessment of the development?

 Will a framework of measures for
 long term community sustainability
 be created and implemented
 throughout the development of the
 precinct?


 Will the development provide future
 users with a high degree of
 environmental, social and economic
 interaction andlor integration with
 any existing and new community
 with particular consideration to
 minimal impacts on
 nativeltrad itiona Iii nd i genous
 communities?


 6: Resource Conservation during Infrastructure Construction

 Will Design Codes and lor policies
 for green technologies, materials
 and processes aimed at achieving
 low environmental impact be
 prepared and included in the
 Precinct Design Guidelines?

 Will targets be set for the purchasing
 of Ecolabel products during the
 development of the precinct?




Dr Richard Moore EC3 Global Earthcheck Assessor                Copyright 2012   24

Page 72

 Will the precincts infrastructure and
 building systems be specifically
 designed and or developed to reduce
 energy consumption and waste
 during and after construction?
 Will reduction targets for water
 usage on site be set for the
 infrastructure construction phase?

 Will reduction targets for waste
 generated on site be set for the
 infrastructure construction phase?

 Will reduction targets for energy use
 on   site be set for the infrastructure
 construction phase?

 6: Chemical Use

 Will there be a Chemical Use
 Strategy in place during the
 development of the precinct?
 Will targets be set to reduce the use
 of non-biodegradable chemicals?

 7: Siting

 Will there be evidence of the
 appropriateness of site planning
 regarding constraints and
 opportunities offered by the natural
 and built environment?

 Will measures be identified to ensure
 the development has minimal impact
 on   native/ traditional/ indigenous
 land and populations?

 Will measures be used to reduce the
 amount of site disturbance caused
 by ground works i.e. cut and fill?
 Will there be enhancement of the
’user’s’ understanding, interaction
 and integration with the natural and
 social environments through siting
 design guidelines?
 8: Waste Water and Storm Water Management

 Will a Waste Water and Storm
 Water Management Plan be
 employed throughout the
 development of the precinct?
 Will measures be identified for the
 harvesting, use, re-use or recycling
 of on-site water resources during the
 life of the development?



Dr Richard Moore EC3 Global Earthcheck Assessor   Copyright 2012   25

Page 73

 Will targets be set for the reduction
 of waste water treated using off site
 facilities?

 Will targets be set for the reduction
 of storm water volume discharged
 into off site facilities?



On completion of this pre commitment questionnaire there should be clear evidence that a
developer and the planning and design team are pursuing a course that leads to the
implementation of sustainable development strategies and policies. The next focus is on the
translation of planning and design objectives in practical guidelines. PPDS again provides the
template for a performance based process which can be followed by a development team
seeking to engender sustainability in its planning and design outcomes.

4. TOWARDS PRACTICAL SUSTAINABILlTY


The following is taken from PPDS and offers information on key areas and their scope of needs
which the   development team will be required to consider and reflect in their planning and
design  decision. Sustainable master    planning is primarily concerned with the project aims,
goals and scope with respect to sustainability. At the feasibility stage of the project it is
advisable to develop a policy for an inclusive planning approach, which prioritizes sustainability,
and increases the probability that sustainable outcomes are achieved in the project. In
addition, the use of benchmarks as planning targets establishes a performance basis for master
planning, ensuring possible reductions in greenhouse gas emissions and other key areas such
as waste   and water use.


The   location   of theprecinct and its site planning with respect to regional services and
infrastructure has    major bearing on its environmental impact in terms of resource use
                      a                                                                          -




energy, water, waste and transportation. The site selection of precincts is therefore a crucial
part of achieving sustainable development. Zoning within the master plan reflects the
environmental siting of buildings and infrastructure this can have a major impact on the
reduction of native habitat and loss of biodiversity. Hence the planning and design process
should examine the loss of the natural environment to the built environment, or conversely, for
’brown field’ sites, the restoration of biodiversity and reuse of existing sites. Designing
buildings to mitigate loss of ground-based habitats should be considered.

Landscaping of the site and the creation of public open space and its relation to the building is
also an important element of microclimate control and the mitigation of heat island effects and
improvement of social amenity. Site planning should seek to minimize disturbance to the site
through changes to the topography and natural environment. This is seen as one of the major
negative impacts of development. Site development processes which include large terra
forming exercises and clear felling of vegetation are not only resource intensive but extremely
damaging to the natural environment.

Energy efficiency is now a crucial element of any development undertaki ng: be it for the short
term construction or   long term post occupancy phases. Significant levels of energy can be
consumed by a precinct’s buildings, its recreational facilities and infrastructure. An overall
reduction in energy consumed will have a positive impact on precinct energy costs and major
environmental benefits through conservation of natural resources and lowering associated
greenhouse gas emissions. Developers need to consider during master planning the principle of
sustainable energy design by taking a whole of systems view. Principles of energy conscious
design are embodied in the following objectives and include passive solar design (PSD), use of
efficient active systems, urban form design, renewable energy use and cogeneration. Urban
form design techniques should also be implemented.



Dr Richard Moore EC3 Global Earthcheck Assessor                               Copyright 2012    26

Page 74

Objectives   can   be   set    and   achieved
                                          by deriving energy from cogeneration facilities and
renewable    sources    like the sun, wind, water and  possibly hydrogen in the future. Of equal
importance is the promotion of the minimisation of water usage, and water treatment prior to
use. Water is used by residents, commercial operations, and public utilities as well as for

irrigation, cleaning, and other services such as firefighting and road washing within precincts. If
not correctly managed, the development and operation of the precinct will place pressure on
existing    water   supplies, reducing availability and affecting wildlife and           habitats.
Implementation     of water  conservation  and  management strategies     should allow  long-term
sustainability to be achieved without compromising overall operation. It is should be recognized
that water supplied to the precinct may be of differing quality to coincide with its use:
residential water supplies must be potable whereas water required for usage where there is no
public access (e.g. irrigation) does not need to be such high quality. As there is an energy and
chemical requirement associated with producing potable and higher quality water, there are
economic and environmental advantages to treating water only to the required standard.
Matching water quality with its use increases sustainability.

