Council archive · source document
OPW11/0043 Development Application part 1 of 2 "Covering Letter\\nIDAS Form 1\\nIDAS Form 28\\nLetter from Department of Transport & Main Roads "29 Wyuna Dr NOOSAVILLE
RRESPONDENCE
THIS IS THE NEXT PART OF A
MULTIPLE PART RECORD
CS IAMJNFORMATION MANAGEMENTRECORDS MANAGEMEN1 Control ofRecords\EDRMS\Multi Pan Record Cover Shod FIRST PART dol
nev ainoment Cc unter
15 FEB 2011
Nambour
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 24 pages
Page 2
PAUL CLOUT
Ut
Ke^ict^'ricC
14th February 2011
Development Assessment - Jetty Application
Sunshine Coast Council
Locked Bag 72
Sunshine Coast Mail Centre
Queensland, 4560
Dear Sir / Madam,
RE: Lot 14 Wyuna Drive, Noosaville - Jetty Application
Please find enclosed Plans and Documentation for prescribed tidal works for a jetty at the above address.
Documents supplied:
1. Jetty Site Plan (1:100) by Paul Clout Design (x5 copies)
2. Engineering and Prescribed Tidal Works drawings by John Norden & Assoc (x5 copies)
3. IDAS Form 1 & 28 and checklist
4. Letter from Regional harbour Master
Can you please send a list of any fees payable and any further information required.
Please call if there are any queries in regard to this submission.
Regards,
Nathan Kenzler
Paul Clout Design P/L
PO Box 152 Noosaville Qld, 4566
Suite 4/44 Mary St Noosaville
Phone: 07 5440 5388 Fax: 07 5440 5399
Email: [email protected]
Page 3
Application details-IDAS form 1 Development Counter
(Sustainable PlanningAct2009 version i.o effective i8 December 2009)
1 S FEB 2011
You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all necessary
information and documentation will result in your application not being a properly made applicati .
tambour
For all development applications, you must:
• complete this form (Application details-IDASform i)
• complete any other forms relevant to your application
• provide any mandatory supporting information identified on the forms as being required to accompany your
application.
Attach extra pages if there is insufficient space on this form.
All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning
Regulation 2009.
This form can also be completed online using Smart eDA at www.smarteda.qld.gov.au
Applicant details (note: the applicant is the person responsible for making the application and need not be the owner of
the land. The applicant is responsible for ensuring the information provided on all IDAS application forms is correct. Any
development permit or preliminary approval that may be issued as a consequence of this application will be issued to the
applicant.)
Name/s (individual or company name in full) I _R'%-
4/1 c lo ut De s f 7 vn f fi l -pt
For companies, contact name Nq- L Ov y Veoz,lec
Postal address P u & ' _ > V 1 5Z
Contact phone number (c-7) 1T f k o c 3
Mobile number (non-mandatory)
Fax number (non-mandatory)
e-mail address (non-mandatory)
[email protected] &lo,_t ales i,y#j . 6ov-, ac/
Page 4
i. What is the nature of development proposed? (tick all applicable box/es)
material change of use of premises
building work
9 operational work
reconfiguring a lot
2. What type of approval is being sought?
q development permit preliminary approval M both-provide details below
q
Jety
3. Is the application for a mobile and temporary environmentally relevant activity (ERA)?
ff No
Yes-complete table A and then go to question 5
Table A-name of each local government area in which the mobile and temporary ERA is proposed to operate
4. Location of the premises (complete table B and/or table C as applicable. Identify each lot in a separate row)
Table B-street address/lot for the premises or street address/lot on plan for the land adjoining or adjacent to the
premises
q street address/lot on the plan
q street address/lot on plan for the land ad joining or adjacent to the premises (appropriate for development in
water e.g. jetty, pontoon)
Street address Lot on plan description Local government area
(e.g. Logan, Cairns)
Unit Street Street name and official suburb/ Post- Lot no. Plan type
no. no. locality name code and plan no.
21 w YLNk D2ivE ¢S^^ I ^lll o^ s ^iz 6&,>t .
