Site Based Stormwater Managment Plan

of 86

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Water Quality and Drainage Code
Noosa Council Plan July 2020
Performance and Acceptable Outcomes Table
Version: 2020

Performance Outcomes                                    Acceptable Outcomes                                    Solution1                      Comments                                    Council Use

PO12                                                    AO12.1
Development protects in-stream ecology by               Where run-off from or within the site passes
maintaining pre development low flow discharge          through or drains to natural channels,
regimes and maintaining fish                            waterways or wetlands, development
passages.                                               protects in steam ecology by maintaining
                                                                                                                  N/A
                                                        pre-development low flow discharge regimes
                                                        in accordance with the frequent flow
                                                        management objectives in PSP6 Engineering
                                                        Design Standards - Roads, drainage and
                                                        earthworks
                                                        AO12.2
                                                        Instream structures such as roads, bridges,
                                                        culverts, and other stormwater infrastructure
                                                                                                                  N/A
                                                        do not cause barriers to fish passage and
                                                        facilitate the movement of terrestrial and
                                                        aquatic fauna along waterway corridors
                                                        AO12.3
                                                        Benthic substrate retains a continuous grade
                                                                                                                  N/A
                                                        with the direction of flow consistent with the
                                                        natural bed profile.
PO13                                                    AO13.1
Development is designed and constructed to              The location and form of stormwater
maintain surface and ground water balances that         discharge points do not alter the pre-                    N/A
sustain the environmental values of water               development hydrology of receiving surface
dependent ecosystems, including downstream              water or groundwater.
aquatic, riparian, wetland and terrestrial              AO13.2
ecosystems.                                             Developments located on groundwater
                                                        recharge or discharge areas are designed
                                                        and managed in accordance with a
                                                        groundwater recharge and discharge
                                                        management plan prepared by a suitably                    N/A
                                                        experienced and qualified groundwater
                                                        hydrologist. The groundwater recharge or
                                                        discharge must demonstrate that the
                                                        development does not affect groundwater
                                                        balances beyond the property boundaries

1
    Solution:        Acceptable Solution                                                                                                                                                         Page 7 of 10
                A/S   Alternative Solution                 \\SERVER\Data\JOBS\20-Jobs\20169 - 101 & 105 Eumundi Noosa Road, Noosaville\Civil\Reports\SBSMP\Working\Appendices\20169 - NSC Water Quality and Drainage
                N/A   Not applicable to this proposal                                                                                                                                               Code 2020.docx
                                                                                                                                                                                                          Job: 20169
                                                                                                                                                                                                         Rev:      1
Site Address: 99, 101 & 105 Eumundi Noosa Road, Noosaville                                                                                                                                           10/08/2021
Log in to download the original file

Site Based Stormwater Managment Plan.pdf · 13.5 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.