Increasing volumes of solid and other waste generated, together with disposal to landfills, can
generate numerous environmental impacts such as contamination of groundwater and
waterways through leachate formation, and increased greenhouse gas emissions. Solid and
other waste will be generated from precinct activities linked to travel and tourism operations
such as accommodation facilities, related retail outlets, and community activity through to
maintenance. Poor decisions at the planning and design stage could lead to levels of solid
waste generation of up to 40% of the material used during the construction of precinct
infrastructure and subsequent precinct buildings. Measures to reduce such an unacceptable
outcome need to be implemented during the planning and design stages of a development to
reduce infrastructure, building and operational waste. Further bad planning and design
decisions could lead to missed opportunities to reclaim and reuse materials generated by
enabling and operational works. Management of the likely solid and other waste is best
achieved through implementation of a waste management plan which seeks to reduce the
volume of solid waste         generated, and also adequately manage waste so that recycling and
treatment can occur efficiently.


Materials required for the building and maintenance of the precinct development will apply to
commercial, residential, community and accommodation buildings, as well as the supporting
infrastructure. Whilst new materials will continually be required for the Precinct, reductions can
be achieved, by giving consideration to reclaimed, recycled, and green materials. Materials
selected in compliance with architectural and landscaping guidelines should minimise
environmental impact. For example, the selection of locally produced materials reduces the
quantity of energy expended on transportation. This practice along with numerous other
guidelines can result in a decrease in harmful emissions and improve air quality.

Chemical usage in a precinct consists of pesticides, herbicides and cleaning chemicals. Further
this range of chemicals is increased during the construction phase. A chemical use strategy can
assist with identification of the purpose of each chemical and    can   also assist determining if a
biodegradable alternative can be utilised. Establishing    target proportion of biodegradable
                                                            a

chemicals to total chemicals will result in decreased environmental impact (contamination of
waterways), and implementation of a chemical use strategy will gradually decrease total usage
of chemicals.


Wastewater is produced from the following sources rainfall runoff from roads and pavements,
domestic residences (kitchens, bathrooms, laundries and tOilets), commercial buildings (toilets,
kitchens, car washing, etc.) and public utilities (toilet blocks, hospitals, schools etc.). The
implementation of sustainable strategies to this key area promotes the management and
treatment of wastewater in such a way that treatment requirements are reduced in terms of



Dr Richard Moore EC3 Global Earthcheck Assessor                                 Copyright 2012   27

Page 75

tankage, energy and chemical requirements, and that treated wastewater is able to be reused
for non-potable uses. There should also be promotion of applications of best practice for the
treatment of wastewater and treatment to an     appropriate standard. Treated wastewater not
recycled for non-potable use should be returned to the source, if extracted from a river, or
detained on site in a constructed wetland or other secondary use. The quality of the local
creeks, streams, and estuaries must be maintained. Runoff from the development will be
defined as that water generated through rainfall on pavements and roads and other impervious
surfaces that are not connected to rainwater tanks. As such this runoff requires a measure of
treatment before non-potable reuse as it usually has some contamination from vehicles and
animals and things like acid sulphate soils. The long term environmental sustainability benefits
to the precinct in terms of dealing with stormwater generated in the precinct as opposed to
discharging it for treatment elsewhere should be recognised.

The    final two areas make up the triple bottom line approach recommended for the
development. However they are primarily dealt with as noted before by a separate document
which focuses on quality of life guidelines. That said there will be references to the issues of
social and economic commitment in the guidelines and checklists that follow. This is due in part
to interrelated aspects of the approach and therefore requires a passing reference to be made
to them at this stage. All new or existing communities will have different characteristics
according to their history, geography and the sum of lifestyle choices made by their
inhabitants. Accordingly, this suggests that an almost infinitely extendable list of desirable
characteristics can be provided, any of which would help to make them more sustainable. Any
list that is formulated should reflect the aims and objectives of the development and act as a
checklist of its translation into what can be termed hard   or soft foundations. These foundations

or  physical and soft policies are seen as being essential to the creation of a sustainable
community leading to an improvement or maintenance of quality of life with quality of life
meaning a shared vision of the future for the whole community. Economic outcomes are
closely linked to environmental and social performance and its impact can be (as with the other
two development factors) both positive and negative. Inward investment for say foreign

currency exchange, increased employment and business opportunities are some of the possible
improvements to be seen. However, the greater dependency on foreign investment and
companies, instability in labour markets and diversion of investment from other development
areas can have detrimental effects. Achieving a well-integrated approach that creates a ’win-

win’ situation will be the major aim of a developer (Figure 10).


 Accordingly it is crucial that when
 making    decisions   environmental,
 social   and     economic     considerations
 must        be      reviewed        by      the
 development       team. There are        major
 implications regarding          outcomes         if
 the    three     are    not    given     equal
 attendance at the time of committing
 to a particular course of action. For
 example locating a building without
 due regard to its views, surrounding
 vegetation, neighboring buildings and
 access to precinct facilities will have

 major social and economic impacts.
 These impacts could be determental
 to an individual resident, and the
 community at large.



