MINUTES
General Committee
Meeting
Monday, 12 September 2022
10am
Council Chambers, 9 Pelican Street, Tewantin
Committee: Crs Frank Wilkie (Chair), Karen Finzel, Joe Jurisevic, Amelia
Lorentson, Clare Stewart, Brian Stockwell, Tom Wegener
“Noosa Shire – different by nature”
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 20 sections
Section 2
GENERAL COMMITTEE MEETING MINUTES 12 SEPTEMBER 2022
1. ATTENDANCE & APOLOGIES
COUNCILLORS
Cr Frank Wilkie (Chair)
Cr Karen Finzel
Cr Joe Jurisevic
Cr Amelia Lorentson
Cr Clare Stewart
Cr Brian Stockwell
Cr Tom Wegener
EXECUTIVE
S Waters, Chief Executive Officer
L Jensen, Acting Director Environment and Sustainable Development
L Sengstock, Director Infrastructure Services
D Iezzi, Director Executive Services
APOLOGIES
Nil.
The meeting commenced at 10.00am.
2. CONFIRMATION OF MINUTES
Committee Resolution
Moved: Cr Lorentson
Seconded: Cr Stewart
The Minutes of the General Committee Meeting held on 15 August 2022 be received and
confirmed.
Carried unanimously.
3. PRESENTATIONS
Nil.
4. DEPUTATIONS
Nil.
Page 2 of 21
Section 3
GENERAL COMMITTEE MEETING MINUTES 12 SEPTEMBER 2022
5. ITEMS REFERRED FROM COMMITTEES
PLANNING & ENVIRONMENT COMMITTEE
1 MCU22/0062 – APPLICATION FOR A MATERIAL CHANGE OF USE FOR OFFICE
AT 2 EMERALD STREET COOROY
Referred from the Planning & Environment Committee Agenda, 6 September 2022
(Item 1, Page 4) for a Further Report - included in this Agenda as Report No. 3.
3 FURTHER REPORT - MCU22/0062 - APPLICATION FOR A MATERIAL CHANGE
OF USE FOR OFFICE AT 2 EMERALD STREET COOROY
The following material was presented to the meeting in relation to this item:
Cr Stockwell – Images - refer to Attachment 1
Motion
Moved: Cr Stockwell
Seconded: Cr Jurisevic
That Council note the further report by the Development Planner to the General
Committee Meeting dated 12 September 2022 and the report to the Planning &
Environment Committee dated 6 September 2022 regarding Application No.
MCU22/0062 for a Development Permit for a Material Change of Use for Offices
situated at 2 Emerald Street, Cooroy and:
A. Vary from the recommendations of staff on the basis that:
1. The staff assessment has placed inadequate weight on the need for
development to contribute to the achievement of
a) the District Centres Zone Overall Outcome 2 (g) and (h);
b) the Cooroy Local Plan Performance Outcomes PO3, PO7 and P10.
2. The staff assessment has placed too much weight on the standard and
design of existing nearby development compared to the desired future
character clearly outlined in the plan.
B. Does not agree to the proposed relaxation of height and carparking requirements
due to the failure of the design to meet the outcomes listed above;
C. Advise the applicant that Council would consider relaxation of height
requirements should
1. The second storey parapet be removed and be replaced with a hip roof
design to reflect the traditional character of two storey buildings in the
business district;
2. That the cantilevered awning be replaced with a street awning that
generally reflects the design criteria outlined in Figure 6.4.2.4 - Pedestrian
Environment - Street Awnings - Cooroy and Hinterland.
Lost unanimously.
Page 3 of 21
Section 4
GENERAL COMMITTEE MEETING MINUTES 12 SEPTEMBER 2022
Committee Recommendation
Moved: Cr Stockwell
Seconded: Cr Jurisevic
A. Approve the application in accordance with the following conditions:
PLANNING
When Conditions must be Complied With
1. Unless otherwise stated, all conditions of this Decision Notice must be
complied with prior to the use commencing, and then compliance
maintained at all times while the use continues.
Approved Plans
2. Development undertaken in accordance with this approval must generally
comply with the approved plans of development. The approved plans are
listed in the following table unless otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
SK-01 G Floor Plans Prepared by Wiltshire Stevens 23.08.2022
Architecture
SK-02 G Elevations Prepared by Wiltshire Stevens 23.08.2022
Architecture
SK-04 G Sections Prepared by Wiltshire Stevens 23.08.2022
Architecture
Building Appearance
3. The parapet to the Emerald Street frontage is to be removed and replaced
with a hip roof design.
4. All deck and balcony areas above ground floor must not be enclosed by
permanent fixtures such as shutters, louvres, glass panelling or the like,
except where required to satisfy any privacy condition of this Decision
Notice or if shown on the approved plans.
5. Street awnings must be provided for the full frontage of the building to
Emerald Street. The awning must be designed to provide maximum
continuous solar and rain protection and promote all weather activity but
provide opportunities for street tree planting and landscaping. The width of
the awning must be determined in consultation with the Manager
Development Assessment prior to the issue of the operational works
approval and is to include a sloping roof form. Posts are to be provided and
must be located to the outer most point of the awning so as not to impede
pedestrian traffic.
6. Ground floor shopfront glazing along the Emerald Street frontage must be
fully transparent to a minimum of 65% of the street frontage to allow passive
surveillance and encourage social interaction and must be provided at full
height (floor to ceiling).
7. Any security screens on the premises consist of grille or translucent
screens and not solid shutters, screens or roller-doors.
8. All mechanical equipment and other service infrastructure located on the
site must be:
a. located not less than 2 metres from a property boundary.
b. fully enclosed or screened such that they are not visible from the
street frontages nor adjoining properties. Where screened by
landscaping, landscaping beds must be at least 1.5 metres wide.
Page 4 of 21
Section 5
GENERAL COMMITTEE MEETING MINUTES 12 SEPTEMBER 2022
9. Roof materials must be non-reflective and designed with colours and styles
to minimise the visual impact of the development.
10. The street awning must extend for the full width of the frontage and be
setback 1m from the face of the kerb. Amended plans must be submitted
prior to the issue of an operational works approval.
11. All ground floor shopfront glazing must be protected against vandalism by
the use of a form of safety glass such as toughened or laminated glass.
12. During operating hours, all parking areas, pedestrian areas and
entrances/exits to all stairwells, lifts, foyers and public toilets must be well
lit with vandal resistant lighting and with intensities to satisfy the
requirements of Australian Standard AS1158 “Public Lighting Code”.
