Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

Part 22 of 37 Appendix 20 - Earthcheck MCU12/0208

of 127

Text shows just the words. Original shows the document exactly as it was published.

Very large file (86.5 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

    Appendix

    Assessment of mixed-use precinct using PPDS Key Performance Areas

Above 40 ./ Best Practice Achieved for Certification,
                    -
                                                                                  X   -
                                                                                          At Baseline, 0            -
                                                                                                                        No Measure
 With no comment being recorded where development has not been able to address the measure

Concept and Measures
(See references for documents used to determine best practice or baseline)

Precinct: Assessment November 2012                                Area 2: Energy Efficiency and
                                                                  Conservation
Noosa on Weyba
                                                                  Commitment Measures
The Sunshine Coast
Queensland                                                        .   A    reduction           in    average    total predicted
Australia                                                             energy      consumption             per    year/predicted         /
                                                                      occupancy levels per year;                                       V
Sustainability Master Planning Approach
                                                                  .   A    reduction           in    average total predicted
Measures                                                              carbon      dioxide           emissions per year from
                                                                                                                                       ~
    The Master                                                        energy consumption;
.
                 Planning Project brief, which
    includes sustainable goals, objectives and                    .   A    reduction           in    average    total    predicted
    performance targets;                                  ./          percentage of renewable energy consumed
                                                                                                                                       ~
                                                          ./          per year;
.   A Community Consultation Plan;
                                                                  .   Use of energy sensitive site                planning and
.   A  multidisciplinary planning          and   design
                                                                      design techniques;                                               ~
    team    with   experience in           sustainable
                                                          ./
    master planning;                                              .
                                                                      Application of passive building design;                          ~
.   An    Architecturaland  Landscape Code,                       .   A percentage of total energy consumption
    which   integrates local mandatory and                            produced from a cogeneration facility;                           ~
    other voluntary environmental standards;              ./      .
                                                                      Percentage improved                 in    energy    efficient
    The     legalintegration of environmental
                                                                                                                                       ~
.
                                                                      equipment;
    standards    including PPDS within the                                                                                             ~
                                                          ./      .   Used in buildings and infrastructure.
    precinct’s community title;
                                                                  Area 3: Water Conservation and
.   The adoption of environmental design and
    operational         standards    for     enabling             Management.
    infrastructure and buildings.                         ./      Measures:

Area 1: Precinct Location and Siting                              .   Reductions in total predicted Precinct water
 Planning                                                             consumption              per    capita    (kL/person       per   ~
Measures:                                                             year);
                                                                                                                                       ~
                                                                      Water management plan in place;
.   Precinct location rating;                             ./
                                                                  .   Reductions          in    total
                                                                                          predicted volume of
    Habitat conservation ratio;
                                                          ./          auxiliary      supplied/ Total predicted
                                                                                   water
                                                                      water consumed (kL/year).
                                                                                                                                       ~
    High public open space ratio;                         ./      Area 4: Solid & Other Waste Management.

    Low building footprint ratio;
                                                          ./      Measures

    Environmental landscaping rating;                             .   Reductions          in    total   predicted       volume    of
                                                          ./          waste to landfill (m3)/occupant;                                 ~
    Low site disturbance ratio.
                                                                      A   Waste   Management                     Plan     to     be    ~
                                                          ./      .




                                                                      implemented.




                                                                                                                                       21
    EC3 (Earthcheck)Prec nct Plann ng and Des gn Standard (PPDS)for Prec ncts. Cert cat on Report
    @ 2007 EC3 Asia Pacific. All rights reserved. Version EC3 PPOS 2012.

Used in these records

About this file

File size
86.5 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Part 22 of 37 Appendix 20 - Earthcheck MCU12_0208.pdf · 86.5 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.