Skip to the record
Every meeting, every word.

Council archive · source document

OPW11/0043 Development Application part 1 of 2 "Covering Letter\\nIDAS Form 1\\nIDAS Form 28\\nLetter from Department of Transport & Main Roads "29 Wyuna Dr NOOSAVILLE

of 25

Text shows just the words. Original shows the document exactly as it was published.

                                                                                  RRESPONDENCE




           THIS IS THE NEXT PART OF A
     MULTIPLE PART RECORD




CS IAMJNFORMATION MANAGEMENTRECORDS MANAGEMEN1 Control ofRecords\EDRMS\Multi Pan Record Cover Shod FIRST PART dol




                                                                           nev ainoment Cc unter
                                                                                          15 FEB 2011

                                                                                          Nambour
Full text of the other 24 pages

Page 2

PAUL CLOUT

                                    Ut
                          Ke^ict^'ricC


14th February 2011
Development Assessment - Jetty Application
Sunshine Coast Council
Locked Bag 72
Sunshine Coast Mail Centre
Queensland, 4560

Dear Sir / Madam,

RE:      Lot 14 Wyuna Drive, Noosaville - Jetty Application

Please find enclosed Plans and Documentation for prescribed tidal works for a jetty at the above address.

Documents supplied:

             1.     Jetty Site Plan (1:100) by Paul Clout Design (x5 copies)
             2.     Engineering and Prescribed Tidal Works drawings by John Norden & Assoc (x5 copies)
             3.     IDAS Form 1 & 28 and checklist
             4.     Letter from Regional harbour Master

Can you please send a list of any fees payable and any further information required.

Please call if there are any queries in regard to this submission.




Regards,




Nathan Kenzler

Paul Clout Design P/L
PO Box 152 Noosaville Qld, 4566
Suite 4/44 Mary St Noosaville
Phone: 07 5440 5388 Fax: 07 5440 5399


Email: [email protected]

Page 3

Application details-IDAS form 1                                                            Development Counter
(Sustainable PlanningAct2009 version i.o effective i8 December 2009)


                                                                                                   1 S FEB 2011
You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all necessary
information and documentation will result in your application not being a properly made applicati .
                                                                                                   tambour
For all development applications, you must:

•     complete this form (Application details-IDASform i)
•     complete any other forms relevant to your application
•     provide any mandatory supporting information identified on the forms as being required to accompany your
      application.
Attach extra pages if there is insufficient space on this form.


All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning
Regulation 2009.


This form can also be completed online using Smart eDA at www.smarteda.qld.gov.au


Applicant details (note: the applicant is the person responsible for making the application and need not be the owner of
the land. The applicant is responsible for ensuring the information provided on all IDAS application forms is correct. Any
development permit or preliminary approval that may be issued as a consequence of this application will be issued to the
applicant.)


Name/s (individual or company name in full)                   I   _R'%-
                                                                      4/1 c lo ut De s f 7 vn     f fi l -pt
For companies, contact name                                         Nq- L Ov y Veoz,lec
Postal address                                                      P u & ' _ > V 1 5Z

Contact phone number                                               (c-7)   1T f k o      c 3

Mobile number (non-mandatory)



Fax number (non-mandatory)


e-mail address (non-mandatory)
                                                                    [email protected] &lo,_t ales i,y#j . 6ov-,   ac/

Page 4

i. What is the nature of development proposed? (tick all applicable box/es)

        material change of use of premises

        building work

9       operational work

        reconfiguring a lot


2. What type of approval is being sought?

q         development permit              preliminary approval    M both-provide details below
                                    q


         Jety
3. Is the application for a mobile and temporary environmentally relevant activity (ERA)?


ff No

        Yes-complete table A and then go to question 5



Table A-name of each local government area in which the mobile and temporary ERA is proposed to operate




4. Location of the premises (complete table B and/or table C as applicable. Identify each lot in a separate row)


Table B-street address/lot for the premises or street address/lot on plan for the land adjoining or adjacent to the
premises

       q street address/lot on the plan
       q street address/lot on plan for the land ad joining or adjacent to the premises (appropriate for development in
         water e.g. jetty, pontoon)
Street address                                                   Lot on plan description      Local government area
                                                                                              (e.g. Logan, Cairns)
Unit      Street    Street name and official suburb/   Post-     Lot no.   Plan type
no.       no.       locality name                      code                and plan no.