IVoo5h F^A'DS r e 5r,dH -1 /
2 Application details-/DA5 form i
Version 1. o 18 December 2009
Page 5
Table C-premises coordinates (appropriate for development in remote areas, over part of a lot or in water e.g. channel
dredging in Moreton Bay)
Coordinates Zone Datum Local government
(note: place each set of coordinates in a separate row) reference area (if applicable)
Easting Northing Latitude Longitude
GDA94
WGS84
other
5. Total area of the premises on which the development is proposed (indicate hectares or m=)
6. Current use/s of the premises (e.g. vacant land, house, apartment building, cane farm, etc.)
U Gi Col4l [Of
7. Provide a brief description of the proposal (e.g. six unit apartment building, 30 lot residential subdivision etc.)
Is owner's consent required for this application? (refer to notes at the end of this form for more information)
q No
Yes-complete either table D, table E or table F as applicable
Table D
Name of owner/s of the land re aV<^ ^,hVI ^(J
I/We, the above-mentioned owner/s of the land, consent to the making of this application.
Signature of owner/s of the land
Date j L (p
Application details-/DAS form i
Version t. o i8 December 2009
Page 6
J"L
Table E
Name of owner/s of the land
R The owner's written consent is attached or will be provided separately to the assessment manager
Table F
Name of owner/s of the land
By making this application, I, the applicant, declare that the owner has given written consent to the making of the
application.
9. Does the application involve a state resource? (e.g. the application involves state land, or taking quarry materials.
Refer to the notes at the end of this form for more information)
No Yes-complete table G
q
Table G-state owned resources (provide details for each state resource in a separate table)
Nature of state-owned resource
Nature of evidence required (tick the
applicable box and attach a copy of the Evidence of an allocation of, or an entitlement to, the resource
q
evidence to this form)
Evidence the chief executive of the department administering the
q
resource is satisfied the development is consistent with an allocation
of, or an entitlement to, the resource
q Evidence the chief executive of the department administering the
resource is satisfied the development application may proceed in the
absence of an allocation of, or an entitlement to, the resource
io. Identify if any of the following apply to the premises (tick applicable box/es)
adjacent to a water body, watercourse or aquifer (e.g. creek, river, lake, canal)-complete table H
I
on strategic port land under the Transport Infrastructure Act 1994-complete table I
d in a tidal water area-complete table
Table H I Name of water body, watercourse or aquifer
4 Application details-IDAS form r
Version i. o z8 December 2009
Page 7
Table I I Lot on plan description for strategic port land I Port authority for the lot
Table J Name of local government for the tidal area (if applicable) Port authority for the tidal area (if applicable)
• (^ 5 ^ ^ 0- ^l/LA
ii. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow, water, etc.)
No
q Yes-ensure the type, location and dimension of each easement is included in the plans submitted
12. Does the proposal include new building work or operational work on the premises? (including any services)
No d Yes-ensure the nature, location and dimension of proposed works are included in plans submitted
q
13. Is the payment of a portable long service leave levy applicable to this application? (refer to notes at the end of this
form for more information)
7f No-go to question 15 Yes
q
14. Has the portable long service leave levy been paid? (refer to notes at the end of this form for more information)
Li No
Yes-complete table K and submit with this application the yellow local government/ private certifier's copy of the
1-1
receipted QLeave form
Table K Amount paid Date paid QLeave Project Number (6 digit number starting with A, B,
E, L or P)
15. Has the local government agreed to apply a superseded planning scheme to this application under section 96 of
the Sustainable PlanningAct 2009?
q Yes-please provide details below
Name of local government Date of written notice given Reference number of written notice given
by local government by local government (if applicable)
W15-WDAS form 1
'8 December 2000
Page 8
16. List below all of the forms and supporting information that accompany this application (include all IDAS forms,
checklists, mandatory supporting information etc. that will be submitted as part of this application. Note: this question
does not apply for applications made on-line using Smart eDA)
Description of attachment or title of attachment Method of lodgement to
assessment manager
I :FOr A 2. V
17. Applicant's declaration
By making this application, I declare that all information in this application is true and correct (note: it is unlawful to
provide false or misleading information).
Notes for completing this form
Question 8:
• Section 263 of the Sustainable PlanningAct 2009 sets out when the consent of the owner of the land is required for an
application. Section 26o(i)(e) of the Sustainable P/anningAct2009 provides that if the owner's consent is required
under section 263, then an application must contain, or be accompanied by, the written consent of the owner, or
include a declaration by the applicant that the owner has given written consent to the making of the application.
