Skip to the record
The gold standard in government transparency.

Original source · versioned page text

Site Based Stormwater Managment Plan

of 86

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Water Quality and Drainage Code
Noosa Council Plan July 2020
Performance and Acceptable Outcomes Table
Version: 2020

Performance Outcomes                                      Acceptable Outcomes                                    Solution1                      Comments                                    Council Use

                                                          of stormwater to incorporate appropriate
                                                          allowance for climate change impacts
                                                          (including rainfall intensity and sea level
                                                          rise), in accordance with PSP6 Engineering
                                                          Design Standards – Roads, Drainage and
                                                          Earthworks.
PO3                                                       AO3.1
Stormwater drainage infrastructure conveys run-           Stormwater drainage infrastructure meets the
off in a manner that allows roads to deliver              desired standards of service for roads
                                                                                                                    N/A
desired standards of service appropriate to the           functionality set out in PSP6 Engineering
local conditions and local stormwater drainage            Design Standards - Roads, Drainage and
characteristics.                                          Earthworks.
PO4                                                       AO4.1                                                                RO4.1
Stormwater infrastructure is compatible with              The location, design and construction of                             Refer to RO2.1.
existing infrastructure, allows for easy access for       stormwater drainage structures is in
the ongoing maintenance by Council, is cost               accordance with PSP6 Engineering Design                    
effective across its design life.                         Standards - Roads, drainage and
                                                          earthworks.
                                                          AO4.2
                                                          Where infrastructure is located on private
                                                          land an easement is dedicated over the
                                                                                                                    N/A
                                                          infrastructure in accordance with PSP6
                                                          Engineering Design Standards - Roads,
                                                          drainage and earthworks.
                                                          AO4.3                                                                RO4.3
                                                          Any alterations or repairs to infrastructure as                      The proposal complies.
                                                          a result of the development are made at no                 
                                                          cost to Council.
                                                          AO4.4                                                                RO4.4
                                                          Development avoids stormwater inflow and                             The proposal complies. Stormwater will
                                                          infiltration to the sewer infrastructure                            be design to avoid inflow and infiltration
                                                          network.                                                             into the sewer infrastructure network.
                                                          AO4.5                                                                RO4.5
                                                          Stormwater infrastructure is designed to                            The proposal complies.
                                                          minimise maintenance costs and the


1
    Solution:          Acceptable Solution                                                                                                                                                         Page 2 of 10
                A/S     Alternative Solution                 \\SERVER\Data\JOBS\20-Jobs\20169 - 101 & 105 Eumundi Noosa Road, Noosaville\Civil\Reports\SBSMP\Working\Appendices\20169 - NSC Water Quality and Drainage
                N/A     Not applicable to this proposal                                                                                                                                               Code 2020.docx
                                                                                                                                                                                                            Job: 20169
                                                                                                                                                                                                           Rev:      1
Site Address: 99, 101 & 105 Eumundi Noosa Road, Noosaville                                                                                                                                             10/08/2021
Log in to download the original file

Site Based Stormwater Managment Plan.pdf · 13.5 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.