          21         w YLNk D2ivE                      ¢S^^        I       ^lll o^                     s ^iz 6&,>t .
                        IVoo5h F^A'DS                                                            r e 5r,dH -1 /




                2                                                                         Application details-/DA5 form i
                                                                                           Version 1. o 18 December 2009

Page 5

Table C-premises coordinates (appropriate for development in remote areas, over part of a lot or in water e.g. channel
dredging in Moreton Bay)

Coordinates                                                            Zone         Datum              Local government
(note: place each set of coordinates in a separate row)                reference                       area (if applicable)

Easting         Northing           Latitude         Longitude


                                                                                          GDA94

                                                                                          WGS84

                                                                                          other




5. Total area of the premises on which the development is proposed (indicate hectares or m=)




6. Current use/s of the premises (e.g. vacant land, house, apartment building, cane farm, etc.)




   U Gi Col4l         [Of
7. Provide a brief description of the proposal (e.g. six unit apartment building, 30 lot residential subdivision etc.)




   Is owner's consent required for this application? (refer to notes at the end of this form for more information)



q No
       Yes-complete either table D, table E or table F as applicable



Table D

Name of owner/s of the land                      re             aV<^ ^,hVI         ^(J

I/We, the above-mentioned owner/s of the land, consent to the making of this application.

Signature of owner/s of the land



Date                                                      j L          (p




                                                                                         Application details-/DAS form i
                                                                                          Version t. o i8 December 2009

Page 6

       J"L


Table E

Name of owner/s of the land

R The owner's written consent is attached or will be provided separately to the assessment manager




Table F

Name of owner/s of the land


       By making this application, I, the applicant, declare that the owner has given written consent to the making of the
application.



9. Does the application involve a state resource? (e.g. the application involves state land, or taking quarry materials.
Refer to the notes at the end of this form for more information)


         No                                Yes-complete table G
                                    q


Table G-state owned resources (provide details for each state resource in a separate table)

Nature of state-owned resource


Nature of evidence required (tick the
applicable box and attach a copy of the                 Evidence of an allocation of, or an entitlement to, the resource
                                                 q
evidence to this form)


                                                        Evidence the chief executive of the department administering the
                                                 q
                                                        resource is satisfied the development is consistent with an allocation
                                                        of, or an entitlement to, the resource


                                                 q      Evidence the chief executive of the department administering the
                                                        resource is satisfied the development application may proceed in the
                                                        absence of an allocation of, or an entitlement to, the resource


io. Identify if any of the following apply to the premises (tick applicable box/es)

         adjacent to a water body, watercourse or aquifer (e.g. creek, river, lake, canal)-complete table H
I
         on strategic port land under the Transport Infrastructure Act 1994-complete table I

    d in a tidal water area-complete table




Table H        I Name of water body, watercourse or aquifer




                 4                                                                         Application details-IDAS form r
                                                                                             Version i. o z8 December 2009

Page 7

Table I        I Lot on plan description for strategic port land                   I Port authority for the lot




Table J         Name of local government for the tidal area (if applicable)         Port authority for the tidal area (if applicable)


                 •     (^ 5 ^ ^                           0-       ^l/LA




ii. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow, water, etc.)

          No
                q Yes-ensure the type, location and dimension of each easement is included in the plans submitted
12. Does the proposal include new building work or operational work on the premises? (including any services)


          No    d Yes-ensure the nature, location and dimension of proposed works are included in plans submitted
q


13. Is the payment of a portable long service leave levy applicable to this application? (refer to notes at the end of this
form for more information)

7f No-go to question 15                        Yes
                                        q


 14. Has the portable long service leave levy been paid? (refer to notes at the end of this form for more information)

Li No

          Yes-complete table K and submit with this application the yellow local government/ private certifier's copy of the
1-1
          receipted QLeave form


Table K         Amount paid                   Date paid               QLeave Project Number (6 digit number starting with A, B,
                                                                      E, L or P)




15. Has the local government agreed to apply a superseded planning scheme to this application under section 96 of
the Sustainable PlanningAct 2009?




q         Yes-please provide details below


Name of local government                               Date of written notice given       Reference number of written notice given
                                                       by local government                by local government (if applicable)




                                                                                                                   W15-WDAS form 1
                                                                                                                  '8 December 2000

Page 8

    16. List below all of the forms and supporting information that accompany this application (include all IDAS forms,
    checklists, mandatory supporting information etc. that will be submitted as part of this application. Note: this question
    does not apply for applications made on-line using Smart eDA)


Description of attachment or title of attachment                                                         Method of lodgement to
                                                                                                         assessment manager


       I                 :FOr     A      2. V




    17. Applicant's declaration

           By making this application, I declare that all information in this application is true and correct (note: it is unlawful to
    provide false or misleading information).


Notes for completing this form

Question 8:
•     Section 263 of the Sustainable PlanningAct 2009 sets out when the consent of the owner of the land is required for an
      application. Section 26o(i)(e) of the Sustainable P/anningAct2009 provides that if the owner's consent is required
      under section 263, then an application must contain, or be accompanied by, the written consent of the owner, or
      include a declaration by the applicant that the owner has given written consent to the making of the application.
•     Owner's consent is not required for a mobile and temporary ERA.


