Council archive · source document
Part 22 of 37 Appendix 20 - Earthcheck MCU12/0208
Very large file (86.5 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
r SCC CORRESPONDENCE
Place barcode here
1111111111111111111111111
80602709
Part d.~Of Sl
Deve: _
.,
. <
Application number: \V\L’-.)\ ~ (O:J.,(jt!
2 0 Cc:: 7. 0~7.
C:lDocumerts and SettingslejelDesk"toplMulti Pan Record Cover Sheet NEXT PART (3l.doc
,..,. .......~l~....l__....
I
I
Box: .c:??\~.’1R: ...~......
~
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of pages 2 to 88 (of 127)
Page 2
2012
THIS IS TO CERTIFY THAT
NOOSA ON WEYBA
HAS BEEN ASSESSED AND CERTIFIED AS MEETING THE REQUIREMENTS
OF THE EARTHCHECK PRECINCT PLANNING & DESIGN STANDARD
ASSESSED IN NOVEMBER 2012
CHAIRMAN
www.earthcheck.org the planet deserves more than half measures
Page 3
ec:~)
EVAlUATE COMMUNICATE EVOLVE
EARTHCHECK
Environmental Sustainability
Development (ESD)Analysis
NOOSA ON WEYBA QUEENSLAND AUSTRALIA
Noosa on Weyba Concept Master Plan and Documentation Analysis
Dr Richard Moore November 2012
11/30/2012
Page 4
INTRODUCTION
Noosa on Weyba achieved Earthcheck Certification using the EC3 Global Precinct Planning
and Design Standard (PPDS)for Ecological Performance Improvements on large mixed use
developments. PPDS is an integrated tool which is the significant outcome from 5 years of
research and testing at The Centre for Sustainable Design -
University of Queensland.
The work is a federally funded initiative with the Sustainable Tourism Cooperative Research
Centre (STCRC) and is undertaken in collaboration with EC3 (Earthcheck) and several
industry partners. The integrated tool provides organisations with environmental design
frameworks, energy and water models, social and economic guidelines and checklists. These
enable the assessment of the development and its operations in terms of outcomes and overall
enhancement of total ecological or ’triple bottom line’ performance.
For Noosa on Weyba to achieve an Industry Best Practice level it gave environmental,
social and economic commitments to establish a set of ’Environmentally Sustainable
Development’ (ESD)related goals to assist in aligning its development outcomes with ethical
and socially responsible business principles. These have been translated into the following
’ESD Analysis’ which provides an overview of the general criteria, specific issues and major
initiatives for this large mixed use precinct.
For a more detailed report see -
Moore R, 2012: Noosa on Weyba PPOS Assessment
Certification Report, EC3 (Earthcheck)Brisbane Queensland Australia.
2
Page 5
CORE PRECINCT INITIATIVES
ENVIRONMENT
Criteria Specific Issue Major Initiative
Noxious Species All noxious environmentally
or invasive species to be
Flora and buffer
progressively removed generally in bushland zones
Fauna
abutting the proposed urban footprint and in areas of future
compensatory planting.
Exotic Species Existing horticultural plantings of exotic species will generally
be removed as described above, except where they are not
environmentally invasive and have positive values in terms of
fauna habitat or food, aesthetic significance or
heritage/cultural conservation values.
Landscape Low total impermeable site coverage.
Planting
Major regeneration plan for 8 hectares of environmentally
valuable land that has previously been cleared for rural
pursuits.
A vegetation management plan involving thousands of new
trees, flora and fauna protection (most of which are rare),
threatened or native habitats linked to a planting strategy
throughout the precinct aimed at the mitigation of emissions
creating a carbon neutral residential development.
The landscape design and species selection to optimise year
round microclimate moderation.
Species requiring minimal watering once established will be
selected.
No synthetic fertilisers, herbicides or pesticides will be used.
In ground water saving and natural fertilizer products will be
used in all new landscape planting throughout the precinct.
Only recycled content compost, soil conditioners and mulches
made to Australian Standards AS4454, AS 3743, AS 4419 will
be used.
Animals Native Reforestation and propagation of local native flora and fauna
and habitat pathways to encourage wider biodiversity
particularly Koala and other native animal species.
A ’Chemical Use’ plan for construction and post-occupancy
phases which dispenses with a need for the broad use of
surface fertilizers on infrastructure and open space.
A set biodegradable chemicals use target for cleaning
chemicals, pesticides, and herbicides to be employed
throughout the precincts educational, resort, retail and
commercial buildings.
3
Page 6
Pets Numbers and types of domestic animals will be controlled
under the requirements of the precincts Community Title
Scheme. All marketing material and individual strata titles will
clearly indicate that domestic animals will be controlled by the
CTS particularly breeds predisposed to hunting.
Pests Insects Buildings will be sealed and caulked and points of entry will be
protected by adequate mechanical means from insect and
pest entry.
Properly fitting door seals will be provided on all exterior and
exposed hallway doors.
Implementation of an environmentally sensitive program
regarding mosquito and insect control.
Landform Cut and Fill Excavations and cut and fill operations are limited to the
minimum practicable with natural landforms being preserved
or reinstated to the greatest degree practicable whilst
Flooding and ensuring minimal impact occurs to the local community.
Drainage
Improvements to the existing flooding classification of the site
with no reduction in the flood storage capacity of the site,
whilst also improving the flood free access & egress for the
adjoining community.
Water Conservation and Roof water will be captured and directed to rainwater tanks
impervious areas for re-supply into precinct non potable water systems.
Rainwater tank overflow in storm events will be directed to
gravel infiltration trenches and dams and then infiltrated into
the groundwater system via discharge onto the proposed
future landscaping and environmental restoration areas.
No impervious areas will connect directly to the drainage
system. All such areas will be drained via:
Rainwater tanks;
Grassed bio-retention swales, buffer strips and basins;
Porous driveways;
Gravel infiltration trenches; or Infiltration basins and
dams.
Gravel infiltration trenches and dams will fully contain the
’first flush’ from all car parks and driveways.
All drainage paths will be vegetated.
Water Quality Construction works to be guided by a comprehensive soil and
water management plan.
Discharge of storm water from the precinct will not exceed the
following ’pre-development’ criteria and in fact the developer
proposes that the project will improve the quality of
stormwater runoff.
4
Page 7
Ground Water Ground water will not be extracted or used for any purpose.
Sewage Treatment No sewage will be stored, treated or disposed of on-site to
and Disposal ensure that the adjoining environmental zones are protected.
All sewage will be piped via a new rising main to be
constructed and linked to the existing Noosa sewage
treatment plant facilities.
Potable Water Potable water will be obtained from an improved existing town
supply main, however the proposed 100% capture and reuse
of roof stormwater will reduce town supplied potable water
use by 25 to 30%.
Water Reticulation The water reticulation system for the precinct will include both
a potable town water system and a separate system for the
reticulation of reclaimed water from the:
-
100% capture and reuse of all roof water.
Appliances Only the highest star rated appliances that are commercially
available (preferably 5 star) will be installed.
Only low flow (91/min)shower heads and aerating taps will be
installed.
AAA rated water fixtures to be used throughout the resort
hotel and promoted in all precinct dwellings.
Hot Water Throughout the precinct all public buildings and facilities will
have gas fired or solar HWS systems. Owner occupiers will be
encouraged to also use energy efficient gas fired or solar HWS
systems in their property designs.
Toilet Flushing Encouragement for the use of rainwater tanks (boosted by
town water if required) will be used for toilet flushing.
Only dual Flush 6/31 toilets will be installed in public buildings
and facilities.
Landscape Irrigation systems will be water efficient drip type with
Irrigation automatic timers and rain/soil moisture sensor shut offs.
Town water will NOT be used for irrigation.
Reclaimed stormwater from the Integrated Water Cycling
Management system will be used.
Construction All Buildings Lightweight, prefabricated, modular building techniques will
be used wherever practicable to minimise site disturbance.
Works Construction works will be guided by a comprehensive soil
and water management plan.
5
Page 8
Wherever removed, existing topsoil on site will be stockpiled
and rehabilitated for reuse, except where so doing may cause
weed reinfestation.
Potential disturbance of acid sulphate soils is reduced by using
screw piled foundations and minimising excavation depth for
sewerage reticulation and other utility services, plus the
terrain of the precinct dictates a very low risk of Acid Sulphate
contamination.
Energy Power The precinct will be connected to the mains power grid, but
will incorporate photovoltaic panels on roofs throughout the
precinct where ever practical to do so.
Lighting Natural lighting by building design will be optimised.
Mean lighting power density will not exceed 2.5Wjm2jlOOlux.
All external lighting will have a maximum upward component
of 2%.
The use of LED lighting will be promoted where suitable, such
as in Common Area lighting.
Comfort Climatic comfort is provided by passive ventilation design and
ceiling fans.
Landscape and precinct design to optimise access to winter
sun and summer shading.
All dwellings to be naturally cross ventilated and oriented to
capture cooling south -
easterly summer breezes.
Air conditioning use will be kept to a minimum by smart
design and building covenants.
Hot Water Hot water will be supplied from energy efficient HWS.
Heating will be provided by gas boosted solar panels or direct
gas heating where possible.
Cooking Gas cooking appliances will be used (subject to gas supply
authority approval).
Appliances Only the highest star rated appliances that are commercially
available (preferably 5 star) will be installed.
Cogeneration Opportunities for the implementation of energy cogeneration
will be examined and implemented were appropriate.
Resources Materials Development of specific ’Precinct Architectural and
Landscaping Guidelines’ for residential building which offer
advice on how to minimize environmental impacts.
Construction materials and products will be selected based on
balancing the following environmental criteria:
6
Page 9
Recyclability
Sustainable sourcing
Embodied energy
Pollution from manufacturing
Transport cost and local availability
Durability and maintenance
Toxicity
Eco-Iabelling and certification
Total life cycle energy use
The proposed buildings adopt a light weight architectural style
that minimises the quantity of building materials employed in
their construction.
Fuel Wood fuelled heaters will not be permitted.
Noise Sleeping areas of dwellings will be oriented away from roads
and noise generating uses in other precincts.
Demolition Waste At least 70% by weight of any demolition material will be re-
used or recycled, subject to local recycling availability.
An on-site recycling system will be implemented for
demolition waste materials (timber for re-use, concrete and
bricks for crushing and steel and copper for recycling)
Waste Collection The precinct will be served by a common garbage system
provided by council with separate bins to permit two-way
recycling of waste.
’Green’ Waste All common property landscape green waste will be mulched
for on-site re-use, unless contrary to an adopted Management
Plan (e.g. noxious weed removal)
Sewage A low and high pressure pumping system will collect sewage
from each suite in the precinct and pipe it to the local
council’s sewerage treatment plants.
SOCIAL
Archaeology Aboriginal If required, regular inspections will be undertaken by suitably
qualified personnel during any land surface disturbance.
If any aboriginal relics or sites are encountered, then the
project archaeologist will be immediately informed. Work in
thevicinity of the relic or site will cease until appropriate
management strategies are developed and required permits
obtained.
7
Page 10
Character Low scale village character consistent with unique lakeside
setting.
Quality of Life Specific ’Quality of Life’ Guidelines developed for the precinct
which recognises the developments socio-economic goals.
Movement The precinct will be provided with secure dedicated bicycle
and electrical buggy pathways and parking stands located in
safe, highly visible locations, to minimise the use of motor
vehicles.
Traffic Safety and Appropriate low speed limits and road designs will apply
Air Quality throughout the precinct to protect wildlife.
Crime and Public All public areas have been designed, and will be detailed and
Safety lit in response to crime prevention through design
recommendations.
The project will include on site security as part of the
Community Title Scheme
Noise and Visitor Sleeping rooms in the precincts apartments will be oriented
Comfort away, and/or will be screened from sources of noise such as
car parks, plant and outdoor dining/activity in other precincts.
Education Programmes An induction program will be provided for all staff explaining
the ecological sensitivities of the site, the environmental
sustainability initiatives of the precinct and how to do their job
sensitively. Future owners and visitors will be provided with a
’Precinct Information Pack’ explaining:
./ The ecological sensitivities of the site.
./ Implementing the environmental sustainability
initiatives of the precinct.
./ Bushfire Evacuation Plan.
Additional copies of the handbook will be publicly available
from the precinct manager. Controls over resident and guest
access and use of environmental areas will be embedded in
the CTS By Laws.
ECONOMIC
Investment Inward Income Part of the community title contribution revenue will be
payable to the body corporate to fund
ongoing management
of the public domain, community facilities and bushland and
wildlife management.
The precincts will augment patronage of businesses in the
adjoining town centres, local markets and shopping malls and
individual shops, restaurants and other retail/commercial
facilities.
8
Page 11
Income generation for the area will flow from the precincts
Area Income
fixed community and visitors in the form of rates, use of
services and patronage of regional facilities.
Employment Opportunities Local employment opportunities will be created in both the
construction and ongoing management stages, particularly as
managed facilities will lead to employment in a range of
servicing capacities.
Ecological Performance The ongoing environmental, social and economic sustainability
of the precinct will set a new benchmark for environmental
performance in the Noosa region and reinforce the marketing
of Noosa on Weyba as an ’ecological’ lifestyle change
community and destination.
Community Tenure and The proposed Community Title and Strata Title system of
Ownership tenure will establish a body corporate (or similar) that can
equitably administer the levying and expenditure of funds
required to manage common property, administer precinct
facilities, provide security, and implement ongoing
environmental management programs in the conservation
precinct whilst also policing the environmental protection By
Laws 24/7 via full time on site management.
Funding Revenue Revenue generated by the Community Title Scheme levies
Generation withinthe precinct will contribute to the long term
management of the rehabilitated environmental areas and
costs associated with the public domain and community
facilities.
c
( -( ( ~l
c::::
EVALUATE COMMUNICATE EVOLVE
9
Page 12
ec
EVALUATE COMMUNICATE EVOLVE
Quality of Life
EARTHCHECK
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright August 2012
Page 13
The Development of a Sustainable Precinct
Community
Content:
Goals, Aims and Objectives
Promoting ’Quality of Life’
’Quality of Life’ Guidelines
Improving ’Quality of Life’
Creating the Foundations
Evaluation
[GOalS, Aims and Objectives
I
The proposal is to build a lifestyle precinct creating some 844 new dwellings which will be a
combination of private residences, townhouses, retirement/aged dwellings and apartments. All are
to be built within several distinct neighborhoods, around local open spaces and green squares. The
Precinct facilities include large areas of public and protected parks, extensive footpaths and
cycleways, a community centre/club house with leisure and recreational facilities. The site
encompasses some 303 hectares of land located on the shores of Lake Weyba and adjoining the
Noosa Heads National Park. The precinct is near the iconic resort of Noosa and market town of
Eumundi. Also close by is Tewantin which offers access to the Great Sandy National Park. At the
north end of the Sunshine Coast Queensland the area is renowned for its scenery and excellent
climate. It’s close to the popular tourist destinations of Caloundra and Maroochydore and enjoys
good road links to the growing Sunshine Coast Airport, the University of the Sunshine Coast and
the State Capital Brisbane. There is a vibrant local retail and commercial sector, high standards of
mixed tenure of residential housing and hospitable accommodation supported by a large
infrastructure of recreational facilities including shops and restaurants. It is a sought-after
destination with lush hinterland and a number of internationally renowned beaches complimented
by bays and coves.
In planning and designing the precinct there is an overriding goal of improved ecological
performance. This has arisen from the Developer (Mantle) who is seeking to implement
’sustainability’ throughout the delivery process aimed at creating an iconic master planned
community using world best practice urban design principles. This it is believed will lead to the
precinct known as ’Noosa on Weyba’ becoming a good place to live, raise families, retire to and
or simply visit. Residents and visitors will be able to enjoy a healthy lifestyle within an environment
that provides both privacy and quiet along with opportunities for safe and possible inspiring
interaction with others. It is to be a place that will also encourage respect for the environment and
its bio diversity. To adhere to these aims, goals and objectives Earthcheck have created a series
of ’Quality of Life’ guidelines and checklists. These set the direction for the planning, design and
construction of the precinct and its facilities. They also seek to create the means by which
environmental, social and economic integration and equity can be achieved to the benefit of all the
precincts stakeholders. It is believed that this approach will create a high quality, well designed
and managed place. This outcome can playa crucial role in promoting individual well-being and
contribute positive social, economic and environmental value to the precinct providing benefits of
specific dimensions of quality of life such as health, safety and economic well-being.
2
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright August 2012
Page 14
l Quality of Life J
Promoting Community ’Quality of Life’
(l)
INTRODUCTION
One of the key aims of a residential precinct development should be the promotion of a better
’Quality of Life’ for all of the eventual community stakeholders. Problematic is no true definition
of ’Quality of Life’ exists. Clarity would make the task of determining what measures are
needed to ensure its achievement much easier. For this proposal ’Quality of Life’ means a
general subjective feeling or attitude towards qualitative aspects of the physical or built
precinct and the softer social dynamics of the precinct. These feelings will reflect on their
characteristics and excellence in achieving the goals, aims and objectives noted earlier. In the
following ’Quality of Life’ plan (See Figure 1) are long held headline indicators universally
common to virtually all industrialised nations. They present a possible framework approach
which can be formulated to the issues of what constitutes ’Quality of Life’ at Noosa on Weyba.
Community Safety
Transport Health
The Built Environment Housing
Quality
Waste
of Equalities & Welfare
Energy,Water and Pollution Life Jobs, Skills & the Local Economy
Nature Conservation Arts and Heritage
Leisure
and Recreation
Figure 1 Quality of Life Plan
How these headline indicators diffuse into the precincts community and individual consciences
is of importance to the suggestion that ’Quality of Life’ can be measured under an independent
third party benchmarking and certification process. It is the intent of the Developer to seek
certification of Noosa on Weyba by undertaking a sustainability assessment by EC3 Global
(Earthcheck) an international research body, which strives amongst other things for
sustainability in precinct development. It’s Precinct Planning and Design Standard
(PPDS}l is an internationally recognised standard developed at the University of Queensland
and University of New South Wales, in conjunction with the Sustainable Tourism Cooperative
Research Centre (STCRC) of Australia. This Standard underpins the global affiliation,
benchmarking and certification programmes of Earthcheck. The Standard seeks to interpret
resultant issues normally in the form of a listing of important topics such as employment,
transport, community safety, social equity and so on. An agreed plan conceived and developed
between Earthcheck and developers can then be implemented to tackle the issues associated
with the topics.
This plan seeks to identify a range of problems and solutions and how they may be resolved
and delivered respectively. The plan is likely to suggest that a community’s wellbeing and its
’Quality of Life’ would be enhanced and more sustainable if the shared social, economic and
environmental linkages common to more than one topic is taken into account. Critical to this
process is the need to determine key sustainability outcomes along with essential and desirable
characteristics of a sustainable community (see Table 1 and Figure 2).
3
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright August 2012
Page 15
Key Linkages and Outcomes
Good Housing, shops and other facilities, which are accessible to all through
high quality infrastructure and reliable public transport;
A flourishing local economy with access to the broader regional economy
which is both ’mainstream’ and social economy, that stimulates local
a
enterprise, meets local needs and helps to overcome poverty;
Access to good primary and tertiary education and training opportunities;
Bio Diversity appropriate to circumstances, good air, water and soil quality;
Low energy use and waste, coupled with cool/warm homes and resource
efficient businesses;
Sustainable lifestyles encouraged and facilitated by education, information
and opportunities supporting behavior change;
A safe and healthy environment, contributing to peoples physical, mental
amend social wellbeing; A vibrant and creative local culture, characterised by
thriving community groups and pride in the local community;
High levels of public participation in decision making including by particular
excluded groups; Governance and development: the mechanisms and means
to facilitate on going improvements in the precinct and immediate area;
High quality information enabling the monitoring of social, economic and
environmental progress.
Table 1: Key linkages and outcomes (After SCANl
As stated it is important to consider just what a community should have as an initial measure
of its sustainability supported bylisting of essential and desirable characteristics against
a
which the sustainability of the community created can be evaluated. However it is worth noting
that what ever the indicators or measures and eventual guidelines are they will come with
caveats. For example:
"Whilst there are, or should be, universal standards for all main social, economic and
environmental indicators, there is of course no single formula to which all communities
must conform in order to be sustainable. Different communities have different
characteristics according to there history, geography and the sum of lifestyle choices
made by there inhabitants". Further; "there is an almost infinitely extendable list of
desirable characteristics of localities and communities, any of which would help to make
them sustainable. It is difficult to establish characteristics or indicators that are all at the
same level of generality. Too long a list would be impracticable, yet to short a list
involves grouping together issues each of which has a claim to being major factors in
3
their own rights".
Accordingly the guidelines and associated checklists that are presented later provide a
compilation of items deemed to be both essential and desirable for the creation of a sustainable
precinct community at Noosa on Weyba. Underlying these guidelines are Key Area Indicators
and Measures of those factors which must be present for this precinct to be regarded as fully
sustainable in terms of its locational geography and proposed lifestyle.