Figure 10: Social and economic value

Dr Richard Moore EC3 Global Earthcheck Assessor                               Copyright 2012   28

Page 76

S. PRECINCT PLANNING AND DESIGN STARTEGIES


At Noosa   on   Weyba opportunity to achieve a wide range of sustainable outcomes arises from
the fact that the     Developer: Northbrook has significant control over strategic planning and
design  decisions.   This  ability to direct and ultimately determine the course of the development
delivery  in  terms    of  sustainability should not be underestimated. How to use this control
effectively  is crucial and   should be aimed at supporting the planning and design team in either
encompassing      third  party criteria and/or generating their own measures. Underpinning these
measures is what Buchanan (2005)terms the ’Ten Shades of Green,13:



       Low Energy/ High Performance;

       Replenisable sources;

       Recycling: Eliminating Waste and Pollution;
       Embodied Energy;

       Long Life Loose Fit;
        Total Life Cycle Costing;

       Embedded in Place;

       Access and Urban Context;

       Health and Happiness;

       Community and Connectivity.

The outcomes from         using these shades in the implementation of a broader strategic approach
will it is believed lead to a development that has the following attribute;

       A   secure     and
                      well-designed precinct with distinctive human scale environments
       (neighborhoods)combined with the best features of a unique, rural hillside location and
       topology;
       Improved pre planning and design, construction and post occupancy management
       processes which encourage, implement and support sustainable practices;

       Empowered stakeholders able to influence decisions which impact on the quality of life
       of themselves and others.


  Precinct Sustainability at Noosa on Weyba Queensland


                                                                          14
 Key Precinct Planning and Design Management Strategies                        (after TCPA)
                                                                         ./ or x        Comments
   1     Encou rage the active         involvement of the Precincts
        existing and        new   stakeholders in   the   development
         process.

   2     Ensure that the precinct development and any related
                (i.e.
         activity            offsite    playing fields, long term
         management)         includes    a   sustainability principles
         statement in its brief.

   3    Apply       the      sustainability principles to the
                          same

        assessment of all   applications made to the Precinct
        for approval to carry out any planning, design and
        construction related activity.




Dr Richard Moore EC3 Global Earthcheck Assessor                                       Copyright 2012   29

Page 77

   4     Enforce sustainable        on-site   processes      dealing    with
         crucial   issue   such    as   waste    management, energy
         usage, construction activity etc.

   5     Make      decisions     that   are   carbon       neutral    where
         practical and seek to reduce impacts that may lead to
         climate change.

   6    All   planning and design decisions taken must ensure
        that appropriate reuse of the land within the Precinct
         particularly regarding densities.
   7    Encourage the concept of zero energy or net export
         energythrough energy efficiency, embedded energy
        generation and energy efficient supply systems
        throughout the precinct.
   S     Where practical  implement plans for the conservation
        of materials and    the promotion of locally sourced,
         recycled or sustainably managed resources.
  9      Ensure the conservation of water both              internally and
        externally of the precinct.
  10     Determine      and     implement       planning     and     design,
        construction       and     post     occupancy   management
         processes that       ensure    reductions in the impacts of
         noise, flooding and micro-climate effects.

  11     Ensure that   planning and design, construction and
        post occupancy activity conserves, protects and
        makes     best   use   of  existing  natural   systems,
        particularly in  relation to bio diversity, both within
        and adjoining the precinct.

  12     Undertake      to     implement        planning     and     design
         decisions    that     create   new     habitats    inhabited    by
         indigenous species.
  13     Facilitate and support the means by which           changes in
        behavior will lead to greater           sustainability practices
        throughout the precinct.
  14     Promote the take up     by the precincts stakeholders of
        sustainable    practices regarding energy, water, waste
        and transport.

  15    Through planning and design ensure appropriate
        development form regarding the characteristics of the
        site and surrounding area: access, proximity to
        amenities, and permeability to promote walking, use
        of public transport, useful open space and community
        security.




The outcomes from the proceeding   key strategies should raise the environmental standards of
the new precinct and make a contribution to sustainable development targets and the reduction
of emissions that contribute to climate change. They should also establish an outline for
practical steps that can be taken to achieve these higher standards by drawing together the

Dr Richard Moore EC3 Global Earthcheck Assessor                                Copyright 2012   30

Page 78

experiences of other innovative projects and assessing how much of current best practice could
be applied as the norm throughout the precinct’s delivery program.


The strategies also offer an opportunity to make recommendations to other stakeholders from
the  development and construction industry who may be involved in providing services or
undertaking specific facility provision at the precinct. Their content provides for the specific
changes to the planning, design and construction regulatory management systems needed to
ensure the best potential for achieving higher standards. This drive for higher standards in new

precincts is in order to raise public and political awareness of the practical possibilities for
making new development generally more sustainable, and the long-term benefits, both
financial and in relation to quality of life more achievable.


6. PRECINCT PLANNING AND DESIGN GUIDELINES


The  following are broad guidelines which seek to achieve and enhance in the longer term
environmental, social and economic sustainability at the development. The guidelines and
subsequent checklists form a suite of documents that start with an initial overview of
sustainability opportunities and then begin to focus on more discrete areas of planning, design
and construction of specific areas and facilities. They are by no means definitive and can be
utilized in the current form or adjusted to accommodate the inevitable changes that come from
the dynamic process that is precinct development. Further there is reference and linkage to
Earthcheck’s benchmarking and certification requirements. This is to ensure that compliance
needs and assessment data or details are noted and recorded were appropriate.