Question 9:
•     Section 264 of the Sustainable Planning Act 2009 provides that if a development involves a state resource, a
      regulation may require the application to be supported by certain evidence prescribed under the regulation. Schedule
      14 of the Sustainable Planning Regulation 2009 prescribes the state resources for which evidence is required to be
      given, and the evidence required, to support the application.

Question 13:
•     The Building and Construction Industry (Portable Long Service Leave) Act 1991 prescribes when the portable long
      service leave levy is payable.
•     The portable long service leave levy amount and other prescribed percentages and rates for calculating the levy are
      prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002.

Question 14:
• The portable long service leave levy need not be paid when the application is made, but the Building and Construction
  Industry (Portable Long Service Leave) Act 1991 requires the levy to be paid before a development permit is issued.
•     Building and Construction Industry Notification and Payment Forms are available from any Queensland post office or
      agency, on request from QLeave, or can be completed on the QLeave website at www.gleave.qld.gov.au. For further
      information contact QLeave on 18oo 803 481 or www.qleave.qld.gov.au.




                                                                                                      Ipplic.u:on d,^i.ii; c-IDASform 1

                                                                                                       Version .1. o 18 December 2009

Page 9

Privacy-the information collected in this form will be used by the Department of Infrastructure and Planning (DIP) in
accordance with the processing and assessment of your application. Your personal details will not be disclosed for a purpose
outside of the IDAS process, except where required by legislation (including the Right to Information Act 2009) or as required
by Parliament. This information may be stored in a departmental database. The information collected will be retained as
required by the Public Records Act 2002.



OFFICE USE ONLY
 Date received                                             Reference numbers


NOTIFICATION OF ENGAGEMENT OF A PRIVATE CERTIFIER
 To                                        Council. I have been engaged as the private certifier for the building work referred
                                           to in this application


                                                                                                           Building
Date of engagement        Name                                         BSA Certification license number
                                                                                                           classification/s




QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable)
                                                                                         Date receipted
                                  QLeave Project         Amount paid                     form sighted by Name of officer who
Description of the work                                                     Date paid
                                  Number                 ($)                             assessment      sighted the form
                                                                                         manager




  The Sustainable PlanningAct 2009 (SPA) is administered by the Department of Infrastructure and Planning. This form and
  all other required application materials should be sent to your assessment manager and any referral agencies.


                                                                                           Ipplii.rrnin deta11s-IDA5Corm r
                                                                                            Version 1.o r8 December 2009

Page 10

                                                                                            Development Counter
Prescribed tidal work-IDAS form 28                                                                      1 S FEB 2011
(Sustainable PlanningAct2009 version i.o effective 18 December 2009)




This form must be completed for development applications for prescribed tidal wor K.
                                                                                                        Nambour

You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all necessary
information and documentation will result in your application not being a properly made application.


For all development applications you must:

•     complete Application details-/DAS form i

•     complete any other forms relevant to your application
•     provide any mandatory supporting information identified on the forms as being required to accompany your
      application.
Attach extra pages if there is insufficient space on this form.


All terms used on this form have the meaning given in the Sustainable Planning Act 2OO9 or the Sustainable Planning
Regulation 2009.

This form can also be completed online using Smart eDA at www.smarteda.qld.gov.au


i. What type of approval is sought?


d      development permit

       preliminary approval



2. What is that nature of the prescribed tidal works and the nature of the use? (tick applicable box/es)

                                                          Private use   Non-private use   Estimated value of completed works ($)

       jetty, pier or wharf

q      mooring pile

       deck or boardwalk
q
       boat ramp or spillway
q
       pontoon
q
q      revetment, sea wall or retaining wall

q      other-please specify below

Page 11

3. Is the application within a cul-de-sac, a bend in a waterway or other location where the side boundaries of the lot
are connected to the work and neighbouring lots are not at right angles to the waterway?

      No              Yes
1-1

4. Has a registered professional engineer of Queensland (RPEQ), or an interstate equivalent, certified that the works
comply with the design and safety provisions of the IDAS code for development applications for prescribed tidal
works in the Coastal Protection and Management Regulation 2003, schedule 4A? (non-mandatory)

      No              Yes-provide details below
q


Engineers name/s                             J,k           V ircAe-i

Organisation name (if applicable)                               c €3I      i'
                                              JcI                                  A- SSOC1a
                                                                                       e

Postal address                                                                                     P Box Zo T
                                         - ^^^       ^,-^ ^a..^►^^                    Tew" "4 (fl            fT65
Contact phone number                        (o--7)    9-                713-7
Fax number (non-mandatory)


e-mail address (non-mandatory)               J VJ-of
                                         @ I vi ter vi o            •O VI ,vie

RPEQ number (or equivalent if interstate)                               /O61^
Reference number of all plans to which this certification relates       10 / 1 6 -2 -1                  (0 / 1 ( 2-Z.

