Council archive · source document
Part 22 of 37 Appendix 20 - Earthcheck MCU12/0208
Very large file (86.5 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
7: Wastewater Management
This key area indicator and its management and
measures seek to consider the
treatment of wastewater in such a way that treatment requirements are reduced in
terms of tankage, energy and chemical requirements, and that treated wastewater is
able to be reused for non-potable uses.
8: Storm water Management
This key area indicator and its measures encourage and reward the idea of the
environmental sustainability in terms of dealing with stormwater generated in the
Precinct as opposed to discharging it for treatment elsewhere.
9: Social Commitment ’Quality of Life’ Approach
This key area indicator and its measures reviews the physical and soft policies seen as
being essential to the creation of a sustainable community leading to an improvement or
maintenance of ’Quality of Life’. (with ’Quality of Life’ meaning a shared vision of the
future for the whole community)
10: Economic Commitment
This key area indicator and measures seek to review the developers approach in terms of
positive inward investment, business opportunity and economic equity.
PROPOSED MASTER PLAN
The proposed uban development foolprirt represents oriy 19% ofthe total site area. and leu than 35% ofthe BDOA Receive site.
Sel’ld Site
~eceive Site
.API BOUMOr)’
I AND l!Sf AREAS HECTARES
Send land/t-.E!wNohooal Part 139..s
En vron mental Protection n ,
7
Land on ~eceive Site
unon FOO1rpril"lt 57.07
Pa~ 8.06
sos.s
PRODUCTSUM’vI’\RY DWELUN GS
R e~dentiol 499
R etiremen flAged Core O’lAelln g5 2:20
TO\l’l.flhoo:s 107
SO
876
.rdICOIW ~d j<.tlJlltod~loll~d dli’l ’"
Mtto~Qle
Figure 7: Master planning a whole community including infrastructure and individual lots.
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright 2012 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 22 of 37 Appendix 20 - Earthcheck MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 86.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.