Lighting must be designed to reduce the contrast between shadows and
well lit areas. In particular, appropriate security lighting must be provided
along the full length of the proposed pedestrian/cycleway.
Currency Period
13. This development approval lapses if the use has not happened by 15
September 2028 unless an application to extend the currency period is
approved by Council.
Building Height
14. The maximum height of the development must not exceed RL118.15 8m
to the peak of the roof line. as detailed on section B-B of Plan SK04.
15. Certification must be submitted to Council from a Licensed Surveyor which
certifies that the building does not exceed the maximum height requirement
of this Decision Notice.
Performance Bond
16. Security in the form of a cash bond or trading bank guarantee to the sum
of $10,000 must be submitted to Council, to secure performance of all
conditions of this approval, prior to the issue of a Development Permit for
Operational Works. The cash bond or trading bank guarantee will be
returned on performance of the conditions of approval less any costs
incurred by Council in respect of enforcing performance of this permit.
Council reserves the right to call upon the bond or guaranteed sum to effect
compliance with conditions.
Street Identification
17. The street address of the development must be clearly visible and
discernible from the primary frontage of the site by the provision of a street
number and, where appropriate, the building name.
External Works – Wimmers Lane
18. Wimmers Lane must be upgraded for the length of its frontage to the
subject site. The works must be undertaken in accordance with an
Operational Works approval and must include in particular:
a. construction of kerb and channelling, road widening and underground
stormwater drainage to the development side only. The final extent
and alignment of works to be determined as part of the subsequent
Operational Works approval.
Road Widening of Wimmers Lane
19. The developer must dedicate as “road” a 2m wide strip extending across
the full frontage of the site to Wimmers Lane. The dedication must be in
Page 5 of 21
Section 6
GENERAL COMMITTEE MEETING MINUTES 12 SEPTEMBER 2022
accordance with drawing number Plan number SK01 Version G dated 23
August 2022 prepared by Wiltshire Stevens Architecture.
20. The dedication must be completed prior to the commencement of the use.
External Works – Emerald Street
21. Emerald Street must be upgraded for the length of its frontage to the
subject site. The works must be undertaken in accordance with an
Operational Works approval and must include in particular:
a. a full width pathway extending from the property boundary to the kerb
and channel.
b. works to transition the new full width pathway to match smoothly with
the existing frontages of the adjoining properties. These works will
extend beyond the frontage of the subject site. The transitions must
be constructed at grades that are in accordance with Council’s
Planning Scheme Policy 5 – Engineering Design Standards – Roads,
Drainage and Earthworks.
c. any necessary relocation or alteration to existing access from
Emerald Street to the adjoining property at 4 Emerald Street must be
undertaken. The type and extent of these works must be in
agreement with the adjoining property owner and clearly shown on
plans submitted for operational works.
d. Any relocation/reinstatement of existing services in the road verge.
These works are to be undertaken at no cost to Council.
Site Access and Driveways
22. A sealed access driveway must be provided from Wimmers Lane to all
parking and manoeuvring areas of the development. The works must be
undertaken in accordance with an Operational Works approval and must
include in particular:
a. a driveway crossover generally in accordance with RS-051 and any
associated addendum.
Car Parking
23. A minimum of 23 car parking spaces and 2 motor cycle spaces must be
provided and marked on the site for the commercial development, and
made available and accessible at all times while the use is open for
business. The works must be undertaken in accordance with an
Operational Works approval and must include in particular:
a. pedestrian routes in accordance with the conditions of this Decision
Notice .
b. 1 disabled parking space within the total.
c. dimensions, crossfalls and gradients in accordance with Australian
Standard AS2890: Parking Facilities.
24. All car parking areas and access driveways must be maintained exclusively
for vehicle parking and manoeuvring and kept in a tidy and safe condition
at all times.
Pedestrian and Bicycle Facilities
25. Pedestrian and bicycle facilities must be provided for the development.
The works must be undertaken in accordance with an Operational Works
approval and must include in particular:
Page 6 of 21
Section 7
GENERAL COMMITTEE MEETING MINUTES 12 SEPTEMBER 2022
a. a 2 metre wide footpath along one side of Wimmers Lane and
Emerald Street.
b. the resealing of the existing asphalt path fronting the development.
26. Pedestrian and bicycle facilities must be provided for the development and
include:
a. 10 bicycle parking spaces and 5 lockers; and
b. one shower cubicle with ancillary change room.
Stormwater Drainage
27. The site must be provided with a stormwater drainage system connecting
to a lawful point of discharge. The works must be undertaken in accordance
with an Operational Works approval and the Queensland Urban Drainage
Manual, and must include in particular:
a. works generally in accordance with the Stormwater Layout Plan. Fig
1.2 Revision B prepared by Callaghan & Toth dated 6 July 2022;
a. extension of the site stormwater system to accommodate stormwater
from the existing external drainage pipe from Lot 2 on RP44101 to
the east; and
b. the use of gravity stormwater drainage and not surcharge pits.
This condition is imposed pursuant to s145 of the Planning Act 2016
being non-trunk infrastructure.
Services
28. Underground reticulated electricity and telecommunication services must
be provided to each lot in accordance with an approval for Operational
Works and the standards and requirements of the relevant service provider.
29. Unless otherwise stipulated by telecommunications legislation at the time
of construction, the development must be provided with all necessary
conduits, pits and pipes to accommodate the future connection of optic fibre
technology telecommunications.
30. Certification must be submitted to Council from all relevant service
providers (Energex, NBN and Unitywater) which certifies that the
development has met the requirements of this Decision Notice and all
applicable legislation at the time of construction.
Easements
31. A 1.5 metre wide easement for stormwater drainage purposes must be
registered against the title of the property in favour of Lot 2 on RP44101
and be generally in accordance with the Stormwater Layout Plan. Fig 1.2
Revision B prepared by Callaghan & Toth dated 6 July 2022. The easement
must be of sufficient width to wholly encompass the drainage infrastructure
and extend to the Emerald Street boundary.
32. A 2.0 metre wide easement for “Public Thoroughfare” purposes must be
registered against the title of the property in favour of Council. The
easement must be located directly adjacent to the eastern property
boundary and extend for the full length between Wimmers Lane and
Emerald Street. The easement must be:
a. clearly shown on all plans submitted for Operational Works; and
b. registered prior to the commencement of the use.
Page 7 of 21
Section 8
GENERAL COMMITTEE MEETING MINUTES 12 SEPTEMBER 2022
33. All easements must be designed in accordance with the planning scheme
and granted at no cost to the Grantee. Where the Grantee is Council or a
service authority, the easement documentation must be in accordance with
the Grantee’s standard easement terms. Draft easement documentation
must be submitted to Council for endorsement.