4
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright August 2012
Page 16
Essential and Desirable Characteristics
Use energy, water and other natural reS()urces efficiently Prudent use of resource
and with care Energy use (gas and electricity) (1)
Minimise waste, then re-use or recover it through recycling, Domestic water use (2)
composting or energy recovery and tln81ly dispose of "",hat is leEr Household waste arisings (3)
Recycling of household waste (4)
. Limit pollution to leveb which do not damage natural system:> Protection of the environment
Value and protect the diversity of nature 6. Number of clays of air pollution (5)
6. Rivers of good or fair qua1ity (6)
tJ. Net change i.n naturaVsemi-natural habitats (7)
t. Changes ill populati.on of ::;elected
characteristic species (8)
(MEETSOCIAL NEEDS) SOCIAL
.Protea human health and amenity through safe, clean, Better health and education for all
pleasant environments 6. Mortality by cause (9)
Emphasis health serVlce prevention action 3S well as care Qualifications of young people (10)
Maximise everyone’s acces~ to the: skills and knowledge t. Adult Cdllc<ltion (11)
needed to plaY}1 full part in society
.Ensure acce$!) to good foc.>d, water, housing and fuel at a Acccs,_ to local services and travel
re<lsoO[~ble C(1St 6. Homes judged unfit to live in (l2)
Encourage necessary access to facilities, services, goods and 6. HomeLessne.ss (13)
other people in W:lys which make less use of the car and 6. Access to key services (14)
minimise -impacts on the environment 6. Travel to work (l5}
.Make opportunities for culture, leisure and recreation 6. How do school children travel to school? (16)
readily available to all 6. Overall traffic volumes (17)
Meet local needs locally wl erevcr possible
-
Create or enhnnce places, spaces and bu dings that work Shaping our surroundings
well, wem well Hnd look wen New homes built on previm.lSly developed land (18)
.Make settlements ’human’ in ~cale and form Public concern over noise (19)
.Value and protect divel’~ity and local distincdvcness and 6. Recorded crime per 1000 population (20)
strengthen local community and cultural identity 6. Fear of crime (21)
I
.
Empower all sections of the community to participate in Empowerment and participation
decision ntak ing anJ cuns L1ct the social and corrununity 6. Social participatiun (22)
impacts of clecisions 6. Community well being (ZJ)
~ Tenant slltisfBctlon/participC\tion (24)
!, (PROMOTEECONOMIC SUCCESS) ECONOMIC
.Create a vibrant local economy that gives access to Sustainable local economy
satit,fying and rewarding work without damaging the 6. EmploymentjUncmploymcnr (25)
local, nationrtl or global env ronment 6. Benefit recipients (26)
Value unpaid work 6. Business start lipS and closLlIes (27)
~ Companies with environment man::tgement
system~ (28)
6. Social and community entelvrises (29)
Figure 2: Characteristics and Indicators (after DETR)4
5
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright August 2012
Page 17
These types of menus and indicator frameworks are useful in offering a means of simplifying,
communicating and eventually measuring important areas and trends in a way that helps
people understand the key issues of sustainable development. They provide possible
benchmarks against which progress can be measured and compared. Useful pointers are also
given for people to determine their own responsibilities in achieving sustainable community
outcomes. Importantly they also show that developers, central and local government can not
deliver sustainability without the stakeholders of a community i.e. citizens, business,
employers, teachers, young and old persons, householders voluntary or community groups
5
taking part or having total responsibility for their community.
Broader Perspectives
Unfortunately many precinct developments (despite research) still tend to focus on simply
enhancing the economic outcome for those most directly involved. Whilst this approach may
result in raising some individual’s income and accrued wealth it has not tended to result in
higher levels of well-being. In fact, it has been suggested that whilst personal wealth for some
has nearly doubled over the last 30 years, measures indicating well-being have remained
static.6 It is recognized that the well being or ’Quality of Life’ of a precincts community is an
important concern in economic terms. However this measure which is largely linked to standard
of living dominates mainly because it is easy to measure. Other measures such as happiness,
health and community spirit are less so and therefore are somewhat marginalized. This has
lead to an inevitable imbalance in creating approaches that seek to encompass a wide range of
measures that may promote greater livability but are harder to assess and therefore predict.
The proposed guidelines seek to achieve a balance and broader understanding of the
relationship between environmental, social and economic ecological impacts associated with the
development of a large mixed use precinct. This it is believed will provide lasting improvements
to the ’Quality of Life’ experienced by all the precincts stakeholders.
Defining the People and the Place
Regarding stakeholders the meaning is employed here to describe the permanent residents,
temporary residents and visitors, workers employed in the precincts businesses or services and
those group networks located within the precinct and the broader environmental, social and
economic footprint of the development. It is important to recognise that when using such a
7
’people in place’ approach there is considerable overlap with adjoining communities because
neither is mutually exclusive. This is because a community usually refers to a group of people
who interact and share certain things as a group, in which intent, beliefs, resources,
preferences, needs, risks and a number of other conditions may be present and common,
affecting the identity of the participants and their degree of adhesion. Such a community will
not be determined by a notional boundary of space or a particular place. This is important
because there is also no standard size for a precinct its community or neighborhoods. The
localised legal or administrative one used in most precincts simply defines an area within which
the actual physical construction infrastructure and operational administration will take place.
The more fluid social capital infrastructure will be less bound by this legally required defining of
the precinct.
Social Capital: Elusive Glue.
The role of social capital must be considered when improved ’Quality of Life’ is fostered as the
major prize of a sustainable development. While the term socialcapital has been used in
varied ways, it can be defined in context of these proposals as "the process and conditions of
social networking among people and organizations that lead to accomplishing a goal of mutual
social benefit, usually characterized by trust, cooperation, involvement in the community, and
sharing".8 Accordingly, "social capital can be understood as a resource to collective action,
6
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright August 2012
Page 18
which may lead to a broad range of outcomes, of varying social scale. For individuals, this can
mean access to social connections that help the processes of getting by or getting ahead. For
communities, social capital reflects the ability of community members to participate, cooperate,
organise and interact".9 Included in this definition are a person’s family relationships, kinship
networks, friendships, acquaintances, civic attachments and institutional ties.10 It is argued
that social capital is an "elusive concept yet has also been heralded as the glue that holds
communities together. The essence of social capital is quality social relations. It is the quality of
relationships, understood through the use of the concept social capital, which affects the
capacity of people to come together to collectively resolve problems they face in common and
achieve outcomes of mutual benefit". Importantly in context of Noosa on Weyba is the belief
that "for communities, social capital reflects the ability of community members to participate,
11
cooperate, organise and interact critical to the success of a community’s sustainability".
Therefore conceptionally whilst ’Quality Of Life’ and social capital are closely related they are
essentially different things. ’Quality of life’ is a broad concept which includes environmental,
social and economic dimensions. Social capital is an important ’hard or soft’ ingredient of
’Quality of Life’. Simply put ’hard’ ingredients represent the physicality of development
provision with ’soft’ ingredients being the ability to participate in the choice and evolution of the
community. Access to basic services such as schools, healthcare and retail offers, cleanliness in
streets, feeling safe to go out at night, accessible open space, habitats for wildlife, number of
trees and shrubs planted, community empowerment, life/work balance are recognisable social
capital elements. At the development level of a new community this could mean sponsorship by
the developer of such things as a range of social events, establishment of liaison forums to
represent local residents, even increased water pressure so that the existing adjoining
community occupiers can have a decent shower. The list can be extensive and ongoing.
No Guarantee of Success
All these ’soft’ ingredients along with the ’hard’ are aimed at engendering community wellbeing
and thus its sustainability. The noted dimensions of modern living and many more are said to
be that which makes for ’Quality of life’. With all these actions it is hoped that they will improve
residents and other precinct stakeholder’s ’Quality of Life’. However at present there is no
guarantee of success therefore whilst a developer cannot directly make a precinct’s
stakeholders happier or more engaged they can shape the culture and society in which the
precincts stakeholders live and work.
As stated concentrating simply on the economic profile of a precinct has only a small effect on
well-being and may be achieved at the expense of other factors that have a greater effect on
well-being: work-life balance, the environment in which we live, and the vibrancy of local
communities. The wider approach suggested flows from an understanding of and contribution
to be made by Social capital. In terms of the development this should mean that people are
proud to live there, that they look out for their neighbors and come together to get things
done. With a growing body of research showing that ’Quality of Life’ is strongly influenced by
social capital it has been found that stakeholders value social capital as an end in itself and as a
12
firm reassurance against such things as crime and anti-social behavior (Moore 2005). The
purpose of the guidelines is to provide a working explanation of ’Quality of Life’ and ’Social
Capital’, what they are and what they do. Most important of all however is they seek to
demonstrate how both can be promoted on a precinct such as Noosa on Weyba.
"A sustainable community accepts that communities are first and foremost for
people and that the primary objective of the planning and development process is
to improve the quality of life of its residents, socially, economically,
psychologically, and spiritually. It implements policies to achieve quality of life and
does so in a fair, open and democratic manner"
Geis and Kutzmark
7
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright August 2012
Page 19
l Quality of Life]
’Quality of Life’ Guidelines
Turning the concept into everyday use &J
Social capital guru Robert Putman13 defines it as "features of social organization, such as trust,
norms and networks that can improve the efficiency of society by facilitating coordinated
actions". For the proposed guidelines to achieve this improvement in social effectiveness there
must be willingness on all stakeholders particularly residents to get involved. This requires that
they have the abilities and skills and are afforded the necessary access to do so. The key to
this is to put the concepts into everyday language and use and then create the means by which
co-ordinated actions can take place.
The main features of everyday social capital include according to SCAN14 the following:
Mutual Trust
People feel should feel that they can trust their neighbors or local organizations involved in
managing of their precinct or neighborhood and that these feelings are reciprocated.
Social Connections
People should have a friendly relationship with their neighbors and a range of other people and
local organizations in the area. Importantly such connections (though not necessarily
friendships) should be facilitated by the built environment.
Shared Values
People should share a set of common values and similar norms of behavior.
Capacity
People and local organizations need to have the skills to organize themselves and act together
in a concerted manner.
Vision
People should share a vision about the future of their precinct and immediate neighborhood.
They should have a sense of belonging and ownership.
Safety
People should feel safe in their precinct or nr immediate neighborhood. Social interaction and
use of public facilities should not be restricted by fear and use of such facilities should actually
reinforce feelings of safety.
Identity
People should identify with their home, neighbors and precinct or immediate neighborhood.
They should have a sense that they belong.
It is alsoimportant to recognise that if community willingness and ability are high
then theamount of added quality of co-ordinated action is also likely to be
correspondingly high between all the stakeholders of a precinct.
8
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright August 2012
Page 20
l Quality of Life
J
Improving ’Quality of Life’
Examples of ’Social Capital’in Action
B
The range and number of examples is extensive. The following are some of those which would
be the hoped for community norms at Noosa on Weyba. If they are it could be claimed that the
building of social capital had been successful.
Watching out for neighbors;
Joining the local neighborhood watch scheme;
Helping elderly or disabled neighbors;
Organising social gatherings to welcome a new neighbor;
Have children attending the local school;
Volunteering for school input i.e. skills tutoring i.e. computers;
Participating in fund raising for a local charity or school
Helping prepare for or attending a local community or local school play;;
Singing in a choir or playing in a local band;
Helping run a community facility i.e. football, soccer, cricket, netball team;
Volunteering for the local library or providing some skill to the library, i.e. story telling;
Joining a carpool or car sharing scheme;
Joining a local health and fitness club;
Setting up a community skills exchange;
Mentoring a local group of amateur artists, gardeners, walkers, cyclists;
Attending local skills or interest courses;
Setting up a new local business;
Supporting local professionals, local tradesmen and merchants;
Starting a local community garden or participating in a planting event;
Participation in community or local political campaigns;
Attending local meetings on issues regarding the precinct and local community.
From this list it is clear that there are different types and therefore means of generating social
capital within a precinct community. The three recognised forms are:
Bonding
The features of these groups are that they are made up of people who are similar in
background e.g. gender, race, ethnicity and socio-economic status. An example would be a
faith or church group.
Bridging
This form of social capital is often felt to be more beneficial than that of bonding. Though it
provides support, it is less tight knit. This form has been described as ’weak ties’. Here more
diverse groups of people engage in an activity with one another including cross generational or
cross neighborhoods examples would be a dance club or keep fit classes.
Linking
Linking social capital is less well known. It is about connecting unlike entities such as local
people, institutions like the council, police or importantly precinct developers and finding new
ways to work together in a positive and productive manner.
9
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright August 2012
Page 21
It is important to note that these types of social capital, especially bridging and linking, are not
easy to generate. Physical separation of say housing types and tenures in the same street can
cause segregation in a community. It needs to be stressed that developers have an important
role in overcoming these challenges, but there is only so much that they or local government
can do to ensure that social capital is built and used constructively. In this guide it is stressed
that their actions can facilitate social capital but these can-not be a substitute for citizen action
and endeavor. Developers cannot build social capital on behalf of the people only with them.
-
A question that is sometimes asked is what are the advantages of seeking to engineer social
capital at the planning and design stage? Research suggests that precincts with high levels of
social capital introduced at this strategically critical time have a number of advantages over
those communities left to develop without a shared vision or means to create beneficial social
is
interaction. Also at this early phase of precinct development good planning and design will
overcome the evident risk of it becoming unregulated, formless or haphazard, inefficient and
likely to lead directly to a range of negative environmental, economic and in particular social
impacts.16
At the more localized level it is also known17 that a high degree of social capital will lead to:
Improvements in resident’s health
Social interaction can considerably strengthen people’s health. Isolation on the other hand can
lead to depression and general ill health. Evidence of reduced health problems where
community cohesion is high exist as does incidences of increased health issues once that
cohesion is lost.18
Lower crime and fear of crime
People look out for each other and take actions against vandalism. A Harvard University Study
showed that violent crimes were 40% lower where residents willingly mingled compared to
areas where no such interaction existed.
Fewer and more easily resolved disputes
People who trust each other have fewer disputes and/or have the ability to settle conflicts
among themselves. This is particularly important when seeking to involve all members of a
community such as young persons who can sometimes be alienated by being seen as part of as
a problem not part of the solution.
Community facilities are better managed
In areas withhigh levels of social capital, the community looks after facilities, parks or
community centres. Community groups or volunteer organizations can often manage these
facilities more cheaply and effectively than local authorities or private sector orgaisations.
Less tension between diverse groups
Different cultural groups know each other and trust each other more
Less isolation with greater social ties and safety nets
People who have local friends and acquaintances tend to be less isolated and get more support
in times of difficulty. For example uncollected mail or non attendance at local group activity will
normally raise an alarm.
10
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright August 2012
Page 22
From these gains it is worth noting that two major reasons exist for Developers to actively
pursue a programme of social capital implementation on their developments. These are:
More socially attractive precincts
Places with open constructive forms of social capital are places where people want to live. It is
known that most people want to live where there is a sense of community spirit and people
look out for each other.
Promoting ’Quality of Life’
Social capital is increasingly seen as an important component in the promotion of ’Quality of
Life’. Often the only interaction between Developers and residents is when something goes
wrong. With social capital that encourages an active community involvement it is possible to
start a new type of relationship that is positive and more about moving forward in the creation
of a sustainable community.
Gains and the role of developers
It is important to recognise that social capital transcends socio economic barriers. It might be
felt that social capital is more an issue of deprived areas where the lack of environmental
quality and economic wealth is compensated by friendship and extended families. This is not
19
borne out by research which shows that whilst more affluent groups can make greater
choices regarding locality the preceeding development gains are still the driving reasons in
lifestyle choices of this group.
Therefore it would seem that social capital matters in both deprived and affluent precincts
because it makes a crucial contribution to the ’Quality of Life’ in a precinct. If the gains from
this dynamic are to be fully realized the developer has to recognise the crucial role they have in
community development particularly when building large mixed use residential precincts.
It was noted earlier that it is not the role of a developer to influence the willingness of the
precincts stakeholders come to together for a joint purpose. This is for the stakeholders to
decide on and act. However developers can and should promote the ability of the stakeholders
to make connections, to organize and undertake joint and mutually beneficial actions. This is
because precincts are not simply about buildings they are about people as well. The developer
can through early planning and design can participate at the forefront of creating social capital
and therefore determining the sustainability of the precinct. To achieve a developer need to
encourage a willingness on the part of the community to be engaged and ready to invest in
relationships and activity aimed at underpinning social capital. They also need to facilitate the
ability of the community to invest in relationships and make use of them.
Finally it must be recognized that a Developer can not take responsibility for the willingness of
people to connect and work together. However this Developer is determined to ensure that the
critical role of giving the stakeholders a helping hand in providing the incentives to take part by
providing the right physical and social infrastructure will be at the forefront of its planning and
design decision making process.
11
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright August 2012
Page 23
l Quality of Life
J
Creating the Foundations
’Hard and Soft’
&J
As suggested the Developer can playa significant role in promoting the social capital needed to
influence the precincts ’Quality of Life’. The following is how this can be carried out at Pacific
Highlands. Providing the foundations necessary to create a cohesive and dynamic community
falls into two categories. First there are the ’hard’ foundations which are about the precincts
physical infrastructure and its design. Second are the ’soft’ foundations which refer to the
processes of living within the built environment.
It important to recognise that others will influence and have responsibilities for the
is
development of large mixed use precincts and their communities. However it is the developer
that by far has the leading role and should take the initiative. What the types of ’foundations’
are as follows:
1. Hard Foundations: Physical buildings and design interventions, such as the layout of
buildings and associated infrastructure including streets and landscaping. The overriding
goal is to provide the means by which the community is able to come together.
Importantly to support bridging social capital planning and design should help
neighboring communities to overlap and provide opportunities for shared social
interaction.
2. Soft Foundations: These are about processes, such as the management of community
facilities, setting up local groups and organizations and the participation of local
stakeholders in the development and post occupancy process.
Social capital will be at its strongest when both are in place without this neither will realise
their full potential. For example if hard foundations lack the soft inputs there will be a possible
lack of the sense of ownership within the community. Whilst facilities may bring the community
together it may not be in a spirit of mutual trust. This unfortunately can lead to a circumstance
of opposition to almost any plan put forward by the developer. Conversely without hard
foundations soft ones can be equally impotent. Stakeholders may be able to come together
through a management structure but if the design of the built environment places barriers
which encourage people to stay at home or requires them to use the car rather than to mingle
freely the opportunity will be lost.
Phasing of social capital is also a major issue for the developer particularly of large mixed use
20
precincts because of their timescales. Importantly it has been noted that those developments
that benefit from ongoing developer involvement normally respond with more positive social
capital outcomes. This is because opportunities to create, and improve on this building of social
capital occur throughout the pre and post development process.
At the planning and design stage ideas for the development come together it is critical that
social capital is built in right from the beginning. After this phase it will be virtually
impossible
to turn bad decision around. The building phase is a difficult period particularly on large
developments simply because of the disruption and timings for implementation of what might
be important social capital infrastructure. Nuisance and delay can be extremely negative forces
as a precinct evolves. The final occupation phase is slightly contradictory in that the
opportunities of laying down social capital have mostly passed by this phase. However it is also
the best time for social capital creation due to there being the key ingredients of residents and
other stakeholders in place and creating the living community.
12
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright August 2012
Page 24
can make
numerous interventions to
PARKLANDS AND TROPICAL GARDENS support social capital through
design and building. There are
five important components
that together to form the hard
HARD FOUNDATIONS FOR A PRECINCT
foundations for social capital
on a large mixed use precinct
development.
SHARED SPACES
Stakeholders need indoor and outdoor spaces where they can meet and interact. These can
range from a retail mall with health and fitness club, coffee shops restaurants to ’village
squares’, parks incorporating sports fields and informal play areas with children’s play
equipment and seating. Such shared space needs to be carefully located and designed as it
can become a source of great local pride or a major point of contention. Further the challenge
of shared space is the number of users throughout the day that are encouraged to visit and
stay to meet friends, shop or take part in activities provided by the facilities of a particular
space. The vibrancy generated will create spaces that are lively and safe offering the possibility
of improving users ’Quality of Life’.
LIFESTYLE MIX AND USE
To encourage an active stakeholder involvement in lifestyle precinct it should offer well
a
designed facilities providing for recreational, leisure and community activity. This is a crucial
issue in that the mix will be an important component of ensuring vibrancy in the precinct areas
at various times of the day. The mix needs to be aimed at encouraging local enterprise by
increasing the business base of the precincts development area. This increase particularly, new
businesses should be done by prioritiesing the precincts needs against the facilities of the
broader development area. This can ensure that there are no negative impacts on the viability
of the new and other local area businesses. This approach can in fact have the affect of
providing the catalyst for improvement in the local business provision. Any large mixed use
Precinct development must also provide health, spiritual and educational opportunities. The
major benefit from this will once again be the use of the precincts facilities by various groups of
stakeholders at different times of the day. That ’Quality of Life’ is improved by this attention to
more holistic needs is without question. Of importance is unhindered access and participation
for all generations and cultures.
13
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright August 2012
Page 25
DIVERSE HOUSING
Mixed-use precincts such as Noosa on Weyba can benefit from the provision of a wide range of
housing types and tenure. This approach encourages physical and social diversity a key
element of a vibrant community because it allows for a much broader mix of generations,
cultures and socio-economic groupings. This approach whilst not necessarily equating to a
socially coherent mixed community will offer a better opportunity of achieving social inclusion
of say key workers. These could include newly qualified teachers, chefs and gardeners all of
whom are crucial to the servicing and maintenance of the precincts facilities.
Also linked to this diversity is the phenomenon of more and more people working from home a
trend that many suggest should be encouraged because of the ’Quality of Life’ spin offs. This
calls for a greater variety in housing types that provide flexible and spacious enough
accommodation to allow for telecommunicating or low impact commercial demands.
STREET LEVEL CONTACT
The Precinct must offer safe and attractive pedestrian environments which encourages
stakeholders into spaces be they malls or street locations. This is paramount for two reasons
firstly, in seeking to stimulate social interaction and secondly, to prevent door to door car
bound living so common in many of today’s communities.
Whilst recognizing the desire that many have for privacy within there own property boundary
this can be achieved by good planning and design without the loss of street connectivity. A
vibrant street life, through a wide variety of spaces and opportunities for activities as well as
chances to meet, whether in a garden or public space should be a primary objective. People
need to be visible and have the means to become known to each other despite the diverse and
busy roles many lead and have today.