   Confirm that the following mandatory supporting information accompanies this application

Plans certified by a registered professional engineer of Queensland (RPEQ)            Confirmation of       Method of
(or an interstate or international equivalent registered with the appropriate         lodgement             lodgement
professional body) showing:

the location (real property description and boundaries) and dimensions of the              confirmed
proposed works in relation to the land (including tidal land) that would abut or
adjoin the proposed works

the proposed works in relation to the locations and levels of lowest astronomical          confirmed
tide, highest astronomical tide, mean high water springs and the coastal
management district

the slope angles of the beds and banks of the tidal area and the finished levels of        confirmed
the proposed works

Written statements or evidence


                                                                                      Prescribed tidal work-IDAS form 28
                                                                                            Version 1.0 18 December 2009

Page 12

a copy of the certificate of title for the land (including tidal land) that would abut   Elconfirmed
or adjoin the proposed works

details of how the proposed work addresses the IDAS code for prescribed tidal                 confirmed
work in the Coastal Protection and Management Regulation 2oo3, schedule 4A

details of the largest vessel, if any, to be moored at the structure                          confirmed
                                                                                              not applicable

evidence that the proposed work will not prejudice the access rights of adjoining             confirmed
property owners in the form of:

         •   letters of support from adjoining property owner, or
         •   plans illustrating a water allocation area

For applications within a cul-de-sac, a bend in the waterway or other location where the side boundaries of the lot
connect to the work and neighbouring lots are not at right angles to the waterway

photos of any constructed neighbouring structures or information about                        confirmed
approved but unconstructed neighbouring structures
                                                                                              not applicable


Privacy-please refer to your assessment manager for further details on the use of information recorded in this form.


OFFICE USE ONLY


 Date received
                         IS•z-II                            Reference numbers                                QQ 1 3




The Sustainable PlanningActzooy(SPA) is administered by the Department of Infrastructure and Planning. This form and all
other required application materials should be sent to your assessment manager and any referral agencies.



                                                                                         Press:                    iDASform.
                                                                                                  Version 1.o 18 Dec?tuber 201

Page 13

Development assessment chec                                                                   djj; ft Counter
checklist 1                                                                                    15 FEB 2011
(Sustainable PlanningAct 2009, version i.o 18 December 2009)

                                                                                               Nambour
This checklist applies to the carrying out of development generally.

You are not required to complete this checklist as part of your development application, however you may submit the
checklist with your application if you wish. The purpose of the checklist is to assist you in identifying:
•   whether you need to make a development application for the proposed development
•   if a development application is required, the relevant IDAS forms you need to complete as part of your application
•   whether you need to give a copy of your application to any referral agencies.

If your development involves a material change of use, reconfiguring a lot, operational works or building work in a declared
fish habitat area, it is recommended that you complete Material change of use - IDAS checklist 2, Reconfiguringa lot -
IDAS checklist3, Operational works - IDAS checklist 4, or Building work in a declared fish habitat area - IDAS checklist S.


If you are unsure how to answer any questions on this checklist, phone or visit your local government, or go to the
Department of Infrastructure and Planning's website at www.dip.cL1_d.gov.au.

All terms used in this checklist have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning
Regulation 2009.


This checklist can also be completed online using Smart eDA at www.smarteda.qld.gov.au


Part 1-General questions


1.1 Have you received a referral agency response in relation to this proposed development prior to making an
application?


      No

El Yes         • To assist you in preparing your application, completing Referralagencyresponses-IDA5checklist6is
                 recommended


1.2 Do you wish the proposed development to be assessed against a superseded planning scheme?


      No

E ]Yes         • You must complete Request to apply a superseded planning scheme-Sustainable Planning Act form 2 and
                 give this notice to the relevant local government. If the local government agrees to your request, details
                 must be provided in Application details-IDAS form i

Page 14

1.3 Does the proposal involve removing quarry material from a watercourse or lake for which an allocation notice is
required under the WaterAct2000?




1-1
      Yes   • It is recommended that you complete part 2 of this checklist


1.4 Is any part of the proposed development intended to be carried out on a Queensland heritage place under the
Queensland Heritage Act 2992?




      Yes   • It is recommended that you complete part 3 of this checklist


1.5 Does the proposal involve development on a local heritage place?




LI          • It is recommended that you complete part 4 of this checklist


1.6 Does the proposal involve an environmentally relevant activity, other than an agricultural ERA, a mining activity
or a chapter 5A activity?


