Skip to the record
Noosa's #1 Council Tracker.

Council archive · source document

Part 22 of 37 Appendix 20 - Earthcheck MCU12/0208

of 127

Text shows just the words. Original shows the document exactly as it was published.

Very large file (86.5 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

management of the project and         are essential in maintaining and achieving the precincts

sustainable vision.   Specifically, they help in identifying the role, responsibilities and goals for
the whole infrastructure construction process. Further they outline the tasks and actions to be
taken in implementing and operating both policy and/or system. For the purpose of
certification, Earthcheck will assess the quality of these management policies and systems and
demonstrated performance against the tasks identified in the policy and/or system framework.
However, it is to be remembered that the ’sustainability assessment’ and real
environmental improvements form the basis of the Earthcheck system and not just the
management process.

       A    Sustainable      Precinct     Planning           and    Design       Management System and
       Sustainable Infrastructure Construction                     Process      Management System should
       include the following actions and tasks:

       A   description of the purpose of the management policy and/or system; identification of
       the principal environmental issues that need to be addressed. These should be prepared
       in the context of the PPDS and Agenda 21;

       Key issues need      to beanalyzed and planning, design and infrastructure construction
       issues identified so that they can be considered for the desirable performance evaluation
       against the KPAs;
       Environmental improvement targets and goals should be set along with    a description of

       actions that need to be taken. These actions would  normally be placed in priority order
       and would be budgeted for as part of the routine budget planning process;

       Implementation plans and procedures should be developed. This would include training
       and development to help implement actions prescribed by the policy and/or system;

       A section dealing with ’working with the local community’ to help achieve environmental

       improvements and community benefits;
       A checklist should be made for any corrective actions;

       Once the policies and/or systems are implemented, the implementation progress would
       be regularly monitored. In particular, environmental improvement actions that have
       been    benchmarked     will
                                 be regularly checked to assess their performance. Such
       monitoring would provide the proof necessary for the certification process;
       Results   of   the   monitoring    will    be    communicated           to   ensure   there   is   continuous
       improvement.

STAKEHOLDER CONSULTATION AND COMMUNICATION (Figure 9)

This section focuses on the importance of dealing with stakeholders and customers along with
social and economic issues.       This aspect of social and economic commitment is present in all
the sections of the standard in       some   way       or   other, because it is a critical area          in terms of

meeting the requirements of Agenda 21.

        Establish effective consultative mechanisms and strategies to ensure all sections of the
        community are able to participate in developing and implementing the environmental,
        social and economic strategy;

        Communicate to the stakeholders and       community in a simple, clear, obvious and
        regularly updated manner, their environmental, social and economic performance based
        on their sustainability assessment and their related activities resulting from participating

        in the Earthcheck program;

        Encourage     customers     and   suppliers         to   engage   in   the   environmental, social and
        economic programs;




Dr Richard Moore EC3 Global Earthcheck Assessor                                               Copyright 2012      17

Used in these records

About this file

File size
86.5 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Part 22 of 37 Appendix 20 - Earthcheck MCU12_0208.pdf · 86.5 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.