SECURED BY DESIGN
21
A critical issue in modern society is that of personnel safety. Secured by Design principles
highlight the need for natural surveillance and the creation of active precincts through the
planning and design of the built environment. Particular importance is given the creation of
connected movement networks and associated issues such as lighting. These are seen as
crucial to providing a means by which residents can be out and about with confidence.
It is worthnoting that usability and security aren’t contrary goals there is no need to sacrifice
one for the sake of the other. Infact, a network that is difficult to understand and use will
almost certainly have security problems in practice. A more secure network is a more reliable,
more effective one and hence, a more usable network. Clear and direct routes through an area
for all forms of movement are desirable, however these should not undermine defensible
space, sense of ownership or responsibility inherent in well-designed precincts. Secured by
Design seeks to promote routes that are active and self-policing, and where leisure routes are
less busy to ensure that the design approach responds accordingly. The creation of underused
and lonely movement routes is to be avoided.
The approach advocated by Secured by Design can positively overcome the living behind locked
doors often seen in many communities. By making people feel safer through the knowledge
that careful consideration has been given to their security in local centres, parks and on the
networks linking these spaces greater confidence in their use will result. The goal of this is to
achieve a safe community which are normally more stable and enjoy a better ’Quality of Life’.
14
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright August 2012
Page 26
Public transport linkages;
Extensive infrastructure landscaping;
Preservation of sensitive habitat;
Koala protection measures;
Protection of environmentally sensitive
areas;
Rehabilitation of existing habitats;
Open space with children’s facilities;
Community centre and club;
Access to Lake Weyba foreshore;
Bush walking trails;
Integrated cycle pathways
A wide range of housing choice and tenure;
Energy efficient homes;
Water harvesting and grey water reuse; A SENSE OF COMMUNITY
Secured by Design principles;
Extensive footpaths; A sense of community often comes at the
Village greens and open spaces; top of many people’s priorities when seeking
Fitness trails and wellness stations;
to find a place to live, raise a family, work,
Lifestyle retail provision, i.e. coffee shop;
Recreational facilities i.e. sailboard club;
retire or simply visit. The developer can
provide the ’hard’ foundation for the
Employment opportunities i.e. maintenance
precinct but as stated earlier he cannot
Training opportunities i.e. environment;
Estate management office create the willingness needed by a
community to organize and participate using
’HARD’FOUNDATIONS their own skills in creating community well
being and hence influencing its ’Quality of
Life’.
LAYING THE ’SOFT’FOUNDATIONS
A Developer can support the community by giVing equal attention to those components that
are not about the design and physical construction of the built environment. Important as these
are when it comes to how people will respond regarding lifestyle choices they are not the sum
of how they use the precincts facilities or participate in its social development. The aspects that
are more associated with people’s potential, behavior and response to motivations need as
careful consideration as does designing the listed ’hard foundations above. Laying down these
’soft’ foundations involves the developer in creating both the opportunities and in most cases
the means for a community to actively participate in its development and management. This
will involve determining how people come together and how any community facility is managed
once in place. Contexts obviously vary and these will affect what the developer can do and
what actions are the most relevant to the precinct.
There are no hard and fast rules or ready made tools for this aspect of precinct development or
at what phase they should be introduced. Some will be appropriate at an early stage of
development whilst others will only be driven when sufficient numbers of residents live on the
precinct. Importantly it best to recognise that no single initiative will be enough it is likely that
a range of inputs will be required over time.
This begins to raise the issue of a developer’s long term commitment to a precinct and its
community’s sustainability. As noted before research has shown considerable social capital
gains where because of the timescales involved the management of the precinct stays with the
developer. This presence is not only at a strategic level but often calls for day to day
involvement. The developer will almost certainly be required to maintain standards particularly
throughout the infrastructure provision. Ongoing maintenance until adoption and pOSSible
15
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright August 2012
Page 27
beyond will feature in maintaining the quality of place achieved. The added value and
community gains of this commitment should not be underestimated.
There are a similar number of components to this aspect of community social capital:
LOCAL GROUPS
A developer can initiate or support residents in organizing or setting up local groups and
organizations. This aid can be in the form of advice, small grants, sponsorship or simply a place
to meet. This help should be totally inclusive but should come with caveats such as obligations
regarding charters, management structures and responsibilities. In the case of financial aid
clear and precise accounting rules must be adopted.
Local groups and organizations can make stakeholder involvement practical and relevant to the
development of social capital at the precinct. This involvement is a major element and essential
means of input to the encouragement of social capital. Without this involvement it is difficult to
create or keep social capital going. However it should be noted that these groups can be a
hindrance as equally as they can be helpful. Open and transparent elective processes, well
managed structures, inclusive membership and clear aims and objectives are needed for them
to succeed. Also of great importance is their ability to have influence on the vision and direction
in which the community wishes to evolve.
PROMOTION OF A LOCAL IDENTITY
Local identity is important to social capital. Not surprisingly stakeholders are most likely to
connect and support each other if they share commonality in elements of identity. This shared
identity can be relatively easily facilitated but may not be self facilitating. Within a community a
sense of belonging to a group can be a positive force for the creation of long term social capital
reflecting a strong sense of local identity. Individual stakeholders who identify with these
groups normally dedicate considerable effort and time to achieving cohesiveness in the
betterment of the community and hence its identity. The developer will of course be seeking to
create an identity for the precinct. Whilst the marketing of the development drives this to some
extent attention should be given to supporting local processes. These can be local events which
promote local identity e.g. concerts, sports events and competitions. Active participation of the
developer and the community in these will encourage ownership and a sense of pride if
successfully managed and repeated.
LINKING PEOPLE AND INSTITUTIONS
A crucial issue for a developer is to create mutual trust between it and the community. This is
best achieved by delivering what has been agreed and by mediating between residents and
other organizations that will be involved in delivering the precinct and its facilities. Constructive
forms of participation that have a champion can help to connect the various stakeholders
involved to each other in a collective dialogue aimed at identifying responsibilities and rights.
This mutuality is at the core of social capital because it is where there is the greatest potential
to change how things are done. This allows for the potential of sharing decisions that influence
and shape the relationships between groups such as residents, the developer and say the local
authority. Th is viewi ng of how decisions a re made a nd the possi ble sha ri ng of decision ma ki ng
can have a major impact on a communities ’Quality of Life’ by overcoming mistrust and lack of
connection.
MANAGEMENT OF SHARED SPACES
It may be appropriate to enable and support residents in the management of community areas
and facilities and to transfer these assets to some form of community ownership. One example
16
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright August 2012
Page 28
of encouraging the use of the social capital provided by the developer is to invest in different
approaches to the management of communal facilities such as sports fields, clubs and open
space. Management committees or other forms of inclusive organizational structures to run the
facilities could be employed. This giving of ownership can be a crucial element in the forming of
positive community groupings.
Such an approach may also help in overcoming a major issue for precincts regarding the use of
developer contributions to local authorities. Statutory charges made against a development
by the local authority tend not to be specific to a development or its infrastructure
maintenance. Large contributions do not guarantee increased or improved facilities service by
the authority, as they are normally distributed throughout the authorities region. This can be a
major source of irritation for developers and occupiers of developments seeking to maintain
standards. Undertaking to maintain infrastructure facilities, landscaping and roadway verges
themselves or to work as pressure groups to ensure standards are maintained by the local
authority may provide both social capital through both the management involvement and in
some cases the physical maintaining of standards in the precinct.
PARTICIPATION
At the heart of social capital is the enabling of a community to play an active role locally in
creating new kinds of democratic space in the neighborhood. This option could be used to
create a local resident’s council, a liaison group forum or association and possibly a crime
prevention watch. (This last initiative is noted because there is clear correlation between lower
crimes when strong local community involvement is present).
Being able to play an active role in shaping the precinct and its ’Quality of Life’ is seen as
fundamental to a community’s long term sustainability. Participation may be a sign of social
capital, but it is also important as a means of generating social capital. It is also very important
at the occupational phase in the life cycle of a development. This is because the incentive to
participate, to become involved will be much stronger when stakeholders live or work on the
precinct.
Establishing effective consultative mechanisms to ensure all sections of the community are able
to participate in developing and implementing environmental, social and economic strategies is
seen as an important issue for the long term success of the development. It is recognized that
there is a major communication issue for the developer as to which community does he
communicate with? Is it the existing or the proposed, the investor or the occupier, the long
term resident or the visitor? Whilst this may present a dilemma for developers, other
stakeholders and interested parties it is not insurmountable. The important issue here is the
willingness to explore and formulate possibilities that can be implemented at different phases
of the development process timescale.
Participation for the community is claimed to be "a chance to constructively
influence the future development of their area, instead of merely reacting to a
proposal". For the developer it may be an opportunity to gain "a real insight into
the needs and aspirations of the community". It is said that on many occasions
developers can be rewarded through the community identifying valuable
opportunities unforeseen by others.
’Enquiry by Design’Redland Bay Queensland
17
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright August 2012
Page 29
l Quality of Life]
Material Elements and Interactions
Towards Creating a Sustainable Community cYJ
The usual way of focusing on approaches creating communities has been to concentrate on well
recognised factors such as housing, employment and public services. These features are often
the only measures taken as being reflective of what a community is and all that is needed to
ensure its social development. It is should be clear that this is not an appropriate manner in
which to accommodate the dynamic and complex relationships that exists between the ’hard’
built environment elements and the more ’soft’ human activity of a precinct. Overcoming this
problem is the main objective of the ’Guidelines’. Further they seek to create a vibrant and
sustainable community within which all stakeholders ’Quality of Life’ is enhanced. Extensive use
of the excellent work by SCAN has been incorporated in the following elements and
interactions. Amendment to their original text has been implemented so as to more closely
relate to the precinct known as Noosa on Weyba.
ELEMENTS AND PLANNING AND DESIGN INTERACTIONS (after SCAN)22
1. Sustainable communities have good housing, shops and other facilities, they
also provides accessibility to all with the help of a high quality infrastructure of
footpaths, cycleways, roads and reliable public transport.
1.1 Provision of good quality and affordable residential housing which contributes to
energy efficiency, public health and ’Quality of Life’.
Provide a range of housing types and tenures to match a range of lifestyle choices i.e.
family, single person, retirement and care, appropriate to local circumstances;
Design housing that can be adapted, renewed or repaired according to needs and long
term changing performance requirements;
Ensure abroad range of mixed tenure providing affordable private ownership,
temporary rented and/or holiday accommodation;
Design for energy, water and resource efficiency during the construction and occupation
phases.
1.2 Provision of facilities, services and goods for people to be achieved without
damage to the environment or limited to extensive car usage.
Create discernable centres within the precinct providing a variety of open spaces and
distinct areas i.e. lakefront, parkland;
Ensure the planning and design of the precinct offers access to a range of Local
Authority and other agencies (i.e. post office) facilities, to Medical facilities i.e. Doctors,
Dentists and Opticians, to legal advice and services and normal banking and credit
systems;
1.3 Provision of good infrastructure providing safe and convenient footpaths and
cycleways.
Provide a well designed, constructed and easy to maintain footpath and cycleway
network with extensive pedestrian crossings.
18
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright August 2012
Page 30
Ensure green, pleasant and safe routes to all facilities i.e. school, centres, open space;
Provide public seating and rest points on footpaths and cycleways;
1.4 Provision of an efficient road network and public transport system.
Negotiate frequent and reliable public transport offering good geographical coverage;
Negotiate affordable public transport with high quality vehicle.
2. Sustainable communities have a flourishing local economy, both mainstream
and social which encourages and stimulates local enterprise by meeting local
needs and aspirations.
2.1 Create the conditions in which a mainstream and social economy can flourish by
encouraging and stimulating local enterprise to the benefit of the precinct
stakeholders.
Encourage a diverse and stable local economy;
Offer good links to the wider regional rural, urban and coastal economies;
Encourage local community enterprises providing employment and training using local
skills to meet local needs;
Encourage activities to retain wealth in the community such as an Artists Co-operative;
Source and supply goods and services from within the local community and economy;
Encourage the sourcing of local food products particularly organic.
2.1 Create the employment opportunities within the precinct to increase the local
economic wealth, reduce transport needs and strengthen the community.
Encourage inward investment into to the precinct and adjoining regional economy;
Createopportunities to help local people to find and provide secure and fairly paid
employment;
Provide opportunities and help to local businesses to set up and grow;
Make provision in the
design of housing and other facilities for home working and
community enterprises respectively.
r-
3. Sustainable communities have good
education and training access and
opportunities for all stakeholders.
f\f’
-r’ t
l I
Training and Education
3.1 Provision of high quality education and training both formally through schools
and informally through the community or workplace will be fundamental in creating a
sustainable Precinct.
Provide access to high quality education;
19
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright August 2012
Page 31
Create a wide range of training opportunities both vocational and non vocational;
Provide access to knowledge and information regarding skills acquisition;
Provide access to a range of opportunities for participation in life long learning;
Create opportunities and appropriate facilities for employment fairs;
Encourage employers who support education and training in the workplace.
4. Sustainable communities have bio
diversity appropriate to the
geographical location. They also have
good air, water and soil quality.
Bio-diversity and connectivity
4.1 Provision of a diverse and vibrant local environment will contribute to people’s
health and well being. Also it will have a direct impact on a precincts ’Quality of Life’.
Ensure natural areas and local bio diversity are protected and enhanced;
Create high quality neighborhood green areas and open spaces;
Create good access to green and open spaces which are managed by the community;
Ensure the maintenance of clean streets and footpaths and cycleways;
Ensure low levels of litter, graffiti and dog mess;
Encourage tree planting and floral displays along with tidy individual gardens;
Provide advice and support for reducing water, noise and light pollution;
Encourage schools and community organisations to introduce environmental education.
5. Sustainable communities have low energy use and waste along with low
emissions coupled with cool/warm buildings that are resource efficient.
5.1 The reduction in energy use, waste and emissions production is crucial if a
precinct is going to improve not only the ’Quality of Life’ of its residents but also
make a contribution to the well being of the adjoining region.
Create partnerships between businesses, schools and community groups in supporting
energy efficiency and waste minimization;
Provide convenient facilities for recycling, repairs and shared resources;
Support and encourage home and community composting;
Provide access to advice and support for residents and businesses on energy and water
efficiency;
20
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright August 2012
Page 32
Use energy supplied from renewable or other green supply:
Monitor energy usage throughout the precinct;
Provide convenient and attractive alternative means to car use;
Encourage resource efficient business, including access to expertise in environmental
performance.
6. Sustainable communities have lifestyles facilitated by education and information
which encourages and supports behavioral change.
6.1 The precinct should offer the opportunity for all to participate in creating a more
satisfying and sustainable lifestyle.
Offer the means to become aware of sustainable development and lifestyles;
Provide information and feed back on the environmental impacts of people’s lifestyle
and consumer choices;
Give access to support for adopting a more sustainable lifestyle.
7. Sustainable communities provide safer and healthier environments. This can
contribute to the physical, mental and well-being of residents.
7.1 Active communities can be effective at discouraging crime and anti social
behavior.
Create through design and occupational management a high level of confidence in public
safety;
Ensure the perception of the community as a safe and secure place to live;
Ensure that the community is one where children can play outside safely;
Use Secured by Design principles throughout the precinct;
Upgrade security services to residents with special needs i.e. disabled, elderly;
Encourage to setting up of neighborhood watch schemes;
Mentor young persons and provide encouragement through activities aimed at reducing
anti social behavior.
7.2 The precinct should enable the residents and others an opportunity to enjoy a
high level of health and longevity of life.
Ensure that adequate health and social welfare services are available, accessible and
responsive to the community;
Encourage the provision of preventative and positive health measures;
Encourage and support alternative health and related spiritual provision;
Create strong formal and informal community care structures;
Make available access to affordable fresh food suppliers;
Encourage organic gardening and possible homegrown vegetable production;
Promote dietary advice and local cooking clubs.
21
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright August 2012
Page 33
8. Sustainable communities have a vibrant and creative local culture, characterised
by thriving community groups and pride in the precinct and the local community.
8.1 In order to maintain the willingness and commitment to bring about change
locally, people must value their community.
Encourage a strong and supportive community spirit;
Enable a strong sense of identity with the locality and shared with others;
Create a place where parents wish to raise there children and can do so;
Encourage the ability of residents to know and trust their neighbors;
Create the means by which residents of all ages can care for and be involved in
community projects and events;
Afford protection and improvement for environmental places of importance.
8.2 Community initiatives, groups and organisations contribute to the precincts
networks and relationships. Individual and communal confidence can be
strengthened through a sharing of abilities and skills within the community
Encourage the setting up of a range of diverse and active community groups;
Provide ready access for advice and aid on setting up community groups;
Support and encourage the representation of community groups;
Provide the means for networking forums and community development projects that
facilitate connections and participations in decision making.
8.3 Communities thrive if opportunities exist for all resident’s young and old, to
participate in creative and individual lifestyle activities.
Provide the opportunity to create a vigorous cultural life;
Create facilities for a range of clubs including retiree, young family, youth, sports and
art;
Ensure easy access to leisure facilities and sports grounds;
Within the Precinct ensure there are cr che and childcare opportunities and extensive
play areas;
Encourage events that provide a wide range of cultural diversity;
Ensure that there is the opportunity to exercise a lifestyle of choice such as yoga and
meditation.
9. Sustainable communities have high levels of public participation in policy and
decision making.
9.1 It is known that the more a community participates in the processes of policy
making and the decisions that impact on them the more sustainable that community
will become.
Encourage the development of community organisational skills;
Provide the means for good communications through out the Precinct;
22
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright August 2012
Page 34
Encourage the integration of procedural and administrative functions;
Encourage high levels of participation by all sectors of the precinct in debates and
decision making on local issues;
Create a core of individuals with experience of initiating and running community
activities;
Encourage young people to take part in shaping the precinct and its community.
10. A sustainable community has governance and development: the mechanisms
and means to facilitate on going improvements in the precinct.
10.1 It is argued that the stability of a community is a key to its sustainability. This
can prove difficult with a large mixed use precinct development that primarily is
speculative. However if the precinct is perceived as a good place to live turnover in
stakeholders may not be extensive. Further some changes may be positive in that
they can bring in fresh ideas and energy (Figure.
Encourage partnerships between all stakeholders involved in the precinct’s
development;
Facilitate good communications between all the stakeholders;
Encourage a low turnover in stakeholders;
Encourage interaction between dispirit groups and organisations;
Provide ongoing and stable management of the precinct;
Seek to make lasting changes and improvements to all aspects of the precincts
provisions;
Ensure that public acceptance and ultimately perceptions that improvements are being
made for the long term benefit of the whole community.
Thriving community groups ~
23
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright August 2012
Page 35
Evaluation and Implementation l
Quality of
Life]
Measuring Performance and Progress
(2)
Within a sustainable community there will be high quality information to enable the monitoring
of social, economic and environmental progress. However the monitoring of progress towards
the achievement of a sustainable community must be meaningful to all the precincts
stakeholders. It is also fundamental to maintain a commitment to the process and to ensure
that the original goal is attained. The monitoring should provide a proactive and accessible
information service. It will need to undertake to measure all sections of the community that are
benefiting from this service. Mapping community participation and the success of organisations
involvement is crucial as is the use of appropriate measurement tools to monitor overall
progress.
Ecological performance evaluation of which social progress is a critical component has already
started for Noosa on Weyba by the use of an internationally recognised third party certification
process. Earthcheck’s Precinct Planning and Design Standard (PPDS)use Key Area Indicators
to measure and communicate important trends, events and issues within a development. It
sets out to assess the environmental, social and economic impacts of plans, designs,
strategies, techniques and other specifications in each of the Key Environmental, Social and
Economic Performance Areas. It does this by gathering data and comparing the environmental,
social and economic performance of the precinct master planning and design against the Sector
Benchmarking Indicators and measures for PPDS. The results are then communicated through
a series of reports to the developer. These reports seek to establish achievable and responsible
improvement targets where necessary, with the help of an External Reviewer or Third Party
Assessor to reduce adverse impacts and, where appropriate, to increase positive impacts in
the Key Performance Areas of the precinct.
PPDS recognises that any guidelines for a new community will have different characteristics
according to history, geography and the sum of lifestyle choices made by the eventual
stakeholders. An almost infinitely extendable list of desirable characteristics can be provided,
any of which would help to make the precinct more sustainable. However any list that is
formulated should reflect the aims and objectives of the development and act as a checklist of
its translation into what has earlier been termed hard or soft foundations. These physical and
soft policies as noted earlier in this document are seen as being essential to the creation of a
sustainable community leading to an improvement or maintenance of ’Quality of Life’ for the
whole community living, working or visiting the precinct.
The content of the attribute listing that follows is typical of the wide and infinitely variable
factors that need to be considered
by a development design team seeking to lay the
foundations for a sustainable precinct community plan. An essentials checklist and compliance
templates for indicator measurement of this large mixed use precinct have also been created.
These documents and in particular the template seek to foster continuous improvement in key
social areas. In this way the developer and design team will be able to continuously refine the
’modus operandi’ so that they can ultimately develop, construct and operate in a sustainable
manner.
The sustainable planning and design performance will be benchmarked by Earthcheck to
facilitate measurable improvements. These improvements are assessed as part of the
certification process. However any improvements that are encouraged will be in a staged
manner consistent with real world needs.
24
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright August 2012
Page 36
Planning and Design Tools and Templates
To help the planning and design team translate the guidelines into practical actions that reflect
in essential and desirable planning and design outcomes the following broad issues, checklists
and compliance tables are provided. These represent the factors selected to form the essential
ingredients of a sustainable community and the means by which its performance can be
measured and benchmarked.
