Council archive · source document
Part 22 of 37 Appendix 20 - Earthcheck MCU12/0208
Very large file (86.5 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
l Quality of Life
J
Creating the Foundations
’Hard and Soft’
&J
As suggested the Developer can playa significant role in promoting the social capital needed to
influence the precincts ’Quality of Life’. The following is how this can be carried out at Pacific
Highlands. Providing the foundations necessary to create a cohesive and dynamic community
falls into two categories. First there are the ’hard’ foundations which are about the precincts
physical infrastructure and its design. Second are the ’soft’ foundations which refer to the
processes of living within the built environment.
It important to recognise that others will influence and have responsibilities for the
is
development of large mixed use precincts and their communities. However it is the developer
that by far has the leading role and should take the initiative. What the types of ’foundations’
are as follows:
1. Hard Foundations: Physical buildings and design interventions, such as the layout of
buildings and associated infrastructure including streets and landscaping. The overriding
goal is to provide the means by which the community is able to come together.
Importantly to support bridging social capital planning and design should help
neighboring communities to overlap and provide opportunities for shared social
interaction.
2. Soft Foundations: These are about processes, such as the management of community
facilities, setting up local groups and organizations and the participation of local
stakeholders in the development and post occupancy process.
Social capital will be at its strongest when both are in place without this neither will realise
their full potential. For example if hard foundations lack the soft inputs there will be a possible
lack of the sense of ownership within the community. Whilst facilities may bring the community
together it may not be in a spirit of mutual trust. This unfortunately can lead to a circumstance
of opposition to almost any plan put forward by the developer. Conversely without hard
foundations soft ones can be equally impotent. Stakeholders may be able to come together
through a management structure but if the design of the built environment places barriers
which encourage people to stay at home or requires them to use the car rather than to mingle
freely the opportunity will be lost.
Phasing of social capital is also a major issue for the developer particularly of large mixed use
20
precincts because of their timescales. Importantly it has been noted that those developments
that benefit from ongoing developer involvement normally respond with more positive social
capital outcomes. This is because opportunities to create, and improve on this building of social
capital occur throughout the pre and post development process.
At the planning and design stage ideas for the development come together it is critical that
social capital is built in right from the beginning. After this phase it will be virtually
impossible
to turn bad decision around. The building phase is a difficult period particularly on large
developments simply because of the disruption and timings for implementation of what might
be important social capital infrastructure. Nuisance and delay can be extremely negative forces
as a precinct evolves. The final occupation phase is slightly contradictory in that the
opportunities of laying down social capital have mostly passed by this phase. However it is also
the best time for social capital creation due to there being the key ingredients of residents and
other stakeholders in place and creating the living community.
12
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright August 2012
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 22 of 37 Appendix 20 - Earthcheck MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 86.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.