      No

q
      Yes   • It is recommended that you complete part 5 of this checklist


1.7 Is any part of the development on strategic port land or airport land (other than development for a material
change of use that is inconsistent with the land use plan for the strategic port land or airport land)




q Yes       • It is recommended that you complete part 6 of this checklist


1.8 Is any part of the development on land below a high water mark within the limits of a port under the Transport
Infrastructure Act 2994 ?




q Yes       • It is recommended that you complete part 7 of this checklist




                                                                                          ctclist /UASchotAlist i
                                                                                   Version i.0 18 DeCerrtbei 200')

Page 15

1.9 Is any part of the premises designated for community infrastructure?




               • It is recommended that you complete part 8 of this checklist


i.io Does the proposal involve the establishment or expansion of a waste water disposal system?




q Yes          • It is recommended that you complete part 9 of this checklist


i.ii Is the development on land that adjoins a declared fish habitat area under the fisheries Acti994?


LI
               • It is recommended that you complete part io of this checklist




Part 2-Removing quarry material


2.1 Is any part of the quarry material which is intended to be removed, located within a wild river area under the Wild
Rivers Act 2005?


     No    •     A development permit is required
q
           •     Your application must include Removal of quarry material from a watercourse-IDAS form 18
           • This application requires assessment by the Department of Environment and Resource Management (DERM).
             If DERM is not the assessment manager for your application, the role of the agency will be as a concurrence
             agency and you must provide a copy of the application to DERM

     Yes
q


2.2 Will the development be carried out on land to which a property development plan under the Wild RiversAct
2005 applies?



q No       • A development permit is required
           •    Your application must include Removal of quarry material from a watercourse-IDAS form 18

           •     This application requires assessment by the Department of Environment and Resource Management (DERM).
                 If DERM is not the assessment manager for the application, the role of the agency will be as a concurrence
                 agency and you must give DERM a copy of the application
q Yes




                                                         3 eb'e/oPfne.?(.i^•r)li(.;;/;;,',?jic'iscii /IC?.'e<i(!r,!   /VA5ihecklisft

                                                                                                    Version i.o 18 December 200v

Page 16

         I C
    2.3 Is the development consistent with the property development plan?


         Yes   • A development permit is required
    q                                                                                                                            i
               •    Your application must include Removal of quarry material from a watercourse-IDAS form 18
               •    This application requires assessment by the Department of Environment and Resource Management (DERM).
                    If DERM is not the assessment manager for the application, the role of the agency will be as a concurrence
                    agency and you must give DERM a copy of the application

         No        • Prohibited development. A development application for this development cannot be made


Section reference:
•    Sustainable Planning Regulation, schedule 3, part 1, table 5, item i
•    Sustainable Planning Regulation, schedule 7, table 2, item 12
•    Sustainable PlanningAct2009, schedule i, item 2




    Part 3-Queensland heritage place


    3.1 Has an exemption certificate for the proposal been issued under the Queensland Heritage Act 1992?


         No
    q

    q Yes       • A development permit is not required for this aspect of the development


    3.2 Is the proposed development liturgical development under section 78 of the Queensland Heritage Act 1992?


         No

         Yes    • A development permit is not required for this aspect of the development


    3.3 Is the work being carried out by the State?


    q No
         Yes    • A development permit is not required for this aspect of the development
    LI


    3.4 Is the work being carried out in an urban development area?


         No     • A development permit is required
                • Your application must include Queensland heritage place-IDASform 3
                • This application requires assessment by the Department of Environment and Resource Management (DERM).
                  If DERM is not the assessment manager for the application, the role of the agency will be as a concurrence
                     agency and you must provide a copy of the application to DERM

         Yes    • A development permit is not required for this aspect of the development


                                                             Development application assessment checklist-/DAS checklist 1
                                                                                             Version i. o i8 December 2009

Page 17

Section reference:
• Sustainable PlanningRegulation, schedule 3, part i, table 5, item 2
• Sustainable PlanningRegulation, schedule 7, table 2, item 19



    Part 4-Local heritage


    4.1 Do any of the following apply to the proposal


    the development is building works to be carried out by or on behalf of the
                                                                                        Yes    q No
    State, a public sector entity or a local government
    the development is for public housing as defined in schedule 3 of the
                                                                                        Yes    F1 No
    Sustainable Planning Act 2009

    the development is to be carried out by the State on land designated for
    community infrastructure under the Sustainable PlanningAct2009
                                                                                   q Yes       q No

    the development is mentioned in schedule 4 of the Sustainable Planning              Yes    1-1 No
    Regulation 2009

    the local heritage place is on an airport lessee's airport land under the           Yes           No
    Airport Assets (Restructuring and Disposal) Act 2008