Precinct Attributes for: Noosa on Weyba Queensland
Within the precinct will there be: Yes No Comments
A wide range of affordable housing and tenure?
A diverse community created?
Vibrant links to regional mainstream and local
economies?
A vibrant and inclusive community centre
provision?
A diverse and inclusive spiritual community?
A strong cultural provision?
Safe and convenient infrastructure networks of
pathways, cycleways and roads?
A clean environment with extensive bio
diversity?
A choice of quality education provision in the
form of schools and tertiary facilities?
A choice of child care facilities?
A range of healthcare facilities?
A network of parks and open spaces?
A network of recreational spaces and facilities?
A ’safe and secure’ management plan for the
community?
A community management plan?
25
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright August 2012
Page 37
Noosa on Weyba Queensland
1.1 Planning and Design Compliance Template
Precinct Planning and Design Needs Assessment
Measure Yes No Comments
Has a needs assessment been carried
out with the existing community
and/or the proposed community?
Has a ’Quality of Life’ Plan been
developed?
Has a proposal for the future
administration of the precinct been
developed (i.e. Community Title)
Noosa on Weyba Queensland
1.2 Planning & Design Compliance Template
Possible ’Hard and Soft’ Strategies for Social Commitment following Community Needs Assessment
Key Area Indicator Yes No Comments
Will the precinct have discernible centres
with large areas of public space and
transport links?
Will the streets within the precinct provide
a connected network with a
comprehensive infrastructure of
cycleways, footpaths and boardwalks
linking facilities?
Is most dwellings and other
accommodation within walking distance of
the precinct centres?
Is there a variety of infrastructure
including retail shops, commercial outlets
and social facilities within the precinct?
Is there are a wide variety of dwelling and
tenure types in the precinct?
Is there a range of leisure and educational
facilities close enough so that children and
adults can walk?
Are there small playgrounds and picnic
areas near all precinct accommodation?
Has consideration of user safety within all
areas of the precinct been reflected in the
Master Plan?
Are the streets pedestrian and cyclist
friendly, relatively narrow and shared by
rows of trees and other shading furniture
providing good opportunities for safe social
interaction between all members of the
precinct’s community?
Are certain prominent sites within the
precinct reserved for civic buildings and
other facilities serving the whole
community integrated with leisure and
recreational facilities and activity?
Are there opportunities for the precinct
Community to be self qoverninq?
Is there provision for the continuing
involvement of the Local Planning
Authority?
26
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright August 2012
Page 38
Noosa on Weyba Queensland
Checklist (after SCAN)
Key Area Actioned Comment
1 Economic
Low incidence of Social Exclusion.
Diverse and stable local economy.
Links to wider regional economy.
Resource efficient businesses.
Access to normal banking and credit systems.
Support for the development of social economy.
2 Housing, Education and Transport
A range of dwelling types and tenures.
Cool, warm and dry dwellings.
Provision of educational opportunities and attainment.
Opportunities for life long learning and life skills
pa rtici pation.
Frequent, safe, accessible and affordable public
transport offering good geographical coverage.
Well designed and maintained green, pleasant and
safe pedestrian routes particular to school.
3 Physicalr mental and social well-being and securit~
Access to local authority services and other agencies.
Access to medical facilities, social and welfare
services.
Affordable fresh foods readily available.
Adequate, effective and community friendly policing.
Designs for low incidence of crime and high levels of
confidence in public safety.
4 Environmental quality and sustainable lifestyles
High quality neighborhood environments.
Open spaces that are pleasant and safe for all.
Natural areas with bio-diversity protected and
enhanced.
Facilities to maximize recycling.
Precinct strategies to encourage sustainable lifestyles
by all precinct stakeholders.
5 Good Local Governance
Effective and dynamic Precinct management
delivering good quality services.
A social climate which encourages all the precincts
stakeholders to care for the area and participate in
community affairs and activities.
A range of diverse and active community groups,
offering a wide variety of association for the precincts
stakeholders.
An infrastructure of organizational support for the
community groups and in particular voluntary
associations.
Facilities for specific sections of the community, such
as children young persons and older residents.
Involvement of all the precincts stakeholders in the
policy and decision making
A high level of interaction amongst the community
groups, associations and outside agencies.
27
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright August 2012
Page 39
Noosa on Weyba Queensland
Planning & Design Compliance Template
Table for measurinq the planninq and desiqn impacts on a larqe mixed use Precinct development with extensive infrastructure facilities.
Key Area Indicator and
Measure Score of 2 Score of 4 Score of 6 Score of 8 Score of 10 Total
1.1 The precinct has discernible Access to outlying Shared centre with A shared centre with A memorable square A busy centre and
centres with large areas of public centres with square and transport a green and square or green with many memorable square
space and transport links transport links and links and with transport links transport links and or green with many
opportunities for opportunities for and opportunities for opportunities for transport links and
community activities community activity community activities community opportunities for
activities. community
activities.
1.2 The streets within the precinct Street network Street network which Street network which Interconnected Interconnected
are a connected network with a which offers limited gives pedestrian reduces the distance street network street network
comprehensive infrastructure of pedestrian access to access to the precinct for pedestrians to the which reduces the which reduces the
cycleway, footpaths and boardwalks the precinct centre centre and other precinct centre and distance to the distance to the
linking the precincts facilities. and other community activities. other community precinct centre and precinct centre and
community activities (i.e. no road activities. (i.e. some other community other community
(i.e. road edge crossings required road edge footpaths activities by activities with
footpaths common but road edge but no road crossings independent provision for
and road crossings footpaths common) required) cycleway and informal social
required) footpaths with traffic meetings and
dispersion. dispersion of
traffic.
1.3 Most of the precincts dwellings 30 min walk for all 25 min walk for all 20 min walk for all 15 min walk for all 10 min walk for all
and accommodation is within pedestrians to the pedestrians to the pedestrians to the pedestrians to the pedestrians to the
walking distance of the precinct centre. centre. centre. centre. centre.
centres.
1.4 There is a variety of The precinct centre The precinct centre The precinct centre The precinct centre The precinct centre
infrastructure including retail shops, has a few outlets has a limited choice has some choice of has choice of outlets has a varied choice
commercial outlets and social sufficient to meet of outlets sufficient to outlets sufficient to sufficient to meet and size of outlets
facilities within the precinct only limited daily meet only the daily meet only the daily the weekly needs of sufficient to meet
needs of some needs of some needs of many most households. the weekly needs
households. households. households. of many
households.
1.5 There are a variety of dwelling 20% in at least two 40% in at least three 60% in at least four 80% in at least five A full and wide
and tenure types in the precinct sectors of tenure sectors of tenure sectors of tenure sectors of tenure range of
along with support staff available. available. available. available. opportunities for all
accommodation sectors of the
community to find
accommodation.
1.6 There is a range of leisure and Distances more than Distances not more Distances not more Distances not more Distances not
educational facilities close enough so 1.5km but no than 1.5km than 1.25km than 1.0km more than 0.5 to
that children and adults can walk. greater than 5km 0.75km
Dr Richard Moore EC3 Global Earthcheck Assessor CopyrightAugu~2012
Page 40
1.7 There are small playgrounds The distances are The distances will not The distances will not The distances will The distances will
and picnic areas near all the precinct more than 1.0km be more than 1.0km. be more than 700m. not be more than not be more than
accommodation. but no greater than 400m. 200m.
5km.
1.8 User safety (i.e. Safety by Safety issues to be Safety issues to be Safety issues noted in Safety by Design Safety by Design
Design, Homezones, etc. or similar) assessed at Design addressed at the master planning of Tools used in master Tools used in
is reflected in the Master Plan. and Construct Detailed Design Stage Precinct and to be planning of Precinct master planning of
Stage. of Precinct Planning. addressed at Detailed with commitment to Precinct and also
Design Stage of involve local local organisations
Precinct Planning. organisations. i.e. surf club, police
involved in the
master planning
process.
1.9 The streets are pedestrian and Streetscape Streetscape providing Streetscape providing Streetscape Streetscape
cycle friendly, relatively narrow and providing shade and shade and helping to shade and helping to providing shade and hierarchy providing
shared by rows of trees and other helping to slow slow traffic slow traffic helping to slow shade and helping
shading furniture and offer good traffic movement movement movement traffic movement to slow traffic
integration opportunities for the encouraging use by encouraging use by encouraging use by encouraging use by movement
whole of the precinct’s community. pedestrians and pedestrians and pedestrians and pedestrians and encouraging
cyclists. cyclists. cyclists. cyclists. informal social
meetings, play by
children and use by
pedestrians and
cyclists.
1.10 Certain prominent sites are Shared buildings Building made Dedicated building Dedicated buildings Several buildings
reserved for major key buildings and public space available for made available for and public space and public space
serving the whole of the precinct’s made available for meetings, education meetings, education available for created for
community. meetings, education and leisure gives an and leisure, gives an meetings, education meetings,
and leisure. opportu n ity. opportunity for civic and leisure, give an education and
involvement and opportunity for civic leisure, which give
pride. involvement and an opportunity for
pride. civic involvement
and pride.
1.11 The precinct is organised to be Limited community Some community Extensive community Community Early community
self governing involvement involvement involvement organisations involvement
encouraged during encouraged during encouraged during formed at beginning encouraged and
the development the development the development of development accommodated in
process. process to take part process to take part process to allow the governance of
in some of the in the decisions opportunities for the the Precinct
decisions affecting affecting the precinct. community to play particularly in
the precinct. an active role in decisions selecting
such matters as sustainable
change, security and development
maintenance. options at every
stage of the
development
process.
29
Dr Richard Moore EC3 Global Earthcheck Assessor CopyrightAugu~2012
Page 41
1.12 Continuing involvement of Recommended Voluntary Implementation of Implementation of Implementation of
Local Planning Authority performance performance agreed performance agreed performance agreed
standards i.e. standards i.e. Design standards i.e. Design standards i.e. performance
Design Codes, Codes, environmental Codes, environmental Design Codes, standards i.e.
environmental performance criteria performance criteria environmental Design Codes,
performance criteria conditioned in conditioned in performance criteria environmental
conditioned in Developers Contract Developers Contract conditioned in performance
Developers Contract Documentation. Documentation. Development criteria conditioned
Documentation. Approval. in Development
Approval and
governed by legal
procedures binding
all parties.
30
Dr Richard Moore EC3 Global Earthcheck Assessor CopyrightAugu~2012
Page 42
Noosa on Weyba Queensland
Post Occupancy Key Area Indicator measure for ’Social Capital’ (after NEF)
Issue Key Area Indicator Measure
1 Livability % of people and other precinct stakeholders who feel that this
is a good place to live and work
2 Caring For Each Other % of neiqhbors who look out for the welfare of others
3 Knowing People % of people who residents and other precinct stakeholders
state they are friendly with
4 Making Friends % of people who state that it is easy to make new friends
5 Relationships With Neighbors The extent to which residents feel comfortable asking a
neighbor to do some act i.e. collect a prescription
6 Pride % of residents and other precinct stakeholders who take pride
in their area
7 Community Activity The extent to which households and other precinct
stakeholders participate in community-based activities and
events i.e. Sports and youth clubs
8 Safety at Night % of residents and other precinct stakeholders who feel safe
out and about at niqht
9 Safety and Children % of residents and other precinct stakeholders who feel safe
allowing their children out on their own
10 Safety and Property % of residents and other precinct stakeholders that feel safe
leavinq their property unquarded
11 Security and Policing % of residents and other precinct stakeholders who feel there
is sufficient local security and policinq
12 Open Space % of residents and other precinct stakeholders who state that
there is qood access to areas of open space
13 Transport The extent to which residents and other precinct stakeholders
feel there is good access to roads and highways and to public
transport
14 Health % of residents who feel that there is good access to health
care facilities
15 Facilities for Young People The extent to which residents and other precinct stakeholders
feel that there is qood facilities for younq persons
16 Facilities to Meet % of residents and other precinct stakeholders feel that there
is good facilities for meeting people and organizing events
17 Leisure % of residents and other precinct stakeholders feel that there
is qood access to leisure and recreational facilities
18 Local Shops % of residents and other precinct stakeholders that feel there
is a good choice of local shops
19 Local Decision Making The extent to which residents and other precinct stakeholders
feel that had or have a chance to influence the development of
their area and the extent to which they are involved in the
decision making process
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright August 2012
Page 43
Economic outcomes are closely linked to environmental and social performance and impacts can
be (as with the other two development factors) both positive and negative. Inward investment
with increased employment and business opportunities are some of the possible improvements to
be seen. However, the greater dependency on such investment and companies, instability in
labour markets and diversion of investment from other development areas can have detrimental
effects. Achieving a well-integrated approach that creates a ’win-win’ situation will be an aim of
the developer.
The Mantle Groups objectives are to include the:
. Creation and maintenance of high and stable levels of economic growth and stability;
. Social progress which recognises the needs of everyone;
. Effective development and protection of the existing economic environment;
. Prudent use of existing resources.
To achieve these it is proposed that the development will encourage economic growth and create
business opportunities for the existing and proposed community. That will also be employment
and training opportunities for the existing and proposed community. Of importance will be the
level of inward investment to the area during and after development of the precinct. Also crucial
will be the increase in the business base of the area, particularly new businesses along with the
improvement of the viability of the existing businesses in the area of the development.
The numbers of permanent and part time employment opportunities created by the development
at all levels of operation are an important indicator of development success. These figures along
with the training and long term career opportunities for local people particularly young persons
and the disabled and related environmental and social linked job opportunities are measures and
outcomes that should be recorded. The following Guidelines and Checklists are proposed for this
purpose.
Noosa on Weyba Queensland
Economic Precinct Attributes Yes No Comments
Will the development attract inward investment and
increase existing business viability?
Will the development increase the business base in
the area?
Will the development increase property values in and
close to the development?
Will the development result in increased viability of
existing businesses and transport?
Is the development likely to increase the provision of
permanent employment opportunities in the area?
Are there proposals to train local people, particularly
the younq and disabled?
Will any new jobs be created to protect or manage
the local environment?
Will any new jobs be created to enhance and maintain
the social aspects of the development and the
existing and proposed community?
It is important that the local business community is engaged in a pa rtnership with the
development if the outcomes are to be beneficial to the region or area.
32
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright August 2012
Page 44
Noosa on Weyba Queensland
Local Business Community Yes No Comments
Is the Local Business Community involved in the
Development’s Business case?
Are Regional and Local Community Organisations
involved in the development process?
A final measure of success at Noosa Weyba will be the levels of economic attributes and
on
their outcomes resulting from the development. Measurement of these during development and
post occupancy will be crucial in determining firstly any adjustments required and secondly the
overall success of the strategies adopted at the planning and design phase.
Noosa on Weyba Queensland
Levels of economic performance achieved
Key Area Indicator Best Practice Score
Is the development likely to attract The development is likely to attract
inward investment? large inward investment to the region
and area via mainly new private and
public investors.
Is the development likely to improve the The development has a strong potential
diversity of the regional or area business to improve the diversity of the regional
base diversity? and local area business base.
Is the development likely to improve The development has a strong potential
existing businesses viability? to improve the diversity of the regional
and local area business base.
Is the development likely to improve The development has a strong potential
property values? to improve and maintain property
values in and around the Precinct
Is the development likely to create The development has a strong potential
permanent jobs? to create permanent jobs.
Is the development likely to undertake The development will be providing
training? extensive training particularly to the
_y_oufl9 and lonq term unemplQyed.
Is the development likely to create The development has a strong potential
permanent or part time employment in to create permanent and part time
Environmental Protection or Management employment in Environmental
(EMP)areas? Protection or Management (EMP)areas?
Is the development likely to create The development has a strong potential
permanent or part time employment in to create permanent and part time
the social protection or management employment in social protection or
areas? management areas?
33
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright August 2012
Page 45
Summary and References l
Quality of
Life]
Building Precincts and Communities cS
The implications for a developer engaging with social capital are profound. Its promotion is an
effective means to broaden
the existing role of building a precinct to that of building a
community. Developing a guide for promoting social capital during the planning and design phase
of the development process has the potential to be influential in the debate regarding ’Quality of
Life’ on the precinct. The drive to create appropriate guidelines and toolkits is in response to the
proposition that the potential for influencing the ’Quality of Life’ of a community and thus its
sustainability via planning and design decisions is considerable. It is a proposition which needs to
be recognised and responded to by those involved in Precinct development. The developer has
taken on the challenge.
It is currently impossible to offer a model that will guarantee long term success. There is no
blueprint for building communities. Sensitivity is required and ultimately Mantle and its advisors
will need to use professional judgment to work out as to what exactly promotes positive social
capital and how best to implement it into Noosa on Weyba? However they and other developers
who want to make the difference by engaging in building a community would do well to consider
the following:
1. Do a stocktaking of what already has been done to achieve successful communities. There
are practices and experiences within the Development Industry that offer guidance and
proven ways of achieving frameworks for implementing social capital.
2. Undertake to create a social capital plan with strategies for specific developments. Such
plans should be based on feasibility study, particularly a needs assessment and the
a
laying down of actions on how the community will be promoted during the planning,
building and occupying phases of the development.
3. Ring fence budgets for promoting social capital. The earlier these are agreed and put aside
in the planning process the better.
4. Create supportive management systems to ensure that social capital does not get
compromised by the planning and implementation process. The checklist becomes crucial
during these stages. The content can help explore the possible outcomes of decisions on
social capital and the community. A monitoring and reporting system is also required and
will allow the developer to communicate more effectively the actions and outcomes of
decisions impacting on the community.
5. Employ dedicated staff with the necessary skills and expertise required for understanding
community needs and identifying appropriate actions.
The developer is seeking to establish a good ecological track record in the building of what it
believes to be sustainable precinct and community has done just that. The development master
plan shows what is, a very large scale mixed use precincts offering new residential homes and
units with a variety of tenures. It also details a planned range of facilities perceived as essential
in giving lifestyle choices such as schools, retail outlets, shops, community buildings, health,
commercial and employment opportunities and leisure activities. Combined with these are
accessible open spaces including structural landscaping, recreational facilities such as bikeways
and footpaths, children’s play areas and equipment.
34
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright August 2012
Page 46
The main objective of this document is to provide guidance on policy making and the
development of strategies to improve the delivery of these master planned undertakings. This
objective is based on the fact that the Developer has recognized that ’a developer does not just
build houses, but creates physical space in which human and social interactions are to take
place’. The well being of people living in these areas depends amongst other things, on the
design and the overall quality of the physical space that is being used for the development and
the social and personal space that is being created. From this perspective a ’sustainable space’ is
one that allows people to achieve their aims and wants in that space at minimal environmental
23
cost.
The proceeding document content also concerned itself with the measurement systems relevant
to the eventual development activity. The current methods employed by many in the
development and construction industries are strong on measuring environmental and economic
issues but not so at highlighting the social impacts of development. Developers have to address
this grey area. The development of a measurement framework and assessment of the social and
related economic impacts at Pacific Highlands is an imperative if the ’Quality of Life’ agenda is to
be implemented. The aim of the assessment is to help the developer and design team to
understand how building homes and associated community infrastructure translates in building
communities.
Finally it is hoped that when the measures of the PPDS Key Area Indicator Social Commitment-
are used that this will raise not only the quality of the scheme but raise the profile of the
Developer and advisors to a position of leading future development evolution in terms of planning
and delivery. The proposed social audit is a framework that should help the team to understand
measure and report on its social performance at Noosa on Weyba. The ultimate aim is of
improving that performance.
The guidelines, checklists templates and social auditing can be used to strengthen relationships
and demonstrate multi stakeholder accountability. There is a growing belief that sustainable
development approaches will become the business model of the future and there is no doubt that
those that get left behind will find themselves lost in the new economic landscape. In making
progress on the journey towards more sustainable patterns of development Mantle has sought to
understand how people live, work and play on developments. The task itself is surprisingly quite
simple; to recognise where practical steps can be taken.
In essence it is all about putting people first.
.11 ’L...
t---,--- -":-
’
’,"\’,’]’:’, !
~\,iA
35
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright August 2012
Page 47
Bibliography and References
Geis D. and Kutzmark T, 2006: Developing Sustainable Communities: The Future is Know,
www.freshstart.neat.org
Moore R, 2006: Pilot Study Redland Bay Retirement Community, Earthcheck Qeensland Australia
1
Hyde R. Moore R., Et al 2006: Precinct Planning and Design Standard’ (PPDS)EC3 Global
(Earthcheck) Brisbane and Canberra Australia
2
SCAN 2999: Towards a blueprint for a sustainable community, Sustainable Communities
Agencies Network, UK
3
Ibid
4
DETR 2000: Local Quality of Life counts -
in a nutshell, Department of Environment and
Transport London UK. London
5
DETR 1999: Building a Better Quality of Life -
A strategy for sustainable development in the UK;
Department of Environment and Transport London UK. London
6
NEF, 2006: A Well Being Manifesto, New Economics Foundation London UK
7
Ziller A, 2004: The Community is not a place and why it matters Urban Policy and Research;
NSW Australia
8
CDC, 2005: Social Capital Definitions -
www.cdc.gov.healthyplaces
9
Stone Wand Hughes J. 2002: Social Capital, AFIS Melbourne Australia
10
Putman R, 2000: Bowling Alone, Simon and Schuster New York USA
11
Stone W, 2001: Measuring Social Capital, AFIS Melbourne Australia
12
Moore R, 2006: Auditing Quality of Life -
ANZAScA Adelaide Australia
13
Putman Op Cit 10
14
SCAN Op Cit 2
15
Moore Op Cit 12
16
R Hyde, R Moore Et al. Op Cit 1
17
NEF 1998: Communities Count’, New Economics Foundation London UK
18
Wilkinson R, 1996: Unhealthy Societies, Routledge London UK
19
Moore Op Cit 12
20
Moore R, 2011: Delivering Ecological Visions -
A Case Study in Sustainable Development, The
International Journal of Environmental, Cultural, Economic and Social Sustainability, Vol 7 April
2011 USA
21
SBD 2006: The concept of Secured by Design, www.securebydesign.com
22
SCAN Op Cit 2
36
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright August 2012
Page 48
"
ec ~
EVALUATE COMMUNICATE EVOLVE
Sustainability Opportunities
EARTHCHECK
---".
