Council archive · source document
Part 22 of 37 Appendix 20 - Earthcheck MCU12/0208
Very large file (86.5 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Will targets be set for the reduction
of waste water treated using off site
facilities?
Will targets be set for the reduction
of storm water volume discharged
into off site facilities?
On completion of this pre commitment questionnaire there should be clear evidence that a
developer and the planning and design team are pursuing a course that leads to the
implementation of sustainable development strategies and policies. The next focus is on the
translation of planning and design objectives in practical guidelines. PPDS again provides the
template for a performance based process which can be followed by a development team
seeking to engender sustainability in its planning and design outcomes.
4. TOWARDS PRACTICAL SUSTAINABILlTY
The following is taken from PPDS and offers information on key areas and their scope of needs
which the development team will be required to consider and reflect in their planning and
design decision. Sustainable master planning is primarily concerned with the project aims,
goals and scope with respect to sustainability. At the feasibility stage of the project it is
advisable to develop a policy for an inclusive planning approach, which prioritizes sustainability,
and increases the probability that sustainable outcomes are achieved in the project. In
addition, the use of benchmarks as planning targets establishes a performance basis for master
planning, ensuring possible reductions in greenhouse gas emissions and other key areas such
as waste and water use.
The location of theprecinct and its site planning with respect to regional services and
infrastructure has major bearing on its environmental impact in terms of resource use
a -
energy, water, waste and transportation. The site selection of precincts is therefore a crucial
part of achieving sustainable development. Zoning within the master plan reflects the
environmental siting of buildings and infrastructure this can have a major impact on the
reduction of native habitat and loss of biodiversity. Hence the planning and design process
should examine the loss of the natural environment to the built environment, or conversely, for
’brown field’ sites, the restoration of biodiversity and reuse of existing sites. Designing
buildings to mitigate loss of ground-based habitats should be considered.
Landscaping of the site and the creation of public open space and its relation to the building is
also an important element of microclimate control and the mitigation of heat island effects and
improvement of social amenity. Site planning should seek to minimize disturbance to the site
through changes to the topography and natural environment. This is seen as one of the major
negative impacts of development. Site development processes which include large terra
forming exercises and clear felling of vegetation are not only resource intensive but extremely
damaging to the natural environment.
Energy efficiency is now a crucial element of any development undertaki ng: be it for the short
term construction or long term post occupancy phases. Significant levels of energy can be
consumed by a precinct’s buildings, its recreational facilities and infrastructure. An overall
reduction in energy consumed will have a positive impact on precinct energy costs and major
environmental benefits through conservation of natural resources and lowering associated
greenhouse gas emissions. Developers need to consider during master planning the principle of
sustainable energy design by taking a whole of systems view. Principles of energy conscious
design are embodied in the following objectives and include passive solar design (PSD), use of
efficient active systems, urban form design, renewable energy use and cogeneration. Urban
form design techniques should also be implemented.
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright 2012 26
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 22 of 37 Appendix 20 - Earthcheck MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 86.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.