                       MINUTES


         General Committee
              Meeting


         Monday, 12 September 2022

                                10am
         Council Chambers, 9 Pelican Street, Tewantin



Committee:   Crs Frank Wilkie (Chair), Karen Finzel, Joe Jurisevic, Amelia
             Lorentson, Clare Stewart, Brian Stockwell, Tom Wegener



                    “Noosa Shire – different by nature”
Log in to download the original file

2022-09-12 General Committee Meeting Minutes(PDF, 2MB).pdf · 2.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 20 sections

Section 2

GENERAL COMMITTEE MEETING MINUTES                                    12 SEPTEMBER 2022



1.   ATTENDANCE & APOLOGIES

     COUNCILLORS
     Cr Frank Wilkie (Chair)
     Cr Karen Finzel
     Cr Joe Jurisevic
     Cr Amelia Lorentson
     Cr Clare Stewart
     Cr Brian Stockwell
     Cr Tom Wegener

     EXECUTIVE
     S Waters, Chief Executive Officer
     L Jensen, Acting Director Environment and Sustainable Development
     L Sengstock, Director Infrastructure Services
     D Iezzi, Director Executive Services

     APOLOGIES
     Nil.


     The meeting commenced at 10.00am.




2.   CONFIRMATION OF MINUTES
     Committee Resolution
     Moved:           Cr Lorentson
     Seconded:        Cr Stewart
     The Minutes of the General Committee Meeting held on 15 August 2022 be received and
     confirmed.
                                                                   Carried unanimously.




3.   PRESENTATIONS
     Nil.




4.   DEPUTATIONS

     Nil.




                                                                            Page 2 of 21

Section 3

GENERAL COMMITTEE MEETING MINUTES                                          12 SEPTEMBER 2022


5.   ITEMS REFERRED FROM COMMITTEES


     PLANNING & ENVIRONMENT COMMITTEE


     1   MCU22/0062 – APPLICATION FOR A MATERIAL CHANGE OF USE FOR OFFICE
         AT 2 EMERALD STREET COOROY
         Referred from the Planning & Environment Committee Agenda, 6 September 2022
         (Item 1, Page 4) for a Further Report - included in this Agenda as Report No. 3.



     3   FURTHER REPORT - MCU22/0062 - APPLICATION FOR A MATERIAL CHANGE
         OF USE FOR OFFICE AT 2 EMERALD STREET COOROY
         The following material was presented to the meeting in relation to this item:
              Cr Stockwell – Images - refer to Attachment 1
         Motion
         Moved:            Cr Stockwell
         Seconded:         Cr Jurisevic
         That Council note the further report by the Development Planner to the General
         Committee Meeting dated 12 September 2022 and the report to the Planning &
         Environment Committee dated 6 September 2022 regarding Application No.
         MCU22/0062 for a Development Permit for a Material Change of Use for Offices
         situated at 2 Emerald Street, Cooroy and:
         A.    Vary from the recommendations of staff on the basis that:
               1.    The staff assessment has placed inadequate weight on the need for
                     development to contribute to the achievement of
                     a)    the District Centres Zone Overall Outcome 2 (g) and (h);
                     b)    the Cooroy Local Plan Performance Outcomes PO3, PO7 and P10.
               2.    The staff assessment has placed too much weight on the standard and
                     design of existing nearby development compared to the desired future
                     character clearly outlined in the plan.
         B.    Does not agree to the proposed relaxation of height and carparking requirements
               due to the failure of the design to meet the outcomes listed above;
         C.    Advise the applicant that Council would consider relaxation of height
               requirements should
               1.    The second storey parapet be removed and be replaced with a hip roof
                     design to reflect the traditional character of two storey buildings in the
                     business district;
               2.    That the cantilevered awning be replaced with a street awning that
                     generally reflects the design criteria outlined in Figure 6.4.2.4 - Pedestrian
                     Environment - Street Awnings - Cooroy and Hinterland.
                                                                               Lost unanimously.




                                                                                     Page 3 of 21

Section 4

GENERAL COMMITTEE MEETING MINUTES                                           12 SEPTEMBER 2022


        Committee Recommendation
        Moved:               Cr Stockwell
        Seconded:            Cr Jurisevic
        A.   Approve the application in accordance with the following conditions:
             PLANNING
             When Conditions must be Complied With
             1.      Unless otherwise stated, all conditions of this Decision Notice must be
                     complied with prior to the use commencing, and then compliance
                     maintained at all times while the use continues.
                     Approved Plans
             2.      Development undertaken in accordance with this approval must generally
                     comply with the approved plans of development. The approved plans are
                     listed in the following table unless otherwise amended by these conditions.
                  Plan No.     Rev.   Plan/Document Name                                Date
                  SK-01        G      Floor Plans Prepared by Wiltshire Stevens         23.08.2022
                                      Architecture
                  SK-02        G      Elevations Prepared by Wiltshire Stevens          23.08.2022
                                      Architecture
                  SK-04        G      Sections Prepared by Wiltshire Stevens            23.08.2022
                                      Architecture
             Building Appearance
             3.      The parapet to the Emerald Street frontage is to be removed and replaced
                     with a hip roof design.
             4.      All deck and balcony areas above ground floor must not be enclosed by
                     permanent fixtures such as shutters, louvres, glass panelling or the like,
                     except where required to satisfy any privacy condition of this Decision
                     Notice or if shown on the approved plans.
             5.      Street awnings must be provided for the full frontage of the building to
                     Emerald Street. The awning must be designed to provide maximum
                     continuous solar and rain protection and promote all weather activity but
                     provide opportunities for street tree planting and landscaping. The width of
                     the awning must be determined in consultation with the Manager
                     Development Assessment prior to the issue of the operational works
                     approval and is to include a sloping roof form. Posts are to be provided and
                     must be located to the outer most point of the awning so as not to impede
                     pedestrian traffic.
             6.      Ground floor shopfront glazing along the Emerald Street frontage must be
                     fully transparent to a minimum of 65% of the street frontage to allow passive
                     surveillance and encourage social interaction and must be provided at full
                     height (floor to ceiling).
             7.      Any security screens on the premises consist of grille or translucent
                     screens and not solid shutters, screens or roller-doors.
             8.      All mechanical equipment and other service infrastructure located on the
                     site must be:
                     a.      located not less than 2 metres from a property boundary.
                     b.      fully enclosed or screened such that they are not visible from the
                             street frontages nor adjoining properties. Where screened by
                             landscaping, landscaping beds must be at least 1.5 metres wide.