• Owner's consent is not required for a mobile and temporary ERA.
Question 9:
• Section 264 of the Sustainable Planning Act 2009 provides that if a development involves a state resource, a
regulation may require the application to be supported by certain evidence prescribed under the regulation. Schedule
14 of the Sustainable Planning Regulation 2009 prescribes the state resources for which evidence is required to be
given, and the evidence required, to support the application.
Question 13:
• The Building and Construction Industry (Portable Long Service Leave) Act 1991 prescribes when the portable long
service leave levy is payable.
• The portable long service leave levy amount and other prescribed percentages and rates for calculating the levy are
prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002.
Question 14:
• The portable long service leave levy need not be paid when the application is made, but the Building and Construction
Industry (Portable Long Service Leave) Act 1991 requires the levy to be paid before a development permit is issued.
• Building and Construction Industry Notification and Payment Forms are available from any Queensland post office or
agency, on request from QLeave, or can be completed on the QLeave website at www.gleave.qld.gov.au. For further
information contact QLeave on 18oo 803 481 or www.qleave.qld.gov.au.
Ipplic.u:on d,^i.ii; c-IDASform 1
Version .1. o 18 December 2009
Page 9
Privacy-the information collected in this form will be used by the Department of Infrastructure and Planning (DIP) in
accordance with the processing and assessment of your application. Your personal details will not be disclosed for a purpose
outside of the IDAS process, except where required by legislation (including the Right to Information Act 2009) or as required
by Parliament. This information may be stored in a departmental database. The information collected will be retained as
required by the Public Records Act 2002.
OFFICE USE ONLY
Date received Reference numbers
NOTIFICATION OF ENGAGEMENT OF A PRIVATE CERTIFIER
To Council. I have been engaged as the private certifier for the building work referred
to in this application
Building
Date of engagement Name BSA Certification license number
classification/s
QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable)
Date receipted
QLeave Project Amount paid form sighted by Name of officer who
Description of the work Date paid
Number ($) assessment sighted the form
manager
The Sustainable PlanningAct 2009 (SPA) is administered by the Department of Infrastructure and Planning. This form and
all other required application materials should be sent to your assessment manager and any referral agencies.
Ipplii.rrnin deta11s-IDA5Corm r
Version 1.o r8 December 2009
Page 10
Development Counter
Prescribed tidal work-IDAS form 28 1 S FEB 2011
(Sustainable PlanningAct2009 version i.o effective 18 December 2009)
This form must be completed for development applications for prescribed tidal wor K.
Nambour
You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all necessary
information and documentation will result in your application not being a properly made application.
For all development applications you must:
• complete Application details-/DAS form i
• complete any other forms relevant to your application
• provide any mandatory supporting information identified on the forms as being required to accompany your
application.
Attach extra pages if there is insufficient space on this form.
All terms used on this form have the meaning given in the Sustainable Planning Act 2OO9 or the Sustainable Planning
Regulation 2009.
This form can also be completed online using Smart eDA at www.smarteda.qld.gov.au
i. What type of approval is sought?
d development permit
preliminary approval
2. What is that nature of the prescribed tidal works and the nature of the use? (tick applicable box/es)
Private use Non-private use Estimated value of completed works ($)
jetty, pier or wharf
q mooring pile
deck or boardwalk
q
boat ramp or spillway
q
pontoon
q
q revetment, sea wall or retaining wall
q other-please specify below
Page 11
3. Is the application within a cul-de-sac, a bend in a waterway or other location where the side boundaries of the lot
are connected to the work and neighbouring lots are not at right angles to the waterway?
No Yes
1-1
4. Has a registered professional engineer of Queensland (RPEQ), or an interstate equivalent, certified that the works
comply with the design and safety provisions of the IDAS code for development applications for prescribed tidal
works in the Coastal Protection and Management Regulation 2003, schedule 4A? (non-mandatory)
No Yes-provide details below
q
Engineers name/s J,k V ircAe-i
Organisation name (if applicable) c €3I i'
JcI A- SSOC1a
e
Postal address P Box Zo T
- ^^^ ^,-^ ^a..^►^^ Tew" "4 (fl fT65
Contact phone number (o--7) 9- 713-7
Fax number (non-mandatory)
e-mail address (non-mandatory) J VJ-of
@ I vi ter vi o •O VI ,vie
RPEQ number (or equivalent if interstate) /O61^
Reference number of all plans to which this certification relates 10 / 1 6 -2 -1 (0 / 1 ( 2-Z.