6.1 SPATIAL PLANNING


Spatial planning has a major and positive contribution to make in meeting the challenge of
sustainable forms of   development. This crucial area of development activity can through
appropriate policy decisions and directed strategies contribute to the following by:

        "Promoting the highest standards of resource and energy efficiency in the new
        development so as to reduce carbon dioxide (C02)emissions arising from construction
       and use;

        Requiring land use patterns that reduce the need and the propensity to travel by car;

        Vigorously promoting small and large scale renewable energy projects;
        Reforming or restricting development which would otherwise have a major impact on
        co2 emissions; and
                                                                  15
       Adapting to the harmful impacts of climate change".

It is also important to note that for Earthcheck there are clear objectives at this stage of the
development process. These include sustainable master planning and management practices
which are integrated into the project at an early stage of the development process with
consideration being given to activities in later phases such as building design and actual
operation. Within the PPDS Handbook16 the ability to achieve these and other objectives for
the identified Ecological Key Areas along with suggested measures are provided. Importantly
any strategy considered must not only respond to specific development needs but also to the
benchmarking and certification criteria contained in the handbook.

For example the following strategies which        are to   be found in the handbook would need to be
reflected in any guidelines or checklist formulated for the early master planning and design
phase. Strategies for Sustainable Master Planning and Design:




Dr Richard Moore EC3 Global Earthcheck Assessor                                  Copyright 2012   31

Page 79

        A  planning approach and project brief, which commits to sustainability as a major
        objective for the precinct, is necessary so the design team can implement new systems,
        methods and visions that are available to achieve sustainability;

         Establish    a    vision    forproject encompassing sustainability which involves
                                            the
        participation from the community and other stakeholders in the establishment of goals
        and objectives for the project;

        Adoption of a life cycle view for the planning and construction of the precinct;
         Formation of a      multidisciplinary planning team that deploys an integrated approach to
        coordinated       planning solutions and also involves the enabling infrastructure design and
        construction tea m;

        A  multidisciplinary team that explores the feasibility of sustainability of the planning
        strategies through the use of planning option exercises. This is necessary to
        demonstrate the environmental performance improvements predicted for the project;

        Ongoing monitoring and environmental performance appraisals are needed                       to ensure
        continuing improvement of environmental performance need;
         Use of the title agreement for the           precinct to ensure compliance with local mandatory
        and   other    voluntary      environmental standards for master       planning, building design,
        construction and operations;

        The enabling precinct infrastructure and its buildings are designed and constructed using
        environmental standards.

The practical   measures      required to achieve these broad strategies would need to be found in
the corresponding checklists and will need to reflect Earthcheck requirements amongst others.
Regarding     assessment  examples would be the development brief which should include
sustainable  goals, objectives and performance targets and the ’Community Consultation
Plan’ or quality of life guidelines which should identify how the existing and the new
community will be involved in the planning and design of the precinct. Another important
measure would be the makeup and structure of the multidisciplinary planning and design team

with regards to its experience in sustainable master planning. Also it has been noted on other
precincts that ’Architectural and Landscape Codes’ which integrate local mandatory and
other voluntary environmental standards can be successfully employed in achieving widespread
sustainability. These tools or standards are particularly powerful when the legal integration of
environmental standards within the precinct’s title is in place within such documents. They can
serve to    guide and enforce the adoption of environmental standards for the design,
construction and operations of enabling infrastructure and buildings for the precinct. Again
these would     be termed assessable documents for the eventual certification of the precinct
under the Earthcheck PPDS process.


With each of the ’Key Area Indicators and Measures’ in the handbook the predicted level of
performance should be identified             as a   target for the project. This target can be expressed
relative to a ’base case’ that is a similar project that does not include environmental measures
or a   ’best practice’ outcome where measurement or assessment of a project has taken place
and been     so described. It is worth noting that some targets are qualitative and somewhat

difficult to predict or measure accurately. Others are quantitative and as such lend themselves
to targets which for example could be to use 30% less non-renewable energy and 10%
renewable energy. These targets provide a basis for the design team who can carry out a
design options study to test the feasibility of their validity.

For the most part the content of the indicators that make up the PPDS handbook is pre-
determined. This is seen as an effective way in ensuring best practice consistency throughout
developments     undertaking          performance     based    benchmarking   and   certification.    However
indicators and       measures       can    be amended    to   accommodate local conditions of individual



Dr Richard Moore EC3 Global Earthcheck Assessor                                        Copyright 2012      32

Page 80

developments. This is because the need to integrate into a whole process view of development
will require the indicators to be able to adjust to a range of influences. In particular it will need
to respond to environmental, social and economic problems which vary greatly from area to
area as will the answers. Any amendment must be agreed so the sector benchmarking can be

adjusted to allow for accurate data measurement and interpretation.

Only the more qualitative ’Social and Economic Indicators’ which utilize commitment
templates can be significantly modified or replaced by agreement with forms that better reflect
the development and its location. It is argued that PPDS may help in the resolution of a much
broader range of issue because of its wide ’Key Area Indicator’ suite and their contents;
however it may not fully reconcile all the issues. Sustainability and planning linkages need to
be reflected in the decisions made on how best to achieve mutuality in terms of developer and
stakeholder goals, aims and objectives.


