Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

Part 22 of 37 Appendix 20 - Earthcheck MCU12/0208

of 127

Text shows just the words. Original shows the document exactly as it was published.

Very large file (86.5 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

         Energy efficient lighting by zoning with intelligent controls
         Heating, ventilation and cooling system requirements are
         determined after the building design has been fully
        optimised and demand is re-calculated.
        Sustainability education packs and induction programmes
         on enerqy   demand manaqement for occupiers
         Energy efficient lighting (low voltage)
         Recycling and compostible materials storage
         Good ventilation to refrigerator space
         Easily cleaned floor wall and bench surfaces
         Energy efficient appliances
         Water conserving fittings and appliances
         Facilities management programme to be implemented
  8      Public and staff toilets
         Provide changing rooms, lockers and showers for cyclists
        and joqqers
        AAA rated showerhead
         Gradated mixer taps to conserve water
        Thermostatic mixers to shower
         Low flush/dual flush water closet

        Energy efficient lighting (low voltage/steam proof))
        Ventilation (natural preferred)
        Solar/gas hot water system
        Rainwater/grey water supply to water closet
         Locate taps away from shower head
         Non slip flooring
         Minimise grout work (limit cleaning chemicals)
         Minimise silicone sealant joints
  9     Cleaning and wet areas
        Multi-function laundry sinks or tubs
        5*Energy efficient washing machine and dryer
        Low toxic cleaning products

        Storage sQace for cleaning products
         Cleanable floors and walls
         Water efficient fittings
         PVC free flooring
        Ventilation to all wet areas
         Ducted vacuum systems
         Space for operational waste and cleaning baskets
         Discharge cleaning water to grey water system
  10    Offices
         Workstation made from durable recyclable materials
        Appropriate storage
         Natural lighting and Cross ventilation

         Energy efficient task lighting
         High ceiling height
         Clerestory’s and ceiling fans to be used
         Secure niqht coolinq
        Intelligent wiring and networked computer facilities
         Cleanable floor, wall and desk surfaces
        Air conditioning availability for computers
         Materials sourced from sustainable sources



Dr Richard Moore EC3 Global Earthcheck Assessor                          Copyright 2012   50

Used in these records

About this file

File size
86.5 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Part 22 of 37 Appendix 20 - Earthcheck MCU12_0208.pdf · 86.5 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.