                                                                                    Page 4 of 21

Section 5

GENERAL COMMITTEE MEETING MINUTES                                        12 SEPTEMBER 2022


            9.    Roof materials must be non-reflective and designed with colours and styles
                  to minimise the visual impact of the development.
            10.   The street awning must extend for the full width of the frontage and be
                  setback 1m from the face of the kerb. Amended plans must be submitted
                  prior to the issue of an operational works approval.
            11.   All ground floor shopfront glazing must be protected against vandalism by
                  the use of a form of safety glass such as toughened or laminated glass.
            12.   During operating hours, all parking areas, pedestrian areas and
                  entrances/exits to all stairwells, lifts, foyers and public toilets must be well
                  lit with vandal resistant lighting and with intensities to satisfy the
                  requirements of Australian Standard AS1158 “Public Lighting Code”.
                  Lighting must be designed to reduce the contrast between shadows and
                  well lit areas. In particular, appropriate security lighting must be provided
                  along the full length of the proposed pedestrian/cycleway.
                  Currency Period
            13.   This development approval lapses if the use has not happened by 15
                  September 2028 unless an application to extend the currency period is
                  approved by Council.
                  Building Height
            14.   The maximum height of the development must not exceed RL118.15 8m
                  to the peak of the roof line. as detailed on section B-B of Plan SK04.
            15.   Certification must be submitted to Council from a Licensed Surveyor which
                  certifies that the building does not exceed the maximum height requirement
                  of this Decision Notice.
                  Performance Bond
            16.   Security in the form of a cash bond or trading bank guarantee to the sum
                  of $10,000 must be submitted to Council, to secure performance of all
                  conditions of this approval, prior to the issue of a Development Permit for
                  Operational Works. The cash bond or trading bank guarantee will be
                  returned on performance of the conditions of approval less any costs
                  incurred by Council in respect of enforcing performance of this permit.
                  Council reserves the right to call upon the bond or guaranteed sum to effect
                  compliance with conditions.
                  Street Identification
            17.   The street address of the development must be clearly visible and
                  discernible from the primary frontage of the site by the provision of a street
                  number and, where appropriate, the building name.
                  External Works – Wimmers Lane
            18.   Wimmers Lane must be upgraded for the length of its frontage to the
                  subject site. The works must be undertaken in accordance with an
                  Operational Works approval and must include in particular:
                  a.    construction of kerb and channelling, road widening and underground
                        stormwater drainage to the development side only. The final extent
                        and alignment of works to be determined as part of the subsequent
                        Operational Works approval.
                  Road Widening of Wimmers Lane
            19.   The developer must dedicate as “road” a 2m wide strip extending across
                  the full frontage of the site to Wimmers Lane. The dedication must be in

                                                                                   Page 5 of 21

Section 6

GENERAL COMMITTEE MEETING MINUTES                                    12 SEPTEMBER 2022


                  accordance with drawing number Plan number SK01 Version G dated 23
                  August 2022 prepared by Wiltshire Stevens Architecture.
            20.   The dedication must be completed prior to the commencement of the use.
                  External Works – Emerald Street
            21.   Emerald Street must be upgraded for the length of its frontage to the
                  subject site. The works must be undertaken in accordance with an
                  Operational Works approval and must include in particular:
                  a.   a full width pathway extending from the property boundary to the kerb
                       and channel.
                  b.   works to transition the new full width pathway to match smoothly with
                       the existing frontages of the adjoining properties. These works will
                       extend beyond the frontage of the subject site. The transitions must
                       be constructed at grades that are in accordance with Council’s
                       Planning Scheme Policy 5 – Engineering Design Standards – Roads,
                       Drainage and Earthworks.
                  c.   any necessary relocation or alteration to existing access from
                       Emerald Street to the adjoining property at 4 Emerald Street must be
                       undertaken. The type and extent of these works must be in
                       agreement with the adjoining property owner and clearly shown on
                       plans submitted for operational works.
                  d.   Any relocation/reinstatement of existing services in the road verge.
                  These works are to be undertaken at no cost to Council.
                  Site Access and Driveways
            22.   A sealed access driveway must be provided from Wimmers Lane to all
                  parking and manoeuvring areas of the development. The works must be
                  undertaken in accordance with an Operational Works approval and must
                  include in particular:
                  a.   a driveway crossover generally in accordance with RS-051 and any
                       associated addendum.
                  Car Parking
            23.   A minimum of 23 car parking spaces and 2 motor cycle spaces must be
                  provided and marked on the site for the commercial development, and
                  made available and accessible at all times while the use is open for
                  business. The works must be undertaken in accordance with an
                  Operational Works approval and must include in particular:
                  a.   pedestrian routes in accordance with the conditions of this Decision
                       Notice .
                  b.   1 disabled parking space within the total.
                  c.   dimensions, crossfalls and gradients in accordance with Australian
                       Standard AS2890: Parking Facilities.
            24.   All car parking areas and access driveways must be maintained exclusively
                  for vehicle parking and manoeuvring and kept in a tidy and safe condition
                  at all times.
                  Pedestrian and Bicycle Facilities
            25.   Pedestrian and bicycle facilities must be provided for the development.
                  The works must be undertaken in accordance with an Operational Works
                  approval and must include in particular:

                                                                               Page 6 of 21

Section 7

GENERAL COMMITTEE MEETING MINUTES                                     12 SEPTEMBER 2022


                  a.   a 2 metre wide footpath along one side of Wimmers Lane and
                       Emerald Street.
                  b.   the resealing of the existing asphalt path fronting the development.
            26.   Pedestrian and bicycle facilities must be provided for the development and
                  include:
                  a.     10 bicycle parking spaces and 5 lockers; and
                  b.   one shower cubicle with ancillary change room.
                  Stormwater Drainage
            27.   The site must be provided with a stormwater drainage system connecting
                  to a lawful point of discharge. The works must be undertaken in accordance
                  with an Operational Works approval and the Queensland Urban Drainage
                  Manual, and must include in particular:
                  a.   works generally in accordance with the Stormwater Layout Plan. Fig
                       1.2 Revision B prepared by Callaghan & Toth dated 6 July 2022;
                  a.   extension of the site stormwater system to accommodate stormwater
                       from the existing external drainage pipe from Lot 2 on RP44101 to
                       the east; and
                  b.   the use of gravity stormwater drainage and not surcharge pits.
                  This condition is imposed pursuant to s145 of the Planning Act 2016
                  being non-trunk infrastructure.
                  Services
            28.   Underground reticulated electricity and telecommunication services must
                  be provided to each lot in accordance with an approval for Operational
                  Works and the standards and requirements of the relevant service provider.
            29.   Unless otherwise stipulated by telecommunications legislation at the time
                  of construction, the development must be provided with all necessary
                  conduits, pits and pipes to accommodate the future connection of optic fibre
                  technology telecommunications.
            30.   Certification must be submitted to Council from all relevant service
                  providers (Energex, NBN and Unitywater) which certifies that the
                  development has met the requirements of this Decision Notice and all
                  applicable legislation at the time of construction.
                  Easements
            31.   A 1.5 metre wide easement for stormwater drainage purposes must be
                  registered against the title of the property in favour of Lot 2 on RP44101
                  and be generally in accordance with the Stormwater Layout Plan. Fig 1.2
                  Revision B prepared by Callaghan & Toth dated 6 July 2022. The easement
                  must be of sufficient width to wholly encompass the drainage infrastructure
                  and extend to the Emerald Street boundary.
            32.   A 2.0 metre wide easement for “Public Thoroughfare” purposes must be
                  registered against the title of the property in favour of Council. The
                  easement must be located directly adjacent to the eastern property
                  boundary and extend for the full length between Wimmers Lane and
                  Emerald Street. The easement must be:
                  a.   clearly shown on all plans submitted for Operational Works; and
                  b.   registered prior to the commencement of the use.