34. All works must be kept clear of any existing or proposed easements on the
subject land, unless agreed otherwise in writing by the Grantee.
B. Agree to reduce the infrastructure charges in respect to the impervious area
calculation for stormwater for the 2m wide public thoroughfare required by
condition 27.
C. Note the report is provided in accordance with Section 63(5) of the Planning Act
2016.
For: Crs Wilkie, Lorentson, Jurisevic, Wilkie, Stewart and Finzel
Against: Cr Wegener
Carried.
2 RAL21/0035 – APPLICATION TO RECONFIGURE A LOT (1 LOT INTO 2 LOTS) AT
21 JIRIMMA CRESCENT, COOROIBAH
The following material was presented to the meeting in relation to this item:
Cr Stockwell - Images – refer to Attachment 2
Committee Recommendation
Moved: Cr Jurisevic
Seconded: Cr Lorentson
That Council note the report by the Coordinator Planning to the Planning &
Environment Committee Meeting dated 6 September 2022 regarding Application
RAL21/0035 for a Development Permit for Reconfiguring a Lot – 1 into 2 lots situated
at 21 Jirrima Crescent, Cooroibah and defer this matter to the Ordinary Meeting dated
15 September to allow staff to further negotiate with the applicant regarding potential
flood and fire issues.
Carried unanimously.
SERVICES & ORGANISATION COMMITTEE
Nil.
Page 8 of 21
Section 9
GENERAL COMMITTEE MEETING MINUTES 12 SEPTEMBER 2022
6. REPORTS DIRECT TO GENERAL COMMITTEE
4 FURTHER REPORT - MCU21/0212 - APPLICATION FOR A MATERIAL CHANGE
OF USE – DWELLING HOUSE AT 66 SEAVIEW TERRACE, SUNSHINE BEACH
In accordance with Chapter 5B of the Local Government Act 2009, Cr Lorentson provided the
following declaration to the meeting of a declarable conflict of interest in this matter:
I, Cr Lorentson inform the meeting that I have a declarable conflict of interest in this matter as
Deborah Reid a submitter to the application, is a personal friend. Although I have a declarable
conflict of interest, I do not believe a reasonable person could have a perception of bias because
I believe I do not have a close personal relationship with Ms Reid. Therefore, I will choose to
remain in the meeting room. However, I will respect the decision of the meeting on whether I
can remain and participate in the decision.
Committee Resolution
Moved: Cr Stewart
Seconded: Cr Jurisevic
That Council note the declarable conflict of interest by Cr Lorentson and determine that it is in
the public interest that Cr Lorentson participates and votes on this matter because Council
believes that Cr Lorentson does not have a close personal relationship with the submitter, Ms
Reid and therefore a reasonable person would trust that the final decision is made in the public
interest.
Carried unanimously.
Cr Lorentson did not vote on the above motion.
The following material was presented to the meeting in relation to this item:
Cr Stockwell - Image – refer to Attachment 3
Committee Recommendation
Moved: Cr Stewart
Seconded: Cr Lorentson
That Council note the Further Report by the Coordinator Planning to the General
Committee Meeting dated 12 September 2022 regarding Application No. MCU21/0212
for a Development Permit for a Material Change of Use – Dwelling situated at 66
Seaview Terrace Sunshine Beach and
A. Approve the application in accordance with the following conditions:
1. Unless otherwise stated, all conditions of this Decision Notice must be
complied with prior to the use commencing, and then compliance
maintained at all times while the use continues.
1. The applicant must provide a copy of the development approval to the
private building certifier who assesses the subsequent development
application for a development permit for building works for the construction
of the Detached House and the associated deck and pool area.
Approved Plans
2. Development must be undertaken strictly under the approved plans listed
in the following table unless otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
100.00 J Site Plan, prepared by Shaun Lockyer 01.09.2022
Architects
200.00 J Floor Plan – Lower Ground 01.09.2022
200.01 I Floor Plan – Ground Level 01.09.2022
200.02 H Floor Plan – Level 01 01.09.2022
210.00 H Roof Plan 01.09.2022
Page 9 of 21
Section 10
GENERAL COMMITTEE MEETING MINUTES 12 SEPTEMBER 2022
Plan No. Rev. Plan/Document Name Date
300.00 H Building Elevations – elevation west 01.09.2022
300.01 H Building Elevations – elevation north 01.09.2022
300.02 H Building Elevations – elevation east 01.09.2022
300.03 H Building Elevations – elevation south 01.09.2022
640.00 A Landscape details – detail driveway plan 06.05.2022
640.01 A Landscape details – driveway detail section 06.05.2022
Amended Plans
3. Prior to the issue of any further development approvals amended plans
must be submitted to Council. The plans must remove the roof top terrace.
The plans must be to the satisfaction of the Manager, Development
Assessment.
Approved Documents
4. Development must be undertaken strictly under the approved documents
listed in the following table unless otherwise amended by these conditions.
Document
Tectonic report “Geotechnical Investigation, Proposed residence 66
Seaview Terrace, Sunshine Beach”, reference 21370-001-Rev 1 dated 28
April 2022
Royal Haskoing DHV report ‘Report 66 Seaview Terrace, Sunshine Beach
Coastal Hazards Assessment, reference PA2906-RHD-ZZ-XX-RP-Z-0001
dated 3 June 2022
Built form
5. The maximum height of the development must not exceed 8 metres above
ground level in accordance with the approved plans.
6. Certification must be submitted to Council from a Licensed Surveyor which
certifies that the building does not exceed the maximum height requirement
of this Decision Notice.
7. The proposed Detached House must be located on the site, as shown on
the Site Plan, Drawing No. 100.00, Revision J. The Detached House is not
to be located closer than 10.5m to the seaward boundary, except for the
cantilevered part of the building which is not to extend closer than 7.5m to
the seaward boundary. Certification of the location of the Detached House,
including the cantilevered section from the seaward boundary, is to be
provided by a licenced surveyor before the issue of a final classification for
the Detached House by the building certifier. The certification must be
submitted to Council.
Currency Period
8. This development approval lapses if the use has not happened by 21 July
2028, unless an application to extend the currency period is approved by
Council.
Performance Bond
9. Security in the form of a cash bond or trading bank guarantee to the sum
of $20,000 must be submitted to Council, to secure performance of all
conditions of this approval, prior to the issue of a Development Permit for
Building Works. The cash bond or trading bank guarantee will be returned
on performance of the conditions of approval less any costs incurred by
Council in respect of enforcing performance of this permit. Council reserves
the right to call upon the bond or guaranteed sum to effect compliance with
conditions.
