Skip to the record
Noosa’s premier civic archive.

Council archive · source document

Part 22 of 37 Appendix 20 - Earthcheck MCU12/0208

of 127

Text shows just the words. Original shows the document exactly as it was published.

Very large file (86.5 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

operations, such as on small non-populated islands, the nearest permanent township can be
used instead of the operation). This may encourage              local   employment and    minimizes
environmental impacts due to personnel transportation.


The  following checklists are intended to provide an overview and understanding of how
environmental   building principles can be implemented in product purchasing and on site
construction delivery.


 Precinct Sustainability at Noosa on Weyba Queensland

 Product Selection Checklist (After SDRGi2                               Comments          -/ or x

   1      Does the manufacturer have an environmental
          policy?
   2      Is the raw material renewable/recyclable?
   3      Does the harvesting/extraction process cause
          environmental degradation?
   4      What happens to waste/pollution in the
          manufacturinq process?
   5      Is it an energy intensive process?
   6      Is the finished product tested/certified by any
          environmental agency?
   7
          (If it saves energy) What is the payback period (the
          time in which initial costs are recouped through
          lower long-term operating and maintenance costs)?
   8
          (If it conserves resources) What is the recycled
          percentage?
   9      Is it more durable than its competitors?
  10      Does it off-gas carcinogens, VOC’s or other toxins?
          For how long?
  11
          (Remember that "right-to-know" regulations entitle
          you to request a Material Safety Data Sheet (MSDS)
          from the manufacturer or the supplier.)
  12      Has the minimum amount of packaging been used?
          Is it recyclable?
  13      How is the product disposed?
  14      It is designed to be easily recyclable?
          Into what?
  15      What are its maintenance requirements?
  16      Are any of the maintenance products hazardous?


For the   implementation phase of the works at the precinct careful selection of appropriate
constructors experienced in the delivery of specific building types and associated infrastructure
(Figure 11) will be as critical as any other action taken by the developer. In selecting the
contractor the following criteria shouldprovide the first step in obtaining a company that has
experience in or is willing to obtain the necessary tools to pursue sustainability options and
adopt sustainable innovations in their operations. The checklist should be able to enable the
developer secure the services of companies that are skilled in the design, construction and
maintenance of high quality structures that adopt industry best practice for sustainability in the
built environment.




Dr Richard Moore EC3 Global Earthcheck Assessor                                Copyright 2012   52

Used in these records

About this file

File size
86.5 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Part 22 of 37 Appendix 20 - Earthcheck MCU12_0208.pdf · 86.5 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.