As noted, PPDS is a process based performance monitoring tool. It uses appropriate indicators
and measures as a mainstay in providing accurate information to aid in decision making,
implementation of solutions, improving planning and design and management outputs.
However it must be recognised that its indicators and measures "are not a one-time procedure
they are most useful when measured repeatedly and consistently through long term monitoring
            17
programs".     They are also useful if development targets in areas such as energy use, water
conservation and employment levels etc. are identified. Verification and possible modification of
these targets can only be achieved by such monitoring. Again the developer has recognized this
issue and has undertaken to use the development as a case study against which the proposed
content of individual indicators and measures could be tested, evaluated and amended as

required. The following are important principles of sustainable planning and design to be
employed at the development


 Precinct Sustainability at Noosa on Weyba Queensland


 Key Planning and Design Principles                                               or x     Comments


   1      Maintain close    proximity to adjoining location areas
          particularly   infrastructure and social and economic
          facilities.
   2      Ensure that ecologically sensitive areas of the
          development site are protected and enhanced
          through appropriate clustering of the precincts
          buildings and infrastructure.
   3      Create    a    philosophy   of       landscape     hierarchy to
          protect and      retain   the   character     of the    existing
          natural environment.
   4      Encourage through design the protection and
                                                                      .   .




          regeneration of the existing vegetation giVing
          particular emphasis to the use of native species.
   5      Develop the Master Plan to minimize the impacts on
          the existing landscape topology by using existing
          contours and natural features.
   6      Utilise the existing landscape for open spaces,
          wildlife protection barriers and movement corridors.
   7      Provide added value and          a   distinctive   precinct rural
          character through the       protection     of lake views and
          natural landscape features.
   8      Locate   buildings and associated infrastructure in                 a

          way that is not determental to the existing site but



Dr Richard Moore EC3 Global Earthcheck Assessor                                          Copyright 2012   33

Page 81

          has positive visual impacts on the precincts location
          and its character.
   9      Design the buildings and associated infrastructure so
          that it isappropriate to the developments location
          and character.
   10     Design buildings and associated          i nfrastructu re that
          are environmental sensitive and         sustainable.
   11    Adopt an ESUD approach regarding water treatment
          and drainage discharge.
   12     Provide significant areas of open space          providing a
          variety of uses and facilities.
   13     Ensure that there is  a wide variety of mix in the

          precincts facilities giving  due    regard to the
          surrounding social and economic profile.
   14     Provide extensive and safe        access    to the Precincts
          facilities and open spaces.
   15     Ensure through      design that there is connectivity to
          the surrounding areas.


Having determined the underlying principles that guide the development team in its
interpretation of sustainability at Noosa on Weyba the following are critical questions
regarding the nature and approach of the development team to the overall goals,
aims and objectives of the development in regards to the delivery of long term
sustainability at the precinct.

6.2 PRECINCT PLANNING AND DESIGN                    -
                                                        CRUCIAL QUESTIONS



 Precinct Sustainability at Noosa on Weyba Queensland


 Sustainable Planning and Design Questions                                          ./ or x     Comments

   1      Have environmental sustainability factors been used in the
          selection of members of the planning and design team?
   2     Are members of the development team              fully aware of the
          developments goals aims and objectives?
   3      Is the    planning and design         process   designed     to   allow
          active    communications        and   balance   between      program
          needs and   long term investments in sustainable precinct
          development?
   4      Is innovative and possible alternative planning and design
          solutions being investigated and encouraged?
   5      Has a full economic and social profile been carried out to
          ensure appropriate      mixed   use zoning at the precinct?

   6     Are    financial    options and    incentives    for    en vi ron mental

          sustainability limited?
   7      Has   a   full    and   comprehensive ecological         study    been
          undertaken at the Development site and surrounding area?
   8      Has thirdparty benchmarking and certification based on
          performance outcomes been introduced into the planning
          and desiqn process?
   9      Has a site specific evaluation of the local ecosystem,
          landscape particularly native tree species and plants been
          undertaken?



Dr Richard Moore EC3 Global Earthcheck Assessor                                           Copyright 2012   34

Page 82

  10      Is there a      policy to provide a greater area of open space,
          public       landscaped areas and protected bio diversity
          corridors?
  11      Will   a   low site disturbance ratio and             building footprint be
          achieved at the precinct?
  11      Has a life        cycle costing exercise regarding the long term
          sustainability of the precinct been undertaken?
  12     Are green energy, renewable energy                     options and energy
          efficiencies beinq actively pursued?
  13     Are     the     energy use         interactions       between
                                                         daylighting,
          lighting,       mechanical            and   natural
                                                  ventilation  being
          investigated and integrated in the planning and design
          process?
  14      Is solar orientation of buildings and infrastructure being
          used to reduce the energy requirements of the precinct?
  15      Will       production         methods       and     material      sources    be
          investiqated to ensure low enerqy profiles?
  16      Will   strategies to reduce carbon emissions at the precinct
          be introduced?
  17      Is   the     precinct giving consideration             to    a   Sustainable
          Urban Drainage system?
  18      Will water treatment be undertaken                   on   site or discharged
          to existing offsite infrastructure?
  19      Is     the        potential     for     recycling     grey       water    being
          investigated?
  20      Is   harvesting   of  rainwater   for  open                      spaces     and
          infrastructure landscaping being considered?
  21     Has water conservation been explored with the local
         supply authority?
  22     Is a Waste Management Plan to be developed for the
         precinct?
  23     Is a policy of seeking out and using recycled materials to
         be pursued at the precinct?
  24     Are design strategies to be developed to reduce the
         quantity of new materials being used at the precinct?
  25     Are green purchasing policies being developed for use at
          the precinct?
  26      Will   material       production methods be checked for their
          environmental impacts?
  27     Are  designs to be developed using pre fabrication and
         component technology?
  28     Is a Chemical Usage Strategy to be developed at the
         precinct?
  29     Is an environmentally friendly pest control strategy to be
         developed for the Precinct?
  30     Are Arch itectu ra I and Landscape Guidelines to be
         developed which include performance covenants.
  31     Is a ’Quality of Life’ or Community Consultation Plan
          to be developed?
  32      Is there      a    clear strategy for economic investment in the
          precinct and adjoining r~ion?
  33      Is there a clear         strategy for educational provision at the
          precinct?
  34      Is there a clear strategy for travel and tourism activity at


