Contracts for building, civil engineering and regional infrastructure operations
amounting to an estimated $250 million over the life of the implementation
programme;
Approximately 2,000 direct construction and enabling related jobs generated during
construction phase with a high expectation that the construction force will come from
the local communities;
Predicted full time equivalent positions will number 306 new long term permanent
employment opportunities;
Direct economic contribution the
region through long term employment
to
opportunities and possible indirect full time equivalent positions arising from the
related businesses;
Training programs regarding environmental, social and operational job opportunities
partly aimed at the disabled and young persons in roles in age care, landscape &
environmental maintenance, and Body Corporate management;
Economic equity by commitment to maintain a wide range of affordable
accommodation.
Indicators and measures evaluation
The development has been independently assessed using an indicator benchmarking
evaluation matrix based on measures that reflect internationally accepted good sustainable
practice. The development achieved ’Industry Best Practice’ in 46 of the SO
measures noted in the assessment matrix {See Appendix}. This achievement
places Noosa on Weyba at the forefront of sustainable large/medium mixed-use
precinct development.
Of the remaining 4 measures several of these cannot be fully benchmarked and certified at
this stage of precinct planning and design evolution. For example, predicted percentages of
green components and systems used cannot be fully ascertained until detailed design work
on individual buildings is completed at the works application stage. Accordingly, the
certification of Noosa on Weyba adjusts as the development progresses through its various
future phases. The remaining measures will be revisited and benchmarked accordingly under
the EC3 Earthcheck programme, which has a requirement for yearly recertification as
projects proceed through construction to the operational phase.
Conclusion and Recommendation
Some lessons taken from the planning and design process
The Client-Developer Northbrook challenged ’business as usual’ process norms whilst
recognizing that sustainable agendas require considerable inputs to a development. Noosa
on Weyba has achieved a high rating due in part to the implementation of an innovative
delivery strategy and by Northbrook’s long-term commitment to the precinct. Also by
showing willingness to put forward a sustainable agenda of its own making, the result has
been a more effective and sustainable development process. This indicates a continuing role
for involvement as a result of recognizing that many sustainable inputs and their impacts
take place over time and may come about by adjustment to aspects of the development.
This phenomenon will most likely be seen in the critical social and economic areas. To
accommodate this factor the power of specifically developed ecological performance
19
EC3 (Earthcheck)Prec nct Plann ng and Des gn Standard (PPDS)for Prec ncts. Cert cat on Report
@ 2007 EC3 Asia Pacific. All rights reserved. Version EC3 PPOS 2012.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 22 of 37 Appendix 20 - Earthcheck MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 86.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.