•     If you answered no to all of the above, a development permit is required and your application must include Local heritage
      place-IDAS form 4
•     If you answered yes to any of the above, a development permit is not required


Section reference:
•     Sustainable PlanningRegulation, schedule 3, part i, table 5, item 3
•     Sustainable PlanningRegulation, schedule 3, part 2, table i, item i
•     Airports Assets (Restructuring and Disposal)Act 2008, section 54



    Part 5-Environmentally relevant activity


    5.1 Is there a code of environmental compliance under the Environmental Protection Regulation 2oo8for every
    aspect of each proposed environmentally relevant activity?


    F] No
    F1 Yes I • Go to question 5.3




                    5                                                                 r . cent , hecklist-IDAS checklist 1
                                                                                           Version 1. o 18 December 2009

Page 18

5.2 Is the proposed development a mobile and temporary environmentally relevant activity?


    No      • No development permit is required. End of part 5 of checklist
q
    Yes     • A development permit is required for this development
            •   Your application must include Environmentally relevant activity-IDAS form 8
            • This application requires assessment by the Department of Environment and Resource Management (DERM).
              If DERM is not the assessment manager for the application, the role of the agency will be as a concurrence
                agency and you must give DERM a copy of the application



5.3 Is any part of the environmentally relevant activity intended to be located within a wild river area under the Wild
RiverAct 2005?


    No      • A development permit is not required
q

    Yes


5.4 Does the development involve development in waters in the wild river area that is for an extraction ERA?


     No     •   Go to question 5.6

    Yes



5.5 Will the application be accompanied by an allocation notice for that environmentally relevant activity?

     No     • Prohibited development. A development application cannot be made for this aspect

    Yes



5.6 Is any part of the proposed environmentally relevant activity intended to be located in a wild river high
preservation area?


    No      • Go to question section 5.8

    Yes




                                                                                      ent checklist-IDAS checklist r

Page 19

    5.7 Is any part of the environmentally relevant activity one of the following:


    a sewage ERA as defined under the Environmental Protection Act 1994,
    section 73AA                                                                           q Yes               No

    a water treatment ERA as defined under the Environmental Protection Act
    1994, section 73AA
                                                                                                Yes     q No

    a dredging ERA
                                                                                           F]Yes        F-1    No

an extraction ERA if the activity is a low impact activity carried out outside
                                                                                           q Yes               No
waters and is for specified works or residential complexes in the area

    a screening ERA carried out outside waters and the activity is for:
                                                                                                Yes      q     No
•     specified works or

• residential complexes
    a crude oil or petroleum product storage ERA if the activity is:                            Yes      LI No
• for residential complexes and
• carried out outside a designated urban area

    an exempt environmentally relevant activity as defined under the
                                                                                           q Yes         q No
    Environmental Protection Act 1994, section 73AA(y) in a designated urban
    area


•       If you answered yes to any of these questions, go to question 5.8

•       If you answered no to all of these questions, this aspect of the development is prohibited development and a
        development application cannot be made

    5.8 Is the environmentally relevant activity an extraction ERA to be carried out in a wild river floodplain management
    area?


         No      • Go to section 5.10

         Yes



    5.9 Is the extraction ERA a low impact activity carried out outside waters and for specified works or residential
    complexes in the area?


    LINO          Prohibited development. A development application cannot be made

    F]Yes




                     7                                         Dcwr lopment appliC.^li n ; use±±mt /r! r iir-t Aiisl-/DAS checklist i
                                                                                                    Version i.o 28 December 2009

Page 20

5.10 Will the development be carried out on land to which a property development plan under the Wild Rivers Act
2005 applies?


     No      •   A development permit is required
q
             • Your application must include Environmentally relevant activity-/DASform 8
             • This application requires assessment by the Department of Environment and Resource Management (DERM).
               If DERM is not the assessment manager for the application, the role of the agency will be as a concurrence
               agency and you must give DERM a copy of the application

     Yes


5.11 Is the development consistent with the property development plan?


     Yes     • A development permit is required
q
             • Your application must include Environmentally relevant activity-/DASform 8
             • This application requires assessment by the Department of Environment and Resource Management (DERM).
               If DERM is not the assessment manager for the application, the role of the agency will be as a concurrence
               agency and you must give DERM a copy of the application

      No     • Prohibited development. A development application cannot be made


Section reference:
• Sustainable Planning Act 2009, schedule i, items 2,9,10 and ii
• Sustainab/e Planning Regulation, schedule 3, part i, table 5, items 4 and 5
• Sustainable Planning Regulation, schedule 7, table 2, items 1 and 24



 Part 6-Strategic port land or airport land


 6.i Does the land use plan for the strategic port land or airport land state that the development is assessable
 development?