’-=-_____"",._,....
_-___
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright 2012 1
Page 49
The Development of a Sustainable Precinct
Community
Content:
Goals, Aims and Objectives
I
Promoting Sustainability
Achieving Sustainability
Ecological Sustainable Performance
Principles for Sustainable Opportunities
Sustainability Opportunities
Evaluation Summary
~oals, Aims and Objectives J
It is proposed to build a medium sized lifestyle precinct creating a minimum of 876 new dwellings
which will be a combination of private residences, townhouses, retirement/aged dwellings and
apartments and a boutique retail and caf village centre. All are to be built within several distinct
neighborhoods, around local open spaces and green squares. The Precinct facilities include large
areas of public and protected parks, extensive footpaths and cycleways, a community resident’s
facility with leisure and recreational uses. The site encompasses some 303 hectares of land located
on the shores of Lake Weyba and adjoining the Noosa Heads National Park. The proposed precinct
is near the iconic coastal resort town of Noosa and the hinterland market town of Eumundi. Also
close by is Tewantin where entry by river crossing to the Great Sandy National Park is found.
At the north end of the sedate Sunshine Coast Queensland the area is renowned for its scenery
and excellent climate. It is close to the popular tourist destinations of Caloundra and Maroochydore
and enjoys good road access with the growing Sunshine Coast Airport. Other road links provide
excellent connectivity to the local campus of the University of the Sunshine Coast and the State
Capital Brisbane with its many economic and social facilities. There is a vibrant local retail and
commercial sector, high standards of mixed tenure of residential housing and
hospitable
accommodation supported by large
a infrastructure of recreational facilities including
shops and
restaurants. It is a sought-after destination with lush hinterland and a number of internationally
renowned beaches complimented by bays and coves.
Transportation and infrastructure planning, sensitive urban drainage design, water management,
energy and other resources conservation are areas that the experienced integrated planning and
design team are giving considerable input to all with the aim of achieving a ’sustainable’ precinct
and community. The overriding goal of improved ecological performance has arisen from the
Developer Northbrook seeking to implement ’sustainability’ throughout the delivery process of
what is to become an iconic master planned community using world best practice urban design
principles. This it is believed will lead to the precinct known as Noosa on Weyba becoming a
good place to live, raise families, retire to and or simply visit. Residents and visitors will be able to
enjoy a healthy lifestyle within an environment that provides both privacy and quiet along with
opportunities for safe and possible inspiring interaction with others. It is to be a place that will also
encourage respect for the environment and its bio diversity. To adhere to these aims, goals and
objectives EC3 Global (Earthcheck)have created a series of guidelines and checklists. These set
the direction for the planning, design and construction of the precinct and its facilities. They also
seek to create the means by which environmental, social and economic integration and equity can
be achieved to the benefit of all the precincts stakeholders.
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright 2012 2
Page 50
’Promoting Sustainability’
Tota/lntegration ~
INTRODUCTION
To achieve the goals of sustainability total integration of development and construction
processes are critical. Solutions will arise out of the overlapping and integration of disciplines
and expertise. A dynamic relationship on a macro and a micro scale will need to exist between
the inputs and outputs if the value of a built environment is to extend beyond simple financial
accounting and offer true social and environmental responsiveness. Accordingly it is critical
there is a recognition that the development and construction industries in all their guises
impact more than most and hold key positions in the often stated objective of progressing
toward sustainable buildings, precincts and cities.
Sustainability is without doubt a complex subject the term itself is often misunderstood and
misused. For many it appears to be no more than being environmentally friendly or a
mechanical means of responding to a government or regulators instruction. This very limited
view must be expanded and given a broader translation. Simply seeking the reduction of
energy usage, the possible recycling of waste and the protection of wildlife species will not aid
in the progress towards achieving greater sustainable patterns of development.
A more appropriate understanding is to recognise that sustainability is a journey which can be
closely identified with development and allied construction undertakings and aimed in particular
at the crucial activity of planning and design. It is also important for those involved in
development and construction to accept sustainability as a dynamic process which offers the
potential to improve the interrelated and highly desirable ’Quality of Life’ of all whilst
simultaneously protecting and enhancing support systems be they environmental, social or
economic (Figure 1).
’.
.~:
’~.~.:.
,
_,’, ,
’M.
..
.~
;
.....L_.
-t,:J
_-:e:;..\
Figure 1: Achieving environmental, social and economic integration.
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright 2012 3
Page 51
Added to this understanding is the need to recognise that sustainability requires an awareness
of how everything natural and man made works. Further there needs to be an equal
understanding of what will be the likely effects and outcomes of development planning and
design decisions and eventual actions on the process. Without this understanding there can be
no possibility of overcoming what is known as the ’Circle of Blame’ (Figure 2). This broader
perspective and acceptance of responsibility by all involved in the development process is
paramount in achieving sustainable planning, design and eventual building outcomes. It can be
said that sustainability and the critically linked improved ecological performance are part of a
woven fabric which impacts on all aspects of our lives. They are constantly challenging us to
seek and pragmatically apply new metrics and solutions in the decisions being made daily
particularly on large scale precincts.
-.~
~.----- ---’-_
Investors
-.~.......\
( We would fund more sustainable Drecincts and
buildinas if there was a demand for them
./
Aooroval Aaencv
We do not have the codes to recoanize
and aoorove best Dractice for sustainable orecinct desian
Develooers Occuoiers
We would develoD sustainable Drecincts and
--........" We would like to have more sustainable Drecincts
buildinas but investors will not Dav for them J and buildinas to fulfill our corDorate Dolicv
and we aain no recoanition or advantaae / commitments but there is little
durina the develoDment choice of orooerties
aDDroval Drocess -~~~
Community
The develoDers. authorities and other aaencies
do not Drovide us with sustainable communities
------~- -~
Constructors --~~--...."
\
We can build sustainable Drecincts. infrastructure and
buildinas but the develoDers do not ask for them ../
1
Figure 2: Circle of Blame (After Sustainable Task Force)
Accordingly sustainable development has without doubt become the primary and most
demanding business challenge of this decade. Whilst the business case for sustainability is all
but proven many still waiver. However demands are continuing to increase especially with
national and state governments pressing business and industry to increase their energy
efficiency and reduce the damaging affects to the environment caused by greenhouse gas
emissions. Many in their strategies seek to provide clear direction on how to shape and support
cleaner environments and promote more effective land usage. Matching these aspirations are
the drives toward smarter designs and construction practices aimed at improved resource
utilization. Crucially many also recognize the critical factor of business certainty. All aim to
ensure sensitive, sustainable planning albeit on the coast, rural or urban areas. Many argue
that by these demands they are creating the means for ensuring a sustainable future for
regional communities by protecting the environment and creating security for industry. In
doing so they claim to be bringing the people a choice in the way they live and work, focusing
on housing options, transport infrastructure, recreational facilities and business opportunities.
Noosa on Weyba is determined to meet all these challenges and demands.
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright 2012 4
Page 52
’Achieving Sustainability’
The Environmental, Social and Economic Case ~
ACHIEVING ENVIRONMENTAL, SOCIAL AND ECONOMIC EQUITY
The regulation of precinct development outcomes linking environmental, social and economic
agendas is a significant topic at federal, state, regional and local level. Since the mid 1990’s
there has been a prolific growth in sustainable strategies and policies. The translation of these
agendas now covers a whole spectrum from environmental stewardship, social equity and
sustainable communities, economic ethics and sustainable industries. Many of the resultant
medium and long term initiatives have filtered down and been translated into sustainability
indexes, quality of life plans, social and ethical standards, benchmarking and certification
programs, checklists and other equally aspiration driven codes. Despite the number the one
common thread they all have is that "at the heart of sustainable development is the simple
idea of ensuring a better quality of life for everyone, now and for generations to come".2 For
the development and construction industries this "means achieving social, economic and
environmental objectives at the same time".3 Other examples of the growth of sustainable
agendas are readily available at the national and state level. Many offer a clear recognition of
the long known fact that "environmental damage causes financial losses at a stupendous
scale".4 Linked to this is an economic desire to conserve an acceptable standard of living for all
people throughout Australia at the same time as conserving or restoring the viability of the
natural environment and hence the very basis of human life.
There is also now an abundance of publications both regulatory and advisory aimed at
specifically identifying the role of the industry in this quest to achieve sustainable objectives
such as:
Effective protection of the environment;
Social progress which recognizes the needs of everyone;
Prudent use of natural resources;
Maintenance of high and stable levels of economic growth and employment.
Specific publications have spelt out the national and state government’s requirement for the
development and construction industries to take up the challenge of sustainability throughout
all its activities. The documents seek to offer frameworks within which the industries would
make a stronger contribution to better the quality of life strategies being signaled. However
many would suggest that there has to be more than theory to meet the radical change of
attitude needed throughout the development and construction industries. Accordingly at Noosa
on Weyba the developer has been encouraged to overcome any sense of unattainable rhetoric.
This is done by the notion that integration of sustainable development, construction and
operation is not only about corporate social responsibility but supports an en-lightened self-
interest regarding competitiveness and survival. All of which makes good business sense.
Most developers and assembled planning and design teams normally deal in specifics, at Noosa
on Weyba they are setting out to make practical sense of the ’sustainability’ demands that
now accompany any medium sized mixed use precinct development. On this front they have
had plenty of help in recent years because many have been required to guard against the
increasingly stringent environmental liability to which they are becoming subject to at national
and local activity. It is recognised that virtually any development activity can lead to
environmental, social and economic disruption in an area. This may lead to concerns being
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright 2012 5
Page 53
raised by the local and broader community. Many developers have begun taking steps to
introduce comprehensive and transparent environmental management systems into their
management structures and processes. At Noosa on Weyba this can be seen in the integrated
team of professionals. Further there has been an open book policy due to the benchmarking
and certification of the development’s processes by the third party international accreditation
body Earthcheck.
BUSINESS CASE
Unfortunately many in the Development Industry at large have found that a business case
for the social and some economic aspects of sustainability difficult to develop. However such
argument holds little credence given the long known impacts on national and global resources
and pollution by the development and construction activity. The global perspective of the
resources used and wasted as first reflected in statistics such as those noted in Figure 3 alone
seem to leave little doubt that a business case that can be mounted.
Global Resource Building Use Global Pollution Building Related
Energy 50% Air Quality (Cities) 24%
Water 42% Global warming gases 50%
Materials by bulk 50% Drinking water pollution 40%
Agriculture Land Loss 48% Landfill waste 20%
Coral Reef Destruction 50% (indirect) CFCs/HCFCs 50%
FIGURE 3: Impacts on Global Resources and Pollution (After Edwards: 2001 :31)
It just takes the right questions to be askedparticularly as many are now suggesting that the
ongoing environment and improved ecological performance sought provide a significant
opportunity for technological and managerial innovation linked to profitable enterprise (See
figure 4). Many such opportunities will present at Noosa on Weyba. The stakeholders should
explore steps which encourage innovative approaches to achieve best practice outcomes in
environmental, social and economic implementation.
investment
Return on investment from savings
Cost:
/
Time
Figure 4: Opportunities by return on investment
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright 2012 6
Page 54
To take the business case even further there needs to be a description provided of some of the
principle benefits of sustainable development which establish the broad parameters of a triple
bottom line business approach. In attempting this it becomes clear that sustainable
development is an inherently rigorous undertaking. There is a requirement to provide clear and
specific expressions of environmental, social and economic objectives both separately and in
integration within the development processes. Also required is a means by which to measure
and learn from actual performance. The advantages for a developer have been recognized as
offering an opportunity to maintain and improve outcomes for all the stakeholders of a
proposed precinct community.
Further there appears to be a means by which a reduction in the environmental impact can be
achieved along with a beneficial improvement in the overall financial performance outcomes of
the development. This should lead to the following:
Broader operational recognition of commitment to sustainable development;
Increased reputation and brand;
Improved strategic capacity and overall performance capabilities;
Greater creativity, innovation and learning;
Increased professional and stakeholder motivation;
Continuing reductions in whole life costs.
Developers have also responded to the recognition that relationships with clients, regulators,
the public and suppliers can be improved with effective and more sustainable practices. It is
also recognized by the developer that legislators are increasingly applying financial incentive
based approaches to legislation, regulation and taxation. Whilst limited, there is on offer
financial incentives for encompassing a sustainability development agenda. What should be
noted is the link between investor’s particularly the large funding institutions who are taking
greater interest in environmental, ethical and social performance and being screened for
sustainability credentials. This attention is significant as these institutions are themselves being
monitored regarding their own ecological performance. It is clear that there are major benefits
being gained by these pressures in habitat and endangered species protection (Figure 5).
Figure 5: Habitat and wildlife protection
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright 2012 7
Page 55
’Ecological Sustainable Performance’
Using a Process Performance Tool ~
MEETING THE DEMANDS WITH A NEW PROCESS TOOL
The demands flowing from such business, legislative and moral imperatives plus the scale of
potential development generated by growing demographic population shifts is in itself stimulus
enough to seek sustainable solutions. The question is how do developers deliver them on
medium to large precinct developments? What tools do they employ to ensure that they meet
the challenge that "has arisen from a number of forces at work within society to address
concerns for the problems of environmental degradation of the planet".5 This is particularly
relevant because it can be argued that many existing standards, checklists and guides are
limited in their ability to deliver meaningful long term performance based outcomes. Also few of
the tools currently in use are able to provide meaningful evidence that environmental
improvement by a development has been achieved.
This is evidenced by noting that even many highly regarded and comprehensive frameworks or
sustainability checklists limit themselves to only providing a means to consider positive
measures that can be taken to reduce environmental impact or enhance social and economic
benefits on schemes. They do not usually provide mechanisms within the tool by which
developers or other stakeholders can measure the possible or actual outcomes of their planning
and design decisions. This means that many of the sustainability tools aimed at developers
tend toward a self-assessment points evaluation of environmental initiatives or impacts on
individual buildings and their immediate surrounds. Further, the third party certification
systems used by these tools normally only provide a reactive process for reviewing (via
documentation provided) the points claimed. Such checklists and rating tools rarely
accommodate the broader, and quite often difficult to translate socio economic approach
advocated for Noosa on Weyba.
It is argued that ’Life Cycle Assessment’ limits itself to environmental impacts and outcomes
and "should be used in conjunction with other environmental assessment, management and
decision making tools".6 This should not be accorded that these are criticism of the tools. Their
shortcomings are due to the lead in time of underpinning research, shifts in demands and
resultant performance pressures faced by the development and construction industries over the
last two decades. Consequentially this means that current best practice is not measured by
actual performance but is more to do with predicted outcomes. Consequently whilst there are a
range of tools they do not offer a whole system view of the total development process (See
Figure 6) and therefore fail to provide a proactive, integrated and comprehensive common
framework for developers, authorities and other stakeholders.
To meet these challenges at Noosa on Weyba the process based Earthcheck Precinct
7
Planning and Design Standard (PPDS) incorporating benchmarking and certification of
best practice performance provides the model to be used for progress in the delivering of a
sustainable development. Implicit to this document is the view that planning and design has a
key role to play in resolving many of the conflicts that such precinct developments may
generate. In the absence of good planning and design unregulated development will be an
evident risk. It is likely the development will become formless or haphazard, inefficient and
likely to lead directly to a range of negative economic, social and environmental impacts. The
developer (and in particular the advisors) have responded when planning and designing the
new precinct to the task of achieving sustainability by recognizing this critical importance.
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright 2012 8
Page 56
- - - - - -- - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - -
.....--- -G~-~~~;’-’;;~;’t-;; :;;~~:~ -;.-.-.-----------------..;;:_- Phase 3 ---.......
.
National, State, .’ Environmental, Social a"nd Ethical Policy’, ,
Regional and : i Assess&ent: and Accreditation
Local Phase 2. .
Policies
Integrat~g Precinct Process lIotanagement
:
_~_____’=..._-_~-~~-------
Realms
I Life CY~le Costing ’Social
Ca~tal’ Foundations Standards, ~rameworks and Checklists I
of
I Maste~Planning Communiiv Consultations Plannin~ Design and Construct I
Influence I Sustai~abilitY Indexation : Benct!marking Indicators I
I: : Predicted I Contracts
Strategies Financtal Strategy :Performance
I’Locati n
:
.
..
Legal Frameworks I ; I
Phase 1
p~’:n~~g ~I Re~?n:,ive _’
Precinct .= Collection ......1 .
Stewardship 11~1.:
~
.::.1:’;;~~~:: :::...~I~~~,:;;~::;~~~~ ::
~
:::w:’ .~: :::~;~~:~::: ::’4:-:-:-:~:.rl
.:" ..
.
.’_ ~
~-,
Development :::a Governance
Champion I"’g. Interpretation ~: I
Transfer
Agendas I g. Measured:
Outputs I
Assessments
FacilitSr Management
I ~ I
I Post Occupational
~aluation Use c?ccupation I
I Operation St4ndards I
Assessment af,d Accreditation I
I
I: : co~munitY Standards +-
I
: --:.._---~------~:_-------
..........=
.. :
Recognition : P~se 5
--:rotal Development.Process
~.
Phase 4
<i.... ~ I
_
;
Tlmes ale
/ /
...__._____.__.._._.._.._..__.~t.:~_.._....__..__....._...._..~:.________________.~~__....__._.._.._..__.._....___.-
Figure 6: A Whole system view of the development process for ’Noosa on Weyba’
UNDERLYING THEMES
The underlying sustainability themes laid down are met by the use of the standards ’Key Area
Indicators,8: widely accepted as a practical and meaningful way to help developers progress
towards sustainable outcomes. Further performance measurement and benchmarking with its
potential to bring greater levels of accountability and ideas for better ways of doing things, can
provide one of the most effective drivers for improvement in areas of governance. It is
accepted that sustainability has a broad and complex nature which may make it difficult to
reconcile all the endless possibilities for indicators and measures. PPDS subscribes to a
common view regarding their appropriate level for them to be meaningful and consistency with
these views has helped in developing the standard into a practical tool with indicators that
measure the sustainability of a precinct development (both buildings and infrastructure) at
several levels.
PPDS provides a means by which developers and their advisors can achieve sustainable
planning and design goals and in doing so, helps them conform to independent third party
certification. A critical dimension of this certification is the ongoing input to the developer’s
processes following the initial phase of planning and design. This will ensure compliance and
maintain recognition for a developer who is seeking to enhance its sustainability record. A
further aspect will be the integration and possible incorporation of other standards which cover
construction, operational and community outcomes. The standard provides essential
sustainability information for all the stakeholders involved in the development process. This
broad and inclusive approach is a means to secure possible early statutory approvals and
development delivery. It elaborates on the mechanisms of sustainability assessment and offers
support tools such as ’Sector Benchmarking Indicators and Measures’. It also describes
the process and requirements of undertaking benchmarking and obtaining certification status
respectively. Finally and most critically it provides a realistic picture of possible outcomes to
developers and their advisors by linking indicators to the development process and the crucial
decision-making stages of the planning and design process.
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright 2012 9
Page 57
ACHIEVING TANGABLE BENEFITS
As stated previously the developer and planning and design team at Noosa on Weyba have to
deal with specifics due to the very nature of development. It is recognised that the
sustainability agenda is becoming more tangible as developers and their advisors respond to
and seek the economic potential inherent in their aims and objectives. However developers will
not innovate if it is not possible to predict benefits such as recognition and reward. Further
resistance is probable if major returns like earlier development approvals are not on offer. To
meet this challenge the process based standard PPDS is linked to an international third party
benchmarking and certification organization to give credibility. Also the standard uses
appropriate indicators and measures as a mainstay in providing accurate information to aid in
decision making, implementation of solutions, improving planning and design and management
outputs and performance outcomes.
PPDS seeks to consider the sustainability of a whole area or community (rather than impacts of
individual buildings). The tool has been integrated into a whole process view of development
adopted at Noosa on Weyba. Accordingly it is able to adjust to a range of influences and
requirements. In particular it will respond to environmental, social and economic problems
which vary greatly from area to area within the precinct as will the answers. Related research
at University Queensland on behalf of EC3 Global created the guidelines and tools including
indicators and associated measures to help tackle these and other development issues.
As previously noted employing indicators is now widely accepted as a practical and meaningful
way to evaluate performance in order to help a developer’s progress towards and achieve
sustainability by:
Providing effective protection of the environment;
Making prudent use of natural resources, especially scarce and important ones;
Helping to integrate other industries i.e. tourism alongside other economic sectors;
Beneficially influencing physical patterns of development.
However it must be recognised that indicators are not a one-time procedure. They are most
useful when measured repeatedly and consistently through a long term independent monitoring
program. Recognition of this need has been given at Noosa on Weyba through the early and
continuing involvement of an advisor charged with creating the means for measuring actual
outcomes during and after actual physical development implementation. It is argued that by
giving focus to ’best practice’ planning and design around sustainability principles this will
bring high calibre results in the form of more efficient operation and management and
increased quality of service. Some of the key premises of the PPDS programme are that sound
principles build strong foundations and that good planning and design should be followed by
good management. Also being smart, resourceful and efficient saves time and money along
with the balancing the needs of people, place and economic returns which ultimately creates
partnerships which benefit all.
