Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

2201-26714 SRA Response with conditions (RAL21_0033)

Attached to the e-mail RAL21/0033 - SRA application correspondence - Referral agency response – with conditions.

of 7

Page text shows just the words. Original shows the document exactly as it was published.

                                                                                            2201-26714 SRA




Attachment 2—Advice to the applicant

General advice
1.      Terms and phrases used in this document are defined in the Planning Act 2016 its regulation or
        the State Development Assessment Provisions, version 2.6. If a word remains undefined it has
        its ordinary meaning.
2.      Road works approval
        Under section 33 of the Transport Infrastructure Act 1994, written approval is required from the
        Department of Transport and Main Roads to carry out road works on a state-controlled road
        including closure of the existing access.
        Please contact the Department of Transport and Main Roads on
        [email protected] to make an application for road works approval. This
        approval must be obtained prior to commencing any works on the state-controlled road
        reserve. The approval process may require the approval of engineering designs of the
        proposed works, certified by a Registered Professional Engineer of Queensland (RPEQ).
        Please contact the Department of Transport and Main Roads as soon as possible to ensure
        that gaining approval does not delay construction.
3.      Public utility works and connection approval
        The applicant is advised that if any works and/or connections are required to public utility
        services within a state-controlled road reserve, approval must be given by the Department of
        Transport and Main Roads under the relevant public utility legislation (electricity, water/sewer,
        telecommunication), and in accordance with Department of Transport and Main Roads’
        technical standards (TN163). Approvals must be obtained prior to commencing any utility works
        within the state-controlled road reserve. Please contact the public utility team via
        [email protected] for further information on the application and approval process.




State Assessment and Referral Agency                                                           Page 4 of 7
Log in to download the original file

2201-26714 SRA Response with conditions (RAL21_0033).pdf · 257 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.