Skip to the record
For the highest quality transcripts.

Council archive · source document

Part 22 of 37 Appendix 20 - Earthcheck MCU12/0208

of 127

Text shows just the words. Original shows the document exactly as it was published.

Very large file (86.5 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Development Imperatives
The Client-Developer, Project Champion and Design Team

Important to any development is the role of and input from the major stakeholder i.e. the
client. This is evident at Noosa           on   Weyba. From the beginning it is apparent that the Client
(who is also the Developer) has played                a   lead role in the precincts planning and design. For

many    projects, client involvement is limited normally by lack of experience or priority. In the
case    of   Noosa     on   Weyba, neither of these               is   evident. The      Client-Developer        is   both

experienced in development and post occupancy organisation and post operational demands.

The development also has a high priority in this client/developer’s portfolio, which has lead to

some    significant decision taking. Not least being the choice of development team personnel
and the commitment to offer the projects management and                         planning and design progression
to the scrutiny of an        independent third party          benchmarking and certification process. These
decisions offer two distinct            advantages. The first           is creation    of   a   direct   route   for the

Development Design Team to the Client-Developer and/or his representative regarding crucial
decisions. This is a pre requisite of the commitment when engaging with PPDS. The second is
the opportunity        to   measure       the
                                     ecological performance of those decisions against an
internationally recognised ecological performance based standard. Also of critical importance
to the success of a project is the role of and inputs made by the Development Director also

known as the ’Development Champion’ when identified in the following ’Triple Bottom Line’

principled process framework model (Figure 1).




Figure 1: A conjectural framework for delivery of a mixed use precinct (Moore,2010/2011)

The Noosa      on   Weyba development process appears to have benefited from the championing
of sustainability throughout the early and crucial planning and design phase. Of significance is
the fact that the aforementioned             champion is an experienced development and construction


                                                                                                                         3
EC3 (Earthcheck)Prec nct Plann ng and Des gn Standard (PPDS)for Prec ncts. Cert cat on Report
@ 2007 EC3 Asia Pacific. All rights reserved. Version EC3 PPOS 2012.

Used in these records

About this file

File size
86.5 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Part 22 of 37 Appendix 20 - Earthcheck MCU12_0208.pdf · 86.5 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.