PPDS is a significant step in the development of sustainability tools. This has in part been the
reason for its adoption at Noosa on Weyba. Of particular importance is its interface between
developer inputs and authorities statutory requirements. It is also an integrated aid in meeting
the increasingly critical tasks facing the planning and design team as it comes under ever
increasing demands and resultant pressure, to ensure that its future activities meet the
growing agenda for ecological sustainable outcomes. PPDS has adopted the following principles
to define sustainable planning and design. The precinct’s development team will be using these
as preliminary guidelines to set objectives and select appropriate processes to fulfill the
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright 2012 10
Page 58
requirements of this Standard. Planning and designing for sustainability integrates Agenda 21
principles through appropriate statements in the Concept Master Plan covering:
Planning and design approach and application of sustainability policies;
Location and siti ng;
Conservation of energy and water resources;
Selection of appropriate materials and processes;
Protection of air, earth and water;
Planning for sustainability in the construction and operation phase of the development;
Social and locational issues.
KEY AREA INDICATORS AND MEASURE’S UNDERLYING THE STANDARD.
There are 10 Indicators using 50 measures underlying the PPDS Key Sector Areas. Each Key
Area Indicator is supported by on average five measures which are fully described in
documents made available to developers. The primary source of information is the PPDS
Handbook which includes examples of guidelines, compliance tables and actual case study
material. This documentation becomes available via Earthcheck when developers enter the
benchmarking and certification process.
The Key Context and Area Sector Benchmarking Indicators are presented here for ease
of reference.
Context: Sustainable Master Planning Approach (See Figure 7)
This key context is concerned with the understanding, introduction and management of
project aims, goals and scope with respect to sustainability.
1: Precinct Location and Siting Planning
This key area indicator and its measures major on the precincts location with respect to
regional services and infrastructure and its bearing on environmental impact in terms of
resource use -
energy, water, waste and transportation.
2: Energy Efficiency and Conservation
This key area indicator and measures consider the developers ’whole of systems’ view
and approach during master planning the principle of sustainable energy design.
3: Water Conservation and Management
This key area indicator and its measures are designed to consider the minimisation of
water usage and on site water treatment prior to use.
4: Solid and Other Waste Management
. This key area indicator seeks to measure reductions of development infrastructure,
building and operational waste.
S: Resource Conservation (Materials)
This key area indicator and its measures consider the reduction of new materials and the
use of reclaimed, recycled, and green materials on a precinct.
6: Chemical Use
This key area indicator and measures review the Chemical Use Strategy of a precinct
and aids in the identification and setting of targets for use of biodegradable alternative.
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright 2012 11
Page 59
7: Wastewater Management
This key area indicator and its management and
measures seek to consider the
treatment of wastewater in such a way that treatment requirements are reduced in
terms of tankage, energy and chemical requirements, and that treated wastewater is
able to be reused for non-potable uses.
8: Storm water Management
This key area indicator and its measures encourage and reward the idea of the
environmental sustainability in terms of dealing with stormwater generated in the
Precinct as opposed to discharging it for treatment elsewhere.
9: Social Commitment ’Quality of Life’ Approach
This key area indicator and its measures reviews the physical and soft policies seen as
being essential to the creation of a sustainable community leading to an improvement or
maintenance of ’Quality of Life’. (with ’Quality of Life’ meaning a shared vision of the
future for the whole community)
10: Economic Commitment
This key area indicator and measures seek to review the developers approach in terms of
positive inward investment, business opportunity and economic equity.
PROPOSED MASTER PLAN
The proposed uban development foolprirt represents oriy 19% ofthe total site area. and leu than 35% ofthe BDOA Receive site.
Sel’ld Site
~eceive Site
.API BOUMOr)’
I AND l!Sf AREAS HECTARES
Send land/t-.E!wNohooal Part 139..s
En vron mental Protection n ,
7
Land on ~eceive Site
unon FOO1rpril"lt 57.07
Pa~ 8.06
sos.s
PRODUCTSUM’vI’\RY DWELUN GS
R e~dentiol 499
R etiremen flAged Core O’lAelln g5 2:20
TO\l’l.flhoo:s 107
SO
876
.rdICOIW ~d j<.tlJlltod~loll~d dli’l ’"
Mtto~Qle
Figure 7: Master planning a whole community including infrastructure and individual lots.
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright 2012 12
Page 60
Principles for ’Sustainable Opportunities’
’The PPDS Handbook at Rise’
USING THE PRINCIPLES OF PPDS FOR SUSTAINBILITY OPPORTUNITIES
The following ’Sustainability Opportunities’ guidelines presented in this document (see also
accompanying development ’Quality of Life’ and ’Architectural and Landscaping’
guidelines) provide a compilation of items deemed to be both essential and desirable for the
creation of a sustainable precinct community at Noosa on Weyba. Underlying these guidelines
(See Figure 8 for the underlying principles of PPDS) are indicators and measures of those
factors which must be present for this precinct to be regarded as fully sustainable in terms of
its locational geography and proposed lifestyle. They are also required to be present to meet
the benchmarking and certification process and criteria of Earthcheck.
DEDICATED ESD
Elwtr mn.ftta’ SU.tllftlbll DlIIgI\
’1.Energy EfficieQcy R8fttctlng Age"21
2.WaterConserva1ion
3.Design and LMng mas aar.egf)nzed ,byEiWP:
...Universal Resort Planning
f. L Jl~d i’Jld [le!,1.EI,oprn.en(;
5.Safety
2. R:f)J’:ii i’_f.Jld _FaLmi..’~
6.Serity 3. Bp hJ War.eF;
7.Management .f’ StomrWii’.ter QLI’ality:
8.Trusport $. SeWge T 8Jiml!J1r(.-
6. iooi’JlcQ!. Sedin:f.efJr[iETOOl;
9.Emissions
r rrWl’i’c i’JJla rf;iiflSpart;-
,10.Materials 8.PlWSi:! Cf)Jlrtl~f)];
11.Land Use and Ecology fl. r QlJlity;
1(1. Visual Ameurty;.
12.11ea1th and WellJeing
11. C::lJJrunIReritaige_;
13.Community and Social Aspects f2. W.aste M_n-ig~.en’(; i’I.Jld
13. R~:;e MJl1sgernet:l’t.
ErwIfoamanbl .....gemalll:.....
Economic Inputs ,nd Outcomes
Figure 8: Underlying principles of PPDS.
Accordingly this document and the other guidelines should be used in conjunction with the
Precinct Planning and Design Handbook.9 (The following notes and details are taken from
the handbook for ease of reference). The PPDS handbook uses a prescriptive approach to
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright 2012 13
Page 61
establish sustainable visions, early planning and design processes and decisions, and a
performance-based approach to assess, benchmark, measure and reward positive
environmental performance (actual or potential). This would include, for example, the
measurable or predicted reduction in the generation of greenhouse gases by taking appropriate
planning and design decisions. The outcome should be an overall enhancement of a
developer’s planning and design intent and the environmental, social and economic
performance of the precinct’s planning, design and related infrastructure construction. The
Handbook is specifically aimed at those involved in the planning and design of mixed use
precincts where there is a variety of residential tenure, education, recreation and health,
commercial, retail and tourism facilities forming the major elements of the development. It
provides help at the strategic and detailed precinct site level.
By using the handbook it will: (after BRE)10
Offer developers, their planners and designers better awareness of how to ensure
sustainability in their precincts;
Provide frameworks for assessing the precinct;
Provide guidance on appropriate standards, indicators and measures;
Be capable of adaptation to local circumstances;
Provide a tool for developers and planning authorities to ascertain that sustainability has
been addressed;
Help planning authorities to specify sustainability in supplementary planning
gUidance/development codes, etc.;
Provide planners with a method of assessing the sustainability aspects of development
proposals consistently.
When considering the sustainability of precincts, wider social and economic issues will need to
be addressed. These issues are as critical to the success of any related precinct community as
are environmental imperatives. The handbook recognises this and offers guidance on how to
address such diverse inputs. It is also structured in such a way as to address the key
components of PPDS these are itemised as follows:
Sustainable Precinct Design, Planning and Infrastructure Construction Policy;
Regulatory Framework;
Sustainable Assessment;
Sustainable Planning & Design Management System;
Sustainable Infrastructure Construction Process Management;
Community and Stakeholder Consultation and Performance Reporting.
These will help to focus the development team on the process which is clearly not mutually
exclusive but interrelated. The handbook’s Key Area Sector Benchmarking Indicators
tackle, through positive measures, the underlying sustainability principles recognised as critical
to any development. It works by seeking to enhance benefits in social and economic outcomes
whilst ensuring minimal impacts on the environment. The indicators and measures and
suggested (but not exclusive approaches) in the handbook are structured so as to recognise
the vast diversity that can be experienced on projects and allow for appropriateness to be
determined without undue difficulty. The standards set are recognised ranges of performances
achieved on other developments or determined by consensus. The handbook’s indicators and
measures are also written to be flexible and provide opportunities to aid in the writing and
demonstration of;
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright 2012 14
Page 62
Master plans, development briefs or proposals;
The sustainability aspects of the development proposals i.e. energy strategy plans;
The specification of sustainability standards i.e. landscape and building codes or
guidelines;
The numerical performance evaluation of the development proposals;
Infrastructure management strategies;
Legal covenants for the implementation of environmental, social and economic
strategies.
THE PROCESS
To become Earthcheck ’Certified’, most of the requirements of the standard are met as a part
of the benchmarking, measurement and assessment process. There are five sections to PPDS
and complying with all five sections will lead to ’Certification’. The handbook provides
assistance for each of the sections and in doing so sets the template for identifying the
’sustainability opportunities’ at Noosa on Weyba. The development team can use these sections
as preliminary guidelines to set objectives and select sustainable practices to achieve
sustainable planning, design and infrastructure construction to fulfill the requirements of the
standard. They are briefly outlined as follows:
SUSTAINABLE PRECINCT PLANNING & DESIGN POLICY
The principal objective of this critical section is to describe a developer’s commitment to a
Sustainable Precinct Planning and Design Approach and have it contained in a formal
policy statement. This section assists in clarifying and declaring the planning and design
intentions and having a well-documented commitment to the goals and objectives (as set out
below) immediately from the outset of the development process.
Have a written Environment and Social Sustainable Precinct Planning and Design
Policy for the project that incorporates the points mentioned in this section and is
appropriate to the precinct and its infrastructure design’s environmental and local social
footprint. Contextual factors such as location, climate and design brief should be taken
into account when planning the required nature and scale of activities. The policy shall
have regard to the sustainable planning and design guidelines as described in preface of
the Standard;
Declare an intent to make appropriate changes and improvements in design to achieve
sustainability performance using indicators and measures at, or better than, the
Earthcheck ’Best Practice Level’;
Have a commitment to comply with relevant environmental legislation and regulations,
and with other requirements to which the planning and design should conform;
Have a commitment to give preference to indigenous planning and design strategies,
infrastructure construction practices and products/services of local origin, which endorse
the planning and design’s sustainable vision;
Have a commitment to promote the Sustainable Policy and Vision in the
infrastructure construction phase and integrate within the infrastructure construction
ma nagement system;
Have a commitment to communicate the aims of the Earthcheck PPDS program to the
infrastructure construction team, other builders and material suppliers;
Have a commitment to give special consideration to the long term employment and
training of persons living in nearby communities.
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright 2012 15
Page 63
REGULATORY FRAMEWORK
Compliance with legislation is a fundamental part of a development. PPDS seeks to ensure that
there is a compliance with the relevant legislation, plans, regulations and other commitments
that are critical for responsible development of the precinct, its environmental, social and
economic infrastructure and its physical construction. This section includes three items that
require particular attention:
1 Earthcheck assumes development process will have thorough inclusion and
that the
accountability for the
regulatory requirements and developers would have used this
information to help frame their environmental and social policies;
2 For the purpose of participating in the program, Earthcheck is seeking evidence that
developers will actually complete this work;
3 An up-to-date register of relevant legislation providing evidence of compliance must be
provided.
ENVIRONMENTAL AND SOCIAL SUSTAINABILITY PERFORMANCE
There are 4 subsections of the PPDS, which focus on the Earthcheck environmental and social
key performance areas and the corresponding precinct planning and design issues that need to
be addressed for the desired level of performance against the key performance areas. These
subsections support the benchmarking process and suggest a systematic and planned approach
to collect benchmarking information and dealing with improvement recommendations arising
from the benchmarking process. External review or reviews (which are subject to the scale of
the precinct) of the final precinct design are an essential part of the benchmarking process.
ECONOMIC SUSTAINABILITY PERFORMANCE
Whilst Earthcheck is primarily concerned with the environmental and social performance of
developments, it recognises that economic performance and its impacts are critical. To this end
it encourages those developers wishing to encompass the ’triple bottom line’ principles to
take the opportunity of showing that their project will bring sustainable economic prosperity to
the existing and proposed communities. This demonstration can be by means of addressing the
’Economic Commitment’ key area indicator and measures.
SUSTAINABLE PRECINCT PLANNING & DESIGN MANAGEMENT SYSTEM AND
SUSTAINABLE CONSTRUCTION PROCESS MANAGEMENT SYSTEM
These two sections are closely interrelated and assist in achieving the most efficient system to
obtain ahigh performance level of the final planning and design stages. These assist in
establishing systems, procedures, assigning responsibilities to ensure that the environmental
vision is fully integrated into the planning and design development process and eventual
i nfrastructu re construction process.
Having an efficient Sustainable Precinct Planning and Design Management Policy and
System is important in following an integrated approach. The early design decisions in a
development process are crucial for the overall performance outcome of the design. The policy
or system assists in establishing these goals and tasks, organizing resources and
responsibilities for implementing these and documenting the process for detecting shortcoming
and facilitating improvements. Whilst it is recognised that the PPDS benchmarking and
certification process is primarily aimed at planning and design outcomes (not actual physical
implementation), impacts of planning and design decisions on precinct infrastructure cannot be
ignored in the assessment. Sustainable infrastructure construction process management
policies and/or systems are seen as a sustainable approach for the eventual day-to-day
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright 2012 16
Page 64
management of the project and are essential in maintaining and achieving the precincts
sustainable vision. Specifically, they help in identifying the role, responsibilities and goals for
the whole infrastructure construction process. Further they outline the tasks and actions to be
taken in implementing and operating both policy and/or system. For the purpose of
certification, Earthcheck will assess the quality of these management policies and systems and
demonstrated performance against the tasks identified in the policy and/or system framework.
However, it is to be remembered that the ’sustainability assessment’ and real
environmental improvements form the basis of the Earthcheck system and not just the
management process.
A Sustainable Precinct Planning and Design Management System and
Sustainable Infrastructure Construction Process Management System should
include the following actions and tasks:
A description of the purpose of the management policy and/or system; identification of
the principal environmental issues that need to be addressed. These should be prepared
in the context of the PPDS and Agenda 21;
Key issues need to beanalyzed and planning, design and infrastructure construction
issues identified so that they can be considered for the desirable performance evaluation
against the KPAs;
Environmental improvement targets and goals should be set along with a description of
actions that need to be taken. These actions would normally be placed in priority order
and would be budgeted for as part of the routine budget planning process;
Implementation plans and procedures should be developed. This would include training
and development to help implement actions prescribed by the policy and/or system;
A section dealing with ’working with the local community’ to help achieve environmental
improvements and community benefits;
A checklist should be made for any corrective actions;
Once the policies and/or systems are implemented, the implementation progress would
be regularly monitored. In particular, environmental improvement actions that have
been benchmarked will
be regularly checked to assess their performance. Such
monitoring would provide the proof necessary for the certification process;
Results of the monitoring will be communicated to ensure there is continuous
improvement.
STAKEHOLDER CONSULTATION AND COMMUNICATION (Figure 9)
This section focuses on the importance of dealing with stakeholders and customers along with
social and economic issues. This aspect of social and economic commitment is present in all
the sections of the standard in some way or other, because it is a critical area in terms of
meeting the requirements of Agenda 21.
Establish effective consultative mechanisms and strategies to ensure all sections of the
community are able to participate in developing and implementing the environmental,
social and economic strategy;
Communicate to the stakeholders and community in a simple, clear, obvious and
regularly updated manner, their environmental, social and economic performance based
on their sustainability assessment and their related activities resulting from participating
in the Earthcheck program;
Encourage customers and suppliers to engage in the environmental, social and
economic programs;
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright 2012 17
Page 65
Encourage and respond to positive and negative feedback from the community on the
environmental, social and economic sustainability policy and related performance
targets;
Maintain records of community consultations and communications;
Be proactive in raising stakeholder awareness of local and global environmental issues;
Regularly produce and distribute a community sustainability report in an appropriate
format.
Figure 9: Community consultation and governance
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright 2012 18
Page 66
’Sustainability Opportunities’
Strategies, Guidelines and Checklists
TASKS AND TOOLS
The following ’guidelines and checklists’ are an attempt to provide through a range of
identified ’Sustainability Opportunities’ the best outcomes for the environmental, social and
economic environments both now and into the future at Noosa on Weyba. The opportunities
relate to the continuity of these triple bottom line aspects of human society, as well as the non-
human environment.
The planning, design and eventual construction outcomes need to manifest as sustainable
physical objects which comply with the principles of economic, social, and ecological
sustainability. At the precinct these will range from the designing of major infrastructure,
individual buildings and related spaces for a wide range of functions through to the designing of
small objects for individual everyday use. When undertaking the critical activities related to this
phase of the development process steps must be taken to avoid irreversible damages to natural
capital in the long term. There must be a clear reconciliation of the development projects short
term benefits with the regenerative capacity of the natural environment.
The guidelines and checklists are documents aimed at streamlining the sustainability planning
and design process. They provide in the case of the guidelines protocols for governing the
inputs procedures needed to comply with the requirements of Earthcheck benchmarking and
certification. They are also a means by which the developments ecological performance and
quality can be predicted, measured and improved. The checklists are essential tools in meeting
the need for consistency and completeness in the task of achieving sustainable outcomes
GUIDELINES
Translation of the principles of sustainability into practical performance based opportunities will
be the intent of the following documentation. These documents aim to provide guidance and a
range of options to help the planning and design team deliver practical actions that reflect
essential and desirable sustainable outcomes. Broad issues, guidelines, checklists and
compliance tables are provided. These represent the factors selected to form the essential
ingredients of a sustainable precinct development and the means by which its performance can
be measured and benchmarked.
In creating a model or framework for Noosa on Weyba it is important to determine that there is
a broad consensus amongst the development team as to what is the sustainability commitment
of the developer. The precinct is a major undertaking and resultant impacts will be felt within
its own boundary much further afield. Therefore it is essential that all those involved ascribe to
a common set of principles and commitments which reflect the original goals, aims and
objectives of the development.
Accordingly it is relevant to note these down in a form that can be
clearly identified and
assessed. This assessment is important not only for the developer, the planning and design
team and other stakeholders but is also needed to align the precincts overall goals with those
of the Precinct Planning and Design Standard (PPDS). The following Guidelines and Checklists
are a commitment at Noosa on Weyba to sustainable master planning and design. The
overriding driver of these documents is to achieve at the precinct a sustainable development
through an ecological performance process that has the capability of ensuring and enhancing
the continuation of natural and human systems over time.
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright 2012 19
Page 67
The developer is committed to the goal of using world class planning and design practices at
Noosa on Weyba, with the responsibility of delivery falling on the planning and design
development team. They are charged with delivering an innovative mixed use precinct with a
wide range of stakeholders. This precinct is to be environmentally, socially and economically
sustainable. The challenge is site specific given the precincts unique location and geography. To
achieve the goals, aims and objectives noted it is important that there is total integration of the
practical dimensions of planning and design delivery. However equally important is the need for
commitment from all members of the development team to the principles of sustainability.
To achieve this: the Development Champion (See Figure 6) will be required to start the
process of commitment by completing sections of the following guidelines and checklists. This
presentation of directives and requirements will amend over time during the phases of total
development. This early whole system review is an indication of awareness by the developer
regarding the need for integration and appropriate decision taking at the critical planning and
design phase.
1. COMMITMENTS (After Hanover Principlesi1
Precinct Sustainability at Noosa on Weyba Queensland
Commitment to ’Sustainability Principles’
V’
1 To provide a healthy, supportive, diverse and sustainable built environment
for the built and natural environment
2 To adopt a broad, interactive and interdependent planning and design
approach to the Master Planning of the precinct.
3 To use ’triple bottom line’ philosophy regarding planning and design inputs
and outcomes
4 To determine responsibility for and consequences of planning and design
decisions.
5 To ensure long term safety, low maintenance and added value throughout
the precinct and adjoining area.
6 To eliminate waste by using ’life cycle’ approaches when planning and
designing all aspects of the precincts products and processes.
7 To utilize energy sources that are from ’green’ sources and sustainable in
the longer term.
8 To seek to ensure the long term evolution of the precinct in a positive and
sustainable manner.
9 To provide an open and sharing planning and design process that is both
ethical and integrative of all stakeholders.
10 To seek constant improvements through knowledge transfer throughout the
planning and design process.
2. ACTIONS (AfterAIAi2
Precinct Sustainability at Noosa on Weyba Queensland
Commitment to Action Sustainability Principles
../
1 Ensure environmental, social and economic sustainability are at the core of
the precincts qoals aims and objectives.
2 Adopt sustainable planning and design practices, procedures and standards
in deliverinq the Master Plan.
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright 2012 20
Page 68
3 Create wide educational value in the integration of sustainable planning and
design at the precinct.
4 Undertake a planning and design approach which is aimed at meeting and
changing statutory regulatory requirements regarding sustainable outcomes.
