Council archive · source document
Part 22 of 37 Appendix 20 - Earthcheck MCU12/0208
Very large file (86.5 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
has positive visual impacts on the precincts location
and its character.
9 Design the buildings and associated infrastructure so
that it isappropriate to the developments location
and character.
10 Design buildings and associated i nfrastructu re that
are environmental sensitive and sustainable.
11 Adopt an ESUD approach regarding water treatment
and drainage discharge.
12 Provide significant areas of open space providing a
variety of uses and facilities.
13 Ensure that there is a wide variety of mix in the
precincts facilities giving due regard to the
surrounding social and economic profile.
14 Provide extensive and safe access to the Precincts
facilities and open spaces.
15 Ensure through design that there is connectivity to
the surrounding areas.
Having determined the underlying principles that guide the development team in its
interpretation of sustainability at Noosa on Weyba the following are critical questions
regarding the nature and approach of the development team to the overall goals,
aims and objectives of the development in regards to the delivery of long term
sustainability at the precinct.
6.2 PRECINCT PLANNING AND DESIGN -
CRUCIAL QUESTIONS
Precinct Sustainability at Noosa on Weyba Queensland
Sustainable Planning and Design Questions ./ or x Comments
1 Have environmental sustainability factors been used in the
selection of members of the planning and design team?
2 Are members of the development team fully aware of the
developments goals aims and objectives?
3 Is the planning and design process designed to allow
active communications and balance between program
needs and long term investments in sustainable precinct
development?
4 Is innovative and possible alternative planning and design
solutions being investigated and encouraged?
5 Has a full economic and social profile been carried out to
ensure appropriate mixed use zoning at the precinct?
6 Are financial options and incentives for en vi ron mental
sustainability limited?
7 Has a full and comprehensive ecological study been
undertaken at the Development site and surrounding area?
8 Has thirdparty benchmarking and certification based on
performance outcomes been introduced into the planning
and desiqn process?
9 Has a site specific evaluation of the local ecosystem,
landscape particularly native tree species and plants been
undertaken?
Dr Richard Moore EC3 Global Earthcheck Assessor Copyright 2012 34
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 22 of 37 Appendix 20 - Earthcheck MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 86.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.