                                                                                Page 7 of 21

Section 8

GENERAL COMMITTEE MEETING MINUTES                                          12 SEPTEMBER 2022


                 33.   All easements must be designed in accordance with the planning scheme
                       and granted at no cost to the Grantee. Where the Grantee is Council or a
                       service authority, the easement documentation must be in accordance with
                       the Grantee’s standard easement terms. Draft easement documentation
                       must be submitted to Council for endorsement.
                 34.   All works must be kept clear of any existing or proposed easements on the
                       subject land, unless agreed otherwise in writing by the Grantee.
           B.    Agree to reduce the infrastructure charges in respect to the impervious area
                 calculation for stormwater for the 2m wide public thoroughfare required by
                 condition 27.
           C.   Note the report is provided in accordance with Section 63(5) of the Planning Act
                2016.
           For:       Crs Wilkie, Lorentson, Jurisevic, Wilkie, Stewart and Finzel
           Against: Cr Wegener
                                                                                        Carried.



    2      RAL21/0035 – APPLICATION TO RECONFIGURE A LOT (1 LOT INTO 2 LOTS) AT
           21 JIRIMMA CRESCENT, COOROIBAH
           The following material was presented to the meeting in relation to this item:
                Cr Stockwell - Images – refer to Attachment 2
           Committee Recommendation
           Moved:           Cr Jurisevic
           Seconded:        Cr Lorentson
           That Council note the report by the Coordinator Planning to the Planning &
           Environment Committee Meeting dated 6 September 2022 regarding Application
           RAL21/0035 for a Development Permit for Reconfiguring a Lot – 1 into 2 lots situated
           at 21 Jirrima Crescent, Cooroibah and defer this matter to the Ordinary Meeting dated
           15 September to allow staff to further negotiate with the applicant regarding potential
           flood and fire issues.
                                                                           Carried unanimously.




    SERVICES & ORGANISATION COMMITTEE

    Nil.




                                                                                     Page 8 of 21

Section 9

GENERAL COMMITTEE MEETING MINUTES                                                12 SEPTEMBER 2022


6.   REPORTS DIRECT TO GENERAL COMMITTEE


     4   FURTHER REPORT - MCU21/0212 - APPLICATION FOR A MATERIAL CHANGE
         OF USE – DWELLING HOUSE AT 66 SEAVIEW TERRACE, SUNSHINE BEACH
         In accordance with Chapter 5B of the Local Government Act 2009, Cr Lorentson provided the
         following declaration to the meeting of a declarable conflict of interest in this matter:
         I, Cr Lorentson inform the meeting that I have a declarable conflict of interest in this matter as
         Deborah Reid a submitter to the application, is a personal friend. Although I have a declarable
         conflict of interest, I do not believe a reasonable person could have a perception of bias because
         I believe I do not have a close personal relationship with Ms Reid. Therefore, I will choose to
         remain in the meeting room. However, I will respect the decision of the meeting on whether I
         can remain and participate in the decision.
         Committee Resolution
         Moved:              Cr Stewart
         Seconded:           Cr Jurisevic
         That Council note the declarable conflict of interest by Cr Lorentson and determine that it is in
         the public interest that Cr Lorentson participates and votes on this matter because Council
         believes that Cr Lorentson does not have a close personal relationship with the submitter, Ms
         Reid and therefore a reasonable person would trust that the final decision is made in the public
         interest.
                                                                                 Carried unanimously.
         Cr Lorentson did not vote on the above motion.
         The following material was presented to the meeting in relation to this item:
              Cr Stockwell - Image – refer to Attachment 3
         Committee Recommendation
         Moved:              Cr Stewart
         Seconded:           Cr Lorentson
         That Council note the Further Report by the Coordinator Planning to the General
         Committee Meeting dated 12 September 2022 regarding Application No. MCU21/0212
         for a Development Permit for a Material Change of Use – Dwelling situated at 66
         Seaview Terrace Sunshine Beach and
         A.    Approve the application in accordance with the following conditions:
               1.     Unless otherwise stated, all conditions of this Decision Notice must be
                      complied with prior to the use commencing, and then compliance
                      maintained at all times while the use continues.
               1.     The applicant must provide a copy of the development approval to the
                      private building certifier who assesses the subsequent development
                      application for a development permit for building works for the construction
                      of the Detached House and the associated deck and pool area.
                      Approved Plans
               2.     Development must be undertaken strictly under the approved plans listed
                      in the following table unless otherwise amended by these conditions.
                       Plan No.      Rev.    Plan/Document Name                              Date
                       100.00         J      Site Plan, prepared by Shaun Lockyer            01.09.2022
                                             Architects
                       200.00          J     Floor Plan – Lower Ground                       01.09.2022
                       200.01          I     Floor Plan – Ground Level                       01.09.2022
                       200.02          H     Floor Plan – Level 01                           01.09.2022
                       210.00          H     Roof Plan                                       01.09.2022

                                                                                           Page 9 of 21

Section 10

GENERAL COMMITTEE MEETING MINUTES                                       12 SEPTEMBER 2022


                  Plan No.    Rev.    Plan/Document Name                              Date
                  300.00       H      Building Elevations – elevation west            01.09.2022
                  300.01       H      Building Elevations – elevation north           01.09.2022
                  300.02       H      Building Elevations – elevation east            01.09.2022
                  300.03       H      Building Elevations – elevation south           01.09.2022
                  640.00       A      Landscape details – detail driveway plan        06.05.2022
                  640.01       A      Landscape details – driveway detail section     06.05.2022
                 Amended Plans
            3.   Prior to the issue of any further development approvals amended plans
                 must be submitted to Council. The plans must remove the roof top terrace.
                 The plans must be to the satisfaction of the Manager, Development
                 Assessment.
                 Approved Documents
            4.   Development must be undertaken strictly under the approved documents
                 listed in the following table unless otherwise amended by these conditions.
                  Document
                     Tectonic report “Geotechnical Investigation, Proposed residence 66
                      Seaview Terrace, Sunshine Beach”, reference 21370-001-Rev 1 dated 28
                      April 2022
                     Royal Haskoing DHV report ‘Report 66 Seaview Terrace, Sunshine Beach
                      Coastal Hazards Assessment, reference PA2906-RHD-ZZ-XX-RP-Z-0001
                      dated 3 June 2022

                 Built form
            5.   The maximum height of the development must not exceed 8 metres above
                 ground level in accordance with the approved plans.
            6.   Certification must be submitted to Council from a Licensed Surveyor which
                 certifies that the building does not exceed the maximum height requirement
                 of this Decision Notice.
            7.   The proposed Detached House must be located on the site, as shown on
                 the Site Plan, Drawing No. 100.00, Revision J. The Detached House is not
                 to be located closer than 10.5m to the seaward boundary, except for the
                 cantilevered part of the building which is not to extend closer than 7.5m to
                 the seaward boundary. Certification of the location of the Detached House,
                 including the cantilevered section from the seaward boundary, is to be
                 provided by a licenced surveyor before the issue of a final classification for
                 the Detached House by the building certifier. The certification must be
                 submitted to Council.
                 Currency Period
            8.   This development approval lapses if the use has not happened by 21 July
                 2028, unless an application to extend the currency period is approved by
                 Council.
                 Performance Bond
            9.   Security in the form of a cash bond or trading bank guarantee to the sum
                 of $20,000 must be submitted to Council, to secure performance of all
                 conditions of this approval, prior to the issue of a Development Permit for
                 Building Works. The cash bond or trading bank guarantee will be returned
                 on performance of the conditions of approval less any costs incurred by
                 Council in respect of enforcing performance of this permit. Council reserves
                 the right to call upon the bond or guaranteed sum to effect compliance with
                 conditions.
                                                                                    Page 10 of 21