Dr Richard Moore EC3 Global Earthcheck Assessor                                             Copyright 2012   35

Page 83

          the precinct?
  3S      Is there a clear strategy for commercial and retail activity
          at the precinct?
  36      Is there a clear strategy for the arts and spiritual needs of
          the precinct?
  37      Will a Construction     Management Plan be developed for
          Infrastructure Implementation?
  38      Will a Construction     Management Plan be developed for
          building implementation?
  39      Will a Post Occupancy Management Plan and structure
          be developed for the precinct?
  40      Will a policy be developed to encourage connectivity with

          local and regional stakeholders?
  41     Are    the   developer and the planning and design
          development team engaged for long term commitments to
          the precinct’s development?




6.3 PLANNING, DESIGN AND CONSTRUCTION CHECKLISTS


Having given regard to crucial questions regarding strategies and actions emphasis is now on
delivery. It is proposed in the following ’Sustainability Checklist’ be used to determine initial
global performance targets and the means and opportunities for achieving sustainable
outcomes on major elements of the precinct profile. The checklist will be aimed at the built
environment in terms of building structures and associated infrastructure such as cycleways
and roads. Also it will seek to identify opportunities associated with the structural landscaping
which includes regeneration of existing natural areas and newly created open spaces. The
checklist will only note social and economic opportunities where linked or appropriate. Again
these areas should be read in conjunction with the quality of life guidelines. Whilst there may
be some repetitiveness between the checklist and the earlier guidelines in the propositions this
is unavoidable as similar goals, aims and objectives transcend the various development phases
and use sectors of the precinct. Also it is deemed an advantage because consistency of
approach is important particularly where on such large scheme as Noosa on Weyba a variety of
professional teams may be employed to undertake specific planning and design tasks i.e.
educational provision and healthcare facilities. The main mixed use areas are:

       Infrastructure Structural Landscaping and Open space;
       Recreational and Leisure Facilities;

       Community Facilities;
       Residential Tenures.

The following guidelines offer themes for an overall response to the needs of environmentally
sustainable planning, design and construction (After LBR).18



 Precinct Sustainability at Noosa on Weyba Queensland


 Major Sustainability Themes                              Comments                         ./ or x


   1      Environmental Rating          Obtain Earthcheck PPDS Certification.
   2      Site Investigation            Investigate any potential contamination and the
                                        soil quality on site.
   3      Site Ecoloqy                  Undertake ecoloqical assessment.
   4      Energy Saving                 Design buildings and infrastructure services for
                                        minimum energy use.



Dr Richard Moore EC3 Global Earthcheck Assessor                                Copyright 2012   36

Page 84

   5      Renewable Energy              Reduce predicted site C02 emissions through the
                                        use   of on site renewable energy.
   6      Construction Materials        Specify     environmentally-friendly           construction
                                        materials.
   7      Water Saving/Recycling        Use   water   conservation        devices and     recycling
                                        techniques
   8      Recycling                     Provide internal/ external recycling facilities.
   9      Surface Water Run Off         Prevent water      pollution and      overbu rdeni ng    of
                                        new and existing drainage systems.

  10      Microclimate                  Desiqn out neqative microclimatic effects.
  11      Public Transport              Facilitate theuse of public or green transport

                                        throughout the precinct.
  12      Cycling and Walking           Ensure development design encourages cycling
                                        and walking.
  13      Green and Open Spaces         Enable easy access to the natural environment/
                                        open spaces and provide new and enhanced
                                        green.
  14      Security                      Adopt best practice in the secure design of the
                                        development.
  15      Liqht Pollution               Mitiqate liqht pollution.
  16      Flood Resistant               Apply the principles of flood          resistant    design
                                        (where applicable)
  17     Access                         Ensure     that the      all   buildings and    associated
                                        infrastructure are accessible to all.
  18      Construction Process          Reduce adverse impact of construction process
                                        on quality of site and its surroundings.

The following  guidelines offer fuller descriptions of the possible approaches to be adopted in
achieving sustainability at throughout the development:

 Precinct Sustainability at Noosa on Weyba Queensland


 Broad Sustainability Actions           Comments                                                      "or x

   1     Adopt a human scale or         Optimize use of exterior and interior space
         ’smaller is better’ design     through careful design so that the overall
          approach.                     building   and     associated     infrastructure
                                        dimensions and resource use in constructing and
                                        operating them are kept to a minimum.
   2      Design energy efficient       Use high quality low maintenance materials, high
          buildings and                 levels of insulation, high-performance    windows,
          infrastructure.               choose   glazing with low solar heat gain and
                                        design for tight fit construction to achieve energy
                                        efficiency.
   3      Design buildings and          Use   passive solar heating, daylighting, and
          associated                    natural cooling which can be incorporated cost-
          infrastructure to use         effectively into most buildings. Also consider
          renewable energy where        solar water heating and photovoltaic or design
          appropriate.                  buildings for future panel installation. If wood
                                        heating is an option, specify a low-emission
                                        wood stove or pellet stove.
   4      Optimize material use.        Minimize waste by designing for standard sizes.
                                        Avoid     waste   from
                                                           structural over-design (use
                                        optimum-value engineering/advanced framing).