 Eli No      • End of part 6 of this checklist

 LI Yes      • A development permit is required
             • Your application must include:
                 •    for a material change of use Material change of use assessable againsta planning sc/ieme-/DAS Form
                      5
                 •    for building or operational work - Building or operational work assessable againsta planning scheme-
                      IDAS Form 6
                 •    for reconfiguring a lot- ReconIiguringalot-IDASForm7


Section reference:
• Sustainab/e P/anningRegulation, schedule 3, part 2, tables, items 6 and 7




                 ti                                       D;.'vCiJ;x:77._.:. ]ry., ,rft   ; !   s   r;;; _-;' t ,   -z I i;t-/DAScheck/ist t
                                                                                                         Version +. o 18 December 2009

Page 21

    Part 7-Within the limits of a port


    7.1 Does any of the following apply to any part of the proposal?


    within 200 metres of a shipping channel or an entry and exit shipping
    corridor for the port
                                                                                               Yes     D No
    within iooo metres of a swing basin, a commercial shipping wharf, a
                                                                                               Yes           No
    mooring, anchorage or spoil grounds

    within iooo metres of a planned port facility identified in a land use plan
                                                                                               Yes    q No

•      If you answered yes to any of the above, then this application requires assessment by the Port Authority for the port relevant
       to your application as a concurrence agency. You must send a copy of your application to the Port Authority.

•       If you answered no to all of the above, then this application requires assessment by the Port Authority for the port
        relevant to your application as an advice agency. You must send a copy of your application to the Port Authority.

Section reference:
•       Sustainable Planning Regulation, schedule 7, table 2, items i6 and 17




    Part 8-Community infrastructure


    8.1 Is the community infrastructure intended to be supplied by a public sector entity?


         No      • End of part 8 of this checklist

         Yes


    8.2 Is the land owned by or on behalf of the State?


         No

         Yes     • End of part 8 of this checklist


    8.3 Is the development for any of the following?


    for the designated purpose                                                                 Yes     q No

    carried out by, or on behalf of, the designated purpose
                                                                                         q Yes         q No


•       If you answered yes to any of these questions, end of part 8 of this checklist




                                                              Development application assess: r ri i h, /c!i st-- IDAS checklist i
                                                                                                Version 1.018 December 2009

Page 22

    8.4 Is the proposal assessable development under the planning scheme, a temporary local planning instrument, a
    preliminary approval to which section 242 of the Act applies or a State planning regulatory provision?


            No
    q

            Yes    • This application must be referred to the Queensland Government department administering the Act
    q
                     authorising the development for the designated purpose as concurrence agency


Section reference:
•        Sustainable Planning Regulation, schedule 7, table 3, item 6




    Part 9-Waste water management


    9.1 Is any part of the proposed waste water disposal system to be located in an area declared to be a catchment area
    under the WaterAct2000?


                   • End of part 9 of this checklist
    1-1 No

L           Yes



        9.2 Is the proposed waste water disposal system an environmentally relevant activity under the Environment
        Protection Act 1994 ?


            No
        q
            Yes    • End of part 9 of this checklist


        9.3 Is the development of the waste water disposal system assessable development under the planning scheme, a
        temporary local planning instrument, a preliminary approval to which section 242 of the Act applies or a State
        planning regulatory provision?


            No     • No development permit is required

        F1 Yes     • If the catchment area is in the SEQ region as defined under the Water Act 2000, section 341, the Queensland
                       Bulk Water Supply Authority (trading as Seqwater) is a concurrence agency for the application. You must
                       give this entity a copy of the application
                    • If the catchment area is not in the SEQ region as defined under the Water Act 2000, section 341, the
                      Department of Environment and Resource Management is a concurrence agency for the application and you
                      must give DERM a copy of the application


    Section reference:
    •     Sustainable Planning Regulation, schedule 7, table 3, item 4




                                                               Development application asses s>>.:   t:   klist-/DAS checklist
                                                                                                  Version r. o 18 December 200,.

Page 23

                  Ju


     Part io-Declared fish habitat areas


     1o.1 Is the development assessable development under schedule 3. part i of the Sustainable Planning Regulation
     2009?

                  • End of part io of checklist

                  • A development permit is required
                  • The Department of Employment, Economic Development and Innovation (DEEDI) is an advice agency for this
                    application and you must give DEEDI a copy of the application
                                                                                                                               j

Section reference:
•      Sustainable Planning Regulations, schedule 7, table 2, item 27

    Privacy-please refer to your assessment manager for further details on the use of Information recorded in
    this checklist.