Section 11

GENERAL COMMITTEE MEETING MINUTES                                    12 SEPTEMBER 2022


                  Landscaping
            10.   A minimum of 20% of the site must be retained as soft landscaping.
            11.   To screen the development, screening vegetation must be planted for the
                  full length of the north and south boundaries, with the exception of the
                  bin/gas/bike store area, in accordance with Council’s Planning Scheme
                  Policy PSP2 - Landscaping. The planted vegetation must have a minimum
                  pot size of 200mm and consist of native, endemic species with a mature
                  height of not less than 8 metres and a maximum spacing of 2 metre centres.
            12.   A mix of native landscaping, such as ground covers, shrubs and trees, is
                  provided for a width of 5 metres from the seaward or rear boundary of the
                  site. The planted vegetation must have a minimum pot size of 200mm and
                  consist of native, endemic species as per Table 3.1 & 3.2 of PSP2
                  Landscaping for suitable coastal species. The planted vegetation must be
                  planted at the following density:
                  a.   trees must have a maximum spacing of 6m;
                  b.   shrubs must have a maximum spacing of 1.5m; and
                  c.   ground covers planted between the trees and shrub must achieve a
                       dense coverage.
            13.   The development is to provide adequate landscape buffering to protect the
                  character of the beachfront, to the reasonable satisfaction of the Manager
                  Development Assessment.
            14.   Two 100 litre street trees must be provided within the frontage. The trees
                  must be a coastal species in accordance with PSP2 – Landscaping.
                  Coastal Protection
            15.   External colours and finishes of the building must comprise of
                  muted/environmental tones that blend with the natural environment.
                  Pedestrian Access
            16.   A pedestrian access gate must not be installed along the seaward property
                  boundary with direct access by residents to the beachfront area not being
                  permitted.
                  Geotechnical Stability
            17.   A footing system and erosion protection system must be designed for the
                  proposed development to withstand the short-term erosion associated with
                  a 500-year average recurrence interval storm event combined with
                  shoreline recession due to sea-level rise for 2100 climate change. The
                  short-term erosion associated with a 500-year average recurrence interval
                  storm event combined with shoreline recession due to sea-level rise for
                  2100 climate change to be considered for the design as per the
                  recommendations of the Royal Haskoing DHV report ‘Report 66 Seaview
                  Terrace, Sunshine Beach Coastal Hazards Assessment, reference
                  PA2906-RHD-ZZ-XX-RP-Z-0001 dated 3 June 2022.
            18.   The footing system and erosion protection system must in accordance with
                  the works detailed in the Tectonic report “Geotechnical Investigation,
                  Proposed residence 66 Seaview Terrace, Sunshine Beach”, (Reference
                  21370-001-Rev 1 dated 28 April 2022) and other supporting documents
                  referenced in the Tectonic report.
            19.   The design must include the protection of the northern and southern
                  boundaries of the site to prevent erosion on neighbouring properties

                                                                             Page 11 of 21

Section 12

GENERAL COMMITTEE MEETING MINUTES                                       12 SEPTEMBER 2022


                  exposing the side boundaries of the site to erosion. The minimum extent of
                  the side boundary protection must be determined by a line drawn at 28°
                  extending upwards to the west from the base of the rear point of the erosion
                  as per the recommendations of Tectonic report “Geotechnical
                  Investigation, Proposed residence 66 Seaview Terrace, Sunshine Beach”,
                  reference 21370-001-Rev 1 dated 28 April 2022.
            20.   The design must be accompanied by certification by a Registered
                  Professional Engineer of Queensland (RPEQ) specialising in geotechnical
                  engineering that the design is satisfactory and will provide a long-term
                  factor of safety concerning slope stability of no less than 1.5.
            21.   Following construction, certification must be supplied to Council by an
                  RPEQ specialising in geotechnical engineering that the works have been
                  constructed in accordance with the approved design.
            22.   A dilapidation survey shall be carried out of all adjacent properties and
                  structures before the commencement of construction of the proposed
                  development on the site.
            23.   Due to the risk of instability on the existing dune slope and the potential for
                  settlement of loose sand on the adjacent properties, vibrations must be
                  kept to a minimum and must be monitored during the construction of the
                  development. Driven piles (both sheet piles and pile footings) are not
                  permitted on the site.
            24.   Landscaping at the rear of the property and the crest of the existing dune
                  slope shall be limited to a maximum surcharge of 5kPa unless a site-
                  specific slope stability analysis is carried out to demonstrate that higher
                  loads are acceptable.
            25.   Under no circumstances shall building materials be temporarily stockpiled
                  in the area of the crest of the existing dune slope or on the slope.
            26.   Discharge of concentrated stormwater flows onto the dune slope must be
                  avoided, and under no circumstances will subsurface disposal of water be
                  permitted using infiltration pits.
            27.   Stormwater runoff from gutters, down-pipes, driveways, and paved areas
                  must be collected and directed by pipes into the Council stormwater system
                  along Seaview Terrace.
            28.   The existing dune slope and any areas disturbed by the construction of the
                  proposed development shall be revegetated as soon as possible to reduce
                  the potential for erosion.
                  Earthworks
            29.   Earthworks required on-site must be carried out in accordance with
                  Council’s Planning Scheme Policy PSP6 Engineering Design Standards,
                  so as not to cause the additional ponding of water on any adjoining lands
                  or concentrate or direct overland flow on to an adjoining property.
            30.   All earthworks carried out on site must not affect the structural stability of
                  the adjoining lands and/or buildings and/or structures and/or services.
            31.   All earthworks and associated retaining structures/batters, both above and
                  below ground level, both temporary and permanent, must be wholly
                  contained within the subject site unless written permission from the
                  respective landowner(s) is provided to Council.
            32.   All earthworks must be undertaken in accordance with the provisions of
                  Australian Standard AS3798: Guidelines on Earthworks for Commercial
                  and Residential Developments.