Page 10 of 21
Section 11
GENERAL COMMITTEE MEETING MINUTES 12 SEPTEMBER 2022
Landscaping
10. A minimum of 20% of the site must be retained as soft landscaping.
11. To screen the development, screening vegetation must be planted for the
full length of the north and south boundaries, with the exception of the
bin/gas/bike store area, in accordance with Council’s Planning Scheme
Policy PSP2 - Landscaping. The planted vegetation must have a minimum
pot size of 200mm and consist of native, endemic species with a mature
height of not less than 8 metres and a maximum spacing of 2 metre centres.
12. A mix of native landscaping, such as ground covers, shrubs and trees, is
provided for a width of 5 metres from the seaward or rear boundary of the
site. The planted vegetation must have a minimum pot size of 200mm and
consist of native, endemic species as per Table 3.1 & 3.2 of PSP2
Landscaping for suitable coastal species. The planted vegetation must be
planted at the following density:
a. trees must have a maximum spacing of 6m;
b. shrubs must have a maximum spacing of 1.5m; and
c. ground covers planted between the trees and shrub must achieve a
dense coverage.
13. The development is to provide adequate landscape buffering to protect the
character of the beachfront, to the reasonable satisfaction of the Manager
Development Assessment.
14. Two 100 litre street trees must be provided within the frontage. The trees
must be a coastal species in accordance with PSP2 – Landscaping.
Coastal Protection
15. External colours and finishes of the building must comprise of
muted/environmental tones that blend with the natural environment.
Pedestrian Access
16. A pedestrian access gate must not be installed along the seaward property
boundary with direct access by residents to the beachfront area not being
permitted.
Geotechnical Stability
17. A footing system and erosion protection system must be designed for the
proposed development to withstand the short-term erosion associated with
a 500-year average recurrence interval storm event combined with
shoreline recession due to sea-level rise for 2100 climate change. The
short-term erosion associated with a 500-year average recurrence interval
storm event combined with shoreline recession due to sea-level rise for
2100 climate change to be considered for the design as per the
recommendations of the Royal Haskoing DHV report ‘Report 66 Seaview
Terrace, Sunshine Beach Coastal Hazards Assessment, reference
PA2906-RHD-ZZ-XX-RP-Z-0001 dated 3 June 2022.
18. The footing system and erosion protection system must in accordance with
the works detailed in the Tectonic report “Geotechnical Investigation,
Proposed residence 66 Seaview Terrace, Sunshine Beach”, (Reference
21370-001-Rev 1 dated 28 April 2022) and other supporting documents
referenced in the Tectonic report.
19. The design must include the protection of the northern and southern
boundaries of the site to prevent erosion on neighbouring properties
Page 11 of 21
Section 12
GENERAL COMMITTEE MEETING MINUTES 12 SEPTEMBER 2022
exposing the side boundaries of the site to erosion. The minimum extent of
the side boundary protection must be determined by a line drawn at 28°
extending upwards to the west from the base of the rear point of the erosion
as per the recommendations of Tectonic report “Geotechnical
Investigation, Proposed residence 66 Seaview Terrace, Sunshine Beach”,
reference 21370-001-Rev 1 dated 28 April 2022.
20. The design must be accompanied by certification by a Registered
Professional Engineer of Queensland (RPEQ) specialising in geotechnical
engineering that the design is satisfactory and will provide a long-term
factor of safety concerning slope stability of no less than 1.5.
21. Following construction, certification must be supplied to Council by an
RPEQ specialising in geotechnical engineering that the works have been
constructed in accordance with the approved design.
22. A dilapidation survey shall be carried out of all adjacent properties and
structures before the commencement of construction of the proposed
development on the site.
23. Due to the risk of instability on the existing dune slope and the potential for
settlement of loose sand on the adjacent properties, vibrations must be
kept to a minimum and must be monitored during the construction of the
development. Driven piles (both sheet piles and pile footings) are not
permitted on the site.
24. Landscaping at the rear of the property and the crest of the existing dune
slope shall be limited to a maximum surcharge of 5kPa unless a site-
specific slope stability analysis is carried out to demonstrate that higher
loads are acceptable.
25. Under no circumstances shall building materials be temporarily stockpiled
in the area of the crest of the existing dune slope or on the slope.
26. Discharge of concentrated stormwater flows onto the dune slope must be
avoided, and under no circumstances will subsurface disposal of water be
permitted using infiltration pits.
27. Stormwater runoff from gutters, down-pipes, driveways, and paved areas
must be collected and directed by pipes into the Council stormwater system
along Seaview Terrace.
28. The existing dune slope and any areas disturbed by the construction of the
proposed development shall be revegetated as soon as possible to reduce
the potential for erosion.
Earthworks
29. Earthworks required on-site must be carried out in accordance with
Council’s Planning Scheme Policy PSP6 Engineering Design Standards,
so as not to cause the additional ponding of water on any adjoining lands
or concentrate or direct overland flow on to an adjoining property.
30. All earthworks carried out on site must not affect the structural stability of
the adjoining lands and/or buildings and/or structures and/or services.
31. All earthworks and associated retaining structures/batters, both above and
below ground level, both temporary and permanent, must be wholly
contained within the subject site unless written permission from the
respective landowner(s) is provided to Council.
32. All earthworks must be undertaken in accordance with the provisions of
Australian Standard AS3798: Guidelines on Earthworks for Commercial
and Residential Developments.
Page 12 of 21
Section 13
GENERAL COMMITTEE MEETING MINUTES 12 SEPTEMBER 2022
Significant Weather Event
33. Should a significant weather event occur which results in substantial
erosion within the site, and undermines the structure and/or renders the
Detached House uninhabitable, the owner must
a. Immediately secure the perimeter of the property to prevent
unauthorised access and then undertake necessary works upon the
land to make the detached house safe and suitable for habitation in
a timely manner.
i. Any work proposed must be designed to ensure that the work
will not cause adverse impacts on other lands or on coastal
processes.
ii. Rock, concrete and like hard materials must not be used for the
construction of beach protection works.
iii. Any work proposed to be carried out must be undertaken in
accordance with Development Permit for Operational Works.
b. or remove the Detached House and all associated structures
including the footpath crossover and make the land safe at no cost to
the Council.
Site Access and Driveways
34. A sealed access driveway must be provided from the existing formation in
Seaview Terrace to all parking and manoeuvring areas of the development.