    Disclaimer:
    While the Department of Infrastructure and Planning (DIP) believes that the information contained on this checklist
    and provided as part of this process will be of assistance to you, it is provided on the basis that you will not rely on
    the information without first making your own enquiries regarding the interpretation and application of the
    applicable legislation to your circumstances.


    To the full extent permitted by law DIP expressly disclaims all liability (including but not limited to liability for
    negligence) for errors or omissions of any kind or for any loss (including direct and indirect losses), damage or
    other consequence which may arise from your reliance on this process and the information contained on this
    checklist.



    OFFICE USE ONLY

    Date received                                               Reference numbers              Pw^ 00 4 Z'




    The Sustainable PlanningAct2009 is administered by the Department of Infrastructure and Planning.


                                                                                                 ^,!,I,•heckiist   /DAS(
                                                                                                 Version j.o i8 Dece'r,

Page 24

                                                                                  ftlk-
                                                                                lm^
                                                                                            Queensland
                                                                                            Government

                                                                                             Department of
    3 February 2011
                                                                                             Transport and Main Roads



   Paul Coult Design P/L
   PO Box 152
   Noosaville Qld 4566



    Dear Sir


   Operational Work, Prescribed Tidal Works - Request for amended comments
   Jetty - Mr. Duley, 29 Wyuna Drive, Noosaville (Lot 14 N10576)


   Thank you for your email of 31 January 2011 requesting a change to the lot number to construct a
   jetty at the location mentioned above.


    As a concurrence agency, Maritime Safety Queensland has no objection to the proposal provided the
    following navigation and marine safety conditions are complied with.

    1.   The contractor must build the jetty according to Paul Clout, Drawing No J 1.0, attached to your
          letter dated 23 August 2010.


    2.   No part of the structure or any ship berthed at this structure is to come closer than 1.5metres from
         the side boundaries of the allocated water space as shown on the submitted water allocation plan.


    3.   The jetty and all freestanding piles must be lit and clearly visible to approaching vessels. The
          contractor must position all lighting so it does not cause a risk to the safe navigation of other
          vessels.


   4.    The applicant or his agent is responsible for the removal of any existing structure above or below
         the waterline, and must contain and remove any debris. Any pile that needs to be removed must
         be totally extracted.


    5.   The ship moored at this pontoon must follow the most direct course from this structure to open
          waters and a similar direct course when returning to this pontoon. By only using the Weyba
          Creek and Noosa River, the ship moored at this jetty is not permitted to enter into any other canal
          enroute.



Department of Transport and Main Roads                   Our ref    215/00003(2) E2302-MOM E2367-MOMF20
                                                                    710/01702(3) P41335 E38714 F38
Maritime Safety Queensland                               Your ref
Marine Operations (Brisbane)                             Enquiries  James O'Connor
MacArthur Avenue East                                    Telephone +61 7 3860 3504
Pinkenba Queensland 4008                                 Facsimile +61 7 3860 3571
                                                         Website    www.msq.gld.gov.au
                                                         Email      [email protected]

Page 25

6.   The owner is to ensure that the ship berthed at this structure must maintain sufficient under keel
       clearance at all stages of tide. The ship must comply with any local restrictions placed on channel
       depths and draft restrictions.

7.   Any ships and equipment you or your agent use must comply with the Transport Operations
     (Marine Safety) Act 1994, the Transport Operations (Marine Safety) Regulation 2004 and the
      Transport Operations (Marine Pollution) Act 1995.

8.   Any ships using this structure must comply with the Transport Operations (Marine Safety) Act
      1994 and the Transport Operations (Marine Safety) Regulation 2004.

9.   Any ship moored at this jetty must not impede the safe navigation of other ships or restrict safe
     access to or from neighbouring structures.

10. Any ship, dry berth or device (including Air Lifting Pontoons) berthed, moored or attached to the
    jetty must not exceed the following sizes:


           Wet Berth                                                       Dry Berth
       Length Overall - 6.7    metres                                        N/A
       Beam -            2.5   metres


11. The contractor must construct the jetty within two years from the date of approval. If
     construction is not completed, you will need additional or amended comments from the Regional
       Harbour Master.


Maritime Safety Queensland does not need to be further consulted if all of the above conditions are
met.

The above conditions must be included in your application to the assessment manager.

This agency will also forward a copy of this letter to the Assessment Manager.



Yours sincerely




Captain Richard C Johnson
Regional Harbour Master (Brisbane)




                                                                                                 Page 2 of 2

Used in these records

About this file

File size
4.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

OPW11_0043 Development Application part 1 of 2 _Covering Letter__nIDAS Form 1__nIDAS Form 28__nLetter from Department of Transport & Main Roads _29 Wyuna Dr.pdf · 4.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.