Confirm that the following mandatory supporting information accompanies this application
Plans certified by a registered professional engineer of Queensland (RPEQ) Confirmation of Method of
(or an interstate or international equivalent registered with the appropriate lodgement lodgement
professional body) showing:
the location (real property description and boundaries) and dimensions of the confirmed
proposed works in relation to the land (including tidal land) that would abut or
adjoin the proposed works
the proposed works in relation to the locations and levels of lowest astronomical confirmed
tide, highest astronomical tide, mean high water springs and the coastal
management district
the slope angles of the beds and banks of the tidal area and the finished levels of confirmed
the proposed works
Written statements or evidence
Prescribed tidal work-IDAS form 28
Version 1.0 18 December 2009
Page 12
a copy of the certificate of title for the land (including tidal land) that would abut Elconfirmed
or adjoin the proposed works
details of how the proposed work addresses the IDAS code for prescribed tidal confirmed
work in the Coastal Protection and Management Regulation 2oo3, schedule 4A
details of the largest vessel, if any, to be moored at the structure confirmed
not applicable
evidence that the proposed work will not prejudice the access rights of adjoining confirmed
property owners in the form of:
• letters of support from adjoining property owner, or
• plans illustrating a water allocation area
For applications within a cul-de-sac, a bend in the waterway or other location where the side boundaries of the lot
connect to the work and neighbouring lots are not at right angles to the waterway
photos of any constructed neighbouring structures or information about confirmed
approved but unconstructed neighbouring structures
not applicable
Privacy-please refer to your assessment manager for further details on the use of information recorded in this form.
OFFICE USE ONLY
Date received
IS•z-II Reference numbers QQ 1 3
The Sustainable PlanningActzooy(SPA) is administered by the Department of Infrastructure and Planning. This form and all
other required application materials should be sent to your assessment manager and any referral agencies.
Press: iDASform.
Version 1.o 18 Dec?tuber 201
Page 13
Development assessment chec djj; ft Counter
checklist 1 15 FEB 2011
(Sustainable PlanningAct 2009, version i.o 18 December 2009)
Nambour
This checklist applies to the carrying out of development generally.
You are not required to complete this checklist as part of your development application, however you may submit the
checklist with your application if you wish. The purpose of the checklist is to assist you in identifying:
• whether you need to make a development application for the proposed development
• if a development application is required, the relevant IDAS forms you need to complete as part of your application
• whether you need to give a copy of your application to any referral agencies.
If your development involves a material change of use, reconfiguring a lot, operational works or building work in a declared
fish habitat area, it is recommended that you complete Material change of use - IDAS checklist 2, Reconfiguringa lot -
IDAS checklist3, Operational works - IDAS checklist 4, or Building work in a declared fish habitat area - IDAS checklist S.
If you are unsure how to answer any questions on this checklist, phone or visit your local government, or go to the
Department of Infrastructure and Planning's website at www.dip.cL1_d.gov.au.
All terms used in this checklist have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning
Regulation 2009.
This checklist can also be completed online using Smart eDA at www.smarteda.qld.gov.au
Part 1-General questions
1.1 Have you received a referral agency response in relation to this proposed development prior to making an
application?
No
El Yes • To assist you in preparing your application, completing Referralagencyresponses-IDA5checklist6is
recommended
1.2 Do you wish the proposed development to be assessed against a superseded planning scheme?
No
E ]Yes • You must complete Request to apply a superseded planning scheme-Sustainable Planning Act form 2 and
give this notice to the relevant local government. If the local government agrees to your request, details
must be provided in Application details-IDAS form i
Page 14
1.3 Does the proposal involve removing quarry material from a watercourse or lake for which an allocation notice is
required under the WaterAct2000?
1-1
Yes • It is recommended that you complete part 2 of this checklist
1.4 Is any part of the proposed development intended to be carried out on a Queensland heritage place under the
Queensland Heritage Act 2992?
Yes • It is recommended that you complete part 3 of this checklist
1.5 Does the proposal involve development on a local heritage place?
LI • It is recommended that you complete part 4 of this checklist
1.6 Does the proposal involve an environmentally relevant activity, other than an agricultural ERA, a mining activity
or a chapter 5A activity?