The works must be undertaken in accordance with an Operational Works
approval and must include a driveway located generally in accordance with
the approved plans.
Stormwater Drainage
35. Stormwater runoff from the development must be collected and disposed
of in accordance with the recommendations of the site specific geotechnical
report. Stormwater runoff from gutters, down-pipes, driveways, and paved
areas must be collected and directed to Council stormwater drainage
system along Seaview Terrace. The works must be undertaken in
accordance with an Operational Works approval.
36. Prior to the commencement of the use a certificate must be issued by an
RPEQ certifying that the stormwater drainage system has been
constructed in accordance with the conditions of this permit.
Easements
37. Unless otherwise agreed in writing by the relevant service provider, any
public or third party infrastructure located on the subject site must be placed
within an easement registered against the title of the property.
38. All easements must be designed in accordance with the planning scheme
and granted at no cost to the Grantee. Where the Grantee is Council or a
service authority, the easement documentation must be in accordance with
the Grantee’s standard easement terms. Draft easement documentation
must be submitted to Council for endorsement.
39. All works must be kept clear of any existing or proposed easements on the
subject land, unless agreed otherwise in writing by the Grantee.
Damage to Services and Assets
40. Any damage caused to existing services and assets as a result of the
development works must be repaired at no cost to the asset owner at the
following times:
a. where the damage would cause a hazard to pedestrian or vehicle
Page 13 of 21
Section 14
GENERAL COMMITTEE MEETING MINUTES 12 SEPTEMBER 2022
safety, immediately; or
b. where otherwise, upon completion of the works associated with the
development.
Any repair work which proposes to alter the alignment or level of existing
services and assets must first be referred to the relevant service authority
for approval.
B. Note the report is provided in accordance with Section 63(5) of the Planning Act
2016.
For: Crs Jurisevic, Lorentson, Wilkie, Stewart, Finzel and Wegener
Against: Cr Stockwell
Carried.
The meeting adjourned at 11.48am.
The meeting resumed at 12.02pm.
5 FURTHER REPORT - MCU19/0017.02 & RAL19/0004.02 FOR A MINOR CHANGE
TO DEVELOPMENT APPROVAL FOR COMMERCIAL BUSINESS - TYPE 1
OFFICE, COMMERCIAL BUSINESS - TYPE 2 MEDICAL & ANCILLARY DWELLING
UNIT & RECONFIGURATION OF A LOT – ACCESS EASEMENT AT 36 - 40
HOFMANN DRIVE, NOOSAVILLE
Committee Recommendation
Moved: Cr Lorentson
Seconded: Cr Wegener
That Council note the report by the Development Planner to the Planning &
Environment Committee Meeting dated 12 July 2022 and the Further Report to the
General Meeting dated 12 September 2022 regarding Application No. MCU19/0017.02
& RAL19/0004.02 to make a minor change to an existing approval for Material Change
of Use - Ancillary Dwelling Unit, Commercial Business - Type 1 Office, Commercial
Business - Type 2 Medical and Reconfiguration of a Lot – Access Easement situated
at 36-40 Hofmann Dr Noosaville and:
A. Refuse the request for increased height and design for the following reasons:
1. The increased height does not comply with Acceptable outcome AO16.1
(b) (iii) of the Major Centre Zone code and Performance Outcome PO16 a),
b) & c) of the Major Centre Zone code in Noosa Plan 2020 and Probable
solution S8.1 d) and Specific outcomes a), c) & d) the Noosaville Locality
Code in Noosa Plan 2006, as it will dominate the site, skyline and
surrounding area and is not in keeping with the character of the area.
2. Changes to the width of balconies and roof overhangs reduces the
architectural appeal of the building from that previously approved.
B. Advise the applicant the following changes are considered generally in
accordance with the approval:
1. Changes to the front entry, as shown on Elevations (East) Plan no DA-
30.10, Rev 23 and dated 22.08.2022 and Cover Sheet Plan no. DA-00.00,
Rev 24 and dated 22.08.2022;
2. Reduced gross floor area as shown on Plan no. DA-00.00 and floor plans;
3. Changes to motorcycle parking.
Amended plans should be lodged with Council showing these changes only.
C. Note the report is provided in accordance with Section 63(5) of the Planning Act
2016.
Carried unanimously.
Page 14 of 21
Section 15
GENERAL COMMITTEE MEETING MINUTES 12 SEPTEMBER 2022
6 LIFEGUARD SERVICES – REQUEST FOR QUOTATION ASSESSMENT (T000075)
In accordance with Chapter 5B of the Local Government Act 2009, Cr Lorentson provided the
following declaration to the meeting of a declarable conflict of interest in this matter:
I, Cr Lorentson, inform the meeting that I have a declarable conflict of interest in this matter as
my daughter Giorgia Lorentson and son Ben Lorentson are employed by Surf Life Saving
Queensland (SLSQ) as casual lifeguards. It could be viewed that I have a have a conflict of
interest, however I do not believe a reasonable person could have a perception of bias as my
daughter and son’s employment is of a casual nature and not exclusively bound to SLSQ.
Therefore, there is no benefit or loss specific to my daughter and son, from the outcome of this
application. Therefore, I will choose to remain in the meeting room. However, I will respect the
decision of the meeting on whether I can remain and participate in the decision.
Committee Resolution
Moved: Cr Stewart
Seconded: Cr Finzel
That Council note the declarable conflict of interest by Cr Lorentson and determine that Council
note the declarable conflict of interest by Cr Lorentson and determine that it is in the public
interest that Cr Lorentson participates and votes on this matter because Council believes that
a reasonable person would not have a perception of bias because Cr Lorentson nor her children
stand to receive a personal benefit or loss in relation to this matter, and therefore a reasonable
person would trust that the final decision is made in the public interest.
Carried unanimously.
Cr Lorentson did not vote on the above motion.
Committee Recommendation
Moved: Cr Stewart
Seconded: Cr Finzel
That Council note the report by the Property Manager to the General Committee
Meeting dated 12 September 2022 regarding the provision of lifeguard services and
A. Agree to award RFQ T000075 for the provision of Lifeguard Services to Surf
Lifesaving Queensland Inc. for an initial 1 x 5 year term commencing 29 October
2022 for the amount of $1,694,186 per annum (ex GST) (noted as Option 3 in
the report);
B. Authorise the CEO to award 1 x 5 year extension to Surf Lifesaving Queensland
Inc. subject to satisfactory performance at Council’s sole discretion;
C. Authorise the CEO to take all necessary action, including but not limited to
negotiating, making, executing and managing the agreement with Surf Lifesaving
Queensland Inc. for the supply of Lifeguard Services and any required variations
of the agreement on Council’s behalf;
D. Note variations to the agreement which seek to increase the agreement’s value
will be considered as part of Council’s budget deliberations;
E. Note given the agreement’s commencement date is within the current financial
year the pro-rata increase to the agreement value will be considered at Budget
Review 2; and
F. Agree the labour component of the agreement will be indexed to annual Fair
Work commission wage rises and the equipment and consumables component
will be indexed to CPI.
