Council archive · source document
Part 22 of 37 Appendix 20 - Earthcheck MCU12/0208
Very large file (86.5 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
A planning approach and project brief, which commits to sustainability as a major
objective for the precinct, is necessary so the design team can implement new systems,
methods and visions that are available to achieve sustainability;
Establish a vision forproject encompassing sustainability which involves
the
participation from the community and other stakeholders in the establishment of goals
and objectives for the project;
Adoption of a life cycle view for the planning and construction of the precinct;
Formation of a multidisciplinary planning team that deploys an integrated approach to
coordinated planning solutions and also involves the enabling infrastructure design and
construction tea m;
A multidisciplinary team that explores the feasibility of sustainability of the planning
strategies through the use of planning option exercises. This is necessary to
demonstrate the environmental performance improvements predicted for the project;
Ongoing monitoring and environmental performance appraisals are needed to ensure
continuing improvement of environmental performance need;
Use of the title agreement for the precinct to ensure compliance with local mandatory
and other voluntary environmental standards for master planning, building design,
construction and operations;
The enabling precinct infrastructure and its buildings are designed and constructed using
environmental standards.
The practical measures required to achieve these broad strategies would need to be found in
the corresponding checklists and will need to reflect Earthcheck requirements amongst others.
Regarding assessment examples would be the development brief which should include
sustainable goals, objectives and performance targets and the ’Community Consultation
Plan’ or quality of life guidelines which should identify how the existing and the new
community will be involved in the planning and design of the precinct. Another important
measure would be the makeup and structure of the multidisciplinary planning and design team
with regards to its experience in sustainable master planning. Also it has been noted on other
precincts that ’Architectural and Landscape Codes’ which integrate local mandatory and
other voluntary environmental standards can be successfully employed in achieving widespread
sustainability. These tools or standards are particularly powerful when the legal integration of
environmental standards within the precinct’s title is in place within such documents. They can
serve to guide and enforce the adoption of environmental standards for the design,
construction and operations of enabling infrastructure and buildings for the precinct. Again
these would be termed assessable documents for the eventual certification of the precinct
under the Earthcheck PPDS process.
With each of the ’Key Area Indicators and Measures’ in the handbook the predicted level of
performance should be identified as a target for the project. This target can be expressed
relative to a ’base case’ that is a similar project that does not include environmental measures
or a ’best practice’ outcome where measurement or assessment of a project has taken place
and been so described. It is worth noting that some targets are qualitative and somewhat
difficult to predict or measure accurately. Others are quantitative and as such lend themselves
to targets which for example could be to use 30% less non-renewable energy and 10%
renewable energy. These targets provide a basis for the design team who can carry out a
design options study to test the feasibility of their validity.
For the most part the content of the indicators that make up the PPDS handbook is pre-
determined. This is seen as an effective way in ensuring best practice consistency throughout
developments undertaking performance based benchmarking and certification. However
indicators and measures can be amended to accommodate local conditions of individual
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright 2012 32
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 22 of 37 Appendix 20 - Earthcheck MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 86.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.