Skip to the record
Every meeting, every word.

Council archive · source document

Part 22 of 37 Appendix 20 - Earthcheck MCU12/0208

of 127

Text shows just the words. Original shows the document exactly as it was published.

Very large file (86.5 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Figure 11: Appropriate building types, materials and services




       Evaluation, Summary and References
                       Building Sustainable Precincts
                                                                                     8
The strategies, guidelines and checklist offer an opportunity through the planning and   design
phase to create a climate within which a broad range of sustainability inputs can be considered
reviewed and implemented if appropriate. The outcomes are less certain because many
recognise that sustainable approaches are evolving and will be subject to legislative and
technical changeY However it is important that whatever measures are taken evaluation of
the success or otherwise of decisions should be a feature of a development.


To help the planning and design team translate the guidelines into practical actions that reflect
in   essential   and   desirable
                            planning and design outcomes the broad issues, guidelines,
checklists and compliance tables have been  provided. These represent the factors selected to
form the essential ingredients of a sustainable precinct development. All that remains is a
means by which its performance can be measured and benchmarked.



This need to evaluate is a requirement of EC3 therefore Noosa on Weyba will be undertaking
benchmarking of its planning and design decisions. The PPDS Handbook includes a range of
compliance tables which are to be used by the Third Party Assessor.

The  following Post Planning and Design Evaluation (After UBC)24 seeks to offer a
summary of those issues deemed to be crucial in achieving not only EC3 PPDS
Certification but also are important in the measurement of the precinct during and
after their implementation.


Dr Richard Moore EC3 Global Earthcheck Assessor                              Copyright 2012   54

Used in these records

About this file

File size
86.5 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Part 22 of 37 Appendix 20 - Earthcheck MCU12_0208.pdf · 86.5 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.