Carried unanimously.
Page 15 of 21
Section 16
GENERAL COMMITTEE MEETING MINUTES 12 SEPTEMBER 2022
7 ENTERPRISE RISK AND OPPORTUNITY MANAGEMENT POLICY
Committee Recommendation
Moved: Cr Finzel
Seconded: Cr Stewart
That Council note the report by the Governance Manager to the General Committee
Meeting dated 12 September 2022 and
A. Adopt the Enterprise Risk and Opportunity Management Policy provided at
Attachment 1; and
B. Authorise the Chief Executive Officer (CEO) to make minor amendments to the
document prior to publication.
Carried unanimously.
8 BURGESS CREEK COASTAL EROSION AND WATER QUALITY
Committee Recommendation
Moved: Cr Lorentson
Seconded: Cr Finzel
That Council note the report by the Principal Environment Officer – River Strategy &
Engagement to the General Committee Meeting dated 12 September 2022 and
A. Consider a detailed project proposal for a Noosa Eastern Beaches Creeks High
Risk Erosion Prioritisation Project for Council at its Budget Review 2
deliberations;
B. Note an internal investigation of erosion impacts from foot traffic at the mouth of
Burgess Creek and adjacent dunes and engagement with the Burgess Creek
Bushcare Group and other interested stakeholders to develop nature-based
restoration and erosion control measures; and
C. Request the CEO (or delegate) liaise with Unitywater to provide Unitywater’s
Receiving Environment Monitoring Program (REMP) and all routine monitoring
reports including water quality and quantity discharges for Burgess Creek to
Council Environment staff to support Council’s Integrated Water Quality
Monitoring Program for Noosa Shire.
Carried unanimously.
9 FINANCIAL PERFORMANCE REPORT – AUGUST 2022
Committee Recommendation
Moved: Cr Stewart
Seconded: Cr Jurisevic
That Council note the report by the Manager Financial Services (Acting) to the General
Committee Meeting dated 12 September 2022 outlining August 2022 year to date
financial performance against budget, including changes to the financial performance
report with the inclusion of key financial sustainability indicators.
Carried unanimously.
7. CLOSED SESSION
Nil.
The meeting closed at 1.45pm.
Page 16 of 21
Section 17
GENERAL COMMITTEE MEETING MINUTES 12 SEPTEMBER 2022
Attachment 1
Cr Stockwell – Images – Report 3
Page 17 of 21
Section 18
GENERAL COMMITTEE MEETING MINUTES 12 SEPTEMBER 2022
Page 18 of 21
ila: cer ABIN: aS i — .
SEUSS Sana acrs aac sarnaga casa meisena de meannen Ren bm ia anes
See te de Se A realy nad OY BR AH NS Ptah Pee — ee ee
ieee Ba horas ing shout interest cad TAT 7
5 1 1 1 4 10 1328 440 12 16 5 PU
5 1 1 1 4 11 1389 440 53 16 0 iees
5 1 1 1 4 12 1461 439 73 9 10 ca
5 1 1 1 4 13 1539 425 93 38 0 scicamhs
5 1 1 1 4 14 1646 439 54 17 27 Mata
5 1 1 1 4 15 1713 437 74 19 11 cite
5 1 1 1 4 16 1790 436 63 19 2 cee
5 1 1 1 4 17 1856 440 29 16 7 cS
5 1 1 1 4 18 1960 429 80 26 6 eRe
5 1 1 1 4 19 2042 433 96 26 16 eR
5 1 1 1 4 20 2140 433 85 26 16 ee
5 1 1 1 4 21 2252 431 19 22 0 Se
4 1 1 1 5 0 387 466 1883 28 -1
5 1 1 1 5 1 380 463 31 28 42 seme
5 1 1 1 5 2 413 463 33 28 40 feeent
5 1 1 1 5 3 474 476 25 7 80 additions
5 1 1 1 5 4 504 463 5 28 29 —
5 1 1 1 5 5 515 475 14 9 66 Sal
5 1 1 1 5 6 643 480 27 7 44 wore
5 1 1 1 5 7 689 479 65 8 2 oaginative
5 1 1 1 5 8 837 466 10 28 0 ss
5 1 1 1 5 9 948 480 5 3 15 fade
5 1 1 1 5 10 982 476 3 2 55 Sor
5 1 1 1 5 11 1084 478 48 8 23 Fae
5 1 1 1 5 12 1326 475 14 12 10 Soha
5 1 1 1 5 13 1458 477 21 6 25 pS
5 1 1 1 5 14 1517 479 16 9 23 ORE
5 1 1 1 5 15 1530 467 16 29 12 Wr
5 1 1 1 5 16 1546 472 23 17 18 hates
5 1 1 1 5 17 1611 477 87 12 17 SSRI
5 1 1 1 5 18 1738 471 151 18 8 SS
5 1 1 1 5 19 1859 467 35 29 30 SRR
5 1 1 1 5 20 1951 472 19 17 7 ace
5 1 1 1 5 21 2151 479 12 9 30 ea
5 1 1 1 5 22 2163 467 16 29 14 os
4 1 1 1 6 0 386 512 1882 56 -1
5 1 1 1 6 1 386 512 39 23 30 Sa
5 1 1 1 6 2 426 508 71 41 31 oes
5 1 1 1 6 3 513 514 112 25 39 Sun
5 1 1 1 6 4 642 516 112 23 35 Se
5 1 1 1 6 5 730 508 21 41 20 ee
5 1 1 1 6 6 936 531 61 37 31 ii
5 1 1 1 6 7 1069 511 21 40 4 ha
5 1 1 1 6 8 1229 528 6 2 9 :
5 1 1 1 6 9 1328 520 15 18 30 3
