Council archive · source document
Part 22 of 37 Appendix 20 - Earthcheck MCU12/0208
Very large file (86.5 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
documentation to have been given a very high priority. This is due in part to the interviewed
director recognizing that it offers a balanced approach to the planning and design process. A
feature noted by others in the team as being politically important in today’s complex
governmental climate. A further more non-altruistic attribute recognised is the marketing
advantages gained from the approach and actual implementation.
Further comment made here regards the use of an established multidisciplinary
architecturally based practice and a professional infrastructure and environmental services
company, with expertise in the development and improvement of physical and social
infrastructure for communities. These well regarded Queensland based firms have
demonstrated strong performances in the design and delivery of a broad range (type and
scale) of projects from commercial, retail, residential, hotel and tourism resorts, public works
and mixed use projects. Elements of which can be found in the make up of virtually all new
precincts particularly those with a wide range of residential provision and tenure. The evident
experienced officers and the extensive skills base offers two major advantages, first a
breadth of understanding and in-depth sensitivity for such complex undertakings. Second an
obvious openness to the exploration of new ideas and urban planning methodologies to
ensure the growing need to deliver appropriate solutions many of which are now driven by
the demand for equitable community living and ongoing ecological performance
improvements.
Sustainability Master Planning Approach -
Overview
On a mixed-use precinct, it is important to find an inclusive design approach, which prioritises
sustainability. This approach increases the probability of achieving sustainable outcomes. The
major influences on the precinct’s sustainable master planning approach
underlying are
principles set by and found in the planning and design documentation. These include the
initial major influences on the precinct’s sustainable Concept Master Planning approach
(Figure 2) which will be the developer’s overview of the primary sustainability planning and
design aims and objectives. It appears that the Noosa on Weyba development team has
sought to ensure that the siting of precinct buildings and associated infrastructure mitigates
negative impacts on the natural environment. In doing this, it is helping in the creation of
positive ecological performance improvements particularly in biodiversity. In addition, as
evidenced by documentation
they seem committed to
reducing the environmental impacts
i.e. water, noise and air
quality loss during building activities on site through appropriate
management strategies during construction. This they have recognized can be achieved by
encouraging the selection of contractors and subcontractors with sufficient experience to
implement ’green’ design and to include sustainable construction in the contractual
agreement.
The major principles and commitments noted at Noosa on Weyba include the
following:
To create a genuine non-gated master planned community by using world’s best
practice urban planning principles via an Urban Design Framework that encourages
place making and an integrated precinct offering a legible community with a sense of
identity providing both life change and connectedness where residents and guests will
live, visit, work and play in safety;
To create collaborative process for the management of high value conservation land
areas with adjoining owners and authorities.
5
EC3 (Earthcheck)Prec nct Plann ng and Des gn Standard (PPDS)for Prec ncts. Cert cat on Report
@ 2007 EC3 Asia Pacific. All rights reserved. Version EC3 PPOS 2012.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 22 of 37 Appendix 20 - Earthcheck MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 86.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.