Dr Richard Moore EC3 Global Earthcheck Assessor                                           Copyright 2012   37

Page 85

   5      Design water-efficient,       Conventional       grass      have a high impact
                                                                    areas

          low-maintenance               because      of     water
                                                                use, pesticide   use,   and
          landscaping.                  pollution generated    from   mowing. Landscape
                                        with    drought-resistant    native    plants   and
                                        perennial groundcovers    and   use  water   release
                                        materials such as ’Terracottom’.
   6      Make it easy for              Make provisions for storage and processing of
          occupants to recycle          recyclables, recycling bins near the open spaces
          waste.                        malls and residential neighborhoods.

   7      Look into the feasibility     Water that has been used can be recycled for
          of graywater and roof-        flushing toilets or irrigation. Consider designing
          top water catchments          rooftop water catchments areas for outdoor
          systems.                      watering.

   8      Design for future reuse.      Make all structures adaptable to other uses, and
                                        choose materials and           components that can be
                                        reused or recycled.
   9     Avoid   potential health       Plan electrical wiring and
                                                                 placement of electrical
          hazards: emf,                 equipment      to         electromagnetic field
                                                             minimize
          pesticides.                   exposure. Design insect-resistant detailing that
                                        will require minimal use of pesticides.
  10      Renovate older                Renovate      or   relocate any existing buildings or
          buildings.                    infrastructure      on the site or to suitable offsite

                                        location.
  11      Evaluate site resources.      Carry out a careful site evaluation; solar access,
                                        soils veqetation, important natural areas etc.
  12      Locate buildings to           Cluster buildings and associated infrastructure or
          minimize environmental        build units to preserve open space and wildlife
          impact.                       habitats,   avoid  especially sensitive  areas

                                        including wetlands, and keep roads and service
                                        lines     short.   Leave      the   most      pristine   areas

                                        untouched, and        look for      areas    that have been
                                        previously damaged to build on.
  13      Give due attention to         Reduce energy use by orienting buildings and
          solar orientation.            associated infrastructure to make optimal use of
                                        passive solar heating, daylighting, and natural
                                        cooling.
  14      Situate buildings to          Correctly oriented trees on the sides of a
          benefit from existing         building can dramatically reduce cooling loads.
          and proposed                  Hedge rows and shrubbery can block cold winter
          landscaping and               winds or help channel cool summer breezes into
          vegetation.                   a building.

  15      Minimize transportation       Locate buildings and infrastructure to provide
          requirements.                 access to public transportation, bicycle paths,

                                        and walking access to basic services. Commuting
                                        can   also be reduced by working at home.
                                        Consider home office needs with layout and
                                        wiring.
  16     Avoid ozone-depleting          Whilst CFC’s have largely been              phased out, their
          chemicals in mechanical       primary replacements HCFC’s may also damage
          equipment and                 the ozone layer and should be avoided where
          insulation.                   possible.
  17      Use durable products          Because manufacturing is very energy-intensive,
          and materials.                a  product that lasts longer or requires less
                                        maintenance         usually    saves    energy.      Durable


Dr Richard Moore EC3 Global Earthcheck Assessor                                             Copyright 2012   38

Page 86

                                        products also contribute less to our solid waste
                                        problems.
  18      Choose building               Relative energy intensity of various materials (by
          materials with low            weight) is as follows: *Lumber=l *Brick=2
                                19
          embodied energy.              *Cement=2 *Glass=3 *Fiberglass=7 *Steel=8
                                        *Plastic=30 *Aluminum=80.
  19      Buy locally produced          Transportation is costly in both energy use and
          building materials            pollution generation. Look for locally produced
                                        materials (local softwoods or hardwoods, for
                                        example) to replace products imported to your
                                        area.

  20      Use building products         Building products made from recycled materials
          made from recycled            reduce   solid    waste   problems, cut energy
          materials                     consumption    in   manufacturing, and save on
                                        natural resource use.
  21      Use salvaged building         Reduce        landfill   pressure     and     save       natural
          materials when                resources by using salvaged materials: lumber,
          possible.                     millwork,   certain  plumbing    fixtures,  and
                                        hardware, for example. Make sure these
                                        materials are safe (test for lead paint and
                                        asbestos), and don’t sacrifice energy efficiency
                                        or water efficiency by reusing old windows or

                                        toilets.
  22      Minimize use of old-          Avoid lumber products produced from old-growth
          growth timber.                timber when   acceptable alternatives exist. You
                                        may     not   need
                                                        clear narrow- grained cedar or
                                        redwood siding, for example, when using an
                                        opaque stain or paint as long as proper detailing
                                        is used to avoid         rot.   Laminated wood timbers
                                        can    be substituted for         old-growth Douglas fir.
                                        Don’t     buy tropical hardwoods unless the seller
                                        can    document that the wood           comes     from well-
                                        managed forests.
  23     Avoid materials that will      Solvent-based   finishes, adhesives, carpeting,
          off gas pollutants.           particleboard, and many other building products
                                        release   formaldehyde and      volatile  organic
                                        compounds (VOC’s)into the air. These chemicals
                                        can affect workers’ and occupants’ health as well

                                        as contribute to smog and ground-level ozone

                                        pollution outside.
  24      Minimize use of               Use  detailing that will prevent soil contact and
          pressure-treated              rot. Where possible, use alternatives such as
          timber.                       recycled plastic lumber. Take measures to
                                        protect workers when cutting and handling
                                        pressure-treated    wood, and     avoid   burning
                                        scraps.
  2S      Minimize packaging            Avoid      excessive      packaging, such         as    plastic-
          waste.                        wrapped        fixtures    or     fasteners    that       aren’t
                                        available in bulk.
                                                         Suppliers to be instructed to
                                        avoid over-packaged products. However keep in
                                        mind that some products must be carefully
                                        packaged to prevent damage and resulting
                                        waste.
  26      Install high-efficiency       Use       well-designed         high-efficiency      furnaces,
          heatinq and coolinq           boilers     and    air   conditioners    (and distribution