                                                                                 Page 12 of 21

Section 13

GENERAL COMMITTEE MEETING MINUTES                                       12 SEPTEMBER 2022


                  Significant Weather Event
            33.   Should a significant weather event occur which results in substantial
                  erosion within the site, and undermines the structure and/or renders the
                  Detached House uninhabitable, the owner must
                  a.    Immediately secure the perimeter of the property to prevent
                        unauthorised access and then undertake necessary works upon the
                        land to make the detached house safe and suitable for habitation in
                        a timely manner.
                        i.     Any work proposed must be designed to ensure that the work
                               will not cause adverse impacts on other lands or on coastal
                               processes.
                        ii.    Rock, concrete and like hard materials must not be used for the
                               construction of beach protection works.
                        iii.   Any work proposed to be carried out must be undertaken in
                               accordance with Development Permit for Operational Works.
                  b.    or remove the Detached House and all associated structures
                        including the footpath crossover and make the land safe at no cost to
                        the Council.
                  Site Access and Driveways
            34.   A sealed access driveway must be provided from the existing formation in
                  Seaview Terrace to all parking and manoeuvring areas of the development.
                  The works must be undertaken in accordance with an Operational Works
                  approval and must include a driveway located generally in accordance with
                  the approved plans.
                  Stormwater Drainage
            35.   Stormwater runoff from the development must be collected and disposed
                  of in accordance with the recommendations of the site specific geotechnical
                  report. Stormwater runoff from gutters, down-pipes, driveways, and paved
                  areas must be collected and directed to Council stormwater drainage
                  system along Seaview Terrace. The works must be undertaken in
                  accordance with an Operational Works approval.
            36.   Prior to the commencement of the use a certificate must be issued by an
                  RPEQ certifying that the stormwater drainage system has been
                  constructed in accordance with the conditions of this permit.
                  Easements
            37.   Unless otherwise agreed in writing by the relevant service provider, any
                  public or third party infrastructure located on the subject site must be placed
                  within an easement registered against the title of the property.
            38.   All easements must be designed in accordance with the planning scheme
                  and granted at no cost to the Grantee. Where the Grantee is Council or a
                  service authority, the easement documentation must be in accordance with
                  the Grantee’s standard easement terms. Draft easement documentation
                  must be submitted to Council for endorsement.
            39.   All works must be kept clear of any existing or proposed easements on the
                  subject land, unless agreed otherwise in writing by the Grantee.
                  Damage to Services and Assets
            40.   Any damage caused to existing services and assets as a result of the
                  development works must be repaired at no cost to the asset owner at the
                  following times:
                  a.    where the damage would cause a hazard to pedestrian or vehicle

                                                                                 Page 13 of 21

Section 14

GENERAL COMMITTEE MEETING MINUTES                                       12 SEPTEMBER 2022


                         safety, immediately; or
                    b.   where otherwise, upon completion of the works associated with the
                         development.
                    Any repair work which proposes to alter the alignment or level of existing
                    services and assets must first be referred to the relevant service authority
                    for approval.
        B.   Note the report is provided in accordance with Section 63(5) of the Planning Act
             2016.
        For:       Crs Jurisevic, Lorentson, Wilkie, Stewart, Finzel and Wegener
        Against: Cr Stockwell
                                                                                     Carried.
        The meeting adjourned at 11.48am.
        The meeting resumed at 12.02pm.

    5   FURTHER REPORT - MCU19/0017.02 & RAL19/0004.02 FOR A MINOR CHANGE
        TO DEVELOPMENT APPROVAL FOR COMMERCIAL BUSINESS - TYPE 1
        OFFICE, COMMERCIAL BUSINESS - TYPE 2 MEDICAL & ANCILLARY DWELLING
        UNIT & RECONFIGURATION OF A LOT – ACCESS EASEMENT AT 36 - 40
        HOFMANN DRIVE, NOOSAVILLE
        Committee Recommendation
        Moved:           Cr Lorentson
        Seconded:        Cr Wegener
        That Council note the report by the Development Planner to the Planning &
        Environment Committee Meeting dated 12 July 2022 and the Further Report to the
        General Meeting dated 12 September 2022 regarding Application No. MCU19/0017.02
        & RAL19/0004.02 to make a minor change to an existing approval for Material Change
        of Use - Ancillary Dwelling Unit, Commercial Business - Type 1 Office, Commercial
        Business - Type 2 Medical and Reconfiguration of a Lot – Access Easement situated
        at 36-40 Hofmann Dr Noosaville and:
        A.   Refuse the request for increased height and design for the following reasons:
             1.     The increased height does not comply with Acceptable outcome AO16.1
                    (b) (iii) of the Major Centre Zone code and Performance Outcome PO16 a),
                    b) & c) of the Major Centre Zone code in Noosa Plan 2020 and Probable
                    solution S8.1 d) and Specific outcomes a), c) & d) the Noosaville Locality
                    Code in Noosa Plan 2006, as it will dominate the site, skyline and
                    surrounding area and is not in keeping with the character of the area.
             2.     Changes to the width of balconies and roof overhangs reduces the
                    architectural appeal of the building from that previously approved.
        B.   Advise the applicant the following changes are considered generally in
             accordance with the approval:
             1.     Changes to the front entry, as shown on Elevations (East) Plan no DA-
                    30.10, Rev 23 and dated 22.08.2022 and Cover Sheet Plan no. DA-00.00,
                    Rev 24 and dated 22.08.2022;
             2.     Reduced gross floor area as shown on Plan no. DA-00.00 and floor plans;
             3.     Changes to motorcycle parking.
             Amended plans should be lodged with Council showing these changes only.
        C.   Note the report is provided in accordance with Section 63(5) of the Planning Act
             2016.
                                                                     Carried unanimously.

                                                                                 Page 14 of 21

Section 15

GENERAL COMMITTEE MEETING MINUTES                                               12 SEPTEMBER 2022


    6   LIFEGUARD SERVICES – REQUEST FOR QUOTATION ASSESSMENT (T000075)
        In accordance with Chapter 5B of the Local Government Act 2009, Cr Lorentson provided the
        following declaration to the meeting of a declarable conflict of interest in this matter:
        I, Cr Lorentson, inform the meeting that I have a declarable conflict of interest in this matter as
        my daughter Giorgia Lorentson and son Ben Lorentson are employed by Surf Life Saving
        Queensland (SLSQ) as casual lifeguards. It could be viewed that I have a have a conflict of
        interest, however I do not believe a reasonable person could have a perception of bias as my
        daughter and son’s employment is of a casual nature and not exclusively bound to SLSQ.
        Therefore, there is no benefit or loss specific to my daughter and son, from the outcome of this
        application. Therefore, I will choose to remain in the meeting room. However, I will respect the
        decision of the meeting on whether I can remain and participate in the decision.
        Committee Resolution
        Moved:              Cr Stewart
        Seconded:           Cr Finzel
        That Council note the declarable conflict of interest by Cr Lorentson and determine that Council
        note the declarable conflict of interest by Cr Lorentson and determine that it is in the public
        interest that Cr Lorentson participates and votes on this matter because Council believes that
        a reasonable person would not have a perception of bias because Cr Lorentson nor her children
        stand to receive a personal benefit or loss in relation to this matter, and therefore a reasonable
        person would trust that the final decision is made in the public interest.
                                                                                  Carried unanimously.
        Cr Lorentson did not vote on the above motion.
        Committee Recommendation
        Moved:              Cr Stewart
        Seconded:           Cr Finzel
        That Council note the report by the Property Manager to the General Committee
        Meeting dated 12 September 2022 regarding the provision of lifeguard services and
        A.    Agree to award RFQ T000075 for the provision of Lifeguard Services to Surf
              Lifesaving Queensland Inc. for an initial 1 x 5 year term commencing 29 October
              2022 for the amount of $1,694,186 per annum (ex GST) (noted as Option 3 in
              the report);
        B.    Authorise the CEO to award 1 x 5 year extension to Surf Lifesaving Queensland
              Inc. subject to satisfactory performance at Council’s sole discretion;
        C.    Authorise the CEO to take all necessary action, including but not limited to
              negotiating, making, executing and managing the agreement with Surf Lifesaving
              Queensland Inc. for the supply of Lifeguard Services and any required variations
              of the agreement on Council’s behalf;
        D.    Note variations to the agreement which seek to increase the agreement’s value
              will be considered as part of Council’s budget deliberations;
        E.    Note given the agreement’s commencement date is within the current financial
              year the pro-rata increase to the agreement value will be considered at Budget
              Review 2; and
        F.    Agree the labour component of the agreement will be indexed to annual Fair
              Work commission wage rises and the equipment and consumables component
              will be indexed to CPI.
                                                                  Carried unanimously.