5 Deliver performance outcomes that improve the new and existing built
environment at and surroundinq the precinct.
The developer has determined that the planning and design of the precinct must give
consideration to ecological sustainability through a range of broad strategies and principles and
practical planning and design inputs. These include at the practical level orientation, energy
efficiency, water conservation and management, waste and resources management. For the
broader precinct development level connectivity to adjoining economic and social infrastructure
is considered critical. However whilst reference is made in the following guidelines and
checklists the majority of the equally important broad and practical social and economic inputs
are to be found in an accompanying document entitled quality of life guidelines.
Noosa on Weyba is a mixed use precinct with a range of residential dwellings and tenure and
community facilities. There are also extensive open spaces. All of these are to be supported by
infrastructure and services. The scale of the development allows for a variety of neighborhoods
to be created within the boundaries of the precinct. Accordingly the following guidelines and
checklists have been created to accommodate in the first instance a broad range of
sustainability opportunities. These will encompass the whole of the precinct and attempt to
determine an aggregated balance for the undertaking. The second suite of documents will
consider individual areas and buildings. This approach it is suggested will provide a means to
achieve wider sustainable outcomes.
Regarding the benchmarking and certification it is essential for there to be full and concise
descriptions of the development, its location, proposals and participations if the process is to
work efficiently and economically. Of critical importance is single point contact. These details
and other relevant facts should be identified in a project profile or executive summary or by
using a ’Pre Commitment Questionnaire’ that is required for all developments seeking to
undertake PPDS benchmarking and certification. This document’s questions which are
reproduced here seek to determine a developers project aims, goals and scope with respect to
sustainability. As this is normally requested at the feasibility stage of a project it is also a
means by which a developer can begin to foster a policy for an inclusive planning approach,
which prioritizes sustainability, and increases the probability that sustainable outcomes are
achieved in the project. In addition, its use is a way to begin the process of establishing
planning targets with a performance basis for master planning, ensuring possible reductions in
greenhouse gas emissions and other key areas such as waste and water use.
3. PRE COMMITMENT AND ACTIONS ASSESSMENT
Pre commitment assessment of development (planning, design and infrastructure construction)
against The EC3 Global (Earthcheck) Precinct Planning and Design Standard (PPDS):
(PPDS)KEY AREAS YES / NO RESPONSIBILITY COMMENTS
1: Sustainable planning, design and infrastructure construction approach
Will the Planning Report and Master
Plan contain a sustainability vision
and appropriate aims and
objectives?
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright 2012 21
Page 69
Will the Precinct Development Design Guidelines reflect the sustainability vision, aims and objectives? Will the Precinct Design Guidelines, Sustainability Briefs, etc., be submitted with the Development Application Will an interdisciplinary and coordinated approach between all design professionals been adopted? Will there be clear evidence of an undertaking to implement an effective Environmental Management System (EMS)? Will there be a statement or plan committing to or outlining the procedures for a post development environmental and social assessment of the development? Will a Life Cycle Cost Plan approach be used in the determination of Total Precinct Development Cost? Will Total Precinct Development Cost include a budget for non- negotiable sustainable strategies and measures? Will there be an Infrastructure Construction Process Management Policy in place for environmentally responsible construction? Will there be a policy/set of criteria in place to judge an infrastructure contractor’s experience (i.e. environment management skills) prior to job assignment? Will there be a contractual agreement with the constructor, to include sustainable infrastructure construction standards and a sustainable infrastructure construction management policy? Will there be a policy for the selection of green materials, technologies and processes for achievement of low environmental impacts? Dr Richard Moore EC3 Global Earthcheck Assessor Copyright 2012 22
Page 70
Will there be Is there a policy for the selection and purchase of Ecolabel products? 2: Energy Efficiency and Conservation Will Passive Design Strategies be used? Will there be information available regarding the annual total energy consumption for the development? Will there be information available regarding the gross CO2 emissions for the development? Will reduction targets be set for CO2 emissions? Will there be information available regarding non-renewable and renewable energy consumption? Will there be information available regarding cogeneration techniques to be employed throughout the precinct development? Will targets be set for the optimal siting of infrastructure, allotments and buildings? Will targets be set for the use of energy efficient equipment in the development of the precinct i nfrastru ctu re? 3: Potable Water Consumption Will a comprehensive Water Management Strategy be in place during the development of the precinct? Will a methodology be in place to calculate the annual potable water consumed? Will reduction targets be set for potable water consumption? Will a methodology be in place to calculate the annual potable water consumed for environmental functions? Will targets be set for water harvesting and the reduction of auxiliary water consumption? Dr Richard Moore EC3 Global Earthcheck Assessor Copyright 2012 23
Page 71
4: Solid Waste Production Will a Waste Management Plan be in place throughout the development of the precinct? Will targets be set to reduce the amount of waste generated during the development of the precinct? Will targets be set for recycling during the development of the precinct? 5: Social &. Economic Commitment Will a ’Quality of Life’ plan be prepared and submitted with the Development Application? Will there be a statement or plan committing to or outlining the procedures for a post development environmental and social assessment of the development? Will a framework of measures for long term community sustainability be created and implemented throughout the development of the precinct? Will the development provide future users with a high degree of environmental, social and economic interaction andlor integration with any existing and new community with particular consideration to minimal impacts on nativeltrad itiona Iii nd i genous communities? 6: Resource Conservation during Infrastructure Construction Will Design Codes and lor policies for green technologies, materials and processes aimed at achieving low environmental impact be prepared and included in the Precinct Design Guidelines? Will targets be set for the purchasing of Ecolabel products during the development of the precinct? Dr Richard Moore EC3 Global Earthcheck Assessor Copyright 2012 24
Page 72
Will the precincts infrastructure and building systems be specifically designed and or developed to reduce energy consumption and waste during and after construction? Will reduction targets for water usage on site be set for the infrastructure construction phase? Will reduction targets for waste generated on site be set for the infrastructure construction phase? Will reduction targets for energy use on site be set for the infrastructure construction phase? 6: Chemical Use Will there be a Chemical Use Strategy in place during the development of the precinct? Will targets be set to reduce the use of non-biodegradable chemicals? 7: Siting Will there be evidence of the appropriateness of site planning regarding constraints and opportunities offered by the natural and built environment? Will measures be identified to ensure the development has minimal impact on native/ traditional/ indigenous land and populations? Will measures be used to reduce the amount of site disturbance caused by ground works i.e. cut and fill? Will there be enhancement of the ’user’s’ understanding, interaction and integration with the natural and social environments through siting design guidelines? 8: Waste Water and Storm Water Management Will a Waste Water and Storm Water Management Plan be employed throughout the development of the precinct? Will measures be identified for the harvesting, use, re-use or recycling of on-site water resources during the life of the development? Dr Richard Moore EC3 Global Earthcheck Assessor Copyright 2012 25
Page 73
Will targets be set for the reduction
of waste water treated using off site
facilities?
Will targets be set for the reduction
of storm water volume discharged
into off site facilities?
On completion of this pre commitment questionnaire there should be clear evidence that a
developer and the planning and design team are pursuing a course that leads to the
implementation of sustainable development strategies and policies. The next focus is on the
translation of planning and design objectives in practical guidelines. PPDS again provides the
template for a performance based process which can be followed by a development team
seeking to engender sustainability in its planning and design outcomes.
4. TOWARDS PRACTICAL SUSTAINABILlTY
The following is taken from PPDS and offers information on key areas and their scope of needs
which the development team will be required to consider and reflect in their planning and
design decision. Sustainable master planning is primarily concerned with the project aims,
goals and scope with respect to sustainability. At the feasibility stage of the project it is
advisable to develop a policy for an inclusive planning approach, which prioritizes sustainability,
and increases the probability that sustainable outcomes are achieved in the project. In
addition, the use of benchmarks as planning targets establishes a performance basis for master
planning, ensuring possible reductions in greenhouse gas emissions and other key areas such
as waste and water use.
The location of theprecinct and its site planning with respect to regional services and
infrastructure has major bearing on its environmental impact in terms of resource use
a -
energy, water, waste and transportation. The site selection of precincts is therefore a crucial
part of achieving sustainable development. Zoning within the master plan reflects the
environmental siting of buildings and infrastructure this can have a major impact on the
reduction of native habitat and loss of biodiversity. Hence the planning and design process
should examine the loss of the natural environment to the built environment, or conversely, for
’brown field’ sites, the restoration of biodiversity and reuse of existing sites. Designing
buildings to mitigate loss of ground-based habitats should be considered.
Landscaping of the site and the creation of public open space and its relation to the building is
also an important element of microclimate control and the mitigation of heat island effects and
improvement of social amenity. Site planning should seek to minimize disturbance to the site
through changes to the topography and natural environment. This is seen as one of the major
negative impacts of development. Site development processes which include large terra
forming exercises and clear felling of vegetation are not only resource intensive but extremely
damaging to the natural environment.
Energy efficiency is now a crucial element of any development undertaki ng: be it for the short
term construction or long term post occupancy phases. Significant levels of energy can be
consumed by a precinct’s buildings, its recreational facilities and infrastructure. An overall
reduction in energy consumed will have a positive impact on precinct energy costs and major
environmental benefits through conservation of natural resources and lowering associated
greenhouse gas emissions. Developers need to consider during master planning the principle of
sustainable energy design by taking a whole of systems view. Principles of energy conscious
design are embodied in the following objectives and include passive solar design (PSD), use of
efficient active systems, urban form design, renewable energy use and cogeneration. Urban
form design techniques should also be implemented.
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright 2012 26
Page 74
Objectives can be set and achieved
by deriving energy from cogeneration facilities and
renewable sources like the sun, wind, water and possibly hydrogen in the future. Of equal
importance is the promotion of the minimisation of water usage, and water treatment prior to
use. Water is used by residents, commercial operations, and public utilities as well as for
irrigation, cleaning, and other services such as firefighting and road washing within precincts. If
not correctly managed, the development and operation of the precinct will place pressure on
existing water supplies, reducing availability and affecting wildlife and habitats.
Implementation of water conservation and management strategies should allow long-term
sustainability to be achieved without compromising overall operation. It is should be recognized
that water supplied to the precinct may be of differing quality to coincide with its use:
residential water supplies must be potable whereas water required for usage where there is no
public access (e.g. irrigation) does not need to be such high quality. As there is an energy and
chemical requirement associated with producing potable and higher quality water, there are
economic and environmental advantages to treating water only to the required standard.
Matching water quality with its use increases sustainability.
Increasing volumes of solid and other waste generated, together with disposal to landfills, can
generate numerous environmental impacts such as contamination of groundwater and
waterways through leachate formation, and increased greenhouse gas emissions. Solid and
other waste will be generated from precinct activities linked to travel and tourism operations
such as accommodation facilities, related retail outlets, and community activity through to
maintenance. Poor decisions at the planning and design stage could lead to levels of solid
waste generation of up to 40% of the material used during the construction of precinct
infrastructure and subsequent precinct buildings. Measures to reduce such an unacceptable
outcome need to be implemented during the planning and design stages of a development to
reduce infrastructure, building and operational waste. Further bad planning and design
decisions could lead to missed opportunities to reclaim and reuse materials generated by
enabling and operational works. Management of the likely solid and other waste is best
achieved through implementation of a waste management plan which seeks to reduce the
volume of solid waste generated, and also adequately manage waste so that recycling and
treatment can occur efficiently.
Materials required for the building and maintenance of the precinct development will apply to
commercial, residential, community and accommodation buildings, as well as the supporting
infrastructure. Whilst new materials will continually be required for the Precinct, reductions can
be achieved, by giving consideration to reclaimed, recycled, and green materials. Materials
selected in compliance with architectural and landscaping guidelines should minimise
environmental impact. For example, the selection of locally produced materials reduces the
quantity of energy expended on transportation. This practice along with numerous other
guidelines can result in a decrease in harmful emissions and improve air quality.
Chemical usage in a precinct consists of pesticides, herbicides and cleaning chemicals. Further
this range of chemicals is increased during the construction phase. A chemical use strategy can
assist with identification of the purpose of each chemical and can also assist determining if a
biodegradable alternative can be utilised. Establishing target proportion of biodegradable
a
chemicals to total chemicals will result in decreased environmental impact (contamination of
waterways), and implementation of a chemical use strategy will gradually decrease total usage
of chemicals.
Wastewater is produced from the following sources rainfall runoff from roads and pavements,
domestic residences (kitchens, bathrooms, laundries and tOilets), commercial buildings (toilets,
kitchens, car washing, etc.) and public utilities (toilet blocks, hospitals, schools etc.). The
implementation of sustainable strategies to this key area promotes the management and
treatment of wastewater in such a way that treatment requirements are reduced in terms of
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright 2012 27
Page 75
tankage, energy and chemical requirements, and that treated wastewater is able to be reused for non-potable uses. There should also be promotion of applications of best practice for the treatment of wastewater and treatment to an appropriate standard. Treated wastewater not recycled for non-potable use should be returned to the source, if extracted from a river, or detained on site in a constructed wetland or other secondary use. The quality of the local creeks, streams, and estuaries must be maintained. Runoff from the development will be defined as that water generated through rainfall on pavements and roads and other impervious surfaces that are not connected to rainwater tanks. As such this runoff requires a measure of treatment before non-potable reuse as it usually has some contamination from vehicles and animals and things like acid sulphate soils. The long term environmental sustainability benefits to the precinct in terms of dealing with stormwater generated in the precinct as opposed to discharging it for treatment elsewhere should be recognised. The final two areas make up the triple bottom line approach recommended for the development. However they are primarily dealt with as noted before by a separate document which focuses on quality of life guidelines. That said there will be references to the issues of social and economic commitment in the guidelines and checklists that follow. This is due in part to interrelated aspects of the approach and therefore requires a passing reference to be made to them at this stage. All new or existing communities will have different characteristics according to their history, geography and the sum of lifestyle choices made by their inhabitants. Accordingly, this suggests that an almost infinitely extendable list of desirable characteristics can be provided, any of which would help to make them more sustainable. Any list that is formulated should reflect the aims and objectives of the development and act as a checklist of its translation into what can be termed hard or soft foundations. These foundations or physical and soft policies are seen as being essential to the creation of a sustainable community leading to an improvement or maintenance of quality of life with quality of life meaning a shared vision of the future for the whole community. Economic outcomes are closely linked to environmental and social performance and its impact can be (as with the other two development factors) both positive and negative. Inward investment for say foreign currency exchange, increased employment and business opportunities are some of the possible improvements to be seen. However, the greater dependency on foreign investment and companies, instability in labour markets and diversion of investment from other development areas can have detrimental effects. Achieving a well-integrated approach that creates a ’win- win’ situation will be the major aim of a developer (Figure 10). Accordingly it is crucial that when making decisions environmental, social and economic considerations must be reviewed by the development team. There are major implications regarding outcomes if the three are not given equal attendance at the time of committing to a particular course of action. For example locating a building without due regard to its views, surrounding vegetation, neighboring buildings and access to precinct facilities will have major social and economic impacts. These impacts could be determental to an individual resident, and the community at large. Figure 10: Social and economic value Dr Richard Moore EC3 Global Earthcheck Assessor Copyright 2012 28
Page 76
S. PRECINCT PLANNING AND DESIGN STARTEGIES
At Noosa on Weyba opportunity to achieve a wide range of sustainable outcomes arises from
the fact that the Developer: Northbrook has significant control over strategic planning and
design decisions. This ability to direct and ultimately determine the course of the development
delivery in terms of sustainability should not be underestimated. How to use this control
effectively is crucial and should be aimed at supporting the planning and design team in either
encompassing third party criteria and/or generating their own measures. Underpinning these
measures is what Buchanan (2005)terms the ’Ten Shades of Green,13:
Low Energy/ High Performance;
Replenisable sources;
Recycling: Eliminating Waste and Pollution;
Embodied Energy;
Long Life Loose Fit;
Total Life Cycle Costing;
Embedded in Place;
Access and Urban Context;
Health and Happiness;
Community and Connectivity.
The outcomes from using these shades in the implementation of a broader strategic approach
will it is believed lead to a development that has the following attribute;
A secure and
well-designed precinct with distinctive human scale environments
(neighborhoods)combined with the best features of a unique, rural hillside location and
topology;
Improved pre planning and design, construction and post occupancy management
processes which encourage, implement and support sustainable practices;
Empowered stakeholders able to influence decisions which impact on the quality of life
of themselves and others.
Precinct Sustainability at Noosa on Weyba Queensland
14
Key Precinct Planning and Design Management Strategies (after TCPA)
./ or x Comments
1 Encou rage the active involvement of the Precincts
existing and new stakeholders in the development
process.
2 Ensure that the precinct development and any related
(i.e.
activity offsite playing fields, long term
management) includes a sustainability principles
statement in its brief.
3 Apply the sustainability principles to the
same
assessment of all applications made to the Precinct
for approval to carry out any planning, design and
construction related activity.
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright 2012 29
Page 77
4 Enforce sustainable on-site processes dealing with
crucial issue such as waste management, energy
usage, construction activity etc.
5 Make decisions that are carbon neutral where
practical and seek to reduce impacts that may lead to
climate change.
6 All planning and design decisions taken must ensure
that appropriate reuse of the land within the Precinct
particularly regarding densities.
7 Encourage the concept of zero energy or net export
energythrough energy efficiency, embedded energy
generation and energy efficient supply systems
throughout the precinct.
S Where practical implement plans for the conservation
of materials and the promotion of locally sourced,
recycled or sustainably managed resources.
9 Ensure the conservation of water both internally and
externally of the precinct.
10 Determine and implement planning and design,
construction and post occupancy management
processes that ensure reductions in the impacts of
noise, flooding and micro-climate effects.
11 Ensure that planning and design, construction and
post occupancy activity conserves, protects and
makes best use of existing natural systems,
particularly in relation to bio diversity, both within
and adjoining the precinct.
12 Undertake to implement planning and design
decisions that create new habitats inhabited by
indigenous species.
13 Facilitate and support the means by which changes in
behavior will lead to greater sustainability practices
throughout the precinct.
14 Promote the take up by the precincts stakeholders of
sustainable practices regarding energy, water, waste
and transport.
15 Through planning and design ensure appropriate
development form regarding the characteristics of the
site and surrounding area: access, proximity to
amenities, and permeability to promote walking, use
of public transport, useful open space and community
security.
The outcomes from the proceeding key strategies should raise the environmental standards of
the new precinct and make a contribution to sustainable development targets and the reduction
of emissions that contribute to climate change. They should also establish an outline for
practical steps that can be taken to achieve these higher standards by drawing together the
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright 2012 30
Page 78
experiences of other innovative projects and assessing how much of current best practice could
be applied as the norm throughout the precinct’s delivery program.
The strategies also offer an opportunity to make recommendations to other stakeholders from
the development and construction industry who may be involved in providing services or
undertaking specific facility provision at the precinct. Their content provides for the specific
changes to the planning, design and construction regulatory management systems needed to
ensure the best potential for achieving higher standards. This drive for higher standards in new
precincts is in order to raise public and political awareness of the practical possibilities for
making new development generally more sustainable, and the long-term benefits, both
financial and in relation to quality of life more achievable.
6. PRECINCT PLANNING AND DESIGN GUIDELINES
The following are broad guidelines which seek to achieve and enhance in the longer term
environmental, social and economic sustainability at the development. The guidelines and
subsequent checklists form a suite of documents that start with an initial overview of
sustainability opportunities and then begin to focus on more discrete areas of planning, design
and construction of specific areas and facilities. They are by no means definitive and can be
utilized in the current form or adjusted to accommodate the inevitable changes that come from
the dynamic process that is precinct development. Further there is reference and linkage to
Earthcheck’s benchmarking and certification requirements. This is to ensure that compliance
needs and assessment data or details are noted and recorded were appropriate.
6.1 SPATIAL PLANNING
Spatial planning has a major and positive contribution to make in meeting the challenge of
sustainable forms of development. This crucial area of development activity can through
appropriate policy decisions and directed strategies contribute to the following by:
"Promoting the highest standards of resource and energy efficiency in the new
development so as to reduce carbon dioxide (C02)emissions arising from construction
and use;
Requiring land use patterns that reduce the need and the propensity to travel by car;
Vigorously promoting small and large scale renewable energy projects;
Reforming or restricting development which would otherwise have a major impact on
co2 emissions; and
15
Adapting to the harmful impacts of climate change".
It is also important to note that for Earthcheck there are clear objectives at this stage of the
development process. These include sustainable master planning and management practices
which are integrated into the project at an early stage of the development process with
consideration being given to activities in later phases such as building design and actual
operation. Within the PPDS Handbook16 the ability to achieve these and other objectives for
the identified Ecological Key Areas along with suggested measures are provided. Importantly
any strategy considered must not only respond to specific development needs but also to the
benchmarking and certification criteria contained in the handbook.
For example the following strategies which are to be found in the handbook would need to be
reflected in any guidelines or checklist formulated for the early master planning and design
phase. Strategies for Sustainable Master Planning and Design:
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright 2012 31
Page 79
A planning approach and project brief, which commits to sustainability as a major
objective for the precinct, is necessary so the design team can implement new systems,
methods and visions that are available to achieve sustainability;
Establish a vision forproject encompassing sustainability which involves
the
participation from the community and other stakeholders in the establishment of goals
and objectives for the project;
Adoption of a life cycle view for the planning and construction of the precinct;
Formation of a multidisciplinary planning team that deploys an integrated approach to
coordinated planning solutions and also involves the enabling infrastructure design and
construction tea m;
A multidisciplinary team that explores the feasibility of sustainability of the planning
strategies through the use of planning option exercises. This is necessary to
demonstrate the environmental performance improvements predicted for the project;
Ongoing monitoring and environmental performance appraisals are needed to ensure
continuing improvement of environmental performance need;
Use of the title agreement for the precinct to ensure compliance with local mandatory
and other voluntary environmental standards for master planning, building design,
construction and operations;
The enabling precinct infrastructure and its buildings are designed and constructed using
environmental standards.