Dr Richard Moore EC3 Global Earthcheck Assessor                                                Copyright 2012   39

Page 87

          equipment.                    systems) which not only save building occupancy
                                        costs, but also produce less pollution during
                                        operation. Install equipment with minimal risk of
                                        combustion    gas    spillage, such as sealed-
                                        combustion appliances.
  27      Install high-efficiency       Fluorescent lighting has improved dramatically in
          lights and appliances.        recent     years   and   is   now   suitable for homes.
                                        High-efficiency appliances offer both economic
                                        and    environmental   advantages over their
                                        conventional counterparts.


  28      Install water efficient       Water-conserving         toilets, shower    heads, and
          equipment to all              faucet aerators not only reduce water use, they
          buildings.                    also      reduce   demand      on septic systems or
                                        sewage treatment         plants. Reducing hot water
                                        use    also saves energy.

  29      Install mechanical            Mechanical   ventilation is usually required to
          ventilation equipment.        ensure  safe, healthy indoor air. Heat recovery
                                        ventilators are preferred in cold climates because
                                        of energy savings, but simpler, less expensive
                                        exhaust-only    ventilation   systems are      also
                                        adequate.
  30      Protect trees and topsoil     Protect trees from        damage during construction
          during sitework.              by fencing     off the   "drip line" around them and
                                        avoidinq major chanqes to surface qrade.
  31      Avoid   use of   pesticides   Look into less toxic termite treatments, and keep
          and other chemicals           exposed    walls   free   from   obstructions  to
          that may leach into the       discourage insects. When backfilling a foundation
          groundwater.                  or grading around a house, do not bury any

                                        construction debris.
  32      Minimize job-site             Centralize    cutting operations      to   reduce waste
          waste.                        and simplify sorting. Set up clearly marked bins
                                        or trash cans for different types of useable waste

                                        (wood scraps for kindling, sawdust for compost,
                                        etc). Find out where different materials can be
                                        taken for recycling, and educate construction
                                        companies about recyclinq procedures.
  33      Make your Precinct and        Make the precinct as energy efficient as possible
          associated business           for example during construction purchase energy
          operations more               efficient vehicles arrange carpools to job sites,
          environmentally               and schedule site visits and movement on or to
          responsible.                  site to minimize unnecessary driving. In post
                                        operational management pool purchase recycled
                                        office paper and supplies.


The following guidelines provide further details of opportunities of sustainable inputs and
outcomes for specific building types and product selection:


       Apartments and hotel/apart rooms, residential lots and buildings;
       Community buildings;
       Materials, products and services.

The guidelines provide a range of planning and design decisions and practices that are felt to
be appropriate in seeking to implement sustainable principles into the major building types to


Dr Richard Moore EC3 Global Earthcheck Assessor                                        Copyright 2012   40

Page 88

be constructed at Noosa on Weyba. They are not definitive and other measures can be added
to the  list at any time during the total development process. What is important is the
recognition that the guidelines need to remain dynamic in that as the precinct evolves over
time practices may change particularly as technology improves or legislation is enacted.


Further other developers and design teams may take responsibility of individual building inputs
at the development. It is important that recognition is given to the common           goals, aims and
objectives of the precinct not an individual project. Accordingly the measures are not a once off
action but   are   intended to achieve best       practice within the limitations of today. Further the
checklists do not in any way mitigate responsibility toward statutory requirements. This is
important because Queensland has specific legislation covering residential building in particular.

Therefore the   following checklists are for initial use by the developer and individual house
builders  providing a one off design and build package. This checklist will need to be read in
conjunction with the Noosa on Weyba Architectural and Landscaping Design Guidelines
and the local authority’s specific requirements which are additional to the developer’s initial
sustainability considerations. This is important matter because all new home building in
Queensland requires specific certificate submissions with their development application.


 Precinct Sustainability at Noosa on Weyba Queensland


 Apartments        -
                       Sustainability Checklist (After TVslo                Comments                or x


   1       Location:
           Close to public transport and road networks
           Close to workplace and shoppinq facilities
           Close to family and friends
           Access to communal spaces within complex
           Access to open spaces and recreational facilities
   2       Orientation
           Windows accessible to daylight
           Prevailinq breezes to be captured by openinqs
           Cross ventilation where possible used
           Sun shadinq to windows and verandahs
           Insulation to cool, heat and reduce noise sources
           Views and privacy are considered
   3       Access
           Easy access for people of all abilities
           Good lighting to entry ways and car-parking
           Easy access for furniture placement
           Safe vehicle and bicycle access to site
           Wide doorways and corridors
   4       Safety
           Security to doors and windows
           Circuit breaker to electrical switchboard
           Slip resistant access ways
           Smoke detectors
   4       Design and Maintenance
           Calculate and achieve statutory sustainability targets
           Apartment desiqned to be refurbished easily in future
              .        accessible paintwork
              .
                       interchangeable doors,



Dr Richard Moore EC3 Global Earthcheck Assessor                                    Copyright 2012     41

The text continues on page 89.

Used in these records

About this file

File size
86.5 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Part 22 of 37 Appendix 20 - Earthcheck MCU12_0208.pdf · 86.5 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.