No
q
Yes • It is recommended that you complete part 5 of this checklist
1.7 Is any part of the development on strategic port land or airport land (other than development for a material
change of use that is inconsistent with the land use plan for the strategic port land or airport land)
q Yes • It is recommended that you complete part 6 of this checklist
1.8 Is any part of the development on land below a high water mark within the limits of a port under the Transport
Infrastructure Act 2994 ?
q Yes • It is recommended that you complete part 7 of this checklist
ctclist /UASchotAlist i
Version i.0 18 DeCerrtbei 200')
Page 15
1.9 Is any part of the premises designated for community infrastructure?
• It is recommended that you complete part 8 of this checklist
i.io Does the proposal involve the establishment or expansion of a waste water disposal system?
q Yes • It is recommended that you complete part 9 of this checklist
i.ii Is the development on land that adjoins a declared fish habitat area under the fisheries Acti994?
LI
• It is recommended that you complete part io of this checklist
Part 2-Removing quarry material
2.1 Is any part of the quarry material which is intended to be removed, located within a wild river area under the Wild
Rivers Act 2005?
No • A development permit is required
q
• Your application must include Removal of quarry material from a watercourse-IDAS form 18
• This application requires assessment by the Department of Environment and Resource Management (DERM).
If DERM is not the assessment manager for your application, the role of the agency will be as a concurrence
agency and you must provide a copy of the application to DERM
Yes
q
2.2 Will the development be carried out on land to which a property development plan under the Wild RiversAct
2005 applies?
q No • A development permit is required
• Your application must include Removal of quarry material from a watercourse-IDAS form 18
• This application requires assessment by the Department of Environment and Resource Management (DERM).
If DERM is not the assessment manager for the application, the role of the agency will be as a concurrence
agency and you must give DERM a copy of the application
q Yes
3 eb'e/oPfne.?(.i^•r)li(.;;/;;,',?jic'iscii /IC?.'e<i(!r,! /VA5ihecklisft
Version i.o 18 December 200v
Page 16
I C
2.3 Is the development consistent with the property development plan?
Yes • A development permit is required
q i
• Your application must include Removal of quarry material from a watercourse-IDAS form 18
• This application requires assessment by the Department of Environment and Resource Management (DERM).
If DERM is not the assessment manager for the application, the role of the agency will be as a concurrence
agency and you must give DERM a copy of the application
No • Prohibited development. A development application for this development cannot be made
Section reference:
• Sustainable Planning Regulation, schedule 3, part 1, table 5, item i
• Sustainable Planning Regulation, schedule 7, table 2, item 12
• Sustainable PlanningAct2009, schedule i, item 2
Part 3-Queensland heritage place
3.1 Has an exemption certificate for the proposal been issued under the Queensland Heritage Act 1992?
No
q
q Yes • A development permit is not required for this aspect of the development
3.2 Is the proposed development liturgical development under section 78 of the Queensland Heritage Act 1992?
No
Yes • A development permit is not required for this aspect of the development
3.3 Is the work being carried out by the State?
q No
Yes • A development permit is not required for this aspect of the development
LI
3.4 Is the work being carried out in an urban development area?
No • A development permit is required
• Your application must include Queensland heritage place-IDASform 3
• This application requires assessment by the Department of Environment and Resource Management (DERM).
If DERM is not the assessment manager for the application, the role of the agency will be as a concurrence
agency and you must provide a copy of the application to DERM
Yes • A development permit is not required for this aspect of the development
Development application assessment checklist-/DAS checklist 1
Version i. o i8 December 2009
Page 17
Section reference:
• Sustainable PlanningRegulation, schedule 3, part i, table 5, item 2
• Sustainable PlanningRegulation, schedule 7, table 2, item 19
Part 4-Local heritage
4.1 Do any of the following apply to the proposal
the development is building works to be carried out by or on behalf of the
Yes q No
State, a public sector entity or a local government
the development is for public housing as defined in schedule 3 of the
Yes F1 No
Sustainable Planning Act 2009
the development is to be carried out by the State on land designated for
community infrastructure under the Sustainable PlanningAct2009
q Yes q No
the development is mentioned in schedule 4 of the Sustainable Planning Yes 1-1 No
Regulation 2009
the local heritage place is on an airport lessee's airport land under the Yes No
Airport Assets (Restructuring and Disposal) Act 2008
• If you answered no to all of the above, a development permit is required and your application must include Local heritage
place-IDAS form 4
• If you answered yes to any of the above, a development permit is not required
Section reference:
• Sustainable PlanningRegulation, schedule 3, part i, table 5, item 3
• Sustainable PlanningRegulation, schedule 3, part 2, table i, item i
• Airports Assets (Restructuring and Disposal)Act 2008, section 54
Part 5-Environmentally relevant activity
5.1 Is there a code of environmental compliance under the Environmental Protection Regulation 2oo8for every
aspect of each proposed environmentally relevant activity?