                                                                                          Page 15 of 21

Section 16

GENERAL COMMITTEE MEETING MINUTES                                          12 SEPTEMBER 2022


     7    ENTERPRISE RISK AND OPPORTUNITY MANAGEMENT POLICY
          Committee Recommendation
          Moved:            Cr Finzel
          Seconded:         Cr Stewart
          That Council note the report by the Governance Manager to the General Committee
          Meeting dated 12 September 2022 and
          A.    Adopt the Enterprise Risk and Opportunity Management Policy provided at
                Attachment 1; and
          B.    Authorise the Chief Executive Officer (CEO) to make minor amendments to the
                document prior to publication.
                                                                      Carried unanimously.

     8    BURGESS CREEK COASTAL EROSION AND WATER QUALITY
          Committee Recommendation
          Moved:            Cr Lorentson
          Seconded:         Cr Finzel
          That Council note the report by the Principal Environment Officer – River Strategy &
          Engagement to the General Committee Meeting dated 12 September 2022 and
          A.    Consider a detailed project proposal for a Noosa Eastern Beaches Creeks High
                Risk Erosion Prioritisation Project for Council at its Budget Review 2
                deliberations;
          B.    Note an internal investigation of erosion impacts from foot traffic at the mouth of
                Burgess Creek and adjacent dunes and engagement with the Burgess Creek
                Bushcare Group and other interested stakeholders to develop nature-based
                restoration and erosion control measures; and
          C.    Request the CEO (or delegate) liaise with Unitywater to provide Unitywater’s
                Receiving Environment Monitoring Program (REMP) and all routine monitoring
                reports including water quality and quantity discharges for Burgess Creek to
                Council Environment staff to support Council’s Integrated Water Quality
                Monitoring Program for Noosa Shire.
                                                                       Carried unanimously.


     9    FINANCIAL PERFORMANCE REPORT – AUGUST 2022
          Committee Recommendation
          Moved:            Cr Stewart
          Seconded:         Cr Jurisevic
          That Council note the report by the Manager Financial Services (Acting) to the General
          Committee Meeting dated 12 September 2022 outlining August 2022 year to date
          financial performance against budget, including changes to the financial performance
          report with the inclusion of key financial sustainability indicators.
                                                                             Carried unanimously.

7.   CLOSED SESSION
     Nil.

The meeting closed at 1.45pm.