5 1 1 1 6 10 1425 517 2 15 4 See
5 1 1 1 6 11 1561 519 2 2 17 aa,
5 1 1 1 6 12 1752 517 33 15 15 ASS
5 1 1 1 6 13 1809 519 53 18 0 Shee
5 1 1 1 6 14 1901 515 64 23 32 Sh
5 1 1 1 6 15 1967 514 71 26 0 RGR
5 1 1 1 6 16 2074 513 34 27 19 ete
5 1 1 1 6 17 2141 514 58 26 17 eae
5 1 1 1 6 18 2201 514 67 25 5 See
4 1 1 1 7 0 386 534 1640 31 -1
5 1 1 1 7 1 386 538 111 24 0 Minicowen
5 1 1 1 7 2 503 533 66 44 40 ome
5 1 1 1 7 3 569 533 56 44 22 ieee
5 1 1 1 7 4 643 543 80 22 12 fee
5 1 1 1 7 5 932 534 84 29 19 Miya:
5 1 1 1 7 6 1031 530 16 46 71 |
5 1 1 1 7 7 1061 534 48 27 0 SR:
5 1 1 1 7 8 1775 536 54 29 30 rer
5 1 1 1 7 9 1871 535 57 29 34 rr
5 1 1 1 7 10 1944 536 45 26 7 ON
4 1 1 1 8 0 384 591 1753 26 -1
5 1 1 1 8 1 384 604 112 12 0 tiara
5 1 1 1 8 2 446 590 21 40 29 te
5 1 1 1 8 3 470 590 27 40 37 doh
5 1 1 1 8 4 512 596 112 20 0 Gemnetomenwett
5 1 1 1 8 5 641 595 34 22 58 dna
5 1 1 1 8 6 681 596 71 21 22 Dove
5 1 1 1 8 7 1037 600 12 3 79 =
5 1 1 1 8 8 1169 603 8 2 0 -
5 1 1 1 8 9 1323 599 59 18 4 Seer
5 1 1 1 8 10 1415 596 142 19 0 commapamenagg
5 1 1 1 8 11 1548 587 40 43 0 ime
5 1 1 1 8 12 1589 591 72 23 35 SR
5 1 1 1 8 13 1645 587 22 43 0 I
5 1 1 1 8 14 1809 607 8 9 11 besa
5 1 1 1 8 15 1888 593 58 24 0 Sica
5 1 1 1 8 16 1946 592 178 25 0 Ai
5 1 1 1 8 17 2042 587 66 43 16 RR
5 1 1 1 8 18 2211 596 18 21 12 aR
4 1 1 1 9 0 385 607 1818 32 -1
5 1 1 1 9 1 385 618 9 7 46 ©
5 1 1 1 9 2 403 617 17 9 43 Ge
5 1 1 1 9 3 429 619 22 8 48 tun
5 1 1 1 9 4 461 605 8 31 16 df
5 1 1 1 9 5 471 618 24 9 67 the
5 1 1 1 9 6 512 619 22 9 51 Aud
5 1 1 1 9 7 562 619 8 9 52 if
5 1 1 1 9 8 597 623 26 6 14 teme
5 1 1 1 9 9 640 611 112 21 0 darusmifaye
5 1 1 1 9 10 967 611 4 28 52 J
5 1 1 1 9 11 1070 612 4 27 71 l
5 1 1 1 9 12 1352 607 17 31 0 sane
5 1 1 1 9 13 1480 630 2 2 14 SP
5 1 1 1 9 14 1547 610 219 22 0 carcass
5 1 1 1 9 15 1776 614 99 18 10 NRO.
5 1 1 1 9 16 1881 612 25 19 0 cL
5 1 1 1 9 17 1914 607 289 25 0 Sennen
5 1 1 1 9 18 2006 603 19 35 11 Gs
5 1 1 1 9 19 2024 607 80 25 0 cununuee
5 1 1 1 9 20 2103 603 36 35 0 ete
5 1 1 1 9 21 2138 603 50 35 0 aaaacr
5 1 1 1 9 22 2212 615 59 16 11 ee
4 1 1 1 10 0 384 617 1888 30 -1
5 1 1 1 10 1 384 630 112 12 39 cect,
5 1 1 1 10 2 426 618 28 37 41 right
5 1 1 1 10 3 454 618 25 37 39 dw
5 1 1 1 10 4 512 632 111 13 0 hapheperniiogs
5 1 1 1 10 5 640 618 24 37 37 ake
5 1 1 1 10 6 670 637 15 8 64 ny
5 1 1 1 10 7 685 622 66 24 28 opto
5 1 1 1 10 8 725 618 22 37 0 Towe
5 1 1 1 10 9 1323 617 17 22 21 &
5 1 1 1 10 10 1354 632 18 12 17 RE
5 1 1 1 10 11 1442 638 18 6 22 ree
5 1 1 1 10 12 1490 620 97 23 15 oR
5 1 1 1 10 13 1600 630 48 15 8 2
5 1 1 1 10 14 1648 630 55 16 28 ae
5 1 1 1 10 15 1760 626 72 17 14 se”
5 1 1 1 10 16 1837 620 69 31 12 (RRL
5 1 1 1 10 17 1910 629 64 16 11 SRE
5 1 1 1 10 18 2073 625 52 20 18 etre
5 1 1 1 10 19 2218 629 54 17 0 reeset
4 1 1 1 11 0 383 625 1883 56 -1
5 1 1 1 11 1 369 639 54 40 21 feed
5 1 1 1 11 2 422 639 48 40 0 emmes
5 1 1 1 11 3 469 639 24 40 29 eel
5 1 1 1 11 4 512 645 111 24 0 pendatoee
5 1 1 1 11 5 635 639 61 40 13 Reese
5 1 1 1 11 6 695 639 31 40 46 ee
5 1 1 1 11 7 732 648 19 9 38 oe
5 1 1 1 11 8 947 625 145 56 0 QROES-
5 1 1 1 11 9 1343 641 28 19 17 co
5 1 1 1 11 10 1414 635 852 35 4 Recaro
5 1 1 1 11 11 2209 631 54 46 16 aes
4 1 1 1 12 0 384 658 1888 27 -1
5 1 1 1 12 1 374 655 71 35 0 Senllagty
5 1 1 1 12 2 461 655 71 35 2 wend
dntuwedemton . te. erchllen” con Beas Recor acco Lh SSR reesei
SSS eae SSS Se Cee
vf ‘pentiy intact So are pend rates: Bir MEhe est Cosine cr atattamhaetaea aes tatin at a i PRRRAREAC Se ear eee
Se ee ae Beenie rf ec Se |
Saiees Coos Se Sen lr rrrtrt—t—r—— —
SORENESS ay : ee —
Race Sea ae oe SE eens
f 7 RSS Sa eS Baeeaee SS Fo SSMU catia ence saecenamene RS
Sa PaHED oR SMem ese oe
wo 4 = YUM eae eee
oorop ! ountryp eek Wi, aaa
é a oe Mee:
SS OU“ | ~ i ae ea oe
Ee ess rg — a . . ai | * i j - ,
Bias Re a ao: Ses Be. ame = a FY LT Tad Vee ee —_ eS
{~~ alas igs tel ES BS Waves | aide | a
<element: ee —S =a
OOROY CAPERS — GARNET PLACE 2 KN OW
“6 99 JHE N\e Bo = © :
All in the Family The face of things to co.