F] No
F1 Yes I • Go to question 5.3
5 r . cent , hecklist-IDAS checklist 1
Version 1. o 18 December 2009
Page 18
5.2 Is the proposed development a mobile and temporary environmentally relevant activity?
No • No development permit is required. End of part 5 of checklist
q
Yes • A development permit is required for this development
• Your application must include Environmentally relevant activity-IDAS form 8
• This application requires assessment by the Department of Environment and Resource Management (DERM).
If DERM is not the assessment manager for the application, the role of the agency will be as a concurrence
agency and you must give DERM a copy of the application
5.3 Is any part of the environmentally relevant activity intended to be located within a wild river area under the Wild
RiverAct 2005?
No • A development permit is not required
q
Yes
5.4 Does the development involve development in waters in the wild river area that is for an extraction ERA?
No • Go to question 5.6
Yes
5.5 Will the application be accompanied by an allocation notice for that environmentally relevant activity?
No • Prohibited development. A development application cannot be made for this aspect
Yes
5.6 Is any part of the proposed environmentally relevant activity intended to be located in a wild river high
preservation area?
No • Go to question section 5.8
Yes
ent checklist-IDAS checklist r
Page 19
5.7 Is any part of the environmentally relevant activity one of the following:
a sewage ERA as defined under the Environmental Protection Act 1994,
section 73AA q Yes No
a water treatment ERA as defined under the Environmental Protection Act
1994, section 73AA
Yes q No
a dredging ERA
F]Yes F-1 No
an extraction ERA if the activity is a low impact activity carried out outside
q Yes No
waters and is for specified works or residential complexes in the area
a screening ERA carried out outside waters and the activity is for:
Yes q No
• specified works or
• residential complexes
a crude oil or petroleum product storage ERA if the activity is: Yes LI No
• for residential complexes and
• carried out outside a designated urban area
an exempt environmentally relevant activity as defined under the
q Yes q No
Environmental Protection Act 1994, section 73AA(y) in a designated urban
area
• If you answered yes to any of these questions, go to question 5.8
• If you answered no to all of these questions, this aspect of the development is prohibited development and a
development application cannot be made
5.8 Is the environmentally relevant activity an extraction ERA to be carried out in a wild river floodplain management
area?
No • Go to section 5.10
Yes
5.9 Is the extraction ERA a low impact activity carried out outside waters and for specified works or residential
complexes in the area?
LINO Prohibited development. A development application cannot be made
F]Yes
7 Dcwr lopment appliC.^li n ; use±±mt /r! r iir-t Aiisl-/DAS checklist i
Version i.o 28 December 2009
Page 20
5.10 Will the development be carried out on land to which a property development plan under the Wild Rivers Act
2005 applies?
No • A development permit is required
q
• Your application must include Environmentally relevant activity-/DASform 8
• This application requires assessment by the Department of Environment and Resource Management (DERM).
If DERM is not the assessment manager for the application, the role of the agency will be as a concurrence
agency and you must give DERM a copy of the application
Yes
5.11 Is the development consistent with the property development plan?
Yes • A development permit is required
q
• Your application must include Environmentally relevant activity-/DASform 8
• This application requires assessment by the Department of Environment and Resource Management (DERM).
If DERM is not the assessment manager for the application, the role of the agency will be as a concurrence
agency and you must give DERM a copy of the application
No • Prohibited development. A development application cannot be made
Section reference:
• Sustainable Planning Act 2009, schedule i, items 2,9,10 and ii
• Sustainab/e Planning Regulation, schedule 3, part i, table 5, items 4 and 5
• Sustainable Planning Regulation, schedule 7, table 2, items 1 and 24
Part 6-Strategic port land or airport land
6.i Does the land use plan for the strategic port land or airport land state that the development is assessable
development?