                                                                                   Page 16 of 21

Section 17

GENERAL COMMITTEE MEETING MINUTES   12 SEPTEMBER 2022


                                          Attachment 1
 Cr Stockwell – Images – Report 3




                                          Page 17 of 21

Section 18

GENERAL COMMITTEE MEETING MINUTES   12 SEPTEMBER 2022




                                          Page 18 of 21

ila: cer                       ABIN: aS                   i                   —                                  .
                                                                SEUSS Sana acrs aac sarnaga casa meisena de meannen Ren bm ia anes
    See te de Se A realy nad          OY BR AH NS               Ptah    Pee      —         ee ee
    ieee Ba horas ing shout interest cad TAT  7
5	1	1	1	4	10	1328	440	12	16	5	PU
5	1	1	1	4	11	1389	440	53	16	0	iees
5	1	1	1	4	12	1461	439	73	9	10	ca
5	1	1	1	4	13	1539	425	93	38	0	scicamhs
5	1	1	1	4	14	1646	439	54	17	27	Mata
5	1	1	1	4	15	1713	437	74	19	11	cite
5	1	1	1	4	16	1790	436	63	19	2	cee
5	1	1	1	4	17	1856	440	29	16	7	cS
5	1	1	1	4	18	1960	429	80	26	6	eRe
5	1	1	1	4	19	2042	433	96	26	16	eR
5	1	1	1	4	20	2140	433	85	26	16	ee
5	1	1	1	4	21	2252	431	19	22	0	Se
4	1	1	1	5	0	387	466	1883	28	-1	
5	1	1	1	5	1	380	463	31	28	42	seme
5	1	1	1	5	2	413	463	33	28	40	feeent
5	1	1	1	5	3	474	476	25	7	80	additions
5	1	1	1	5	4	504	463	5	28	29	—
5	1	1	1	5	5	515	475	14	9	66	Sal
5	1	1	1	5	6	643	480	27	7	44	wore
5	1	1	1	5	7	689	479	65	8	2	oaginative
5	1	1	1	5	8	837	466	10	28	0	ss
5	1	1	1	5	9	948	480	5	3	15	fade
5	1	1	1	5	10	982	476	3	2	55	Sor
5	1	1	1	5	11	1084	478	48	8	23	Fae
5	1	1	1	5	12	1326	475	14	12	10	Soha
5	1	1	1	5	13	1458	477	21	6	25	pS
5	1	1	1	5	14	1517	479	16	9	23	ORE
5	1	1	1	5	15	1530	467	16	29	12	Wr
5	1	1	1	5	16	1546	472	23	17	18	hates
5	1	1	1	5	17	1611	477	87	12	17	SSRI
5	1	1	1	5	18	1738	471	151	18	8	SS
5	1	1	1	5	19	1859	467	35	29	30	SRR
5	1	1	1	5	20	1951	472	19	17	7	ace
5	1	1	1	5	21	2151	479	12	9	30	ea
5	1	1	1	5	22	2163	467	16	29	14	os
4	1	1	1	6	0	386	512	1882	56	-1	
5	1	1	1	6	1	386	512	39	23	30	Sa
5	1	1	1	6	2	426	508	71	41	31	oes
5	1	1	1	6	3	513	514	112	25	39	Sun
5	1	1	1	6	4	642	516	112	23	35	Se
5	1	1	1	6	5	730	508	21	41	20	ee
5	1	1	1	6	6	936	531	61	37	31	ii
5	1	1	1	6	7	1069	511	21	40	4	ha
5	1	1	1	6	8	1229	528	6	2	9	:
5	1	1	1	6	9	1328	520	15	18	30	3
5	1	1	1	6	10	1425	517	2	15	4	See
5	1	1	1	6	11	1561	519	2	2	17	aa,
5	1	1	1	6	12	1752	517	33	15	15	ASS
5	1	1	1	6	13	1809	519	53	18	0	Shee
5	1	1	1	6	14	1901	515	64	23	32	Sh
5	1	1	1	6	15	1967	514	71	26	0	RGR
5	1	1	1	6	16	2074	513	34	27	19	ete
5	1	1	1	6	17	2141	514	58	26	17	eae
5	1	1	1	6	18	2201	514	67	25	5	See
4	1	1	1	7	0	386	534	1640	31	-1	
5	1	1	1	7	1	386	538	111	24	0	Minicowen
5	1	1	1	7	2	503	533	66	44	40	ome
5	1	1	1	7	3	569	533	56	44	22	ieee
5	1	1	1	7	4	643	543	80	22	12	fee
5	1	1	1	7	5	932	534	84	29	19	Miya:
5	1	1	1	7	6	1031	530	16	46	71	|
5	1	1	1	7	7	1061	534	48	27	0	SR:
5	1	1	1	7	8	1775	536	54	29	30	rer
5	1	1	1	7	9	1871	535	57	29	34	rr
5	1	1	1	7	10	1944	536	45	26	7	ON
4	1	1	1	8	0	384	591	1753	26	-1	
5	1	1	1	8	1	384	604	112	12	0	tiara
5	1	1	1	8	2	446	590	21	40	29	te
5	1	1	1	8	3	470	590	27	40	37	doh
5	1	1	1	8	4	512	596	112	20	0	Gemnetomenwett
5	1	1	1	8	5	641	595	34	22	58	dna
5	1	1	1	8	6	681	596	71	21	22	Dove
5	1	1	1	8	7	1037	600	12	3	79	=
5	1	1	1	8	8	1169	603	8	2	0	-
5	1	1	1	8	9	1323	599	59	18	4	Seer
5	1	1	1	8	10	1415	596	142	19	0	commapamenagg
5	1	1	1	8	11	1548	587	40	43	0	ime
5	1	1	1	8	12	1589	591	72	23	35	SR
5	1	1	1	8	13	1645	587	22	43	0	I
5	1	1	1	8	14	1809	607	8	9	11	besa
5	1	1	1	8	15	1888	593	58	24	0	Sica
5	1	1	1	8	16	1946	592	178	25	0	Ai
5	1	1	1	8	17	2042	587	66	43	16	RR
5	1	1	1	8	18	2211	596	18	21	12	aR
4	1	1	1	9	0	385	607	1818	32	-1	
5	1	1	1	9	1	385	618	9	7	46	©
5	1	1	1	9	2	403	617	17	9	43	Ge
5	1	1	1	9	3	429	619	22	8	48	tun
5	1	1	1	9	4	461	605	8	31	16	df
5	1	1	1	9	5	471	618	24	9	67	the
5	1	1	1	9	6	512	619	22	9	51	Aud
5	1	1	1	9	7	562	619	8	9	52	if
5	1	1	1	9	8	597	623	26	6	14	teme
5	1	1	1	9	9	640	611	112	21	0	darusmifaye
5	1	1	1	9	10	967	611	4	28	52	J
5	1	1	1	9	11	1070	612	4	27	71	l
5	1	1	1	9	12	1352	607	17	31	0	sane
5	1	1	1	9	13	1480	630	2	2	14	SP
5	1	1	1	9	14	1547	610	219	22	0	carcass
5	1	1	1	9	15	1776	614	99	18	10	NRO.
5	1	1	1	9	16	1881	612	25	19	0	cL
5	1	1	1	9	17	1914	607	289	25	0	Sennen
5	1	1	1	9	18	2006	603	19	35	11	Gs
5	1	1	1	9	19	2024	607	80	25	0	cununuee
5	1	1	1	9	20	2103	603	36	35	0	ete
5	1	1	1	9	21	2138	603	50	35	0	aaaacr
5	1	1	1	9	22	2212	615	59	16	11	ee
4	1	1	1	10	0	384	617	1888	30	-1	
5	1	1	1	10	1	384	630	112	12	39	cect,
5	1	1	1	10	2	426	618	28	37	41	right
5	1	1	1	10	3	454	618	25	37	39	dw
5	1	1	1	10	4	512	632	111	13	0	hapheperniiogs
5	1	1	1	10	5	640	618	24	37	37	ake
5	1	1	1	10	6	670	637	15	8	64	ny
5	1	1	1	10	7	685	622	66	24	28	opto
5	1	1	1	10	8	725	618	22	37	0	Towe
5	1	1	1	10	9	1323	617	17	22	21	&
5	1	1	1	10	10	1354	632	18	12	17	RE
5	1	1	1	10	11	1442	638	18	6	22	ree
5	1	1	1	10	12	1490	620	97	23	15	oR
5	1	1	1	10	13	1600	630	48	15	8	2
5	1	1	1	10	14	1648	630	55	16	28	ae
5	1	1	1	10	15	1760	626	72	17	14	se”
5	1	1	1	10	16	1837	620	69	31	12	(RRL
5	1	1	1	10	17	1910	629	64	16	11	SRE
5	1	1	1	10	18	2073	625	52	20	18	etre
5	1	1	1	10	19	2218	629	54	17	0	reeset
4	1	1	1	11	0	383	625	1883	56	-1	
5	1	1	1	11	1	369	639	54	40	21	feed
5	1	1	1	11	2	422	639	48	40	0	emmes
5	1	1	1	11	3	469	639	24	40	29	eel
5	1	1	1	11	4	512	645	111	24	0	pendatoee
5	1	1	1	11	5	635	639	61	40	13	Reese
5	1	1	1	11	6	695	639	31	40	46	ee
5	1	1	1	11	7	732	648	19	9	38	oe
5	1	1	1	11	8	947	625	145	56	0	QROES-
5	1	1	1	11	9	1343	641	28	19	17	co
5	1	1	1	11	10	1414	635	852	35	4	Recaro
5	1	1	1	11	11	2209	631	54	46	16	aes
4	1	1	1	12	0	384	658	1888	27	-1	
5	1	1	1	12	1	374	655	71	35	0	Senllagty
5	1	1	1	12	2	461	655	71	35	2	wend

              dntuwedemton . te. erchllen” con                  Beas Recor acco Lh SSR reesei
    SSS eae SSS                                                 Se   Cee
       vf   ‘pentiy intact So are pend rates:                     Bir    MEhe est Cosine cr atattamhaetaea aes tatin at a i PRRRAREAC Se ear eee
    Se      ee ae     Beenie               rf                      ec Se                                                    |
    Saiees Coos Se                  Sen                     lr rrrtrt—t—r——                                         —
   SORENESS ay                            :                     ee —
                                                                 Race           Sea           ae    oe               SE  eens
                                       f                7       RSS       Sa eS             Baeeaee SS Fo SSMU catia ence saecenamene RS
                                                                  Sa          PaHED oR SMem ese oe
 wo                                4                              =       YUM eae eee
              oorop                 !    ountryp                             eek    Wi,                     aaa
                                                                                         é      a   oe         Mee:
                                   SS  OU“                                 |            ~       i   ae          ea       oe
                Ee      ess       rg —    a  .   .                 ai       |     * i                          j    -     ,
  Bias     Re a                    ao: Ses Be.      ame                   =       a    FY            LT Tad Vee ee —_ eS
 {~~      alas igs tel       ES   BS Waves | aide                              |                       a
<element:                                          ee                           —S                                    =a
OOROY CAPERS —                       GARNET PLACE                                              2      KN OW
                                   “6                        99  JHE        N\e            Bo       =    ©               :
    All in the Family              The face of things to co.
                  1970             -   80s