The practical measures required to achieve these broad strategies would need to be found in
the corresponding checklists and will need to reflect Earthcheck requirements amongst others.
Regarding assessment examples would be the development brief which should include
sustainable goals, objectives and performance targets and the ’Community Consultation
Plan’ or quality of life guidelines which should identify how the existing and the new
community will be involved in the planning and design of the precinct. Another important
measure would be the makeup and structure of the multidisciplinary planning and design team
with regards to its experience in sustainable master planning. Also it has been noted on other
precincts that ’Architectural and Landscape Codes’ which integrate local mandatory and
other voluntary environmental standards can be successfully employed in achieving widespread
sustainability. These tools or standards are particularly powerful when the legal integration of
environmental standards within the precinct’s title is in place within such documents. They can
serve to guide and enforce the adoption of environmental standards for the design,
construction and operations of enabling infrastructure and buildings for the precinct. Again
these would be termed assessable documents for the eventual certification of the precinct
under the Earthcheck PPDS process.
With each of the ’Key Area Indicators and Measures’ in the handbook the predicted level of
performance should be identified as a target for the project. This target can be expressed
relative to a ’base case’ that is a similar project that does not include environmental measures
or a ’best practice’ outcome where measurement or assessment of a project has taken place
and been so described. It is worth noting that some targets are qualitative and somewhat
difficult to predict or measure accurately. Others are quantitative and as such lend themselves
to targets which for example could be to use 30% less non-renewable energy and 10%
renewable energy. These targets provide a basis for the design team who can carry out a
design options study to test the feasibility of their validity.
For the most part the content of the indicators that make up the PPDS handbook is pre-
determined. This is seen as an effective way in ensuring best practice consistency throughout
developments undertaking performance based benchmarking and certification. However
indicators and measures can be amended to accommodate local conditions of individual
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright 2012 32
Page 80
developments. This is because the need to integrate into a whole process view of development
will require the indicators to be able to adjust to a range of influences. In particular it will need
to respond to environmental, social and economic problems which vary greatly from area to
area as will the answers. Any amendment must be agreed so the sector benchmarking can be
adjusted to allow for accurate data measurement and interpretation.
Only the more qualitative ’Social and Economic Indicators’ which utilize commitment
templates can be significantly modified or replaced by agreement with forms that better reflect
the development and its location. It is argued that PPDS may help in the resolution of a much
broader range of issue because of its wide ’Key Area Indicator’ suite and their contents;
however it may not fully reconcile all the issues. Sustainability and planning linkages need to
be reflected in the decisions made on how best to achieve mutuality in terms of developer and
stakeholder goals, aims and objectives.
As noted, PPDS is a process based performance monitoring tool. It uses appropriate indicators
and measures as a mainstay in providing accurate information to aid in decision making,
implementation of solutions, improving planning and design and management outputs.
However it must be recognised that its indicators and measures "are not a one-time procedure
they are most useful when measured repeatedly and consistently through long term monitoring
17
programs". They are also useful if development targets in areas such as energy use, water
conservation and employment levels etc. are identified. Verification and possible modification of
these targets can only be achieved by such monitoring. Again the developer has recognized this
issue and has undertaken to use the development as a case study against which the proposed
content of individual indicators and measures could be tested, evaluated and amended as
required. The following are important principles of sustainable planning and design to be
employed at the development
Precinct Sustainability at Noosa on Weyba Queensland
Key Planning and Design Principles or x Comments
1 Maintain close proximity to adjoining location areas
particularly infrastructure and social and economic
facilities.
2 Ensure that ecologically sensitive areas of the
development site are protected and enhanced
through appropriate clustering of the precincts
buildings and infrastructure.
3 Create a philosophy of landscape hierarchy to
protect and retain the character of the existing
natural environment.
4 Encourage through design the protection and
. .
regeneration of the existing vegetation giVing
particular emphasis to the use of native species.
5 Develop the Master Plan to minimize the impacts on
the existing landscape topology by using existing
contours and natural features.
6 Utilise the existing landscape for open spaces,
wildlife protection barriers and movement corridors.
7 Provide added value and a distinctive precinct rural
character through the protection of lake views and
natural landscape features.
8 Locate buildings and associated infrastructure in a
way that is not determental to the existing site but
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright 2012 33
Page 81
has positive visual impacts on the precincts location
and its character.
9 Design the buildings and associated infrastructure so
that it isappropriate to the developments location
and character.
10 Design buildings and associated i nfrastructu re that
are environmental sensitive and sustainable.
11 Adopt an ESUD approach regarding water treatment
and drainage discharge.
12 Provide significant areas of open space providing a
variety of uses and facilities.
13 Ensure that there is a wide variety of mix in the
precincts facilities giving due regard to the
surrounding social and economic profile.
14 Provide extensive and safe access to the Precincts
facilities and open spaces.
15 Ensure through design that there is connectivity to
the surrounding areas.
Having determined the underlying principles that guide the development team in its
interpretation of sustainability at Noosa on Weyba the following are critical questions
regarding the nature and approach of the development team to the overall goals,
aims and objectives of the development in regards to the delivery of long term
sustainability at the precinct.
6.2 PRECINCT PLANNING AND DESIGN -
CRUCIAL QUESTIONS
Precinct Sustainability at Noosa on Weyba Queensland
Sustainable Planning and Design Questions ./ or x Comments
1 Have environmental sustainability factors been used in the
selection of members of the planning and design team?
2 Are members of the development team fully aware of the
developments goals aims and objectives?
3 Is the planning and design process designed to allow
active communications and balance between program
needs and long term investments in sustainable precinct
development?
4 Is innovative and possible alternative planning and design
solutions being investigated and encouraged?
5 Has a full economic and social profile been carried out to
ensure appropriate mixed use zoning at the precinct?
6 Are financial options and incentives for en vi ron mental
sustainability limited?
7 Has a full and comprehensive ecological study been
undertaken at the Development site and surrounding area?
8 Has thirdparty benchmarking and certification based on
performance outcomes been introduced into the planning
and desiqn process?
9 Has a site specific evaluation of the local ecosystem,
landscape particularly native tree species and plants been
undertaken?
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright 2012 34
Page 82
10 Is there a policy to provide a greater area of open space,
public landscaped areas and protected bio diversity
corridors?
11 Will a low site disturbance ratio and building footprint be
achieved at the precinct?
11 Has a life cycle costing exercise regarding the long term
sustainability of the precinct been undertaken?
12 Are green energy, renewable energy options and energy
efficiencies beinq actively pursued?
13 Are the energy use interactions between
daylighting,
lighting, mechanical and natural
ventilation being
investigated and integrated in the planning and design
process?
14 Is solar orientation of buildings and infrastructure being
used to reduce the energy requirements of the precinct?
15 Will production methods and material sources be
investiqated to ensure low enerqy profiles?
16 Will strategies to reduce carbon emissions at the precinct
be introduced?
17 Is the precinct giving consideration to a Sustainable
Urban Drainage system?
18 Will water treatment be undertaken on site or discharged
to existing offsite infrastructure?
19 Is the potential for recycling grey water being
investigated?
20 Is harvesting of rainwater for open spaces and
infrastructure landscaping being considered?
21 Has water conservation been explored with the local
supply authority?
22 Is a Waste Management Plan to be developed for the
precinct?
23 Is a policy of seeking out and using recycled materials to
be pursued at the precinct?
24 Are design strategies to be developed to reduce the
quantity of new materials being used at the precinct?
25 Are green purchasing policies being developed for use at
the precinct?
26 Will material production methods be checked for their
environmental impacts?
27 Are designs to be developed using pre fabrication and
component technology?
28 Is a Chemical Usage Strategy to be developed at the
precinct?
29 Is an environmentally friendly pest control strategy to be
developed for the Precinct?
30 Are Arch itectu ra I and Landscape Guidelines to be
developed which include performance covenants.
31 Is a ’Quality of Life’ or Community Consultation Plan
to be developed?
32 Is there a clear strategy for economic investment in the
precinct and adjoining r~ion?
33 Is there a clear strategy for educational provision at the
precinct?
34 Is there a clear strategy for travel and tourism activity at
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright 2012 35
Page 83
the precinct?
3S Is there a clear strategy for commercial and retail activity
at the precinct?
36 Is there a clear strategy for the arts and spiritual needs of
the precinct?
37 Will a Construction Management Plan be developed for
Infrastructure Implementation?
38 Will a Construction Management Plan be developed for
building implementation?
39 Will a Post Occupancy Management Plan and structure
be developed for the precinct?
40 Will a policy be developed to encourage connectivity with
local and regional stakeholders?
41 Are the developer and the planning and design
development team engaged for long term commitments to
the precinct’s development?
6.3 PLANNING, DESIGN AND CONSTRUCTION CHECKLISTS
Having given regard to crucial questions regarding strategies and actions emphasis is now on
delivery. It is proposed in the following ’Sustainability Checklist’ be used to determine initial
global performance targets and the means and opportunities for achieving sustainable
outcomes on major elements of the precinct profile. The checklist will be aimed at the built
environment in terms of building structures and associated infrastructure such as cycleways
and roads. Also it will seek to identify opportunities associated with the structural landscaping
which includes regeneration of existing natural areas and newly created open spaces. The
checklist will only note social and economic opportunities where linked or appropriate. Again
these areas should be read in conjunction with the quality of life guidelines. Whilst there may
be some repetitiveness between the checklist and the earlier guidelines in the propositions this
is unavoidable as similar goals, aims and objectives transcend the various development phases
and use sectors of the precinct. Also it is deemed an advantage because consistency of
approach is important particularly where on such large scheme as Noosa on Weyba a variety of
professional teams may be employed to undertake specific planning and design tasks i.e.
educational provision and healthcare facilities. The main mixed use areas are:
Infrastructure Structural Landscaping and Open space;
Recreational and Leisure Facilities;
Community Facilities;
Residential Tenures.
The following guidelines offer themes for an overall response to the needs of environmentally
sustainable planning, design and construction (After LBR).18
Precinct Sustainability at Noosa on Weyba Queensland
Major Sustainability Themes Comments ./ or x
1 Environmental Rating Obtain Earthcheck PPDS Certification.
2 Site Investigation Investigate any potential contamination and the
soil quality on site.
3 Site Ecoloqy Undertake ecoloqical assessment.
4 Energy Saving Design buildings and infrastructure services for
minimum energy use.
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright 2012 36
Page 84
5 Renewable Energy Reduce predicted site C02 emissions through the
use of on site renewable energy.
6 Construction Materials Specify environmentally-friendly construction
materials.
7 Water Saving/Recycling Use water conservation devices and recycling
techniques
8 Recycling Provide internal/ external recycling facilities.
9 Surface Water Run Off Prevent water pollution and overbu rdeni ng of
new and existing drainage systems.
10 Microclimate Desiqn out neqative microclimatic effects.
11 Public Transport Facilitate theuse of public or green transport
throughout the precinct.
12 Cycling and Walking Ensure development design encourages cycling
and walking.
13 Green and Open Spaces Enable easy access to the natural environment/
open spaces and provide new and enhanced
green.
14 Security Adopt best practice in the secure design of the
development.
15 Liqht Pollution Mitiqate liqht pollution.
16 Flood Resistant Apply the principles of flood resistant design
(where applicable)
17 Access Ensure that the all buildings and associated
infrastructure are accessible to all.
18 Construction Process Reduce adverse impact of construction process
on quality of site and its surroundings.
The following guidelines offer fuller descriptions of the possible approaches to be adopted in
achieving sustainability at throughout the development:
Precinct Sustainability at Noosa on Weyba Queensland
Broad Sustainability Actions Comments "or x
1 Adopt a human scale or Optimize use of exterior and interior space
’smaller is better’ design through careful design so that the overall
approach. building and associated infrastructure
dimensions and resource use in constructing and
operating them are kept to a minimum.
2 Design energy efficient Use high quality low maintenance materials, high
buildings and levels of insulation, high-performance windows,
infrastructure. choose glazing with low solar heat gain and
design for tight fit construction to achieve energy
efficiency.
3 Design buildings and Use passive solar heating, daylighting, and
associated natural cooling which can be incorporated cost-
infrastructure to use effectively into most buildings. Also consider
renewable energy where solar water heating and photovoltaic or design
appropriate. buildings for future panel installation. If wood
heating is an option, specify a low-emission
wood stove or pellet stove.
4 Optimize material use. Minimize waste by designing for standard sizes.
Avoid waste from
structural over-design (use
optimum-value engineering/advanced framing).
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright 2012 37
Page 85
5 Design water-efficient, Conventional grass have a high impact
areas
low-maintenance because of water
use, pesticide use, and
landscaping. pollution generated from mowing. Landscape
with drought-resistant native plants and
perennial groundcovers and use water release
materials such as ’Terracottom’.
6 Make it easy for Make provisions for storage and processing of
occupants to recycle recyclables, recycling bins near the open spaces
waste. malls and residential neighborhoods.
7 Look into the feasibility Water that has been used can be recycled for
of graywater and roof- flushing toilets or irrigation. Consider designing
top water catchments rooftop water catchments areas for outdoor
systems. watering.
8 Design for future reuse. Make all structures adaptable to other uses, and
choose materials and components that can be
reused or recycled.
9 Avoid potential health Plan electrical wiring and
placement of electrical
hazards: emf, equipment to electromagnetic field
minimize
pesticides. exposure. Design insect-resistant detailing that
will require minimal use of pesticides.
10 Renovate older Renovate or relocate any existing buildings or
buildings. infrastructure on the site or to suitable offsite
location.
11 Evaluate site resources. Carry out a careful site evaluation; solar access,
soils veqetation, important natural areas etc.
12 Locate buildings to Cluster buildings and associated infrastructure or
minimize environmental build units to preserve open space and wildlife
impact. habitats, avoid especially sensitive areas
including wetlands, and keep roads and service
lines short. Leave the most pristine areas
untouched, and look for areas that have been
previously damaged to build on.
13 Give due attention to Reduce energy use by orienting buildings and
solar orientation. associated infrastructure to make optimal use of
passive solar heating, daylighting, and natural
cooling.
14 Situate buildings to Correctly oriented trees on the sides of a
benefit from existing building can dramatically reduce cooling loads.
and proposed Hedge rows and shrubbery can block cold winter
landscaping and winds or help channel cool summer breezes into
vegetation. a building.
15 Minimize transportation Locate buildings and infrastructure to provide
requirements. access to public transportation, bicycle paths,
and walking access to basic services. Commuting
can also be reduced by working at home.
Consider home office needs with layout and
wiring.
16 Avoid ozone-depleting Whilst CFC’s have largely been phased out, their
chemicals in mechanical primary replacements HCFC’s may also damage
equipment and the ozone layer and should be avoided where
insulation. possible.
17 Use durable products Because manufacturing is very energy-intensive,
and materials. a product that lasts longer or requires less
maintenance usually saves energy. Durable
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright 2012 38
Page 86
products also contribute less to our solid waste
problems.
18 Choose building Relative energy intensity of various materials (by
materials with low weight) is as follows: *Lumber=l *Brick=2
19
embodied energy. *Cement=2 *Glass=3 *Fiberglass=7 *Steel=8
*Plastic=30 *Aluminum=80.
19 Buy locally produced Transportation is costly in both energy use and
building materials pollution generation. Look for locally produced
materials (local softwoods or hardwoods, for
example) to replace products imported to your
area.
20 Use building products Building products made from recycled materials
made from recycled reduce solid waste problems, cut energy
materials consumption in manufacturing, and save on
natural resource use.
21 Use salvaged building Reduce landfill pressure and save natural
materials when resources by using salvaged materials: lumber,
possible. millwork, certain plumbing fixtures, and
hardware, for example. Make sure these
materials are safe (test for lead paint and
asbestos), and don’t sacrifice energy efficiency
or water efficiency by reusing old windows or
toilets.
22 Minimize use of old- Avoid lumber products produced from old-growth
growth timber. timber when acceptable alternatives exist. You
may not need
clear narrow- grained cedar or
redwood siding, for example, when using an
opaque stain or paint as long as proper detailing
is used to avoid rot. Laminated wood timbers
can be substituted for old-growth Douglas fir.
Don’t buy tropical hardwoods unless the seller
can document that the wood comes from well-
managed forests.
23 Avoid materials that will Solvent-based finishes, adhesives, carpeting,
off gas pollutants. particleboard, and many other building products
release formaldehyde and volatile organic
compounds (VOC’s)into the air. These chemicals
can affect workers’ and occupants’ health as well
as contribute to smog and ground-level ozone
pollution outside.
24 Minimize use of Use detailing that will prevent soil contact and
pressure-treated rot. Where possible, use alternatives such as
timber. recycled plastic lumber. Take measures to
protect workers when cutting and handling
pressure-treated wood, and avoid burning
scraps.
2S Minimize packaging Avoid excessive packaging, such as plastic-
waste. wrapped fixtures or fasteners that aren’t
available in bulk.
Suppliers to be instructed to
avoid over-packaged products. However keep in
mind that some products must be carefully
packaged to prevent damage and resulting
waste.
26 Install high-efficiency Use well-designed high-efficiency furnaces,
heatinq and coolinq boilers and air conditioners (and distribution
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright 2012 39
Page 87
equipment. systems) which not only save building occupancy
costs, but also produce less pollution during
operation. Install equipment with minimal risk of
combustion gas spillage, such as sealed-
combustion appliances.
27 Install high-efficiency Fluorescent lighting has improved dramatically in
lights and appliances. recent years and is now suitable for homes.
High-efficiency appliances offer both economic
and environmental advantages over their
conventional counterparts.
28 Install water efficient Water-conserving toilets, shower heads, and
equipment to all faucet aerators not only reduce water use, they
buildings. also reduce demand on septic systems or
sewage treatment plants. Reducing hot water
use also saves energy.
29 Install mechanical Mechanical ventilation is usually required to
ventilation equipment. ensure safe, healthy indoor air. Heat recovery
ventilators are preferred in cold climates because
of energy savings, but simpler, less expensive
exhaust-only ventilation systems are also
adequate.
30 Protect trees and topsoil Protect trees from damage during construction
during sitework. by fencing off the "drip line" around them and
avoidinq major chanqes to surface qrade.
31 Avoid use of pesticides Look into less toxic termite treatments, and keep
and other chemicals exposed walls free from obstructions to
that may leach into the discourage insects. When backfilling a foundation
groundwater. or grading around a house, do not bury any
construction debris.
32 Minimize job-site Centralize cutting operations to reduce waste
waste. and simplify sorting. Set up clearly marked bins
or trash cans for different types of useable waste
(wood scraps for kindling, sawdust for compost,
etc). Find out where different materials can be
taken for recycling, and educate construction
companies about recyclinq procedures.
33 Make your Precinct and Make the precinct as energy efficient as possible
associated business for example during construction purchase energy
operations more efficient vehicles arrange carpools to job sites,
environmentally and schedule site visits and movement on or to
responsible. site to minimize unnecessary driving. In post
operational management pool purchase recycled
office paper and supplies.
The following guidelines provide further details of opportunities of sustainable inputs and
outcomes for specific building types and product selection:
Apartments and hotel/apart rooms, residential lots and buildings;
Community buildings;
Materials, products and services.
The guidelines provide a range of planning and design decisions and practices that are felt to
be appropriate in seeking to implement sustainable principles into the major building types to
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright 2012 40
Page 88
be constructed at Noosa on Weyba. They are not definitive and other measures can be added
to the list at any time during the total development process. What is important is the
recognition that the guidelines need to remain dynamic in that as the precinct evolves over
time practices may change particularly as technology improves or legislation is enacted.
Further other developers and design teams may take responsibility of individual building inputs
at the development. It is important that recognition is given to the common goals, aims and
objectives of the precinct not an individual project. Accordingly the measures are not a once off
action but are intended to achieve best practice within the limitations of today. Further the
checklists do not in any way mitigate responsibility toward statutory requirements. This is
important because Queensland has specific legislation covering residential building in particular.
Therefore the following checklists are for initial use by the developer and individual house
builders providing a one off design and build package. This checklist will need to be read in
conjunction with the Noosa on Weyba Architectural and Landscaping Design Guidelines
and the local authority’s specific requirements which are additional to the developer’s initial
sustainability considerations. This is important matter because all new home building in
Queensland requires specific certificate submissions with their development application.
Precinct Sustainability at Noosa on Weyba Queensland
Apartments -
Sustainability Checklist (After TVslo Comments or x
1 Location:
Close to public transport and road networks
Close to workplace and shoppinq facilities
Close to family and friends
Access to communal spaces within complex
Access to open spaces and recreational facilities
2 Orientation
Windows accessible to daylight
Prevailinq breezes to be captured by openinqs
Cross ventilation where possible used
Sun shadinq to windows and verandahs
Insulation to cool, heat and reduce noise sources
Views and privacy are considered
3 Access
Easy access for people of all abilities
Good lighting to entry ways and car-parking
Easy access for furniture placement
Safe vehicle and bicycle access to site
Wide doorways and corridors
4 Safety
Security to doors and windows
Circuit breaker to electrical switchboard
Slip resistant access ways
Smoke detectors
4 Design and Maintenance
Calculate and achieve statutory sustainability targets
Apartment desiqned to be refurbished easily in future
. accessible paintwork
.
interchangeable doors,
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright 2012 41
The text continues on page 89.
Used in these records
About this file
- File size
- 86.5 MB (very large file)
- File type
No other editions are linked here.
Original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.