Site Based Stormwater Managment Plan

of 86

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                                         20169 - SBSMP/2
                                                                                                  Page 18




6.3.4 MUSIC Modelling Parameters
The MUSIC model was set up in accordance with the Water-By-Design MUSIC Modelling Guidelines
for South East Queensland to the parameters listed in Table 6.5 and Table 6.6. Refer to Figure 6.1
for source node areas.

                                          Table 6.6 – MUSIC Parameters

                       Parameter                               Data Used

                      Rainfall Data                          40908 TEWANTIN

                  Modelling Timestep                           6 minutes

                         Routing                   No routing drain links were adopted



                             Table 6.7 – Catchment Runoff Generation Parameters

                                   Parameter                       Residential Catchment


                              Rainfall Threshold                               1

                         Soil Storage Capacity (mm)                           500

                     Initial Storage Capacity (% capacity)                    10

                             Field Capacity (mm)                              200

                      Infiltration Capacity Coefficient a                     211

                      Infiltration Capacity Coefficient b                      5

                              Initial Depth (mm)                              50

                           Daily Recharge Rate (%)                            28

                           Daily Baseflow Rate (%)                            27

                        Daily Deep Seepage Rate (%)                            0


6.3.5 MUSIC Modeling Results
Refer to Figure 6.1 for a print screen schematic of the MUSIC model for the proposed development
and Figure 6.2 for the annual pollutant loads that will be discharged from the site for the proposed
development.




Site Based Stormwater Management Plan
Proposed Townhouse Development at 99, 101 & 105 Eumundi Noosa Road, Noosaville
Log in to download the original file

Site Based Stormwater Managment Plan.pdf · 13.5 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.