                                                    -_     SS.                     Se    ae           ——
 2 (h) Development                                 :            = es
 reinforces the                                 Se                                                  =               :        !
 traditional ‘main street’                 oe                           :                                  —
 character and scale of                                     .                                       :                Ae
 development in the            —   =a          ff      ,         2.     a                   Pas bn                          :
                               7           ee           St                    s          ——    ee ee                      —
centre.                       ,                     |        ~~     g           ic          ————                  |
                              E        3                    WY ———                7                               /          ll
                              l                                      :      1                             e
                                                                      =     !     |               }           Y
                            =,                                           ot || | ioe |                         |
                                          az         ———     =  =                  Hu
                                             :      =              =        “               a       ’
                             fe                                    PE         2    ee         ee           a
                                gated                                                an  f   tae            4            i
                                   em |      oT                        ste        ey                                         .
                                  a .         —    Tone                           2                      —                 -
                                        eal                           —              i      | meg    ay   ”      :      PT
                                     =                             SS] MENSWEAR         i        |      haereet}      ‘
                                 X                                              ‘                            :      aha =
                                  “        en         Ed        |                            |                         rT
                                       r      Seen i        ——    ———      ——  —                ai {1
     1980-90s                            “@”                       * =e
                                          eS
5	1	1	1	57	2	1021	2525	58	19	56	——
5	1	1	1	57	3	1107	2500	39	26	27	Bie:
5	1	1	1	57	4	1244	2512	70	7	16	nn
5	1	1	1	57	5	1755	2513	28	4	3	——
5	1	1	1	57	6	1911	2518	2	2	0	.
5	1	1	1	57	7	1987	2518	13	9	75	3
5	1	1	1	57	8	2044	2513	44	15	0	tS
5	1	1	1	57	9	2144	2515	2	2	0	.
5	1	1	1	57	10	2161	2503	27	52	0	y
5	1	1	1	57	11	2191	2510	33	41	37	4g
4	1	1	1	58	0	1514	2554	710	38	-1	
5	1	1	1	58	1	1514	2554	202	38	28	=a
5	1	1	1	58	2	1877	2574	51	18	54	a
5	1	1	1	58	3	2205	2557	19	8	0	“s
4	1	1	1	59	0	349	2593	1801	37	-1	
5	1	1	1	59	1	349	2602	307	17	80	MCU22/0062
5	1	1	1	59	2	481	2589	22	42	80	—
5	1	1	1	59	3	506	2602	150	17	96	APPLICATION
5	1	1	1	59	4	665	2589	44	42	96	FOR
5	1	1	1	59	5	717	2602	13	17	96	A
5	1	1	1	59	6	737	2602	115	17	96	MATERIAL
5	1	1	1	59	7	860	2602	96	17	96	CHANGE
5	1	1	1	59	8	963	2602	31	17	96	OF
5	1	1	1	59	9	1002	2602	45	17	96	USE
5	1	1	1	59	10	1318	2623	21	3	27	_.
5	1	1	1	59	11	1351	2623	32	4	12	2
5	1	1	1	59	12	1498	2593	314	37	29	rare
5	1	1	1	59	13	2035	2588	22	41	39	Pe
5	1	1	1	59	14	2048	2599	102	25	78	|
4	1	1	1	60	0	349	2625	1928	32	-1	
5	1	1	1	60	1	349	2617	29	41	96	FOR
5	1	1	1	60	2	380	2628	274	18	96	OFFICE
5	1	1	1	60	3	481	2617	39	41	95	AT
5	1	1	1	60	4	519	2617	28	41	95	2
5	1	1	1	60	5	546	2628	107	18	96	EMERALD
5	1	1	1	60	6	663	2628	89	18	92	STREET
5	1	1	1	60	7	759	2617	85	41	92	COOROY
5	1	1	1	60	8	850	2628	27	18	96	3
5	1	1	1	60	9	1175	2634	38	23	7	Oe
5	1	1	1	60	10	1223	2633	83	9	37	age
5	1	1	1	60	11	1396	2626	23	25	22	ce
5	1	1	1	60	12	1501	2631	87	26	15	“ey.
5	1	1	1	60	13	1679	2633	39	18	22	ire
5	1	1	1	60	14	1830	2625	180	30	30	eee
5	1	1	1	60	15	2263	2625	14	8	37	a
4	1	1	1	61	0	1954	3315	283	44	-1	
5	1	1	1	61	1	1954	3315	105	44	96	Page
5	1	1	1	61	2	2076	3316	47	34	95	18
5	1	1	1	61	3	2138	3315	43	35	95	of
5	1	1	1	61	4	2194	3316	43	33	96	21

Section 19

GENERAL COMMITTEE MEETING MINUTES   12 SEPTEMBER 2022




                                          Page 19 of 21

GENERAL COMMITTEE MEETING MINUTES                                                                      12 SEPTEMBER 2022

                                                                          2 (g) Development has a high level of architectural merit and
                                                                          contributes positively to the activation of the street and the
                                                                          character of the centre.

                     ="                               >>
                     re                         I)         >
                                                          SS

                                                                |                                     i lt.
                 =          Tet                    :                                               Or recae
                                                                                            te     it      j   i
                                                                                         aa        i          a   ah         a
                                                                                       5       von         AN ca  TT   /    _—,
                                                                                      i      ] OLY |       “THIOL TEL       C O}O RIO
                                                                                              En OY [+ eee)           acme
                                                                                                ;   otTin      a      maennint_|
                                                                                       nf    ve   “ih: e                          es
                                                                                              Ce         ae        =             ae

     MCU22/0062 — APPLICATION FOR A MATERIAL CHANGE OF USE
     FOR OFFICE AT 2 EMERALD STREET COOROY 3

                             Oe ee,
                                  ‘oh     Peo =         E
                             EF   3                      %  —s
                                                            |                  =
                                                                                  NO MORE THAN 0.5m USE AN ANWING SLOPE OF PROVIDE ALONG
                                                                                   HIGHER OR LOWER WITHIN 15 DEGREES OF FULL FRONTAGE OF
                                                                                    THAN ADJACENT  ADJACENT AWNINGS THE BUILDING
                                                                                        AWNINGS

                                                                                      L_   J                   a)        :
                                                                                   ee      == _     = Sei  sous        5

                                                                          ——

                                                                                             AWNINGS  TIMBER POSTS
     MCU22/0062 — APPLICATION FOR A MATERIAL CHANGE OF USE                              vena] teen «6 (lI
      FOR OFFICE AT 2 EMERALD STREET COOROY 3                                           EDGE| KERB EDGE! FROM KERB EDGE

                                                                                                                   Page 19 of 21

Section 20

GENERAL COMMITTEE MEETING MINUTES   12 SEPTEMBER 2022


                                          Attachment 2
 Cr Stockwell – Images – Report 2




                                          Page 20 of 21

Section 21

GENERAL COMMITTEE MEETING MINUTES   12 SEPTEMBER 2022


                                          Attachment 3
 Cr Stockwell – Image – Report 4




                                          Page 21 of 21

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.