Original source · versioned page text
2022-09-12 General Committee Meeting Minutes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING MINUTES 12 SEPTEMBER 2022
Significant Weather Event
33. Should a significant weather event occur which results in substantial
erosion within the site, and undermines the structure and/or renders the
Detached House uninhabitable, the owner must
a. Immediately secure the perimeter of the property to prevent
unauthorised access and then undertake necessary works upon the
land to make the detached house safe and suitable for habitation in
a timely manner.
i. Any work proposed must be designed to ensure that the work
will not cause adverse impacts on other lands or on coastal
processes.
ii. Rock, concrete and like hard materials must not be used for the
construction of beach protection works.
iii. Any work proposed to be carried out must be undertaken in
accordance with Development Permit for Operational Works.
b. or remove the Detached House and all associated structures
including the footpath crossover and make the land safe at no cost to
the Council.
Site Access and Driveways
34. A sealed access driveway must be provided from the existing formation in
Seaview Terrace to all parking and manoeuvring areas of the development.
The works must be undertaken in accordance with an Operational Works
approval and must include a driveway located generally in accordance with
the approved plans.
Stormwater Drainage
35. Stormwater runoff from the development must be collected and disposed
of in accordance with the recommendations of the site specific geotechnical
report. Stormwater runoff from gutters, down-pipes, driveways, and paved
areas must be collected and directed to Council stormwater drainage
system along Seaview Terrace. The works must be undertaken in
accordance with an Operational Works approval.
36. Prior to the commencement of the use a certificate must be issued by an
RPEQ certifying that the stormwater drainage system has been
constructed in accordance with the conditions of this permit.
Easements
37. Unless otherwise agreed in writing by the relevant service provider, any
public or third party infrastructure located on the subject site must be placed
within an easement registered against the title of the property.
38. All easements must be designed in accordance with the planning scheme
and granted at no cost to the Grantee. Where the Grantee is Council or a
service authority, the easement documentation must be in accordance with
the Grantee’s standard easement terms. Draft easement documentation
must be submitted to Council for endorsement.
39. All works must be kept clear of any existing or proposed easements on the
subject land, unless agreed otherwise in writing by the Grantee.
Damage to Services and Assets
40. Any damage caused to existing services and assets as a result of the
development works must be repaired at no cost to the asset owner at the
following times:
a. where the damage would cause a hazard to pedestrian or vehicle
Page 13 of 21
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.