1970 - 80s
-_ SS. Se ae ——
2 (h) Development : = es
reinforces the Se = : !
traditional ‘main street’ oe : —
character and scale of . : Ae
development in the — =a ff , 2. a Pas bn :
7 ee St s —— ee ee —
centre. , | ~~ g ic ———— |
E 3 WY ——— 7 / ll
l : 1 e
= ! | } Y
=, ot || | ioe | |
az ——— = = Hu
: = = “ a ’
fe PE 2 ee ee a
gated an f tae 4 i
em | oT ste ey .
a . — Tone 2 — -
eal — i | meg ay ” : PT
= SS] MENSWEAR i | haereet} ‘
X ‘ : aha =
“ en Ed | | rT
r Seen i —— ——— —— — ai {1
1980-90s “@” * =e
eS
5 1 1 1 57 2 1021 2525 58 19 56 ——
5 1 1 1 57 3 1107 2500 39 26 27 Bie:
5 1 1 1 57 4 1244 2512 70 7 16 nn
5 1 1 1 57 5 1755 2513 28 4 3 ——
5 1 1 1 57 6 1911 2518 2 2 0 .
5 1 1 1 57 7 1987 2518 13 9 75 3
5 1 1 1 57 8 2044 2513 44 15 0 tS
5 1 1 1 57 9 2144 2515 2 2 0 .
5 1 1 1 57 10 2161 2503 27 52 0 y
5 1 1 1 57 11 2191 2510 33 41 37 4g
4 1 1 1 58 0 1514 2554 710 38 -1
5 1 1 1 58 1 1514 2554 202 38 28 =a
5 1 1 1 58 2 1877 2574 51 18 54 a
5 1 1 1 58 3 2205 2557 19 8 0 “s
4 1 1 1 59 0 349 2593 1801 37 -1
5 1 1 1 59 1 349 2602 307 17 80 MCU22/0062
5 1 1 1 59 2 481 2589 22 42 80 —
5 1 1 1 59 3 506 2602 150 17 96 APPLICATION
5 1 1 1 59 4 665 2589 44 42 96 FOR
5 1 1 1 59 5 717 2602 13 17 96 A
5 1 1 1 59 6 737 2602 115 17 96 MATERIAL
5 1 1 1 59 7 860 2602 96 17 96 CHANGE
5 1 1 1 59 8 963 2602 31 17 96 OF
5 1 1 1 59 9 1002 2602 45 17 96 USE
5 1 1 1 59 10 1318 2623 21 3 27 _.
5 1 1 1 59 11 1351 2623 32 4 12 2
5 1 1 1 59 12 1498 2593 314 37 29 rare
5 1 1 1 59 13 2035 2588 22 41 39 Pe
5 1 1 1 59 14 2048 2599 102 25 78 |
4 1 1 1 60 0 349 2625 1928 32 -1
5 1 1 1 60 1 349 2617 29 41 96 FOR
5 1 1 1 60 2 380 2628 274 18 96 OFFICE
5 1 1 1 60 3 481 2617 39 41 95 AT
5 1 1 1 60 4 519 2617 28 41 95 2
5 1 1 1 60 5 546 2628 107 18 96 EMERALD
5 1 1 1 60 6 663 2628 89 18 92 STREET
5 1 1 1 60 7 759 2617 85 41 92 COOROY
5 1 1 1 60 8 850 2628 27 18 96 3
5 1 1 1 60 9 1175 2634 38 23 7 Oe
5 1 1 1 60 10 1223 2633 83 9 37 age
5 1 1 1 60 11 1396 2626 23 25 22 ce
5 1 1 1 60 12 1501 2631 87 26 15 “ey.
5 1 1 1 60 13 1679 2633 39 18 22 ire
5 1 1 1 60 14 1830 2625 180 30 30 eee
5 1 1 1 60 15 2263 2625 14 8 37 a
4 1 1 1 61 0 1954 3315 283 44 -1
5 1 1 1 61 1 1954 3315 105 44 96 Page
5 1 1 1 61 2 2076 3316 47 34 95 18
5 1 1 1 61 3 2138 3315 43 35 95 of
5 1 1 1 61 4 2194 3316 43 33 96 21Section 19
GENERAL COMMITTEE MEETING MINUTES 12 SEPTEMBER 2022
Page 19 of 21
GENERAL COMMITTEE MEETING MINUTES 12 SEPTEMBER 2022
2 (g) Development has a high level of architectural merit and
contributes positively to the activation of the street and the
character of the centre.
=" >>
re I) >
SS
| i lt.
= Tet : Or recae
te it j i
aa i a ah a
5 von AN ca TT / _—,
i ] OLY | “THIOL TEL C O}O RIO
En OY [+ eee) acme
; otTin a maennint_|
nf ve “ih: e es
Ce ae = ae
MCU22/0062 — APPLICATION FOR A MATERIAL CHANGE OF USE
FOR OFFICE AT 2 EMERALD STREET COOROY 3
Oe ee,
‘oh Peo = E
EF 3 % —s
| =
NO MORE THAN 0.5m USE AN ANWING SLOPE OF PROVIDE ALONG
HIGHER OR LOWER WITHIN 15 DEGREES OF FULL FRONTAGE OF
THAN ADJACENT ADJACENT AWNINGS THE BUILDING
AWNINGS
L_ J a) :
ee == _ = Sei sous 5
——
AWNINGS TIMBER POSTS
MCU22/0062 — APPLICATION FOR A MATERIAL CHANGE OF USE vena] teen «6 (lI
FOR OFFICE AT 2 EMERALD STREET COOROY 3 EDGE| KERB EDGE! FROM KERB EDGE
Page 19 of 21Section 20
GENERAL COMMITTEE MEETING MINUTES 12 SEPTEMBER 2022
Attachment 2
Cr Stockwell – Images – Report 2
Page 20 of 21
Section 21
GENERAL COMMITTEE MEETING MINUTES 12 SEPTEMBER 2022
Attachment 3
Cr Stockwell – Image – Report 4
Page 21 of 21