Eli No • End of part 6 of this checklist
LI Yes • A development permit is required
• Your application must include:
• for a material change of use Material change of use assessable againsta planning sc/ieme-/DAS Form
5
• for building or operational work - Building or operational work assessable againsta planning scheme-
IDAS Form 6
• for reconfiguring a lot- ReconIiguringalot-IDASForm7
Section reference:
• Sustainab/e P/anningRegulation, schedule 3, part 2, tables, items 6 and 7
ti D;.'vCiJ;x:77._.:. ]ry., ,rft ; ! s r;;; _-;' t , -z I i;t-/DAScheck/ist t
Version +. o 18 December 2009
Page 21
Part 7-Within the limits of a port
7.1 Does any of the following apply to any part of the proposal?
within 200 metres of a shipping channel or an entry and exit shipping
corridor for the port
Yes D No
within iooo metres of a swing basin, a commercial shipping wharf, a
Yes No
mooring, anchorage or spoil grounds
within iooo metres of a planned port facility identified in a land use plan
Yes q No
• If you answered yes to any of the above, then this application requires assessment by the Port Authority for the port relevant
to your application as a concurrence agency. You must send a copy of your application to the Port Authority.
• If you answered no to all of the above, then this application requires assessment by the Port Authority for the port
relevant to your application as an advice agency. You must send a copy of your application to the Port Authority.
Section reference:
• Sustainable Planning Regulation, schedule 7, table 2, items i6 and 17
Part 8-Community infrastructure
8.1 Is the community infrastructure intended to be supplied by a public sector entity?
No • End of part 8 of this checklist
Yes
8.2 Is the land owned by or on behalf of the State?
No
Yes • End of part 8 of this checklist
8.3 Is the development for any of the following?
for the designated purpose Yes q No
carried out by, or on behalf of, the designated purpose
q Yes q No
• If you answered yes to any of these questions, end of part 8 of this checklist
Development application assess: r ri i h, /c!i st-- IDAS checklist i
Version 1.018 December 2009
Page 22
8.4 Is the proposal assessable development under the planning scheme, a temporary local planning instrument, a
preliminary approval to which section 242 of the Act applies or a State planning regulatory provision?
No
q
Yes • This application must be referred to the Queensland Government department administering the Act
q
authorising the development for the designated purpose as concurrence agency
Section reference:
• Sustainable Planning Regulation, schedule 7, table 3, item 6
Part 9-Waste water management
9.1 Is any part of the proposed waste water disposal system to be located in an area declared to be a catchment area
under the WaterAct2000?
• End of part 9 of this checklist
1-1 No
L Yes
9.2 Is the proposed waste water disposal system an environmentally relevant activity under the Environment
Protection Act 1994 ?
No
q
Yes • End of part 9 of this checklist
9.3 Is the development of the waste water disposal system assessable development under the planning scheme, a
temporary local planning instrument, a preliminary approval to which section 242 of the Act applies or a State
planning regulatory provision?
No • No development permit is required
F1 Yes • If the catchment area is in the SEQ region as defined under the Water Act 2000, section 341, the Queensland
Bulk Water Supply Authority (trading as Seqwater) is a concurrence agency for the application. You must
give this entity a copy of the application
• If the catchment area is not in the SEQ region as defined under the Water Act 2000, section 341, the
Department of Environment and Resource Management is a concurrence agency for the application and you
must give DERM a copy of the application
Section reference:
• Sustainable Planning Regulation, schedule 7, table 3, item 4
Development application asses s>>.: t: klist-/DAS checklist
Version r. o 18 December 200,.
Page 23
Ju
Part io-Declared fish habitat areas
1o.1 Is the development assessable development under schedule 3. part i of the Sustainable Planning Regulation
2009?
• End of part io of checklist
• A development permit is required
• The Department of Employment, Economic Development and Innovation (DEEDI) is an advice agency for this
application and you must give DEEDI a copy of the application
j
Section reference:
• Sustainable Planning Regulations, schedule 7, table 2, item 27
Privacy-please refer to your assessment manager for further details on the use of Information recorded in
this checklist.
