Council archive · source document
Part 22 of 37 Appendix 20 - Earthcheck MCU12/0208
Very large file (86.5 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
A new sewerage rising main to be constructed to service the precinct to ensure that
sewerage pollution of adjoining waterways cannot occur;
New and extensive reticulation sewers for retail, community and residential lots
connection, again to protect the environment;
Adoption of current best practice water quality standards for the design of treatment
measures;
The quality of runoff discharged from the site to be significantly improved and to meet
best practice water quality objectives;
Due to the importance of control of insect activity, this matter requires noting
separately:
Implementation of an environmentally sensitive programme regarding mosquito and
insect control so as to ensure an optimum resident and visitor experience.
Stormwater Management
The Client-Developer has committed to the implementation of an Urban Stormwater
Drainage Management Strategy, which is part of an Integrated Water Cycle Management
Strategy. To achieve this objective, site sensitivity requires that a range of sustainable
solutions be implemented. These need to contain and utilise as far as possible rain and
ground water that comes to the site within the life cycle of the development and operation of
the precinct. The precinct buildings and associated infrastructure provide points of collection
and reuse of stormwater offering a sustainable supply of water for non-potable uses.
The design documentation includes the following:
Short and long term strategies have been developed i.e. The site will be fertilized
using only organic based products in major infrastructure landscaping areas;
Protection of the existing and environmental value of the receiving waters in the
locality of the development;
A comprehensive ’Stormwater Management Plan’ (SMP)prepared and supporting the
Integrated Water Cycle Management Plan;
Replenishing of existing ponds and/or groundwater table;
100% of stormwater runoff from roof areas will be collected in community and private
rainwater tanks for reuse;
Potential source of contaminants strategy implemented i.e. runoff from road surfaces
minimized by low traffic volumes;
’Bio filter retention’ systems to be used in appropriate areas of the precinct;
Rock or grass lined drains used where appropriate to collect stormwater runoff for
diversion to water collection dams.
Social Commitment ’Quality of Life’ Approach
Any proposed precinct should develop and maintain positive, productive and sustainable
contributions to the local community. The precinct should provide improved ’Quality of Life’
opportunities and address key ’community’ issues by encouraging and facilitating
participation of communities and community organizations’ in the precinct and associated
15
EC3 (Earthcheck)Prec nct Plann ng and Des gn Standard (PPDS)for Prec ncts. Cert cat on Report
@ 2007 EC3 Asia Pacific. All rights reserved. Version EC3 PPOS 2012.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 22 of 37 Appendix 20 - Earthcheck MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 86.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.