Disclaimer:
While the Department of Infrastructure and Planning (DIP) believes that the information contained on this checklist
and provided as part of this process will be of assistance to you, it is provided on the basis that you will not rely on
the information without first making your own enquiries regarding the interpretation and application of the
applicable legislation to your circumstances.
To the full extent permitted by law DIP expressly disclaims all liability (including but not limited to liability for
negligence) for errors or omissions of any kind or for any loss (including direct and indirect losses), damage or
other consequence which may arise from your reliance on this process and the information contained on this
checklist.
OFFICE USE ONLY
Date received Reference numbers Pw^ 00 4 Z'
The Sustainable PlanningAct2009 is administered by the Department of Infrastructure and Planning.
^,!,I,•heckiist /DAS(
Version j.o i8 Dece'r,
Page 24
ftlk-
lm^
Queensland
Government
Department of
3 February 2011
Transport and Main Roads
Paul Coult Design P/L
PO Box 152
Noosaville Qld 4566
Dear Sir
Operational Work, Prescribed Tidal Works - Request for amended comments
Jetty - Mr. Duley, 29 Wyuna Drive, Noosaville (Lot 14 N10576)
Thank you for your email of 31 January 2011 requesting a change to the lot number to construct a
jetty at the location mentioned above.
As a concurrence agency, Maritime Safety Queensland has no objection to the proposal provided the
following navigation and marine safety conditions are complied with.
1. The contractor must build the jetty according to Paul Clout, Drawing No J 1.0, attached to your
letter dated 23 August 2010.
2. No part of the structure or any ship berthed at this structure is to come closer than 1.5metres from
the side boundaries of the allocated water space as shown on the submitted water allocation plan.
3. The jetty and all freestanding piles must be lit and clearly visible to approaching vessels. The
contractor must position all lighting so it does not cause a risk to the safe navigation of other
vessels.
4. The applicant or his agent is responsible for the removal of any existing structure above or below
the waterline, and must contain and remove any debris. Any pile that needs to be removed must
be totally extracted.
5. The ship moored at this pontoon must follow the most direct course from this structure to open
waters and a similar direct course when returning to this pontoon. By only using the Weyba
Creek and Noosa River, the ship moored at this jetty is not permitted to enter into any other canal
enroute.
Department of Transport and Main Roads Our ref 215/00003(2) E2302-MOM E2367-MOMF20
710/01702(3) P41335 E38714 F38
Maritime Safety Queensland Your ref
Marine Operations (Brisbane) Enquiries James O'Connor
MacArthur Avenue East Telephone +61 7 3860 3504
Pinkenba Queensland 4008 Facsimile +61 7 3860 3571
Website www.msq.gld.gov.au
Email [email protected]
Page 25
6. The owner is to ensure that the ship berthed at this structure must maintain sufficient under keel
clearance at all stages of tide. The ship must comply with any local restrictions placed on channel
depths and draft restrictions.
7. Any ships and equipment you or your agent use must comply with the Transport Operations
(Marine Safety) Act 1994, the Transport Operations (Marine Safety) Regulation 2004 and the
Transport Operations (Marine Pollution) Act 1995.
8. Any ships using this structure must comply with the Transport Operations (Marine Safety) Act
1994 and the Transport Operations (Marine Safety) Regulation 2004.
9. Any ship moored at this jetty must not impede the safe navigation of other ships or restrict safe
access to or from neighbouring structures.
10. Any ship, dry berth or device (including Air Lifting Pontoons) berthed, moored or attached to the
jetty must not exceed the following sizes:
Wet Berth Dry Berth
Length Overall - 6.7 metres N/A
Beam - 2.5 metres
11. The contractor must construct the jetty within two years from the date of approval. If
construction is not completed, you will need additional or amended comments from the Regional
Harbour Master.
Maritime Safety Queensland does not need to be further consulted if all of the above conditions are
met.
The above conditions must be included in your application to the assessment manager.
This agency will also forward a copy of this letter to the Assessment Manager.
Yours sincerely
Captain Richard C Johnson
Regional Harbour Master (Brisbane)
Page 2 of 2
Used in these records
OPW11/0043 Development Application part 1 of 2 "Covering Letter\\nIDAS Form 1\\nIDAS Form 28\\nLetter from Department of Transport & Main Roads "29 Wyuna Dr NOOSAVILLERelated documentApplication case desk ↗
About this file
- File size
- 4.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.